株探米国株
英語
エドガーで原本を確認する
0001160791--12-312024FYfalse91949110885142438870743088707430884059358840593591004348910043488985589089855890884685428846854288437413884374139327975093279750910055079100550788499327884993278845827688458276GOLD RESOURCE CORP0.610.27http://fasb.org/us-gaap/2024#CommonStockMemberP10Y20125800.050.010.060.020.030.300.300.350.010.360.050.030.080.060.050.110.110.030.140.460.040.500.080.020.100.150.060.210001160791srt:ScenarioPreviouslyReportedMemberus-gaap:CommonStockMember2024-07-012024-09-300001160791us-gaap:CommonStockMember2024-07-012024-09-300001160791us-gaap:TreasuryStockCommonMember2024-12-310001160791us-gaap:RetainedEarningsMember2024-12-310001160791us-gaap:AdditionalPaidInCapitalMember2024-12-310001160791us-gaap:AccumulatedOtherComprehensiveIncomeMember2024-12-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:TreasuryStockCommonMember2024-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:RetainedEarningsMember2024-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AdditionalPaidInCapitalMember2024-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2024-09-300001160791srt:RestatementAdjustmentMemberus-gaap:RetainedEarningsMember2024-09-300001160791us-gaap:TreasuryStockCommonMember2024-09-300001160791us-gaap:RetainedEarningsMember2024-09-300001160791us-gaap:AdditionalPaidInCapitalMember2024-09-300001160791us-gaap:AccumulatedOtherComprehensiveIncomeMember2024-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:TreasuryStockCommonMember2024-06-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:RetainedEarningsMember2024-06-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AdditionalPaidInCapitalMember2024-06-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2024-06-300001160791srt:RestatementAdjustmentMemberus-gaap:RetainedEarningsMember2024-06-300001160791us-gaap:TreasuryStockCommonMember2024-06-300001160791us-gaap:RetainedEarningsMember2024-06-300001160791us-gaap:AdditionalPaidInCapitalMember2024-06-300001160791us-gaap:AccumulatedOtherComprehensiveIncomeMember2024-06-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:TreasuryStockCommonMember2024-03-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:RetainedEarningsMember2024-03-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AdditionalPaidInCapitalMember2024-03-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2024-03-310001160791srt:RestatementAdjustmentMemberus-gaap:RetainedEarningsMember2024-03-310001160791us-gaap:TreasuryStockCommonMember2024-03-310001160791us-gaap:RetainedEarningsMember2024-03-310001160791us-gaap:AdditionalPaidInCapitalMember2024-03-310001160791us-gaap:AccumulatedOtherComprehensiveIncomeMember2024-03-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:TreasuryStockCommonMember2023-12-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:RetainedEarningsMember2023-12-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AdditionalPaidInCapitalMember2023-12-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2023-12-310001160791srt:RestatementAdjustmentMemberus-gaap:RetainedEarningsMember2023-12-310001160791us-gaap:TreasuryStockCommonMember2023-12-310001160791us-gaap:RetainedEarningsMember2023-12-310001160791us-gaap:AdditionalPaidInCapitalMember2023-12-310001160791us-gaap:AccumulatedOtherComprehensiveIncomeMember2023-12-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:TreasuryStockCommonMember2023-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:RetainedEarningsMember2023-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AdditionalPaidInCapitalMember2023-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2023-09-300001160791srt:RestatementAdjustmentMemberus-gaap:RetainedEarningsMember2023-09-300001160791us-gaap:TreasuryStockCommonMember2023-09-300001160791us-gaap:RetainedEarningsMember2023-09-300001160791us-gaap:AdditionalPaidInCapitalMember2023-09-300001160791us-gaap:AccumulatedOtherComprehensiveIncomeMember2023-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:TreasuryStockCommonMember2023-06-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:RetainedEarningsMember2023-06-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AdditionalPaidInCapitalMember2023-06-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2023-06-300001160791srt:RestatementAdjustmentMemberus-gaap:RetainedEarningsMember2023-06-300001160791us-gaap:TreasuryStockCommonMember2023-06-300001160791us-gaap:RetainedEarningsMember2023-06-300001160791us-gaap:AdditionalPaidInCapitalMember2023-06-300001160791us-gaap:AccumulatedOtherComprehensiveIncomeMember2023-06-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:TreasuryStockCommonMember2023-03-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:RetainedEarningsMember2023-03-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AdditionalPaidInCapitalMember2023-03-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2023-03-310001160791srt:RestatementAdjustmentMemberus-gaap:RetainedEarningsMember2023-03-310001160791us-gaap:TreasuryStockCommonMember2023-03-310001160791us-gaap:RetainedEarningsMember2023-03-310001160791us-gaap:AdditionalPaidInCapitalMember2023-03-310001160791us-gaap:AccumulatedOtherComprehensiveIncomeMember2023-03-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:TreasuryStockCommonMember2022-12-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:RetainedEarningsMember2022-12-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AdditionalPaidInCapitalMember2022-12-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2022-12-310001160791srt:RestatementAdjustmentMemberus-gaap:RetainedEarningsMember2022-12-310001160791us-gaap:TreasuryStockCommonMember2022-12-310001160791us-gaap:RetainedEarningsMember2022-12-310001160791us-gaap:AdditionalPaidInCapitalMember2022-12-310001160791us-gaap:AccumulatedOtherComprehensiveIncomeMember2022-12-310001160791srt:RestatementAdjustmentMember2022-12-310001160791us-gaap:CommonStockMember2024-12-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:CommonStockMember2024-09-300001160791us-gaap:CommonStockMember2024-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:CommonStockMember2024-06-300001160791us-gaap:CommonStockMember2024-06-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:CommonStockMember2024-03-310001160791us-gaap:CommonStockMember2024-03-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:CommonStockMember2023-12-310001160791us-gaap:CommonStockMember2023-12-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:CommonStockMember2023-09-300001160791us-gaap:CommonStockMember2023-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:CommonStockMember2023-06-300001160791us-gaap:CommonStockMember2023-06-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:CommonStockMember2023-03-310001160791us-gaap:CommonStockMember2023-03-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:CommonStockMember2022-12-310001160791us-gaap:CommonStockMember2022-12-310001160791goro:GreenLightMetalsMemberus-gaap:SubsequentEventMember2025-02-110001160791us-gaap:SubsequentEventMembergoro:RegisteredDirectOfferingMember2025-01-210001160791goro:Range2Member2024-01-012024-12-310001160791goro:Range1Member2024-01-012024-12-310001160791goro:Range2Member2024-12-310001160791goro:Range1Member2024-12-3100011607912022-01-012022-12-310001160791us-gaap:RestrictedStockUnitsRSUMember2023-12-310001160791us-gaap:RestrictedStockUnitsRSUMember2022-12-310001160791goro:DeferredStockUnitsInLieuOfBoardFeeAndBonusMember2023-01-012023-12-310001160791goro:DeferredStockUnitsInLieuOfBoardFeeAndBonusMember2024-01-012024-12-310001160791goro:AquilaResourcesIncorporationMembergoro:BackFortyProjectMembergoro:GoldAndSilverStreamingAgreementWithOsiskoBermudaLimitedMember2021-12-100001160791goro:ZincConcentrateMember2024-01-012024-12-310001160791goro:SilverDoreMember2024-01-012024-12-310001160791goro:SilverConcentrateMember2024-01-012024-12-310001160791goro:LeadConcentrateMember2024-01-012024-12-310001160791goro:GoldDoreMember2024-01-012024-12-310001160791goro:GoldConcentrateMember2024-01-012024-12-310001160791goro:CopperConcentrateMember2024-01-012024-12-310001160791goro:ZincConcentrateMember2023-01-012023-12-310001160791goro:SilverDoreMember2023-01-012023-12-310001160791goro:SilverConcentrateMember2023-01-012023-12-310001160791goro:LeadConcentrateMember2023-01-012023-12-310001160791goro:GoldDoreMember2023-01-012023-12-310001160791goro:GoldConcentrateMember2023-01-012023-12-310001160791goro:CopperConcentrateMember2023-01-012023-12-310001160791srt:MinimumMembergoro:FurnitureComputerAndOfficeEquipmentMember2024-12-310001160791srt:MaximumMemberus-gaap:MachineryAndEquipmentMember2024-12-310001160791srt:MaximumMemberus-gaap:BuildingMember2024-12-310001160791srt:MaximumMembergoro:FurnitureComputerAndOfficeEquipmentMember2024-12-310001160791us-gaap:VehiclesMember2024-12-310001160791us-gaap:MineDevelopmentMember2024-12-310001160791us-gaap:MachineryAndEquipmentMember2024-12-310001160791us-gaap:LandMember2024-12-310001160791us-gaap:ConstructionInProgressMember2024-12-310001160791us-gaap:ComputerSoftwareIntangibleAssetMember2024-12-310001160791us-gaap:AssetRetirementObligationCostsMember2024-12-310001160791goro:MineralInterestsAndMineralRightsMember2024-12-310001160791goro:MillFacilitiesAndInfrastructureMember2024-12-310001160791goro:FurnitureAndOfficeEquipmentMember2024-12-310001160791us-gaap:VehiclesMember2023-12-310001160791us-gaap:MineDevelopmentMember2023-12-310001160791us-gaap:MachineryAndEquipmentMember2023-12-310001160791us-gaap:LandMember2023-12-310001160791us-gaap:ConstructionInProgressMember2023-12-310001160791us-gaap:ComputerSoftwareIntangibleAssetMember2023-12-310001160791us-gaap:AssetRetirementObligationCostsMember2023-12-310001160791goro:MineralInterestsAndMineralRightsMember2023-12-310001160791goro:MillFacilitiesAndInfrastructureMember2023-12-310001160791goro:FurnitureAndOfficeEquipmentMember2023-12-310001160791goro:MaritimeResourcesCorpMember2024-09-232024-09-230001160791goro:GreenLightMetalsMemberus-gaap:SubsequentEventMember2025-02-112025-02-110001160791us-gaap:SubsequentEventMembergoro:AtMarketOfferingAgreementMember2025-02-012025-02-280001160791us-gaap:SubsequentEventMembergoro:RegisteredDirectOfferingMember2025-01-212025-01-210001160791us-gaap:SubsequentEventMembergoro:AtMarketOfferingAgreementMember2025-01-012025-01-310001160791goro:MaritimeResourcesCorpMember2022-09-222022-09-220001160791stpr:COus-gaap:StateAndLocalJurisdictionMembergoro:NoExpirationMember2024-12-310001160791stpr:COus-gaap:StateAndLocalJurisdictionMembergoro:Between2025And2037Member2024-12-310001160791us-gaap:DomesticCountryMembergoro:NoExpirationMember2024-12-310001160791us-gaap:DomesticCountryMembergoro:Between2027And2037Member2024-12-310001160791us-gaap:DomesticCountryMembergoro:Between2025And2026Member2024-12-310001160791stpr:WIgoro:ExpiringIn2042Member2024-12-310001160791stpr:MIgoro:Between2025And2034Member2024-12-310001160791stpr:COus-gaap:StateAndLocalJurisdictionMember2024-12-310001160791country:CAgoro:Between2026And2044Member2024-12-310001160791us-gaap:DomesticCountryMember2024-12-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:RetainedEarningsMember2024-07-012024-09-300001160791srt:RestatementAdjustmentMemberus-gaap:RetainedEarningsMember2024-07-012024-09-300001160791us-gaap:RetainedEarningsMember2024-07-012024-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:RetainedEarningsMember2024-04-012024-06-300001160791srt:RestatementAdjustmentMemberus-gaap:RetainedEarningsMember2024-04-012024-06-300001160791us-gaap:RetainedEarningsMember2024-04-012024-06-300001160791us-gaap:RetainedEarningsMember2024-01-012024-12-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:RetainedEarningsMember2024-01-012024-09-300001160791srt:RestatementAdjustmentMemberus-gaap:RetainedEarningsMember2024-01-012024-09-300001160791us-gaap:RetainedEarningsMember2024-01-012024-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:RetainedEarningsMember2024-01-012024-06-300001160791srt:RestatementAdjustmentMemberus-gaap:RetainedEarningsMember2024-01-012024-06-300001160791us-gaap:RetainedEarningsMember2024-01-012024-06-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:RetainedEarningsMember2024-01-012024-03-310001160791srt:RestatementAdjustmentMemberus-gaap:RetainedEarningsMember2024-01-012024-03-310001160791us-gaap:RetainedEarningsMember2024-01-012024-03-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:RetainedEarningsMember2023-07-012023-09-300001160791srt:RestatementAdjustmentMemberus-gaap:RetainedEarningsMember2023-07-012023-09-300001160791us-gaap:RetainedEarningsMember2023-07-012023-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:RetainedEarningsMember2023-04-012023-06-300001160791srt:RestatementAdjustmentMemberus-gaap:RetainedEarningsMember2023-04-012023-06-300001160791us-gaap:RetainedEarningsMember2023-04-012023-06-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:RetainedEarningsMember2023-01-012023-12-310001160791srt:RestatementAdjustmentMemberus-gaap:RetainedEarningsMember2023-01-012023-12-310001160791us-gaap:RetainedEarningsMember2023-01-012023-12-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:RetainedEarningsMember2023-01-012023-09-300001160791srt:RestatementAdjustmentMemberus-gaap:RetainedEarningsMember2023-01-012023-09-300001160791us-gaap:RetainedEarningsMember2023-01-012023-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:RetainedEarningsMember2023-01-012023-06-300001160791srt:RestatementAdjustmentMemberus-gaap:RetainedEarningsMember2023-01-012023-06-300001160791us-gaap:RetainedEarningsMember2023-01-012023-06-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:RetainedEarningsMember2023-01-012023-03-310001160791srt:RestatementAdjustmentMemberus-gaap:RetainedEarningsMember2023-01-012023-03-310001160791us-gaap:RetainedEarningsMember2023-01-012023-03-310001160791goro:BackFortyProjectMember2024-12-310001160791goro:AquilaResourcesIncorporationMembergoro:GoldResourcesAcquisitionCompanyMembergoro:GoldBullionMembergoro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2020-06-300001160791goro:BackFortyProjectMember2023-03-310001160791goro:MaterialsAndSuppliesMember2024-12-310001160791goro:MaterialsAndSuppliesMember2023-12-310001160791us-gaap:MexicanTaxAuthorityMemberus-gaap:TaxYear2015Member2024-12-310001160791us-gaap:MexicanTaxAuthorityMemberus-gaap:TaxYear2015Member2023-10-310001160791goro:GreenLightMetalsMemberus-gaap:FairValueInputsLevel3Member2024-12-310001160791goro:MaritimeResourcesCorpMemberus-gaap:FairValueInputsLevel1Member2023-12-310001160791goro:GreenLightMetalsMemberus-gaap:FairValueInputsLevel3Member2023-12-310001160791goro:MaritimeResourcesCorpMember2024-12-310001160791goro:GreenLightMetalsMember2024-12-310001160791goro:MaritimeResourcesCorpMember2023-12-310001160791goro:GreenLightMetalsMember2023-12-310001160791goro:GreenLightMetalsMember2022-12-280001160791us-gaap:PerformanceSharesMember2022-01-012022-12-310001160791us-gaap:RestrictedStockUnitsRSUMember2024-12-310001160791us-gaap:GoldMember2023-01-012023-12-310001160791goro:ZincMember2023-01-012023-12-310001160791goro:SilverMember2023-01-012023-12-310001160791goro:LeadMember2023-01-012023-12-310001160791goro:CopperMember2023-01-012023-12-310001160791us-gaap:SalesMember2024-01-012024-12-310001160791us-gaap:AccountsReceivableMember2024-01-012024-12-310001160791us-gaap:SalesMember2023-01-012023-12-310001160791us-gaap:AccountsReceivableMember2023-01-012023-12-310001160791country:USgoro:AquilaResourcesIncorporationMember2024-12-310001160791country:MXgoro:AquilaResourcesIncorporationMember2024-12-310001160791country:CAgoro:AquilaResourcesIncorporationMember2024-12-310001160791goro:AquilaResourcesIncorporationMember2024-12-310001160791country:USgoro:AquilaResourcesIncorporationMember2023-12-310001160791country:CAgoro:AquilaResourcesIncorporationMember2023-12-310001160791goro:AquilaResourcesIncorporationMember2023-12-310001160791stpr:MI2023-12-310001160791goro:AquilaResourcesIncorporationMembergoro:SilverBullionMembergoro:SilverStreamingAgreementWithOsiskoBermudaLimitedMember2024-12-310001160791goro:SilverStreamingAgreementWithOsiskoBermudaLimitedMember2024-12-310001160791goro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2024-12-310001160791goro:SilverStreamingAgreementWithOsiskoBermudaLimitedMember2023-12-310001160791goro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2023-12-310001160791goro:DeferredStockUnitMember2024-12-310001160791goro:DeferredStockUnitMember2023-12-310001160791us-gaap:PerformanceSharesMember2022-12-310001160791goro:DeferredStockUnitMember2022-12-310001160791us-gaap:PerformanceSharesMember2024-12-310001160791us-gaap:PerformanceSharesMember2023-12-310001160791goro:GreenLightMetalsMember2022-12-282022-12-280001160791srt:RestatementAdjustmentMember2024-07-012024-09-300001160791srt:RestatementAdjustmentMember2024-04-012024-06-300001160791goro:DoreMember2024-01-012024-12-310001160791goro:ConcentrateMember2024-01-012024-12-310001160791goro:DoreMember2023-01-012023-12-310001160791goro:ConcentrateMember2023-01-012023-12-310001160791goro:CustomerDMemberus-gaap:SalesRevenueNetMemberus-gaap:CustomerConcentrationRiskMember2024-01-012024-12-310001160791goro:CustomerDMemberus-gaap:AccountsReceivableMemberus-gaap:CustomerConcentrationRiskMember2024-01-012024-12-310001160791goro:CustomerCMemberus-gaap:SalesRevenueNetMemberus-gaap:CustomerConcentrationRiskMember2024-01-012024-12-310001160791goro:CustomerCMemberus-gaap:AccountsReceivableMemberus-gaap:CustomerConcentrationRiskMember2024-01-012024-12-310001160791goro:CustomerBMemberus-gaap:SalesRevenueNetMemberus-gaap:CustomerConcentrationRiskMember2024-01-012024-12-310001160791goro:CustomeraMemberus-gaap:SalesRevenueNetMemberus-gaap:CustomerConcentrationRiskMember2024-01-012024-12-310001160791goro:CustomeraMemberus-gaap:AccountsReceivableMemberus-gaap:CustomerConcentrationRiskMember2024-01-012024-12-310001160791goro:AristaAndAltaGraciaMinesAtDdgmMemberus-gaap:SalesRevenueNetMembergoro:SalesRevenueMember2024-01-012024-12-310001160791goro:CustomerCMemberus-gaap:SalesRevenueNetMemberus-gaap:CustomerConcentrationRiskMember2023-01-012023-12-310001160791goro:CustomerCMemberus-gaap:AccountsReceivableMemberus-gaap:CustomerConcentrationRiskMember2023-01-012023-12-310001160791goro:CustomerBMemberus-gaap:SalesRevenueNetMemberus-gaap:CustomerConcentrationRiskMember2023-01-012023-12-310001160791goro:CustomerBMemberus-gaap:AccountsReceivableMemberus-gaap:CustomerConcentrationRiskMember2023-01-012023-12-310001160791goro:CustomeraMemberus-gaap:SalesRevenueNetMemberus-gaap:CustomerConcentrationRiskMember2023-01-012023-12-310001160791goro:CustomeraMemberus-gaap:AccountsReceivableMemberus-gaap:CustomerConcentrationRiskMember2023-01-012023-12-310001160791srt:ScenarioPreviouslyReportedMember2022-12-310001160791us-gaap:FairValueInputsLevel1Member2024-12-310001160791us-gaap:FairValueInputsLevel1Member2023-12-310001160791us-gaap:OperatingSegmentsMembergoro:MichiganUsaSegmentMember2024-12-310001160791us-gaap:CorporateNonSegmentMember2024-12-310001160791goro:AquilaProjectMember2024-12-310001160791goro:AquilaResourcesIncorporationMembergoro:BackFortyProjectMember2024-12-310001160791goro:AquilaResourcesIncorporationMembergoro:BackFortyProjectMember2023-12-310001160791srt:RestatementAdjustmentMember2023-12-310001160791us-gaap:EmployeeStockOptionMember2024-01-012024-12-310001160791us-gaap:PerformanceSharesMember2023-01-012023-12-310001160791us-gaap:EmployeeStockOptionMember2023-01-012023-12-310001160791goro:AtMarketOfferingAgreementMember2024-01-012024-12-310001160791goro:AtMarketOfferingAgreementMember2023-01-012023-12-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AdditionalPaidInCapitalMember2024-07-012024-09-300001160791us-gaap:AdditionalPaidInCapitalMember2024-07-012024-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AdditionalPaidInCapitalMember2023-04-012023-06-300001160791us-gaap:AdditionalPaidInCapitalMember2023-04-012023-06-300001160791goro:ShortTermIncentivePlanMember2024-12-310001160791goro:ShortTermIncentivePlanMember2023-12-310001160791goro:CurrentLiabilitiesAndProductionCostMember2024-12-310001160791goro:CurrentLiabilitiesAndProductionCostMember2023-12-310001160791us-gaap:FairValueInputsLevel2Member2024-12-310001160791us-gaap:FairValueInputsLevel2Member2023-12-310001160791srt:RestatementAdjustmentMember2024-09-300001160791srt:RestatementAdjustmentMember2024-06-300001160791srt:RestatementAdjustmentMember2024-03-310001160791srt:RestatementAdjustmentMember2023-09-300001160791srt:RestatementAdjustmentMember2023-06-300001160791srt:RestatementAdjustmentMember2023-03-310001160791goro:AquilaResourcesIncorporationMembergoro:SilverBullionMembergoro:SilverStreamingAgreementWithOsiskoBermudaLimitedMember2020-06-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AdditionalPaidInCapitalMember2024-04-012024-06-300001160791us-gaap:AdditionalPaidInCapitalMember2024-04-012024-06-300001160791us-gaap:AdditionalPaidInCapitalMember2024-01-012024-12-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AdditionalPaidInCapitalMember2024-01-012024-09-300001160791us-gaap:AdditionalPaidInCapitalMember2024-01-012024-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AdditionalPaidInCapitalMember2024-01-012024-06-300001160791us-gaap:AdditionalPaidInCapitalMember2024-01-012024-06-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AdditionalPaidInCapitalMember2024-01-012024-03-310001160791us-gaap:AdditionalPaidInCapitalMember2024-01-012024-03-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AdditionalPaidInCapitalMember2023-07-012023-09-300001160791us-gaap:AdditionalPaidInCapitalMember2023-07-012023-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AdditionalPaidInCapitalMember2023-01-012023-12-310001160791us-gaap:AdditionalPaidInCapitalMember2023-01-012023-12-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AdditionalPaidInCapitalMember2023-01-012023-09-300001160791us-gaap:AdditionalPaidInCapitalMember2023-01-012023-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AdditionalPaidInCapitalMember2023-01-012023-06-300001160791us-gaap:AdditionalPaidInCapitalMember2023-01-012023-06-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:AdditionalPaidInCapitalMember2023-01-012023-03-310001160791us-gaap:AdditionalPaidInCapitalMember2023-01-012023-03-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:CommonStockMember2024-04-012024-06-300001160791us-gaap:CommonStockMember2024-04-012024-06-300001160791us-gaap:CommonStockMember2024-01-012024-12-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:CommonStockMember2024-01-012024-09-300001160791us-gaap:CommonStockMember2024-01-012024-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:CommonStockMember2024-01-012024-06-300001160791us-gaap:CommonStockMember2024-01-012024-06-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:CommonStockMember2024-01-012024-03-310001160791us-gaap:CommonStockMember2024-01-012024-03-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:CommonStockMember2023-07-012023-09-300001160791us-gaap:CommonStockMember2023-07-012023-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:CommonStockMember2023-01-012023-12-310001160791us-gaap:CommonStockMember2023-01-012023-12-310001160791srt:ScenarioPreviouslyReportedMemberus-gaap:CommonStockMember2023-01-012023-09-300001160791us-gaap:CommonStockMember2023-01-012023-09-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:CommonStockMember2023-01-012023-06-300001160791us-gaap:CommonStockMember2023-01-012023-06-300001160791srt:ScenarioPreviouslyReportedMemberus-gaap:CommonStockMember2023-01-012023-03-310001160791us-gaap:CommonStockMember2023-01-012023-03-310001160791us-gaap:PerformanceSharesMember2024-01-012024-12-310001160791us-gaap:RestrictedStockUnitsRSUMember2023-01-012023-12-310001160791us-gaap:RestrictedStockUnitsRSUMember2022-01-012022-12-310001160791goro:DeferredStockUnitMember2024-01-012024-12-310001160791goro:DeferredStockUnitMember2023-01-012023-12-310001160791us-gaap:RestrictedStockUnitsRSUMember2024-01-012024-12-310001160791country:MX2025-01-012025-01-010001160791goro:DonDavidGoldMineMember2024-12-310001160791goro:DonDavidGoldMineMember2023-12-3100011607912022-12-310001160791srt:RestatementAdjustmentMember2023-07-012023-09-300001160791srt:RestatementAdjustmentMember2023-04-012023-06-300001160791goro:CopperLeadAndZincMember2024-01-012024-12-310001160791goro:CopperLeadAndZincMember2023-01-012023-12-310001160791us-gaap:DeferredProfitSharingMember2024-01-012024-12-3100011607912021-04-232021-04-230001160791goro:AquilaResourcesIncorporationMembergoro:SilverBullionMembergoro:SilverStreamingAgreementWithOsiskoBermudaLimitedMember2024-01-012024-12-310001160791goro:AquilaResourcesIncorporationMembergoro:GoldBullionMembergoro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2024-01-012024-12-310001160791goro:AquilaResourcesIncorporationMembergoro:SilverBullionMembergoro:SilverStreamingAgreementWithOsiskoBermudaLimitedMember2023-01-012023-12-310001160791goro:AquilaResourcesIncorporationMembergoro:GoldBullionMembergoro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2023-01-012023-12-310001160791goro:HudbayMichiganIncMembergoro:BackFortyProjectMember2023-12-310001160791goro:HudbayMichiganIncMembergoro:HudbayMichiganIncMember2013-12-302013-12-3000011607912012-01-012012-12-310001160791country:MX2025-01-010001160791country:MX2024-12-310001160791srt:ScenarioPreviouslyReportedMember2024-09-3000011607912024-09-300001160791srt:ScenarioPreviouslyReportedMember2024-06-300001160791srt:ScenarioPreviouslyReportedMember2024-03-3100011607912024-03-310001160791srt:ScenarioPreviouslyReportedMember2023-12-310001160791srt:ScenarioPreviouslyReportedMember2023-09-3000011607912023-09-300001160791srt:ScenarioPreviouslyReportedMember2023-06-3000011607912023-06-300001160791srt:ScenarioPreviouslyReportedMember2023-03-3100011607912023-03-310001160791srt:ScenarioPreviouslyReportedMember2024-07-012024-09-3000011607912024-07-012024-09-300001160791srt:ScenarioPreviouslyReportedMember2024-04-012024-06-3000011607912024-04-012024-06-300001160791srt:ScenarioPreviouslyReportedMember2024-01-012024-03-310001160791srt:ScenarioPreviouslyReportedMember2023-07-012023-09-3000011607912023-07-012023-09-300001160791srt:ScenarioPreviouslyReportedMember2023-04-012023-06-3000011607912023-04-012023-06-300001160791srt:ScenarioPreviouslyReportedMember2023-01-012023-12-310001160791srt:ScenarioPreviouslyReportedMember2023-01-012023-03-310001160791srt:ScenarioPreviouslyReportedMembergoro:OaxacaMexicoSegmentMember2024-07-012024-09-300001160791srt:ScenarioPreviouslyReportedMembergoro:MichiganUsaSegmentMember2024-07-012024-09-300001160791srt:RestatementAdjustmentMembergoro:MichiganUsaSegmentMember2024-07-012024-09-300001160791goro:OaxacaMexicoSegmentMember2024-07-012024-09-300001160791goro:MichiganUsaSegmentMember2024-07-012024-09-300001160791srt:ScenarioPreviouslyReportedMembergoro:OaxacaMexicoSegmentMember2024-04-012024-06-300001160791srt:ScenarioPreviouslyReportedMembergoro:MichiganUsaSegmentMember2024-04-012024-06-300001160791goro:OaxacaMexicoSegmentMember2024-04-012024-06-300001160791goro:MichiganUsaSegmentMember2024-04-012024-06-300001160791us-gaap:OperatingSegmentsMembergoro:OaxacaMexicoSegmentMember2024-01-012024-12-310001160791us-gaap:OperatingSegmentsMembergoro:MichiganUsaSegmentMember2024-01-012024-12-310001160791goro:OaxacaMexicoSegmentMember2024-01-012024-12-310001160791goro:MichiganUsaSegmentMember2024-01-012024-12-310001160791srt:ScenarioPreviouslyReportedMembergoro:OaxacaMexicoSegmentMember2024-01-012024-09-300001160791srt:ScenarioPreviouslyReportedMembergoro:MichiganUsaSegmentMember2024-01-012024-09-300001160791srt:RestatementAdjustmentMembergoro:MichiganUsaSegmentMember2024-01-012024-09-300001160791goro:OaxacaMexicoSegmentMember2024-01-012024-09-300001160791goro:MichiganUsaSegmentMember2024-01-012024-09-300001160791srt:ScenarioPreviouslyReportedMembergoro:OaxacaMexicoSegmentMember2024-01-012024-06-300001160791srt:ScenarioPreviouslyReportedMembergoro:MichiganUsaSegmentMember2024-01-012024-06-300001160791goro:OaxacaMexicoSegmentMember2024-01-012024-06-300001160791goro:MichiganUsaSegmentMember2024-01-012024-06-300001160791srt:ScenarioPreviouslyReportedMembergoro:OaxacaMexicoSegmentMember2024-01-012024-03-310001160791srt:ScenarioPreviouslyReportedMembergoro:MichiganUsaSegmentMember2024-01-012024-03-310001160791goro:OaxacaMexicoSegmentMember2024-01-012024-03-310001160791goro:MichiganUsaSegmentMember2024-01-012024-03-310001160791srt:ScenarioPreviouslyReportedMembergoro:OaxacaMexicoSegmentMember2023-07-012023-09-300001160791srt:ScenarioPreviouslyReportedMembergoro:MichiganUsaSegmentMember2023-07-012023-09-300001160791goro:OaxacaMexicoSegmentMember2023-07-012023-09-300001160791goro:MichiganUsaSegmentMember2023-07-012023-09-300001160791srt:ScenarioPreviouslyReportedMembergoro:OaxacaMexicoSegmentMember2023-04-012023-06-300001160791srt:ScenarioPreviouslyReportedMembergoro:MichiganUsaSegmentMember2023-04-012023-06-300001160791goro:OaxacaMexicoSegmentMember2023-04-012023-06-300001160791goro:MichiganUsaSegmentMember2023-04-012023-06-300001160791us-gaap:OperatingSegmentsMembergoro:OaxacaMexicoSegmentMember2023-01-012023-12-310001160791srt:ScenarioPreviouslyReportedMembergoro:OaxacaMexicoSegmentMember2023-01-012023-12-310001160791srt:ScenarioPreviouslyReportedMembergoro:MichiganUsaSegmentMember2023-01-012023-12-310001160791goro:OaxacaMexicoSegmentMember2023-01-012023-12-310001160791goro:MichiganUsaSegmentMember2023-01-012023-12-310001160791srt:ScenarioPreviouslyReportedMembergoro:OaxacaMexicoSegmentMember2023-01-012023-09-300001160791srt:ScenarioPreviouslyReportedMembergoro:MichiganUsaSegmentMember2023-01-012023-09-300001160791goro:OaxacaMexicoSegmentMember2023-01-012023-09-300001160791goro:MichiganUsaSegmentMember2023-01-012023-09-300001160791srt:ScenarioPreviouslyReportedMembergoro:OaxacaMexicoSegmentMember2023-01-012023-06-300001160791srt:ScenarioPreviouslyReportedMembergoro:MichiganUsaSegmentMember2023-01-012023-06-300001160791goro:OaxacaMexicoSegmentMember2023-01-012023-06-300001160791goro:MichiganUsaSegmentMember2023-01-012023-06-300001160791srt:ScenarioPreviouslyReportedMembergoro:OaxacaMexicoSegmentMember2023-01-012023-03-310001160791srt:ScenarioPreviouslyReportedMembergoro:MichiganUsaSegmentMember2023-01-012023-03-310001160791goro:OaxacaMexicoSegmentMember2023-01-012023-03-310001160791goro:MichiganUsaSegmentMember2023-01-012023-03-310001160791goro:MaritimeResourcesCorpMember2024-09-230001160791srt:RestatementAdjustmentMember2024-01-012024-09-300001160791srt:ScenarioPreviouslyReportedMember2024-01-012024-06-300001160791srt:RestatementAdjustmentMember2024-01-012024-06-3000011607912024-01-012024-06-300001160791srt:RestatementAdjustmentMember2024-01-012024-03-3100011607912024-01-012024-03-310001160791srt:RestatementAdjustmentMember2023-01-012023-12-310001160791srt:ScenarioPreviouslyReportedMember2023-01-012023-09-300001160791srt:RestatementAdjustmentMember2023-01-012023-09-3000011607912023-01-012023-09-300001160791srt:ScenarioPreviouslyReportedMember2023-01-012023-06-300001160791srt:RestatementAdjustmentMember2023-01-012023-06-3000011607912023-01-012023-06-300001160791srt:RestatementAdjustmentMember2023-01-012023-03-3100011607912023-01-012023-03-310001160791goro:AquilaResourcesIncorporationMembergoro:GoldBullionMembergoro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2020-06-300001160791goro:AquilaResourcesIncorporationMembergoro:GoldBullionMembergoro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2017-11-300001160791goro:MaritimeResourcesCorpMember2022-09-220001160791us-gaap:GoldMember2024-01-012024-12-310001160791goro:ZincMember2024-01-012024-12-310001160791goro:SilverMember2024-01-012024-12-310001160791goro:LeadMember2024-01-012024-12-310001160791goro:CopperMember2024-01-012024-12-310001160791us-gaap:CorporateNonSegmentMember2024-01-012024-12-310001160791us-gaap:OperatingSegmentsMembergoro:MichiganUsaSegmentMember2023-01-012023-12-310001160791us-gaap:CorporateNonSegmentMember2023-01-012023-12-310001160791goro:AquilaResourcesIncorporationMembergoro:GoldBullionMembergoro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2024-12-310001160791goro:AquilaResourcesIncorporationMembergoro:TwoHundredAndSeventyDaysAfterCommencementOfCommercialProductionMembergoro:BackFortyProjectMember2013-12-300001160791goro:AquilaResourcesIncorporationMembergoro:NinetyDaysAfterCommencementOfCommercialProductionMembergoro:BackFortyProjectMember2013-12-300001160791goro:AquilaResourcesIncorporationMembergoro:FourHundredAndFiftyDaysAfterCommencementOfCommercialProductionMembergoro:BackFortyProjectMember2013-12-300001160791goro:BackFortyProjectMember2023-12-310001160791goro:AquilaResourcesIncorporationMembergoro:BackFortyProjectMember2013-12-300001160791us-gaap:OperatingSegmentsMembergoro:OaxacaMexicoSegmentMember2024-12-310001160791us-gaap:CorporateNonSegmentMembergoro:MichiganUsaSegmentMember2024-12-310001160791us-gaap:OperatingSegmentsMembergoro:OaxacaMexicoSegmentMember2023-12-310001160791us-gaap:OperatingSegmentsMembergoro:MichiganUsaSegmentMember2023-12-310001160791us-gaap:CorporateNonSegmentMember2023-12-310001160791srt:ScenarioPreviouslyReportedMember2024-01-012024-09-3000011607912024-01-012024-09-300001160791goro:AquilaResourcesIncorporationMembergoro:SilverBullionMembergoro:SilverStreamingAgreementWithOsiskoBermudaLimitedMember2020-06-012020-06-300001160791goro:AquilaResourcesIncorporationMembergoro:GoldBullionMembergoro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2020-06-012020-06-300001160791goro:HudbayMichiganIncMember2013-12-300001160791goro:HudbayMichiganIncMembergoro:BackFortyProjectMember2013-12-3000011607912023-01-012023-12-310001160791country:MX2024-01-012024-12-310001160791goro:OtherLongTermLiabilitiesAndOtherExpensesMember2024-12-310001160791goro:OtherLongTermLiabilitiesAndOtherExpensesMember2023-12-3100011607912023-12-3100011607912024-12-3100011607912024-10-012024-12-3100011607912024-06-3000011607912025-04-0400011607912024-01-012024-12-31iso4217:CADxbrli:sharesiso4217:MXNgoro:segmentxbrli:sharesiso4217:USDxbrli:pureiso4217:USDxbrli:sharesiso4217:CADutr:tutr:oziso4217:USDutr:tiso4217:USDutr:oz

Table of Contents

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 10-K

(Mark One)

ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the fiscal year ended December 31, 2024

TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from __________ to ___________

Commission File Number: 001-34857

Graphic

Gold Resource Corporation

(Exact name of registrant as specified in its charter)

Colorado

84-1473173

(State or other jurisdiction of
incorporation or organization)

(I.R.S. Employer
Identification No.)

7900 E. Union Ave, Suite 320, Denver, Colorado 80237

(Address of Principal Executive Offices) (Zip Code)

(303) 320-7708

(Registrant’s telephone number including area code)

Securities registered pursuant to Section 12(b) of the Act:

Title of each class

Trading Symbol

Name of each exchange on which registered

Common Stock, $0.001 par value

GORO

NYSE American

Securities registered pursuant to Section 12(g) of the Act:

None

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes ◻ No ⌧

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes ◻ No ⌧

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes ⌧ No ◻

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes ⌧ No ◻

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See definition of “large accelerated filer,” “accelerated filer”, “smaller reporting company”, and “emerging growth company” in Rule 12b-2 of the Exchange Act.

Large accelerated filer

Accelerated filer

Non-accelerated filer

Smaller reporting company

Emerging growth company

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act ◻

Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C.7262(b)) by the registered public accounting firm that prepared or issued its audit report. ◻

If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements. ⌧

Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to §240.10D-1(b). ⌧

Indicate by check mark whether registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes ◻ No ⌧

The aggregate market value of the common stock of Gold Resource Corporation held by non-affiliates as of June 30, 2024, the last business day of the registrant’s most recently completed second fiscal quarter, was $34,119,764 based on the closing price of the common stock of $0.37 as reported on the NYSE American.

As of April 4, 2025, there were 120,442,686 shares of the registrant’s common stock outstanding.

DOCUMENTS INCORPORATED BY REFERENCE:

Portions of the Definitive Proxy Statement to be filed pursuant to Regulation 14A for the registrant’s 2025 annual meeting of shareholders will be filed no later than 120 days after the close of Registrant’s fiscal year ended December 31, 2024, and are incorporated by reference into Part III of this Form 10-K.

Table of Contents

TABLE OF CONTENTS

Page

2024 Summary

2

PART I

ITEM 1:

Business

6

ITEM 1A:

Risk Factors

12

ITEM 1C:

Cybersecurity

26

ITEM 1B:

Unresolved Staff Comments

26

ITEM 2:

Properties

28

ITEM 3:

Legal Proceedings

43

ITEM 4:

Mine Safety Disclosures

43

PART II

ITEM 5:

Market For Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities

44

ITEM 6:

Reserved

44

ITEM 7:

Management’s Discussion and Analysis of Financial Condition and Results of Operations

45

ITEM 7A:

Quantitative and Qualitative Disclosures About Market Risk

64

ITEM 8:

Financial Statements

66

ITEM 9:

Changes in and Disagreements with Accountants on Accounting and Financial Disclosure

126

ITEM 9A:

Controls and Procedures

126

ITEM 9B:

Other Information

127

ITEM 9C:

Disclosures Regarding Foreign Jurisdictions that Prevent Inspections

127

PART III

ITEM 10:

Directors, Executive Officers, and Corporate Governance

128

ITEM 11:

Executive Compensation

128

ITEM 12:

Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters

128

ITEM 13:

Certain Relationships and Related Transactions, and Director Independence

128

ITEM 14:

Principal Accounting Fees and Services

128

PART IV

ITEM 15:

Exhibits and Financial Statement Schedules

129

ITEM 16:

Form 10-K Summary

131

Signatures

132

Gold Resource Corporation

1

Table of Contents

2024 SUMMARY

The summary for the full-year ended December 31, 2024 is included below and discussed further under Item 7—Management’s Discussion and Analysis of Financial Condition and Results of Operations:

Don David Gold Mine:

The Company achieved an Accident Free Full Year, with a lost time injury frequency rate per million hours of zero. This hallmark is a direct result of the dedication of the Company’s team and the DDGM safety program, which aims to bolster the overall health and safety culture of the employees.
The Company’s exploration program progressed as planned with positive results through the first three quarters of 2024. The primary focus was on infill drilling of targets in the Three Sisters and North Arista vein systems. To preserve cash, exploration drilling was suspended on August 1, 2024. However, the infill drilling completed in 2024 successfully increased both the potential resources of and confidence in the economic mineralization contained within the Three Sisters vein system, as well as in the Splay 31 vein of the North Arista vein system. Diamond drilling for grade control at the Arista Mine continued uninterrupted throughout the year, focusing on the delineation of reserves in both the Arista and Switchback vein systems.
DDGM received the Mexican Empresa Socialmente Responsable (“ESR”) award in 2024 for the tenth consecutive year.
DDGM produced and sold a total of 18,580 gold equivalent ounces, comprising of 8,598 gold ounces and 817,333 silver ounces, sold at an average price per ounce of $2,354 and $28.75, respectively.

Corporate and Financial:

The Company closed the year with a $1.6 million cash and cash equivalent balance as at December 31, 2024. The decrease of $4.6 million from December 31, 2023 is mainly attributable to a cash outflow of $6.4 million for capital investments and $0.6 million from operating activities for 2024, which included $1.1 million of income tax payments for the tax years 2023 and 2024, exploration investment of $2.0 million at the Don David Gold Mine (“DDGM”), and $0.4 million in maintaining the Back Forty Project.
Working capital at December 31, 2024, was $2.1 million, an 86% decrease from the December 31, 2023 working capital of $15.2 million. The decrease is primarily driven by the decline in cash balance discussed above in combination with a lower level of annual gold production.
DDGM total cash costs (after co-product credits) and total all-in sustaining cost per gold equivalent (“AuEq”)1 ounce sold for the year were $2,330 and $2,939, respectively. See Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations—Non-GAAP Measures below for a reconciliation of non-GAAP measures to applicable GAAP measures.
During 2024, an aggregate of 6,510,914 shares of the Company’s common stock were sold and settled through the Company’s At-The-Market Offering Agreement (the “ATM Agreement”) with H.C. Wainwright & Co., LLC (the “Agent”) for net proceeds to the Company of $2.7 million, after deducting $0.1 million for agent’s commissions and other expenses. The ATM Agreement was entered into in November 2019, and renewed in June 2023, pursuant to which the Agent agreed to act as the Company’s sales agent with respect to the offer and sale from time to time of the Company’s common stock having an aggregate in gross sales of up to $75.0 million (the “ATM Program”).

1 Gold equivalent is determined by taking gold ounces produced and sold, plus silver ounces produced and sold, converted to gold equivalent ounces using the gold to silver average realized price ratio for the period.

Gold Resource Corporation

2

Table of Contents

Liquidity Update

Tonnes and grade, with respect to the Company’s mining operations at DDGM, declined during 2024 and are below guidance. There are several factors that caused these declines. The Company has encountered significant issues with equipment availability due to the age and condition of some of the critical mining equipment in use at the mine. Due to the continued challenges with equipment availability and the decreased cash due to prior production shortfalls, the Company was not able to maintain its projected timeline for the development of future production zones. As a result, the Company is currently mining only one face at a time in areas that are accessible. The current lack of other available production zones has placed additional pressure on the Company’s ability to achieve its production estimates, as any problems encountered at the current production zone cannot be offset by production elsewhere in the mine. In addition, the mill also experienced some mechanical issues and wet ore handling difficulties due to unusually high rain fall during the year that resulted in lower throughput and a production shortfall. To minimize the mechanical issues and return the mine to a cash positive position, capital is necessary to replace some of the mining fleet and upgrade the mill.

The Company believes that the mine has significant potential to generate positive cash flow based on the information to date from the new areas of the Three Sisters, as well as other areas that have been discovered near the existing mining zones. In order to develop access and better define these new areas, an investment must be made in the equipment and mine plan. Without the addition of these areas to the life-of-mine plan, the Company does not believe that the mine will generate sufficient free cash flow in the near term.

Despite production improving in the fourth quarter, the Company’s inability to achieve its production estimates and lack of adequate liquidity has created substantial doubt about its ability to continue as a going concern. The Company previously announced that it would require approximately $7.0 million to obtain additional mining equipment and for mill upgrades. Management is currently looking to reduce the amount necessary for mining equipment purchases by looking for good used equipment and or using a third-party contractor that will provide its own equipment. The Company also expects to require approximately $8.0 million in working capital over the next 12 months in order to fund the initial development to access the Three Sisters and Splay 31 systems, although not all of this capital will be required immediately. Due to the 2024 production challenges described above, the Company does not believe that the mine will generate sufficient cash flow to fund these improvements. The Company is evaluating various financing options in order to fund this development in the near term. The Company raised $2.5 million through a registered direct offering in January 2025. Additionally, the Company raised $3.0 million through its ATM Program in January and February 2025 and intends to utilize it further to raise additional capital, as required, throughout the year. Further, in February 2025, the Company sold its interest in Green Light Metals for approximately $0.9 million.

If the Company is unable to obtain this additional capital and successfully develop the new mining areas, the continued operation of the mine may not be possible beyond the first half of 2025. If continued operation of the mine is not possible, the Company may be compelled to place the mine on “care and maintenance” status, which would likely trigger significant severance and other costs, which the Company may not be able to pay.

Gold Resource Corporation

3

Table of Contents

FORWARD-LOOKING STATEMENTS

This report contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. The Company uses the words “anticipate,” “continue,” “likely,” “estimate,” “expect,” “may,” “could,” “will,” “project,” “should,” “believe,” and similar expressions (including negative and grammatical variations) to identify forward looking statements. Such forward-looking statements include, without limitation, statements regarding:

The Company’s ability to satisfy its financial and contractual obligations and other potential cash requirements over the next twelve months;
The Company’s anticipated near-term capital requirements and potential sources of capital;
Expectations regarding 2025 general and administrative costs;
The Company’s expectations regarding whether dividends will be paid in the future;
Compliance with existing legal and regulatory requirements, including future asset reclamation costs;
The Company’s strategy for significant future investment in Oaxaca, Mexico, and in Michigan, USA, for development and exploration activities;
Expectations regarding capital investment, exploration spending, and general and administrative costs, including the Company’s near-term estimates for the cost of additional mining equipment, mill upgrades, and working capital;
The Company’s expectations regarding future grades and recoveries from mining at DDGM; and its expectations regarding its ability to generate positive cash flow from future production at DDGM;
Future exploration plans at DDGM, including vein systems targeted for future exploration activity;
Estimates of Mineral Resources and Mineral Reserves;
The sufficiency of the Company’s water rights;
The Company’s expectation for the outcome of the 2015 DDGM tax audit;
Expectations regarding 2025 DDGM and Back Forty capital investment; and
The expected timing and success of the Back Forty Project with respect to permitting, detailed engineering, and project financing.

Forward-looking statements are neither historical facts nor assurances of future performance. Rather, they are based only on the Company’s current beliefs, expectations, and assumptions regarding the future of its business, future plans and strategies, projections, anticipated events and trends, the economy, and other future conditions. Because forward-looking statements relate to the future, they are subject to inherent uncertainties, risks, and changes in circumstances that are difficult to predict, and many of which are outside of the Company’s control. The Company’s actual results and financial condition may differ materially from those indicated in the forward-looking statements. Therefore, you should not rely on any of these forward-looking statements. Important factors that could cause the Company’s actual results and financial condition to differ materially from those indicated in the forward-looking statements include, among others, the following:

Whether the Company is able to raise the necessary capital required to continue its business on terms acceptable to it or at all;
The possibility of unforeseen production or processing challenges at DDGM, such as mechanical breakdowns, staffing shortages, weather events, unexpected decreases in grade, lower than anticipated production at existing mining faces, or inability or delays in the access and development of new mining faces;
Commodity price fluctuations;
Mine protests and work stoppages;
Rock formations, faults and fractures, water flow and possible CO2 gas exhalation, or other unanticipated geological challenges;
Unexpected changes in business and economic conditions, including supply chain challenges, the rate of inflation, and their impact on operating and capital costs;
Changes in interest rates and currency exchange rates;
Adverse technological changes and cybersecurity threats;
Unanticipated increases in the Company’s operating costs and other costs of doing business;

Gold Resource Corporation

4

Table of Contents

Access to land and availability of materials, equipment, supplies, labor and supervision, power, and water;
Results of current and future feasibility studies;
Interpretation of drill hole results and the geology, grade, and continuity of mineralization;
Litigation by private parties or regulatory action by governmental entities;
Acts of God, such as excessively wet weather, floods, earthquakes, and any other natural disasters;
Changes in investor perception of the Company and/or the mining industry;
The inherent uncertainty of Mineral Resources and Mineral Reserves estimates;
The Company’s internal controls over financial reporting, including its ability to remedy the identified material weakness as well as any potential future material weaknesses; and
Such other factors are discussed below under Part 1, Item 1A. Risk Factors.

Many of these factors are beyond the Company’s ability to control or predict. Although the Company believes that the expectations reflected in its forward-looking statements are based on reasonable assumptions, such expectations may prove to be materially incorrect due to known and unknown risks and uncertainties. You should not unduly rely on any of the Company’s forward-looking statements. These statements speak only as of the date of this annual report on Form 10-K. Except as required by law, the Company is not obligated to publicly release any revisions to these forward-looking statements to reflect future events or developments. All subsequent written and oral forward-looking statements attributable to the Company and persons acting on its behalf are qualified in their entirety by the cautionary statements contained in this section and elsewhere in this annual report on Form 10-K.

Gold Resource Corporation

5

Table of Contents

PART I

ITEM 1.

BUSINESS

History and Organization

In this report, “Company” and “GRC” refer to Gold Resource Corporation together with its subsidiaries, unless the context otherwise requires. See Item 2. Properties—Glossary for additional definitions.

Gold Resource Corporation was organized under the laws of Colorado, USA on August 24, 1998. Since 2010, the Company has produced gold and silver doré and copper, lead, and zinc concentrates in Oaxaca, Mexico at its subsidiary, Don David Gold Mexico S.A. de C.V. (“Don David Gold Mine” or “DDGM”). The Don David Gold Mine holds six properties located in what is known as the San Jose structural corridor. The Company’s properties span 55 continuous kilometers of this structural corridor, which include three historic mining districts in Oaxaca.

On December 10, 2021, the Company successfully completed the acquisition of all the issued and outstanding common shares of Aquila Resources Inc (“Aquila”). Aquila’s principal asset is its 100% interest in the Back Forty Project located in Menominee County, Michigan, USA. The Back Forty Project has a polymetallic (gold, silver, copper, lead, and zinc) Volcanogenic Massive Sulfide deposit. The Back Forty Project controls surface and mineral rights through ownership and leases with the State of Michigan. Optimization work related to metallurgy and the economic model was completed during the third quarter of 2023, and the Company released the Back Forty Project Technical Report Summary, effective as of September 30, 2023, on October 26, 2023 (the “Back Forty Project Technical Report Summary”). Results of the work indicate a more robust economic project with no planned impacts to wetlands that is more protective of the environment, which should facilitate a successful mine permitting process. The Board of Directors of the Company (the “Board”) continues to evaluate options that could lead to the development of the Back Forty Project.

Graphic

Gold Resource Corporation

6

Table of Contents

Mexico Production Stage Properties:

The primary production stage properties at DDGM commenced operations in 2010. The current operations include the Arista underground mine and the DDGM processing facility. The DDGM processing facility currently produces metal concentrates from ore mined at the Arista Mine. The Arista Mine was expanded in 2016 with the development of the Switchback vein system. The Arista Mine portal is located approximately two kilometers from the processing facility. Additionally, underground mining at the Alta Gracia Mine was conducted from 2017 to 2019. Alta Gracia is approximately 32 kilometers from the processing facilities.

The Arista and Alta Gracia Mines include a total of approximately 30,000 hectares of mining concessions, access roads from a major highway, haul roads, a processing facility and adjoining buildings, an assay lab, a now depleted open pit, underground mines, tailings facilities, and other infrastructure. Please see Item 2. Properties for additional information.

Mexico Exploration Prospects:

The Company’s current land package sits within the highly prospective 55-kilometer-long San Jose structural corridor, in Oaxaca, Mexico. Multiple volcanic domes of various scales, and likely non-vented intrusive domes, dominate the district geology. These volcanogenic features are imposed on a pre-volcanic basement of sedimentary rocks. Gold and silver, as well as base metal mineralization in this district is related to the manifestations of this classic volcanogenic system and is considered epithermal in character. The Company intends to advance organic growth and to unlock the value of the mine, existing infrastructure, and its large property position by continuing to invest in exploration and development. Please see Item 2. Properties for additional information.

Graphic

Processing Plant at Night

Back Forty Project:

There is a long history of exploration at the Back Forty Project. After the acquisition of Aquila and the Back Forty Project by the Company in 2021, optimization work was initiated to address the mine’s footprint, potential for an underground mine, wetland mitigation, and other key construction and design decisions. This optimization work related to a change in mine design, tailings relocation, metallurgy, and the economic model was completed, and the Company released the Back Forty Project Technical Report Summary on October 26, 2023.

Gold Resource Corporation

7

Table of Contents

Results of the work indicate a more robust economic project with no planned impacts to wetlands that are more protective of the environment, which should facilitate a successful mine permitting process. With much higher copper and gold prices since the technical was completed for Back Forty, the Board continues to evaluate options that could lead to the development of the project. Please see Item 2. Properties for additional information.

Before the Aquila acquisition, Aquila’s common shares were traded on the Toronto Stock Exchange (“TSX”) under the ticker symbol AQA. Effective December 10, 2021, Aquila ceased to be a reporting issuer in British Columbia, Alberta, Saskatchewan, Ontario, and Nova Scotia. At the same time, GRC became a reporting issuer in British Columbia, Alberta, Saskatchewan, Ontario, and Nova Scotia by virtue of the completion of the acquisition. As a Canadian reporting issuer, GRC is now required to file reports on the System for Electronic Document Analysis and Retrieval (“SEDAR”) in Canada. All financial statements filed on SEDAR conform to United States generally accepted accounting principles (“U.S. GAAP”).

Administrative Offices:

The Company’s principal executive offices are located at 7900 E. Union Ave, Suite 320, Denver, Colorado 80237, and its telephone number is (303) 320-7708. The Company maintains a website at www.goldresourcecorp.com. Information on its website is not incorporated into this annual report on Form 10-K and is not a part of this report. The U.S. Securities and Exchange Commission (“SEC”) maintains an internet site (www.sec.gov) on which the reports that the Company files with the SEC are available to review. The SEC filings can also be accessed through the Company’s website.

Gold Resource Corporation

8

Table of Contents

2024 Developments

For the year ended December 31, 2024, the Company reported a net loss of $56.5 million. The loss is mainly attributable to low production due to a reduction in equipment availability and insufficient development to higher grade areas of the deposit, which resulted in higher production and capital costs (including but not limited to energy, payroll, services, and equipment costs). Financial results for 2024 include revenue of $65.7 million and mine gross loss of $20.5 million. The Company’s production results for the year totaled 9,906 gold ounces, 919,836 silver ounces, 642 copper tonnes, 2,682 lead tonnes, and 7,805 zinc tonnes.

Graphic

For the tenth consecutive year, DDGM received the prestigious ESR award from the Mexican Center for Philanthropy (“CEMEFI”). Awards are given to organizations that demonstrate a commitment to supporting social and environmental protection programs within their local communities.

In 2024, the Company’s exploration activities were focused on drilling at the Arista, Switchback and Three Sisters vein systems within the Arista Mine. During the year, the Company completed 87 underground diamond drill holes totaling 12,761 meters. This included one expansion drill hole totaling 324 meters, 22 infill drill holes totaling 7,348 meters, and 63 ore-control drill holes totaling 4,974 meters. Additionally, one geo-technical hole was drilled totaling 115 meters in support of the construction of a ventilation raise. The Company also completed a limited amount of drift development to support the expansion, infill, and grade control drilling.

During 2024, exploration was primarily dedicated to infill drilling on multiple high-grade, polymetallic epithermal veins within the recently discovered Three Sisters vein system and the Splay 31 vein within the northern extension of the Arista vein system. This drilling was aimed at defining additional Mineral Resources and Mineral Reserves. The Three Sisters vein system, located near existing mine infrastructure and consisting of at least 10 distinct veins, including the Gloria vein, is located between and north of the Arista and Switchback vein systems. Both the Three Sisters and North Arista vein systems remain the primary drill targets in 2025. The 2024 drilling program successfully upgraded significant inferred Mineral Resources to the measured and indicated Mineral Resource categories within the Three Sisters vein system, as well as in the Splay 31 vein. All areas remain open for further expansion drilling both up- and down-dip, as well as along strike to the northwest.

Surface exploration activities during 2024 focused on evaluating and prioritizing advanced-stage projects within the 551 km2 land package controlled by DDGM surrounding the Arista Mine. These activities included re-processing historical geologic information comprised of mapping, sampling, geophysics, and drill data from various projects, such as Rey, Alta Gracia, Margaritas, Chamizo, and Jabali. Additionally, prospects near the Arista Mine were re-evaluated for their near-term potential, aiming to define additional near-mine drill targets. The Company’s continued exploration efforts demonstrate its commitment to long-term investment in Oaxaca, Mexico.

In connection with the Back Forty Project, the Company is monitoring the U.S. Army Corps of Engineers’ review of a petition by the Menominee Indian Tribe of Wisconsin (“MITW”) to have the Menominee River designated as Navigable under Section 10 of the Rivers and Harbor Act. The MITW asked the Environmental Protection Agency and the U.S. Army Corps of Engineers to revisit whether they—as opposed to the state of Michigan—should exercise authority over Aquila’s Back Forty permit applications. In response to a petition from the MITW, the U.S. Army Corps of Engineers is updating its navigability study on the Menominee River, which is expected to be completed sometime in 2025.

Dividends

In February 2023, to conserve cash for development and equipment expenses, the Company announced the suspension of its quarterly dividend until such time that it may become practicable to reinstate such dividend. Please see Item 5. Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchase of Equity Securities for additional information regarding the Company’s dividend policy.

Gold Resource Corporation

9

Table of Contents

Insurance

The Company’s business is capital intensive and requires ongoing investment for the replacement, modernization, or expansion of equipment and facilities. For more information, please see Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations—Liquidity and Capital Resources below. The Company maintains insurance policies against property loss and business interruption and insure against most risks that are typical in the operation of its business in amounts that the Company believes to be reasonable. Such insurance, however, contains exclusions and limitations on coverage, particularly with respect to property loss, environmental liability, and political risk. There can be no assurance that claims would be paid under such insurance policies in connection with a particular event. Please see Item 1A. Risk Factors below for additional information.

Competitive Business Conditions

The acquisition of gold and silver properties is subject to intense competition. Identifying and evaluating potential mining prospects is a costly and time-consuming endeavor. In 2021, the Company successfully acquired the Back Forty Project as discussed above. The Company expects to continue significant investment in exploration and growth activities in the future; however, competition for acquiring mineral prospects will continue to be intense.

Government Regulations and Permits

In connection with mining, milling, and exploration activities in Mexico, the Company is subject to Mexican federal, state, and local laws and regulations governing the protection of the environment, including laws and regulations relating to the protection of air and water quality, hazardous waste management, mine reclamation, as well as the protection of endangered or threatened species. The government department responsible for environmental protection in Mexico is Secretaria de Medio Ambiente y Recursos Naturales (“SEMARNAT”). SEMARNAT has broad authority over environmental regulations and standards. Potential areas of environmental consideration for mining companies include, but are not limited to, acid rock drainage, cyanide containment and handling, contamination of water sources, dust, and noise.

For operations at the Don David Gold Mine, the Company has secured and continues to maintain various regulatory permits from federal, state, and local agencies. These governmental and regulatory permits generally govern the processes being used to operate, the stipulations concerning air quality, water issues, hazardous and waste management, and the plans and obligations for reclamation of the properties at the conclusion of operations. These laws and regulations are continually changing and are generally becoming more restrictive.

The Company’s production stage mines in Mexico have reclamation plans in place that it believes meet all applicable legal and regulatory requirements. As of December 31, 2024, $10.6 million has been accrued on the Company’s Consolidated Balance Sheets for reclamation costs relating to its production and exploration stage properties in Mexico. In addition, the Company accrued $0.1 million for drill-hole capping in Michigan.

The State of Michigan has been delegated authority under federal environmental law to issue all necessary environmental permits required for the Back Forty Project. The State of Michigan’s “Natural Resource Environmental Protection Act” provides rules and regulations for the State Department of Environment, Great Lakes and Energy (EGLE) to issue permits for mining, treated wastewater discharge, air emissions, and related environmental permits necessary for the Back Forty Project.

Customers

During the year ended December 31, 2024, three customers accounted for 91% of the Company’s revenue from DDGM. In the event that the Company’s relationship with any of the customers is interrupted for any reason, the Company believes that it would be able to locate another entity to purchase its products in a timely manner on substantially similar terms. However, any interruption could temporarily disrupt the sale of the Company’s principal products and materially adversely affect its operating results.

Gold Resource Corporation

10

Table of Contents

The Company periodically reviews its options for alternative sales outlets to mitigate the concentration of risk in case of any unforeseen disruptions.

Human Capital Resources

The Company values excellence and recognizes that embracing the diverse backgrounds, skills, and perspectives of the local workforce will lead to a competitive advantage. The Company is committed to leading by example and maintaining a fair and inclusive work environment built on mutual respect and integrity. Diversity means understanding, accepting, respecting, and valuing differences among people regardless of age, gender, race, ethnicity, culture, religion or spiritual practices, disabilities, sexual orientation, gender identity, family status, or veteran status.

The Company believes it has good morale and a dedicated workforce. The Company’s human capital resources objectives include, as applicable, identifying, recruiting, retaining, incentivizing, and integrating its existing employees and new hires. The principal purposes of the Company’s equity incentive plans are to attract, retain, and motivate selected employees and directors by granting stock-based compensation awards that align employee compensation with shareholder returns.

Graphic

DDGM Employee Housing

As of December 31, 2024, the Company had 465 employees at DDGM. There were 15 full-time corporate employees, three of whom serve as executive officers, and three full-time employees in Michigan who are fully dedicated to progressing the Back Forty Project.

Gold Resource Corporation

11

Table of Contents

ITEM 1A.RISK FACTORS

The Company’s business, and the mining industry in general, is influenced by significant risks and uncertainties. These risks include those described below and may include additional risks and uncertainties not presently known or currently deemed immaterial. The Company’s business, financial condition, and results of operations could be materially adversely affected by any of these risks, and the trading price of the Company’s common stock could decline by virtue of these risks. These risks should be read in conjunction with the other information in this annual report on Form 10-K.

Financial Risks

There is substantial doubt about whether the Company can continue as a going concern.

At December 31, 2024, the Company’s aggregate cash and cash equivalents totaled approximately $1.6 million. As a result of challenges encountered in mining and processing at DDGM, the Company is not currently generating positive cash flow from its mining operations. The Company’s financial position and recent operating results, along with its inability to achieve its production estimates, raise substantial doubt about its ability to continue as a going concern. Failure to raise some form of long-term debt or additional equity capital will cause the Company to further increase its working capital decline, and the Company may be compelled to place the mine on “care and maintenance” status and cease operations until sufficient capital is available. Additionally, even if the Company does raise sufficient capital to support its operating expenses and generate revenues, there can be no assurances that the revenue will be sufficient to enable it to achieve a level where it generates profits and positive cash flows from operations.

The Company’s consolidated financial statements have been prepared assuming that the Company will continue as a going concern. The financial statements do not include any adjustments that might be necessary if the Company is unable to continue as a going concern. Such adjustments could be material.

The Company’s results of operations, cash flows, and the value of its properties are highly dependent on the market prices of gold, silver, and certain base metals, and these prices can be volatile.

The profitability of the Company’s mining operations and the value of its mining properties are directly related to the market price of gold, silver, copper, lead, and zinc. The price of gold and silver may also significantly influence the market price of the Company’s common stock. The market prices of these metals historically have fluctuated significantly and are affected by numerous factors beyond the Company’s control, including (i) global or regional consumption patterns; (ii) supply of and demand for gold, silver, and base metals on a worldwide basis; (iii) speculative and hedging activities; (iv) expectations for inflation; (v) political and economic conditions; (vi) supply of, and demand for, consumables required for extraction and processing of metals, and (vii) general economic conditions worldwide. Over the last five years (as reported on the London Bullion Market Association using the London PM Fix for gold and silver), gold prices have fluctuated from a low of $1,474 per ounce to a high of $2,778 per ounce, and silver prices have fluctuated from a low of $12.01 per ounce to a high of $34.51 per ounce. On December 31, 2024, the London PM Fix gold price was $2,609 per ounce, and the London PM silver price was $28.91 per ounce.

Currently, the Company does not use hedging transactions with respect to any of its metal production. Accordingly, the Company is fully exposed to price fluctuations in precious metals. In the event metal prices decline or remain low for prolonged periods of time, the Company might be unable to develop its exploration properties, which may materially adversely affect its results of operations, financial performance, and cash flows. An asset impairment charge may result from the occurrence of unexpected adverse events that impact the Company’s estimates of expected cash flows generated from its mining operations or the market value of its non-producing properties, including a material diminution in the price of metals.

Gold Resource Corporation

12

Table of Contents

The Company may not achieve profitability.

The Company’s only production-stage property that produces revenue is DDGM in Mexico, and it may not generate sufficient cash flow to cover the Company’s operating, development, exploration, general and administrative, and other costs due to certain risk factors. Unexpected interruptions in the mining business may cause the Company to incur losses, or the revenue that is generated from extraction may not be sufficient to fund continuing operations, including exploration and mine development costs. The Company’s failure to generate future profits may materially adversely affect the price of its common stock, and stockholders may lose all or part of their investment. Metal prices and foreign currency rates have a significant impact on the Company’s profit margin, and there is no assurance that the Company will be profitable in the future. Please see Item 1A. Risk Factors—General Risks—The Company’s results of operations, cash flows, and the value of its properties are highly dependent on the market prices of gold, silver, and certain base metals and these prices can be volatile.

The Company requires access to additional capital in order to finance its business plans, and there is no guarantee the Company will have access to that capital on favorable terms, or at all.

The Company requires significant funds to develop, access, and determine if Mineral Reserves exist at any of its non-producing properties, continue exploration, and if warranted, develop existing properties and identify and acquire additional properties to diversify its property portfolio.

The Company’s ability to obtain necessary funding for these purposes, in turn, depends upon several factors, including historical and prospective results of operations, the status of the national and worldwide economy, the price of gold, silver, and other metals, the condition of the debt and equity markets, the costs associated with extracting and acquiring minerals, and the market value for its common stock. The Company may not be successful in generating or obtaining the required financing, or if it can obtain such financing, such financing may not be on terms that are favorable to the Company and its shareholders. The Company also may be unable to obtain funding by monetizing additional non-core exploration or other assets at an acceptable price.

The Company cannot provide assurance it will be able to obtain financing to fund its general and administrative costs and other working capital needs to fund continuing business activities in the future on favorable terms, or at all. Failure to obtain financing could result in delay or indefinite postponement of further mining operations, exploration, and construction, as well as the possible partial or total loss of the Company’s interest in its properties.

The Company’s ability to recognize the benefits of deferred tax assets is dependent on future cash flows and taxable income.

The Company recognizes deferred tax assets when the tax benefit is more likely than not to be realized; otherwise, a valuation allowance is applied against deferred tax assets. Assessing the recoverability of deferred tax assets requires management to make significant estimates related to expectations of future taxable income. Estimates of future taxable income are based on forecasted cash flows from operations and the application of existing tax laws in each jurisdiction. To the extent that future cash flows and taxable income differ significantly from estimates, the Company’s ability to realize the deferred tax assets could be impacted. Additionally, future changes in tax laws could limit the Company’s ability to realize the future tax benefits represented by its deferred tax assets.

The Company’s accounting and other estimates may be imprecise.

Preparing financial statements requires management to make estimates and assumptions that affect the reported amounts and related disclosure of assets, liabilities, revenue, and expenses at the date of the consolidated financial statements and reporting periods. The more significant areas requiring the use of management assumptions and estimates relate to:

Mineral Resources that are the basis for future potential income and cash flow estimates;

Gold Resource Corporation

13

Table of Contents

Mineral Reserves that are the basis for units-of-production depreciation, depletion, and amortization calculations;
Future mine plans, ore grades, throughput, and recoveries;
Future metals prices;
Future capital and operating costs;
Environmental, reclamation, and closure obligations;
The Back Forty Project Gold and Silver Stream Agreements with Osisko Bermuda Limited (“Osisko”);
Contingent Consideration Liabilities;
Permitting and other regulatory considerations;
Asset impairments;
The valuation of the Company’s investments in equity securities;
Asset acquisition accounting, including the valuation of the transaction and related instruments;
Future foreign exchange rates, inflation rates, and applicable tax rates; and
Deferred tax asset valuation allowance.

Future estimates and actual results may differ materially from these estimates as a result of using different assumptions or conditions. For additional information, see Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.

The Company may be required to repay a significant amount if it defaults under certain gold and silver stream agreements.

In connection with the Aquila acquisition, the Company assumed substantial liabilities related to the Gold and Silver Stream Agreements with Osisko (the “Osisko Stream Agreements”). Under the Osisko Stream Agreements, Osisko deposited a total of $37.2 million upfront in exchange for a portion of the future gold and silver production from the Back Forty Project. The Osisko Stream Agreements contain customary provisions regarding default and security. In the event that the Company’s subsidiary defaults under the Osisko Stream Agreements, including by failing to achieve commercial production by an agreed upon date, it may be required to repay the deposit plus accumulated interest at a rate agreed with Osisko. If the Company fails to do so, Osisko may elect to enforce its remedies as a secured party and take possession of the assets that comprise the Back Forty Project.

The Company’s revenues are concentrated among a select few customers. Any interruption in the Company’s relationship with such customers could materially affect the Company’s operating results.

During the year ended December 31, 2024, three customers accounted for 91% of the Company’s revenue from DDGM. In the event that the Company’s relationship with any of the customers is interrupted for any reason, the Company believes that it would be able to locate another entity to purchase its products in a timely manner on substantially similar terms. However, any interruption could temporarily disrupt the sale of the Company’s principal products and materially adversely affect its operating results.

Operational Risks

The Company’s production is derived from a single operating unit, and any interruptions or stoppages in its mining activities at that operating unit would materially adversely affect revenue.

The Company is dependent on revenues from a single operating unit to fund its operations. Any interruption in the Company’s ability to mine this location, such as a labor strike, natural disaster, or loss of permits would negatively impact its ability to generate revenue following such interruption. Additionally, if the Company is unable to develop additional mines economically, it will eventually deplete the body of mineralized material and will no longer generate cash flow sufficient to fund its operations. A decrease in, or cessation of, the Company’s mining operations at this operating unit would materially adversely affect its financial performance and may eventually cause the Company to cease operations.

Gold Resource Corporation

14

Table of Contents

Since the Company’s current property portfolio is limited to one operating unit, its ability to be profitable over the long-term will depend on the Company’s ability to (1) expand the known Arista, Switchback and Three Sisters vein systems and /or identify, explore, and develop additional properties in Mexico, (2) successfully develop the Back Forty Project in Michigan, USA, or (3) acquire and develop an alternative project.

Gold and silver producers must continually replace reserves depleted by production to maintain production levels over the long-term and provide a return on invested capital. Depleted reserves can be replaced in several ways, including expanding known ore bodies, locating new deposits, or acquiring interests in reserves from third parties. Exploration is highly speculative in nature, capital intensive, involves many risks, and frequently unproductive. The Company’s current or future exploration programs may not result in new mineralization. Even if significant mineralization is discovered, it will likely take many years from the initial phases of exploration until commencement of production, during which time the economic feasibility of production may change.

From time to time, the Company may acquire mineral interests from other parties. Such acquisitions are based on an analysis of a variety of factors, including historical exploration results, estimates and assumptions regarding the extent of mineralized material and/or reserves, the timing of production from such reserves, and cash and other operating costs. In addition, the Company may rely on data and reports prepared by third parties, which may contain information or data that the Company would be unable to independently verify or confirm. All of these factors are uncertain and may impact the Company’s ability to develop the mineral interests.

As a result of these uncertainties, the Company’s exploration programs and any acquisitions which it may pursue may not result in the expansion or replacement of its current production with new ore reserves or operations, which could have a material adverse effect on the Company’s business, prospects, results of operations, and financial position.

Increased operating and capital costs have materially adversely impacted the Company’s results of operations and could continue to do so in the near term.

Costs at the Company’s mining properties are subject to fluctuation due to a number of factors, such as variable ore grade, changing metallurgy, and revisions to mine plans in response to the physical shape and location of the ore body, as well as the age and utilization rates for the mining and processing-related facilities and equipment. In addition, costs are affected by the price and availability of input commodities, such as fuel, electricity, labor, chemical reagents, explosives, steel, concrete, and mining and processing related equipment and facilities. Commodity costs are often subject to volatile price movements, including increases that could make mineral extraction less profitable. Further, changes in laws and regulations can affect commodity prices, uses, and transport. Reported costs may also be affected by changes in accounting standards. Increases in costs have materially adversely impacted the Company’s results of operations and operating cash flow and could continue to do so.

The Company could have significant increases in capital and operating costs over the next several years in connection with developing new projects in challenging jurisdictions and sustaining and/or expanding existing mining and processing operations. Costs associated with capital expenditures may increase in the future as a result of factors beyond the Company’s control, such as inflation. Increased capital expenditures may have an adverse effect on the results of operations and cash flow generated from existing operations, as well as the economic returns anticipated from new projects, or may make the development of future projects uneconomic.

Competition in the mining industry is intense, and the Company has limited financial and personnel resources with which to compete.

In the mining industry, competition for desirable properties, investment capital, and human capital is intense. Numerous companies headquartered in the United States, Canada, and worldwide compete for properties and human capital on a global basis. The Company is a small participant in the mining industry due to its limited financial and human capital resources. The Company presently operates with a limited number of people, and it anticipates operating in the same manner going forward. The Company competes with other companies in its industry to hire qualified employees and consultants when needed to operate its mines successfully and to advance its exploration properties. The Company may be unable to attract the necessary human capital to fully explore, and if warranted, develop its properties and be unable to acquire other desirable properties.

Gold Resource Corporation

15

Table of Contents

The Company believes that competition for acquiring mineral properties, as well as the competition to attract and retain qualified human capital, will continue to be intense in the future.

Estimates of Proven and Probable Mineral Reserves and Measured and Indicated Mineral Resources include some uncertainty, such that the volume and grade of ore actually recovered may vary from the Company’s estimates.

The proven and probable Mineral Reserves stated in this report represent the amount of gold, silver, copper, lead, and zinc that the Company estimated at December 31, 2024, that could be economically and legally extracted or produced at the time of the reserve determination. Estimates of proven and probable Mineral Reserves and measured and indicated Mineral Resources are subject to considerable uncertainty. Such estimates are largely based on the prices of gold, silver, copper, lead, and zinc, as well as interpretations of geologic data obtained from drill holes and other exploration techniques. These prices and interpretations are subject to change. If the Company determines that certain estimated Mineral Reserves or Mineral Resources have become uneconomic, it may be forced to reduce its estimates. Actual production from proven and probable Mineral Reserves may be significantly less than the Company expects. There can be no assurance that estimates of Mineral Resources will be upgraded to Mineral Reserves or may ultimately be extracted.

Any material changes in Mineral Resources and Mineral Reserves estimates and grades of mineralization may affect the economic viability of the Company’s current operations, a decision to place a new property into production, and/or such property’s return on capital. There can be no assurance that mineral recoveries in small-scale laboratory tests will be duplicated in a large-scale on-site operation in a production environment. Declines in market prices for contained metals may render portions of the Company’s Mineral Resources and Mineral Reserves estimates uneconomic and result in reduced reported mineralization or materially adversely affect the commercial viability of one or more of the Company’s properties. Any material reductions in estimates of mineralization, or of the Company’s ability to extract this mineralization, could have a material adverse effect on its results of operations or financial condition.

Products processed from the Company’s operating mines or other mines in the future could contain higher than expected contaminants, thereby negatively impacting the Company’s financial condition.

Contracts for treatment charges paid to smelters and refineries include penalties for certain deleterious elements that exceed contract limits. If the material mined from the Company’s operating mines includes higher than expected contaminants, the Company would incur higher treatment expenses and penalty charges that could increase costs and negatively impact the business, financial condition, and results of operations. This could occur due to unexpected variations in the occurrence of these elements in the material mined, problems occurring during blending of material from various locations in the mine prior to processing, and other unanticipated events.

Continuation of the Company’s mining and processing activities is dependent on the availability of sufficient water supplies to support its mining activities.

Water is critical to the Company’s business, and the increasing pressure on water resources requires the Company to consider both current and future conditions in its management approach. Across the globe, water is a shared and regulated resource. Mining operations require significant quantities of water for mining, ore processing, and related support facilities. Many of the Company’s properties in Mexico are in areas where water is scarce, and competition among users for continuing access to water is significant. Continuous production and mine development depend on the Company’s ability to acquire and maintain water rights and defeat claims adverse to current water use in legal proceedings. Although the Company believes that its operations currently have sufficient water rights and claims to cover operating demands, it cannot predict the potential outcome of future legal proceedings relating to water rights, claims, and uses. Water shortages may also result from weather or environmental and climate impacts beyond the Company’s control. Shortages in water supply could result in production and processing interruptions. In addition, the scarcity of water in certain regions could result in increased costs to obtain sufficient quantities of water to conduct the Company’s operations. The loss of some or all water rights, in whole or in part, ongoing shortages of water to which the Company has rights, or significantly higher costs to obtain sufficient quantities of water (or the failure to procure sufficient quantities of water) could result in the Company’s inability to maintain mineral extraction at current or expected levels, require the Company to curtail or shut down mining operations, and prevent it from pursuing expansion or any development opportunities.

Gold Resource Corporation

16

Table of Contents

Laws and regulations may be introduced in some jurisdictions where the Company operates, which could also limit access to sufficient water resources, thus materially adversely affecting its operations.

The nature of mineral exploration, mining, and processing activities involves significant hazards, a high degree of risk, and the possibility of uninsured losses.

Exploration for and the production of minerals is highly speculative and involves greater risk than many other businesses. Many exploration programs do not result in the discovery of mineralization, and any mineralization discovered may not be of sufficient quantity or quality to be profitably mined. The Company’s operations are, and any future mining operations or construction that may be conducted will be, subject to all of the operating hazards and risks normally incident to exploring for and mining of mineral properties, such as, but not limited to:

Fluctuation in production costs that make mining uneconomic;
Fluctuation in commodity prices;
Social, community, or labor force disputes resulting in work stoppages or delays, or related loss of social acceptance of community support;
Changes to legal and regulatory requirements;
Unanticipated variations in grade and other geologic problems;
Environmental hazards, noxious fumes, and gases;
Ground and water conditions;
Difficult surface or underground conditions;
Industrial accidents;
Security incidents;
Failure of unproven or evolving technologies or loss of information integrity or data;
Metallurgical and other processing problems;
Mechanical and equipment performance problems;
Failure of pit walls, dams, declines, drifts, and shafts;
Unusual or unexpected rock formations;
Personal injury;
Pandemics;
Fire, flooding, cave-ins, seismic activity, landslides, or other inclement weather conditions, including those impacting operations or the ability to access and supply sites; and
Decrease in the value of mineralized material due to lower gold, silver, and metal prices.

These occurrences could result in damage to—or destruction of—mineral properties, processing facilities, and equipment; personal injury or death; environmental damage; reduced extraction and processing; delays in mining; asset write-downs; monetary losses; and possible legal liability. Although the Company maintains insurance in amounts that it considers reasonable for general commercial liability claims, physical assets at its Arista and Alta Gracia Mines, and risks inherent in the conduct of its business, this insurance contains exclusions and limitations on coverage and will not cover all potential risks associated with mining and exploration activities. As such, the related liabilities might exceed policy limits. As a result of any or all of the foregoing, the Company could incur significant liabilities and costs that may exceed the limits of its insurance coverage or that it may elect not to insure against because of unreasonable premium costs or other reasons, which could materially adversely affect its results of operations and financial condition. The Company may also not be insured against all interruptions to its operations. Losses from these or other events may cause the Company to incur significant costs which could materially adversely affect its financial condition and its ability to fund activities on its properties. A significant loss could force the Company to reduce or suspend its operations and development.

Gold Resource Corporation

17

Table of Contents

Revenue from the sale of metal concentrate may be materially adversely affected by loss or damage during shipment and storage at the Company’s buyer’s facilities.

The Company relies on third-party transportation companies to transport its metal concentrate to each buyer’s facilities for processing and further refining. The terms of the Company’s sales contracts with the buyers require the Company to rely, in part, on assay results from samples of its metal concentrate that are obtained at the buyer’s warehouse to determine the final sales value for metals. Once the metal concentrate leaves the processing facility, the Company no longer have direct custody and control of these products. Theft, loss, road accidents, improper storage, fire, natural disasters, tampering, or other unexpected events while in transit or at the buyer’s location may lead to the loss of all or a portion of the Company’s metal concentrate products. Such losses may not be covered by insurance and may lead to a delay or interruption in revenue, and as a result, the Company’s operating results may be materially adversely affected.

A significant delay or disruption in sales of doré or concentrates as a result of the unexpected disruption in services provided by smelters or refiners could have a material adverse effect on results of operations.

The Company relies on third-party smelters and refiners to refine and process and, in some cases, purchase, the gold and silver doré and copper, lead, and zinc concentrate produced from its mines. Access to smelters and refiners on economic terms is critical to the Company’s ability to sell its products to buyers and generate revenues. The Company periodically enters into agreements with smelters and refiners, some of which operate their smelting or refining facilities outside the United States, and it believes it currently has contractual arrangements with a sufficient number of smelters and refiners so that the loss of any one refiner or smelter would not significantly or materially impact the Company’s operations or its ability to generate revenues. Nevertheless, services provided by a refiner or smelter may be disrupted by operational issues; new or increased tariffs, duties, or other cross-border trade barriers; the bankruptcy or insolvency of one or more smelters or refiners; or the inability to agree on acceptable commercial or legal terms with a refiner or smelter. Such an event or events may disrupt an existing relationship with a refiner or smelter or result in the inability to create a contractual relationship with a refiner or smelter, which may leave the Company with limited, uneconomical, or no access to smelting or refining services for short or long periods of time. Any such delay or loss of access may significantly impact the Company’s ability to sell doré and concentrate products. The Company cannot ensure that alternative smelters or refiners would be available or offer comparable terms if the need for them arose or that it would not experience delays or disruptions in sales that would materially adversely affect the results of operations.

The Company relies on contractors to conduct a significant portion of the Company’s exploration, development, and construction projects.

A significant portion of the Company’s development and construction projects are currently conducted in whole or in part by contractors. As a result, the Company’s operations are subject to a number of risks, some of which are outside of its control, including:

Negotiating agreements with contractors on acceptable terms;
New foreign or domestic legislation limiting or altering the ability to utilize contractors or outsourced resources;
The difficulty and inherent delay in replacing a contractor and its equipment in the event that either party terminates the agreement;
Reduced control and oversight over those aspects of the work which are the responsibility of the contractor;
Failure of a contractor to perform under its agreement;
Interruption of development and construction or increased costs in the event that a contractor ceases its business due to insolvency or other unforeseen events;
Injuries or fatalities on the job as a result of the failure to implement or follow adequate safety measures;
Failure of a contractor to comply with applicable legal and regulatory requirements, to the extent it is responsible for such compliance; and
Problems of a contractor managing its workforce, labor unrest, or other related employment issues.

Gold Resource Corporation

18

Table of Contents

In addition, the Company may incur liability to third parties as a result of the actions of its contractors. The occurrence of one or more of these risks could materially adversely affect the Company’s results of operations and financial position.

Risks Related to the Company’s Exploration Activities

The exploration of the Company’s mineral properties is highly speculative in nature, involves substantial expenditures, and is frequently non-productive.

Mineral exploration is highly speculative in nature and frequently results in no or very little return on amounts invested in evaluating a particular property. The probability of an individual prospect ever having Mineral Reserves that meets the requirements of Subpart 1300 of Regulation S-K (“S-K 1300”) is low. Even if the Company does eventually discover Mineral Resources and Mineral Reserves on its exploration properties, there can be no assurance that it can develop a mine and extract those minerals. Substantial expenditures are required to (i) establish the existence of a potential ore body through drilling and metallurgical and other testing techniques; (ii) determine metal content and metallurgical recovery processes to process metal from the ore; (iii) determine the feasibility of mine development and production; and (iv) construct, renovate, or expand mining and processing facilities. If the Company discovers a deposit or ore at a property, it usually takes several years from the initial phases of exploration until mineral extraction is possible, if at all. During this time, the economic feasibility of a project may change because of increased costs, lower metal prices, or other factors. As a result of these uncertainties, the Company’s exploration programs may not result in the identification of proven and probable Mineral Reserves in sufficient quantities to justify developing a particular property.
The Company has acquired and may in the future acquire additional mining properties, and the Company’s business may be negatively impacted if Mineral Resources and Mineral Reserves are not located on acquired properties or if it is unable to successfully execute and/or integrate the acquisitions as planned.
The Company has in the past, and may in the future, acquire additional mining properties. There can be no assurance that reserves will be identified on any properties that it acquires. The Company may experience negative impacts on the trading price of its common stock or on its ability to access capital if it successfully completes acquisitions of additional properties and reserves are not located on these properties.
In December 2021, the Company acquired the Back Forty Project when it purchased Aquila. The acquisition may result in various material adverse impacts on the Company’s business and the trading price of its common stock. Adverse impacts may include, without limitation, the risk that the acquisition does not achieve the expected benefits, increased cash outflows, the unavailability of capital to develop the Back Forty Project, and the risk of potential material adverse tax consequences for the Company and its shareholders. Additional risks, difficulties, and uncertainties may result from the separation of previously co-mingled businesses, including necessary ongoing relationships. While the Company has invested significant time, money, and equity in acquiring the Back Forty Project, there can be no assurance that the Back Forty Project will be permitted or will ultimately be productive.
The success of any future acquisition would depend on a number of factors, including, but not limited to:
Identifying suitable candidates for acquisition and negotiating acceptable terms;
Obtaining approval from regulatory authorities and potentially the Company’s shareholders;
Implementing the Company’s standards, controls, procedures, and policies at the acquired business and addressing any pre-existing liabilities or claims involving the acquired business; and
To the extent the acquired operations are in a country where the Company has not operated historically, understanding the regulations and challenges of operating in that new jurisdiction.

There can be no assurance that the Company will be able to successfully conclude any acquisitions, or that any acquisition will achieve the anticipated synergies or other anticipated positive results. Any material problems that the Company encounters in connection with such an acquisition could have a material adverse effect on its business, results of operations, and financial position.

Gold Resource Corporation

19

Table of Contents

These factors may materially adversely affect the trading price of the Company’s common stock.

Regulatory Risks

The Company’s operations are subject to ongoing permitting requirements, which could result in the delay, suspension, or termination of its operations.

The Company’s operations, including ongoing exploration drilling programs and mining, require ongoing permits from governmental and local authorities. The Company may also be required to obtain certain property rights to access or use its properties. Obtaining or renewing licenses and permits and acquiring property rights can be complex and time-consuming processes. There can be no assurance that the Company will be able to acquire all required licenses, permits, or property rights on reasonable terms or in a timely manner, or at all, and that such terms will not be adversely changed; that required extensions will be granted; or that the issuance of such licenses, permits or property rights will not be challenged by third parties. If the Company cannot obtain or maintain the necessary permits, or if there is a delay in receiving future permits, its timetable and business plan will be materially adversely affected.

The Company’s operating properties located in Mexico are subject to changes in political or economic conditions and regulations in that country.

The risks with respect to operating in Mexico or other developing countries include, but are not limited to: nationalization of properties, military repression, extreme fluctuations in currency exchange rates, increased security risks, labor instability or militancy, mineral title irregularities, and high rates of inflation. In addition, changes in mining or investment policies or shifts in political attitudes in Mexico may materially adversely affect the Company’s business. The Company may be affected in varying degrees by government regulation concerning restrictions on production, price controls, export controls, income taxes, expropriation of property, maintenance of claims, environmental legislation, land use, land claims of local people, opposition from non-governmental organizations, labor legislation, water use, and mine safety. The effect of these factors cannot be accurately predicted and may adversely impact the Company’s operations.

Most of the Company’s properties are subject to extensive environmental laws and regulations, which could materially adversely affect its business.

The Company’s exploration and mining operations are subject to extensive laws and regulations governing land use and the protection of the environment, which control the exploration and mining of mineral properties and their effects on the environment, including air and water quality, mine reclamation, waste generation, handling and disposal, the protection of different species of flora and fauna, and the preservation of lands. These laws and regulations require the Company to acquire permits and other authorizations for conducting certain activities. In many countries, there is relatively new comprehensive environmental legislation, and the permitting and the authorization process may not be established or predictable. The Company may not be able to acquire necessary permits or authorizations on a timely basis, if at all. Delays in acquiring any permit or authorization could increase the cost of the Company’s projects and could suspend or delay the commencement of extraction and processing of mineralized material.

Environmental legislation in Mexico and in many other countries is evolving in a manner that will require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects, and a heightened degree of responsibility for companies and their officers, directors, and employees. Future changes in environmental regulation in the jurisdictions where the Company’s properties are located may materially adversely affect its business, make the business prohibitively expensive, or prohibit it altogether. The Company cannot predict what environmental legislation or regulations will be enacted or adopted in the future or how future laws and regulations will be administered or interpreted. Compliance with more stringent laws and regulations, as well as potentially more vigorous enforcement policies, stronger regulatory agencies, or stricter interpretation of existing laws, may (i) necessitate significant capital outlays, (ii) cause the Company to delay, terminate, or otherwise change its intended activities with respect to one or more projects, or (iii) materially adversely affect future exploration activities.

Gold Resource Corporation

20

Table of Contents

Climate change and climate change legislation or regulations could impact the Company’s business.

The Company is subject to physical risks associated with climate change, which could seriously harm its results of operations and increase costs and expenses. The occurrence of severe adverse weather conditions, including increased temperatures and droughts, fires, longer wet or dry seasons, increased precipitation, floods, hail, snow, or more severe storms may have a potentially devastating impact on the Company’s operations. Adverse weather may result in physical damage to operations, instability of the Company’s infrastructure and equipment, washed-out roads to its properties, and altered water and electricity supply to projects. Increased temperatures may also decrease worker productivity at the Company’s projects and raise ventilation and cooling costs. Changes in the quantity of water, whether in excess or deficient amounts, may impact exploration and development activities, mining and processing operations, water storage and treatment facilities, tailings storage facilities, closure and reclamation efforts, and may increase levels of dust in dry conditions, and land erosion and slope stability in case of prolonged wet conditions. Should the impacts of climate change be material in nature or occur for lengthy periods of time in the areas in which the Company operates, financial condition or results of operations could be materially adversely affected.

The Company’s continuing reclamation obligations at its operations could require significant additional expenditures.

The Company is responsible for the reclamation obligations related to disturbances located on all of its properties and have recorded a liability on its Consolidated Balance Sheets to cover the estimated reclamation obligation. However, there is a risk that any reserve could be inadequate to cover the actual costs of reclamation when carried out. Continuing reclamation obligations will require a significant amount of capital. There is a risk that the Company will be unable to fund these obligations and that the regulatory authorities may increase reclamation requirements to such a degree that it would not be commercially reasonable to continue mining and exploration activities, which may materially adversely affect results of operations, financial performance, and cash flows.

Title to mineral properties can be uncertain, and in the event of a dispute regarding the title to the Company’s Mexican properties, it will likely be necessary for the Company to resolve the dispute in Mexico, where it would be faced with unfamiliar laws and procedures.

The Company’s ability to explore and operate its properties depends on the validity of its title to that property. Uncertainties inherent in mineral properties relate to such things as the sufficiency of mineral discovery, proper posting and marking of boundaries, assessment work and possible conflicts with other claims not determinable from public record. There may be valid challenges to the title to the Company’s properties which, if successful, could impair development and/or operations. The resolution of disputes in foreign countries can be costly and time consuming. In a foreign country, the Company face the additional burden of understanding unfamiliar laws and procedures. Not like in the U.S., the Company may not be entitled to a jury trial. Further, to litigate in any foreign country, the Company would be faced with the necessity of hiring lawyers and other professionals who are familiar with the foreign laws. For these reasons, the Company may incur unforeseen costs if it is forced to resolve a dispute in Mexico or any other foreign country.

In most of the countries where the Company operates, failure to comply with applicable laws and regulations relating to mineral right applications and tenure could result in loss, reduction or expropriation of entitlements, or the imposition of additional local or foreign parties as joint venture partners. Any such loss, reduction, or imposition of partners could have a material adverse effect on the Company’s financial condition, results of operations, and prospects.

Under the laws of Mexico, Mineral Resources belong to the United States of Mexico, and government concessions are required to explore for or exploit Mineral Reserves. Mineral rights derive from concessions granted—on a discretionary basis—by the Ministry of Economy, pursuant to the Mexican mining law and regulations thereunder. The Company’s concessions in Mexico are subject to continuing government regulation, and failure to adhere to such regulations will result in the termination of the concession. A title defect could result in losing all or a portion of the Company’s right, title, and interest in and to the properties to which the title defect relates.

Additionally, in 2014, new mining concessions became subject to additional review and approval by the Mexico Ministry of Energy, and in recent years, the federal government has been reluctant to issue new mining concessions.

Gold Resource Corporation

21

Table of Contents

Mining concessions in Mexico give exclusive exploration and exploitation rights to the minerals located in the concessions but do not include surface rights to the real property, which requires that the Company negotiates the necessary agreements with surface landowners. Many of the mining properties are subject to the Mexican Ejido system, requiring the Company to contract with the local communities surrounding the properties in order to obtain surface rights to land needed in connection with mining exploration activities. Please see Item 1A. Risk Factors—Regulatory Risks—The Company’s ability to develop its Mexican properties is subject to the rights of the Ejido (agrarian cooperatives) who use or own the surface for agricultural purposes.

The Company’s ability to develop its Mexican properties is subject to the rights of the Ejido (agrarian cooperatives), who use or own the surface for agricultural purposes.

The Company’s ability to mine minerals is subject to maintaining satisfactory arrangements and relationships with the Ejido for access and surface disturbances. Ejidos are groups of local inhabitants who were granted rights to conduct agricultural activities on the property. The Company must negotiate and maintain a satisfactory arrangement with these residents in order to disturb or discontinue their rights to farm. While the Company has successfully negotiated and signed such agreements related to the DDGM operations, its inability to maintain these agreements or consummate similar agreements for new projects could impair or impede the ability to successfully explore, develop, and mine the properties, which in turn could materially adversely affect the Company’s future cash flow.

A significant amount of the Company’s mining properties are subject to exchange control policies, the effects of inflation, and currency fluctuations between the U.S. dollar and the Mexican peso.

 The Company’s revenue and external funding are primarily denominated in U.S. dollars. However, certain mining, processing, maintenance, and exploration costs are denominated in Mexican pesos. These costs principally include electricity, labor, water, maintenance, local contractors, and fuel. The appreciation of the peso against the U.S. dollar increases expenses and the cost of purchasing capital assets in U.S. dollar terms in Mexico, which can adversely impact the Company’s operating results and cash flows. Conversely, the depreciation of the Mexican peso decreases operating costs and capital asset purchases in U.S. dollar terms. When inflation in Mexico increases without a corresponding devaluation of the Mexican peso, the Company’s financial position, results of operations, and cash flows could be materially adversely affected. The annual average inflation rate in Mexico was approximately 4.72% in 2024 and 5.55% in 2023. Current and future inflationary effects may be driven by, among other things, supply chain disruptions, governmental stimulus or fiscal policies, and geopolitical instability. For additional information, please see Item 1A. Risk Factors—General Risks— Global and regional political and economic conditions could adversely impact the Company’s business. Continuing increases in inflation could increase the costs of labor and other costs related to the business, which could have an adverse impact on the Company’s business, financial position, results of operations, and cash flows.

At the same time, the peso has been subject to fluctuation, which may not have been proportionate to the inflation rate and may not be proportional to the inflation rate in the future. The value of the peso decreased by 16.7% in 2024 and increased by 14.6% in 2023. In addition, fluctuations in currency exchange rates may have a significant impact on the Company’s financial results. There can be no assurance that the Mexican government will maintain its current policies with regard to the peso or that the peso’s value will not fluctuate significantly in the future. The Company cannot assure you that currency fluctuations, inflation, and exchange control policies will not have an adverse impact on its financial condition, results of operations, earnings, and cash flows.

Lack of infrastructure could forestall or prevent further exploration and advancement.

Exploration activities, as well as any advancement activities, depend on adequate infrastructure. Reliable roads, bridges, power sources, and water supply are important factors that affect capital and operating costs and the feasibility and economic viability of a project. Unanticipated or higher than expected costs and unusual or infrequent weather phenomena, or government or other interference in the maintenance or provision of such infrastructure, could materially adversely affect the Company’s business, financial condition, and results of operations.

Gold Resource Corporation

22

Table of Contents

Risks Related to the Company’s Common Stock

Volatility in the Company’s stock price could result in shareholders losing part or all of their investment.

In addition to other risk factors identified in this annual report on Form 10-K, and due to volatility associated with equity securities in general, the value of a shareholder’s investment could decline due to the impact of numerous factors upon the market price of the Company’s common stock, including divergence between its actual or anticipated financial results and published expectations of analysts or the expectations of the market, the gain or loss of customers, announcements that the Company, its competitors or its customers may make regarding their operating results and other factors that are beyond the Company’s control, such as market conditions in the Company’s or its customers’ industry, new market entrants, technological innovations, and economic and political conditions or events.

Stock markets in general have experienced extreme price and volume fluctuations, and the market prices of individual securities have been highly volatile. These fluctuations are often unrelated to operating performance and may materially adversely affect the market price of the Company’s common stock. As a result, shareholders may be unable to sell their shares at a desired price.

Past payments of dividends on the Company’s common stock are not a guaranty of future payments of dividends.

In 2010, the Company began paying cash dividends to the holders of its common stock. However, the Company’s ability to pay dividends in the future will depend on a number of factors, including free cash flow, expected operational performance, mine construction requirements and strategies, other acquisition and/or construction projects, spot metal prices, taxation, government-imposed royalties, and general market conditions. Further, a portion of the Company’s cash flow is expected to be retained to finance operations, explorations, and development of mineral properties. In February 2023, in order to conserve cash for future development and exploration, the Company announced the suspension of quarterly dividends. There is no assurance that the Board will elect to re-institute a dividend payment in the near-term or at all.

Issuances of the Company’s stock in the future could dilute existing shareholders and materially adversely affect the market price of its common stock.

The Company has the authority to issue up to 200,000,000 shares of common stock, 5,000,000 shares of preferred stock, and to issue options and warrants to purchase shares of its common stock, in some cases without shareholder approval. As of April 4, 2025, there were 120,442,686 shares of common stock outstanding. Future issuances of the Company’s securities could be at prices substantially below the price paid for its common stock by current shareholders. The Company can issue significant blocks of its common stock without further shareholder approval. Because it has issued less common stock than many of its larger peers, the issuance of a significant amount of common stock may have a disproportionately large impact on share price compared to larger companies.

General Risks

The Company has identified a material weakness in its internal control over financial reporting that has resulted in the restatement of certain previously issued financial statements. If the Company is unable to remediate the material weakness, or if it identifies additional material weaknesses in the future or otherwise fails to maintain effective internal control over financial reporting or disclosure controls and procedures, it may result in future material misstatements of the Company’s consolidated financial statements or cause the Company to fail to meet its periodic reporting obligations, which may adversely affect the Company’s business, financial condition, and results of operations.

The Company is required to provide management’s attestation on internal controls. As disclosed in Item 9A. Controls and Procedures in this Form 10-K, management has identified a material weakness in the Company’s internal control over financial reporting. A material weakness is a deficiency, or combination of deficiencies, in internal control over financial reporting, such that there is a reasonable possibility that a material misstatement of the Company’s annual or interim financial statements could occur but will not be prevented or detected on a timely basis.

Gold Resource Corporation

23

Table of Contents

In connection with the Company’s evaluation of internal control over financial reporting for the year ended December 31, 2024, the following material weakness has been identified:

The Company did not have adequate policies and procedures to maintain effective internal control over the accounting treatment related to complex areas.

If the Company is unable to remediate its existing material weakness or if, in the future, the Company is unable to maintain effective internal control over financial reporting pursuant to Section 404(a), the Company may not be able to assess whether its internal controls over financial reporting are effective, which may subject it to financial reporting misstatements and adverse regulatory consequences and could harm investor confidence and the market price of the Company’s shares of common stock.

The restatement of certain previously issued financial statements may affect stockholder and investor confidence in the Company, or harm the Company's reputation, and may subject the Company to additional risks and uncertainties, including increased cost and the increased probability of legal proceedings, regulatory inquiries, sanctions, or investigations.

As mentioned above, management identified a material weakness in the Company’s internal control over financial reporting, which has resulted in the restatement of the following previously issued financial statements within this Form 10-K: (i) its interim consolidated financial statements for the quarterly periods ended March 31, 2023, June 30, 2023, September 30, 2023, March 31, 2024, June 30, 2024 and September 30, 2024 and (ii) its consolidated audited financial statements for the year ended December 31, 2023.

As a result of the restatement, the Company has incurred, and may continue to incur, unanticipated costs for accounting and legal fees in connection with, or related to, such restatement. In addition, such restatement could subject the Company to several additional risks and uncertainties, including the increased possibility of legal proceedings and inquiries, sanctions or investigations by the SEC or other regulatory authorities. Any of the foregoing may adversely affect the Company’s reputation, the accuracy and timing of its financial reporting, or its business, results of operations, liquidity and financial condition, or cause stockholders, investors, members and customers to lose confidence in the accuracy and completeness of the Company’s financial reports or cause the market price of its common stock to decline.

The Company’s operations may be disrupted, and its financial results may be materially adversely affected by any future pandemic.

 Any pandemic may pose a risk to the business and operations. If a significant portion of the Company’s workforce becomes unable to work or travel to the operations due to illness or state or federal government restrictions (including travel restrictions and “shelter-in-place” and similar orders restricting certain activities that may be issued or extended by authorities), the Company may be forced to reduce or suspend operations, exploration activities, and/or development projects, which may impact liquidity and financial results. These restrictions have significantly disrupted economic activity in both the world, national, and local economies and have caused volatility in capital markets.

To the extent any pandemic materially adversely affects the Company’s business and financial results, as discussed above, it may also have the effect of heightening many of the other risks described in this “Risk Factors” section, such as those relating to operation, indebtedness, and financing. The Company is unable to predict the ultimate adverse impact of any pandemic on the business, which will depend on numerous evolving factors and future developments, including the pandemic’s ongoing effect on the demand for silver and gold, as well as the response of the overall economy and the financial markets after the pandemic and response measures come to an end, the timing of which remains highly unpredictable.

Gold Resource Corporation

24

Table of Contents

Global and regional political and economic conditions could adversely impact the Company’s business.

Political and economic shifts, both domestic and international, may create uncertainty and pose risks to the Company’s operations. Policies related to populism, protectionism, economic nationalism, and attitudes toward multinational corporations could result in regulatory changes, trade barriers, or investment restrictions. Additionally, international trade disputes—including tariffs, counter-tariffs, export controls, sanctions, and currency regulations—may increase costs and disrupt supply chain, operating model, and customer relationships.

Further, market volatility, driven by shifts in U.S. and foreign trade policies, fluctuating interest rates, or currency controls may affect gold prices, capital availability, and investor confidence. Even the perception of these risks could lead to reduced investment, higher production costs, and operational challenges. If such trends continue, they may have a material adverse effect on the business and financial performance.

The Company may not be able to operate successfully if it is unable to recruit, hire, retain, and develop key personnel and maintain a qualified and diverse workforce. In addition, the Company is dependent upon its employees being able to safely perform their jobs, but there is risk of physical injuries or illness.

The Company depends upon the services of a number of key executives and management personnel. These individuals include executive officers and other key employees. If any of these individuals were to die, become disabled, or leave the Company, the Company would be forced to identify and retain individuals to replace them but may be unable to hire a suitable replacement on favorable terms should that become necessary.

The Company’s success is also dependent on the contributions of its highly skilled and experienced workforce. The Company’s ability to achieve its operating goals depend upon the ability to recruit, hire, retain, and develop qualified and diverse personnel to execute on its strategy. There continues to be competition over highly skilled personnel in the industry. If the Company loses key personnel or one or more members of senior management team; or if it fails to develop adequate succession plans; or if it fails to hire, retain, and develop qualified and diverse employees; the business, financial condition, results of operations, and cash flows could be harmed.

The Company is dependent on information technology systems, which are subject to certain risks, including cybersecurity risks, data leakage risks, and risks associated with implementation and integration.

The Company is dependent upon information technology systems in the conduct of its business. Any significant breakdown, invasion, virus, cyberattack, security breach, destruction, or interruption of these systems by employees, others with authorized access to its systems, or unauthorized persons could negatively impact the business. To the extent any invasion, cyberattack, or security breach results in disruption to the business; such as loss or disclosure of, or damage to data or confidential information; business reputation, results of operations, and financial condition could be materially adversely affected. The Company has implemented various measures to manage the risks related to information technology systems and network disruptions. However, given the unpredictability of the timing, nature, and scope of information technology disruptions, the Company could potentially be subject to production downtimes, operational delays, the compromising of confidential or otherwise protected information, destruction or corruption of data, security breaches, other manipulation or improper use of its systems, and networks or financial losses from remedial actions, any of which could have a material adverse effect on cash flows, competitive position, financial condition, or results of operations. The Company’s systems and insurance coverage for protecting against cyber security risks may not be sufficient. Although to date the Company has not experienced any material losses relating to cyberattacks, it may suffer such losses in the future. The Company may be required to expend significant additional resources to continue to modify or enhance protective measures. The Company also may be subject to significant litigation, regulatory investigation, and remediation costs associated with any information security vulnerabilities, cyberattacks, or security breaches.

The Company may also be materially adversely affected by system or network disruptions if new or upgraded information technology systems are defective, not installed properly, or not properly integrated into its operations. If the Company is unable to successfully implement system upgrades or modifications, it may have to rely on manual reporting processes and controls over financial reporting that have not been planned, designed, or tested.

Gold Resource Corporation

25

Table of Contents

Various measures have been implemented to manage the risks related to the system upgrades and modifications, but system upgrades and modification failures could have a material adverse effect on the business, financial condition, and results of operations and could, if not successfully implemented, adversely impact the effectiveness of internal controls over financial reporting.

The Company’s business is subject to the U.S. Foreign Corrupt Practices Act and similar worldwide anti-bribery laws, a breach or violation of which could lead to civil and criminal fines and penalties, loss of licenses or permits, and reputational harm.

The Company operates in certain jurisdictions that have experienced some degree of governmental and private sector corruption, and in certain circumstances, strict compliance with anti-bribery laws may conflict with certain local customs and practices. The U.S. Foreign Corrupt Practices Act and anti-bribery laws in other jurisdictions generally prohibit companies and their intermediaries from making improper payments for the purpose of obtaining or retaining business or other commercial advantages. The Company’s Code of Ethics and other corporate governance mandate compliance with these anti-bribery laws, which often carry substantial penalties. However, there can be no assurance that internal control policies and procedures will always protect the Company from recklessness, fraudulent behavior, dishonesty, or other inappropriate acts committed by affiliates, employees, contractors, or agents. As such, the corporate policies and processes may not prevent all potential breaches of law or other governance practices. Violations of these laws, or allegations of such violations, could lead to civil and criminal fines and penalties, litigation, loss of operating licenses or permits, and may damage the Company’s reputation, which could have a material adverse effect on the business, financial position, and results of operations, or cause the market value of common stock to decline.

ITEM 1B.UNRESOLVED STAFF COMMENTS

None.

ITEM 1C.CYBERSECURITY

Risk Management and Strategy

The Company has established policies and processes for assessing, identifying, and managing material risk from cybersecurity threats and have integrated these processes into its overall risk management systems and processes. The Company routinely assesses material risks from cybersecurity threats, including any potential unauthorized occurrence on or conducted through its information systems that may result in adverse effects on the confidentiality, integrity, or availability of information systems or any information residing therein.

The Company conducts periodic risk assessments to identify cybersecurity threats, as well as assessments in the event of a material change in business practices that may affect information systems that are vulnerable to such cybersecurity threats. These risk assessments include identification of reasonably foreseeable internal and external risks, the likelihood and potential damage that could result from such risks, and the sufficiency of existing policies, procedures, systems, and safeguards in place to manage such risks.

Governance

One of the key functions of the Board is informed oversight of the risk management process, including risks from cybersecurity threats. The Board is responsible for monitoring and assessing strategic risk exposure, and management is responsible for the day-to-day management of any material risks that may arise. The Board receives periodic updates from management regarding cybersecurity matters and is notified between such updates regarding any significant new cybersecurity threats or incidents. The Company does not believe that there are currently any known risks from cybersecurity threats that are reasonably likely to materially affect it or its business strategy, results of operations, or financial condition. For more information regarding the expertise of the Board as it relates to cybersecurity, see the section entitled “Governance” in the Company’s definitive proxy statement relating to the 2024 Annual Meeting of Stockholders filed with the SEC on April 29, 2024.

Gold Resource Corporation

26

Table of Contents

 Management is responsible for the operational oversight of company-wide cybersecurity strategy, policy, and standards across relevant departments to assess and help prepare the Company to address cybersecurity risks. As part of the overall risk management system, the Company monitors and tests safeguards and trains employees on these safeguards. Personnel at all levels and departments are made aware of the cybersecurity policies through trainings.

Cybersecurity Threats

As of December 31, 2024, the Company has not identified an indication of a cybersecurity incident that would have a material impact on the Company’s business and consolidated financial statements. For further discussion of cybersecurity risks, please refer to Item 1A. Risk Factors.

Gold Resource Corporation

27

Table of Contents

ITEM 2. PROPERTIES

Glossary.

The following terms used in this report shall have the following meanings:

Andesite:

An extrusive igneous, volcanic rock, of intermediate composition, with aphanitic to porphyritic texture characteristic of subduction zones, such as the western margin of South America.

Concentrate:

A product from a mineral processing facility, such as gravity separation or flotation, in which the valuable constituents have been upgraded and unwanted gangue materials rejected as waste.

Doré:

Composite gold and silver bullion, usually consisting of approximately 90% precious metals that will be further refined to separate pure metals.

Drift:

A horizontal tunnel generally driven within or alongside an ore body and aligned parallel to the long dimension of the ore.

Epithermal:

Used to describe gold deposits found on or just below the surface close to vents or volcanoes, formed at low temperature and pressure.

Exploration:

Prospecting, sampling, mapping, diamond-drilling, and other work involved in locating the presence of economic deposits and establishing their nature, shape, and grade.

Grade:

The concentration of an element of interest expressed as relative mass units (percentage, ounces per ton, grams per tonne (“g/t”), etc.).

Hectare:

A metric unit of measurement, for surface area. One hectare equals 1/200th of a square kilometer, 10,000 square meters, or 2.47 acres. A hectare is approximately the size of a soccer field.

Long-hole Stoping:

Mining method which uses holes drilled by a production drill to a predetermined pattern by a mining engineer. Long-hole stoping is a highly selective and productive method of mining and can cater for varying ore thicknesses and dips (0 - 90 degree). Blasted rock is designed to fall into a supported drawpoint or be removed with remote control LHD (load, haul, dump machine).

Net Smelter Return

(“NSR”):

The net revenue that the owner of a mining property receives from the sale of the mine’s metal products, less transportation and refining costs. As a royalty, it refers to the fraction of net smelter return that a mine operator is obligated to pay the owner of the royalty agreement.

Mineral Deposit:

Rocks that contain economic amounts of minerals in them and that are expected to be profitably mined.

Tonne:

A metric ton. One tonne equals 1000 kg. It is equal to approximately 2,204.62 pounds.

Volcanogenic:

Of volcanic origin.

Gold Resource Corporation

28

Table of Contents

Volcanic domes:

These are mounds that form when viscous lava erupts slowly and piles up over the vent, rather than moving away as lava flow. The sides of most domes are very steep and typically are mantled with unstable rock debris formed during or shortly after dome emplacement. Most domes are composed of silica-rich lava, which may contain enough pressurized gas to cause explosions during dome extrusion.

Overview

The Company classifies its mineral properties into three categories: “Production Stage Properties,” “Development Stage Properties,” and “Exploration Stage Properties.” Production Properties are properties for which the Company operates a producing mine.

At the Don David Gold Mine, the Company currently has 100% interest in six properties, including two Production Stage Properties and four Exploration Stage Properties, located in Oaxaca, Mexico, along the San Jose structural corridor. Because of their proximity and relatively integrated operations, the Company collectively refers to the six properties as the Don David Gold Mine. The two Production Stage Properties are the only two of the six properties that make up the Don David Gold Mine that the Company considers to be independently material at this time. Please see Item 2. Properties – Don David Gold Mine for further discussion of the properties.

The Company also has 100% interest in the Back Forty Project, an advanced Exploration Stage Property, located in Menominee County, Michigan, USA. The Company does not consider the Back Forty Project to be independently material to the Company at this time. Please see Item 2. Properties – Back Forty Project for further discussion of the property.

Mineral Resources

Under S-K 1300, a “Mineral Resource” is defined as “a concentration or occurrence of material of economic interest in or on the Earth’s crust in such form, grade or quality, and quantity that there are reasonable prospects for economic extraction.” A “Mineral Resource” is a “reasonable estimate of mineralization, taking into account relevant factors such as cut-off grade, likely mining dimensions, location or continuity, that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in part, become economically extractable. It is not merely an inventory of all mineralization drilled or sampled.”

Gold Resource Corporation

29

Table of Contents

The following tables summarize the estimated Mineral Resources at DDGM and at Back Forty:

Don David Gold Mine – Summary of Gold, Silver, and Base Metal Mineral Resources
at December 31, 2024(1)(2)(3)(4)(5)

Description

KTonnes

Gold
g/t

Silver
g/t

Copper
%

Lead
%

Zinc
%

Cut-off grade

Metallurgical Recovery (%)

Arista

$/Tonne

Au

Ag

Cu

Pb

Zn

Measured Mineral Resources

4

0.54

79.40

0.31

1.35

5.14

120

80

91

74

72

83

Indicated Mineral Resources

201

1.02

164.52

0.29

0.94

2.54

120

80

91

74

72

83

Measured + Indicated

205

1.01

163.00

0.29

0.95

2.59

120

80

91

74

72

83

Inferred Mineral Resources

1,838

1.03

100.33

0.23

1.29

3.62

120

80

91

74

72

83

Alta Gracia

AuEq/tonne

Measured Mineral Resources

27

0.81

370.58

-

-

-

2.35

85

72

-

-

-

Indicated Mineral Resources

141

0.49

269.96

-

-

-

2.35

85

72

-

-

-

Measured + Indicated

168

0.54

286.13

-

-

-

2.35

85

72

-

-

-

Inferred Mineral Resources

148

0.62

259.61

-

-

-

2.35

85

72

-

-

-

Notes on Mineral Resources:

1. Mineral Resources estimated at December 31, 2024 are based on $2,200/oz for Gold, $28.00/oz for Silver, $4.52/pound for Copper, $1.00/pound for Lead and $1.22/pound for Zinc. The metal prices used are based on conservative estimates of the average median consensus prices for each of the three years starting 2025 through 2027 as provided by Bloomberg’s consensus commodity price forecast as at January 7, 2025. The 2027 consensus was used for the remaining life of mine.
2. The definitions for Mineral Resources in S-K 1300 were followed, which are consistent with definitions outlined by the Canadian Institute of Mining’s Definition Standards for Mineral Resources & Mineral Reserves (“CIM (2014)”) and are exclusive of Mineral Reserves.
3. The Arista Mine cut-off grade applied to Mineral Resources estimated at December 31, 2024 is $120/tonne NSR.
4. Mineral Resources that are not Mineral Reserves are materials of economic interest with reasonable prospects for economic extraction.
5. Rounding of tonnes, average grades, and contained ounces may result in apparent discrepancies with total rounded tonnes, average grades, and total contained ounces.

For comparison, as at December 31, 2023, DDGM’s estimates of Mineral Resources, exclusive of Mineral Reserves, are provided in the below table.

Don David Gold Mine – Summary of Gold, Silver, and Base Metal Mineral Resources

at December 31, 2023(1)(2)(3)(4)(5)

Description

KTonnes

Gold
g/t

Silver
g/t

Copper

%

Lead

%

Zinc

%

Cut-off grade

Metallurgical Recovery (%)

Arista

$/Tonne

Au

Ag

Cu

Pb

Zn

Measured Mineral Resources

68

1.49

109.69

0.42

1.42

4.39

100

80

91

77

74

84

Indicated Mineral Resources

489

1.10

131.89

0.28

1.33

4.25

100

80

91

77

74

84

Measured + Indicated

557

1.15

129.16

0.29

1.34

4.26

100

80

91

77

74

84

Inferred Mineral Resources

1,418

1.01

107.87

0.21

1.31

3.68

100

80

91

77

74

84

Alta Gracia

AuEq/tonne

Measured Mineral Resources

27

0.81

370.58

-

-

-

2.35

85

72

-

-

-

Indicated Mineral Resources

141

0.49

269.96

-

-

-

2.35

85

72

-

-

-

Measured + Indicated

168

0.54

286.13

-

-

-

2.35

85

72

-

-

-

Inferred Mineral Resources

148

0.62

259.61

-

-

-

2.35

85

72

-

-

-

Notes on Mineral Resources:

1. Mineral Resources estimated at December 31, 2023 are based on $1,800/oz for Gold, $23.30/oz for Silver, $3.90/pound for Copper, $0.95/pound for Lead and $1.25/pound for Zinc. The metal prices used are based on the average median consensus prices for years 2024 through 2028 as provided by the Bank of Montreal in June 2023. The median price was based on the price estimates contributed by 38 participating financial institutions. These prices are also very similar to the three-year average.
2. The definitions for Mineral Resources in S-K 1300 were followed, which are consistent with definitions outlined CIM (2014) and are exclusive of Mineral Reserves.
3. The Arista Mine cut-off grade applied to Mineral Resources estimated at December 31, 2023 is $100/tonne NSR.
4. Alta Gracia Mineral Reserves reported December 31, 2022 have been downgraded to Mineral Resources for the December 31, 2023 estimate.
5. Rounding of tonnes, average grades, and contained ounces may result in apparent discrepancies with total rounded tonnes, average grades, and total contained ounces.

Gold Resource Corporation

30

Table of Contents

During 2024, the Company performed a comprehensive review of its geological database and interpretation of the mineralization, the block models derived from them, and ultimately the mine plan to ensure more reliable and accurate mine planning and forecasting. In addition, metallurgy, mining methods, ground control, and other parameters were reviewed. As a result of this review, measured and indicated Mineral Resources decreased from approximately 0.73 million tonnes at December 31, 2023 to approximately 0.37 million tonnes at December 31, 2024. The primary factor for this decrease was the change in the NSR cutoff grade from $100/tonne to $120/tonne resulting in a decrease of 0.89 million tonnes. These reductions were partially offset by a 0.02 million tonne increase due to higher metal prices and the conversion and addition of 0.51 million tonnes of inferred Mineral Resource to measured and indicated Mineral Resource, attributed to the 2024 infill and step-out drilling program. The total inferred Mineral Resources increased from approximately 1.56 million tonnes at December 31, 2023 to approximately 1.99 million tonnes at December 31, 2024. The increase in inferred Mineral Resources was mainly due to the successful 2024 infill and step-out drilling program at the Three Sisters vein system along with optimized mine planning.

More information regarding the assumptions, methodologies, and procedures utilized in the estimation of Mineral Resources at DDGM can be found in the updated Don David Gold Mine Technical Report Summary, effective as of December 31, 2024, which is incorporated by reference as Exhibit 96.2 to this Form 10-K (the “DDGM Technical Report Summary”).

Back Forty Project – Summary of Gold, Silver, and Base Metal Mineral Resources

at December 31, 2023 and 2024(1) (2) (3) (4)

Description

KTonnes

Gold
g/t

Silver
g/t

Copper %

Lead %

Zinc %

Cut-off grade

Back Forty - Open Pit

$/Tonne

Measured Mineral Resources

-

-

-

-

-

-

-

Indicated Mineral Resources

9,360

2.41

28.06

0.36

-

3.74

33

Measured + Indicated

9,360

2.41

28.06

0.36

-

3.74

33

Inferred Mineral Resources

566

2.70

48.84

0.35

-

1.31

33

Back Forty - Underground

AuEq/tonne

Measured Mineral Resources

-

-

-

-

-

-

-

Indicated Mineral Resources

5,137

1.86

24.05

0.41

-

2.65

73

Measured + Indicated

5,137

1.86

24.05

0.41

-

2.65

73

Inferred Mineral Resources

627

2.00

26.10

0.37

-

2.89

73

Notes on Mineral Resources:

1.

Mineral Resources estimated at December 31, 2023 and 2024 are based on $1,800/oz for Gold, $23.30/oz for Silver, $3.90/pound for Copper, $0.95/pound for Lead and $1.25/pound for Zinc. The metal prices used are based on the average median consensus prices for years 2024 through 2028 as provided by the Bank of Montreal in June 2023. The median price was based on the price estimates contributed by 38 participating financial institutions. These prices are also very similar to the three-year average.

2.

The definitions for Mineral Resources in S-K 1300 were followed, which are consistent with definitions outlined by CIM (2014) and are exclusive of Mineral Reserves.

3.

Mineral Resources that are not Mineral Reserves are materials of economic interest with reasonable prospects for economic extraction.

4.

Rounding of tonnes, average grades, and contained ounces may result in apparent discrepancies with total rounded tonnes, average grades, and total contained ounces.

Following the completion of the optimization work for the Back Forty Project, the Company published an update on indicated and inferred Mineral Resources in the Back Forty Project Technical Report Summary released in October 2023. A measured Mineral Resource estimate or a Mineral Reserve estimate have yet to be established for the Back Forty Project.

More information regarding the assumptions, methodologies, and procedures utilized in the estimation of Mineral Resources at Back Forty can be found in the Back Forty Project Technical Report Summary incorporated by reference as Exhibit 96.1 to this Form 10-K.

Gold Resource Corporation

31

Table of Contents

Mineral Reserves

Under S-K 1300, a “Mineral Reserve” is defined as “an estimate of tonnage and grade or quality of measured and indicated Mineral Resources that, in the opinion of the qualified person, can be the basis of an economically viable project.”

The following tables summarize the estimated Mineral Reserves at DDGM:

Don David Gold Mine – Summary of Gold, Silver and Base Metal Mineral Reserves
at December 31, 2024 (1) (2) (3) (4)

  

Recovery

Description

Tonnes

   

Gold
g/t

  

Silver
g/t

  

Cu (%)

Pb (%)

Zn (%)

  

Cut-off Grade (2)

% Au

% Ag

% Cu

% Pb

% Zn

Don David Gold Mine

Arista Mine (2)

$/Tonne

Proven Mineral Reserves

60,000

2.25

276

0.24

1.20

3.14

120

79.5

91.4

73.9

71.8

83.2

Probable Mineral Reserves

1,057,000

1.21

136

0.17

0.70

2.19

120

79.5

91.4

73.9

71.8

83.2

Arista Mine Total

1,117,000

1.26

143

0.18

0.73

2.24

Alta Gracia Mine (3)

AuEq/tonne

Proven Mineral Reserves

-

-

-

-

-

-

-

-

-

Probable Mineral Reserves

-

-

-

-

-

-

-

-

-

Alta Gracia Mine Total

-

-

-

Don David Gold Mine Total

1,117,000

1.26

143

Notes on Mineral Reserves:

1. Mineral Resources estimated at December 31, 2024 are based on $2,200/oz for Gold, $28.00/oz for Silver, $4.52/pound for Copper, $1.00/pound for Lead and $1.22/pound for Zinc. The metal prices used are based on conservative estimates of the average median consensus prices for each of the three years starting 2025 through 2027 as provided by Bloomberg’s consensus commodity price forecast as at January 7, 2025. The 2027 consensus was used for the remaining life of mine.
2. The Arista Mine NSR cut-off grades for Mineral Reserves are $120/tonne.
3. Alta Gracia Mineral Reserves reported at December 31, 2022 have been downgraded to Mineral Resources for the December 31, 2023 and 2024 estimates.
4. Rounding of tonnes, average grades, and contained ounces may result in apparent discrepancies with total rounded tonnes, average grades, and total contained ounces.

Gold Resource Corporation

32

Table of Contents

For comparison, as at December 31, 2023, DDGM’s estimates of Mineral Reserves are presented in the table below.

Don David Gold Mine – Summary of Gold, Silver and Base Metal Mineral Reserves
at December 31, 2023 (1) (2) (3) (4)

  

Recovery

Description

Tonnes

   

Gold
g/t

  

Silver
g/t

  

Cu (%)

Pb (%)

Zn (%)

  

Cut-off Grade (2)

% Au

% Ag

% Cu

% Pb

% Zn

Don David Gold Mine

Arista Mine (2)

$/Tonne

Proven Mineral Reserves

90,000

2.91

176

0.50

1.65

5.02

120

79.5

91.1

76.6

73.9

83.9

Probable Mineral Reserves

973,000

1.14

126

0.23

0.84

2.50

120

79.5

91.1

76.6

73.9

83.9

Arista Mine Total

1,063,000

1.29

131

0.26

0.91

2.71

Alta Gracia Mine (3)

AuEq/tonne

Proven Mineral Reserves

-

-

-

-

-

-

-

-

-

Probable Mineral Reserves

-

-

-

-

-

-

-

-

-

Alta Gracia Mine Total

-

Don David Gold Mine Total

1,063,000

1.29

131

Notes on Mineral Reserves:

1. Mineral Reserves estimated at December 31, 2023 are based on $1,800/oz for Gold, $23.30/oz for Silver, $3.90/pound for Copper, $0.95/pound for Lead and $1.25/pound for Zinc. The metal prices used are based on the average median consensus prices for years 2024 through 2028 as provided by the Bank of Montreal in June 2023. The median price was based on the price estimates contributed by 38 participating financial institutions. These prices are also very similar to the three-year average.
2. The Arista Mine NSR cut-off grades for Mineral Reserves are $120/tonne.
3. Alta Gracia reserves reported December 31, 2022 have been downgraded to resources for the December 31, 2023 estimate.
4. Rounding of tonnes, average grades, and contained ounces may result in apparent discrepancies with total rounded tonnes, average grades, and total contained ounces.

Proven and probable Mineral Reserves increased from 1.06 million tonnes at December 31, 2023 to 1.12 million tonnes at December 31, 2024. This increase was primarily due to the reclassification of 0.43 million tonnes from Inferred Mineral Resources to proven and probable Mineral Reserves due to the successful results of the 2024 infill drilling program at the Three Sisters vein system and detailed engineering. There was no appreciable conversion of measured and indicated Mineral Resources to proven and probable Mineral Reserves in 2024. Mineral Reserves were depleted by 0.35 million tonnes from 2024 mining activities and by an additional 0.03 million tonnes resulting from engineering deductions at the Arista Mine.

More information regarding the assumptions, methodologies, and procedures utilized in the estimation of Mineral Reserves can be found in the DDGM Technical Report Summary incorporated by reference as Exhibit 96.2 to this Form 10-K.

Gold Resource Corporation

33

Table of Contents

Don David Gold Mine

All of the properties that make up the Don David Gold Mine are located in Oaxaca, Mexico, in what is known as the San Jose structural corridor, which trends 70 degrees north-west. The Company’s properties comprise 551 continuous square kilometers of ground along a 55 kilometer structural corridor, encompassing three historic mining districts in Oaxaca. The map below shows the general location of the properties:

Graphic

The Company was granted concessions from the Mexican federal government to explore and mine the properties in Mexico. Please see below Item 2. Properties—Mining Concessions and Regulations in Mexico below for additional information. The Company holds certain properties as the concession holder and lease other properties from third parties. The Company is required to pay concession fees to the Mexican government to maintain its interest in these concessions, and it pays concession fees for all the mineral properties, including those which are subject to the third-party lease.

Gold Resource Corporation

34

Table of Contents

The table below details information related to the mining concessions that comprise the properties in Oaxaca, Mexico:

Total Number of Concessions

Total Size

Acquisition Date Range

2024 Maintenance Fees Paid

 

(in hectares)

Production Stage Properties:

Arista

18

24,372

2002 to 2016

$

579,801

Alta Gracia

3

5,175

2008

123,332

Total Production Stage Properties:

29,547

$

703,133

Exploration Stage Properties:

Rey

4

2,335

2002 to 2009

$

55,643

Chamizo

2

19,758

2011 to 2013

470,852

Margaritas

1

925

2002

22,044

Fuego

1

2,554

2013

60,865

Total Exploration Stage Properties:

25,572

$

609,404

Total:

29

55,119

$

1,312,537

Production Stage Properties

Arista & Alta Gracia Mines

History: The Arista and Alta Gracia Mines are in the regional Tlacolula mining district within Oaxaca State, in southern Mexico. According to the Mexican Geological Survey, the Servicio Geologico Mexicano (“SGM”), mining activity was initiated in the early 1880s in the Tlacolula mining district, producing some 300,000 gold and silver ounces from an ore shoot in the La Leona mine. However, no separate amounts of production were reported for each metal. According to the SGM, in 1892, two smelters were built and operated (Magdalena Teitipac and O’Kelly) near the village of Tlacolula for processing ores from the Alta Gracia La Soledad, San Ignacio y Anexas, La Leona, La Victoria, and San Rafael silver mines. Subsequently, in 1911, Mr. Sken Sanders investigated the Totolapam mining region with a particular interest in the Margaritas mine. Most of these historical mines are within DDGM’s mining concessions.

While the DDGM Arista Mine and Alta Gracia Mine are in the smaller mining subdistricts of San Jose de Gracia and Alta Gracia, respectively, only small-scale artisanal mining was historically conducted in these areas’ subdistricts. No reliable production records exist for the historic production performed in the Arista and Alta Gracia Project areas.

Arista Mine

Background: The Arista Mine currently holds 18 mining concessions aggregating 24,372 hectares.

In 2002, three initial concessions were leased from a third-party. Two of the concessions are part of the Arista Mine, while the third concession comprises the Margaritas property. In November 2023, the royalties related to the lease agreement were renegotiated, reducing the net smelter return royalty from 4% to 3% for production sold in the form of gold/silver doré, and from 5% to 3% for production sold in concentrate form. Subject to meeting minimum exploration requirements, there is no expiration term for the lease. The Company may terminate the lease at any time upon written notice to the lessor, and the lessor may terminate it if the Company fails to fulfill any of its obligations, which primarily consist of paying the appropriate royalty to the lessor.

In August 2003, initial drilling and exploration programs commenced at the Arista Mine. By the end of 2024, the Company had drilled a total of 1,881 core holes (both surface and underground) totaling 495,032 meters and 166 reverse circulation holes totaling 14,367 meters, for a grand total of 2,047 holes totaling 509,399 meters.

Gold Resource Corporation

35

Table of Contents

Graphic

DDGM Ore Terminal

In 2010, additional concessions were acquired from a third-party at no additional cost, which are subject to a 2% royalty. The Company filed for and received additional concessions from the Mexican government which are also not part of the concessions leased or acquired from the third-party. Two concessions are considered within the Arista Mine.

Location and Access: The Arista Mine is located in the Sierra Madre del Sur Mountains of southern Mexico in the central part of the State of Oaxaca. The property is located along a major paved highway approximately 120 kilometers southeast of Oaxaca City, the state’s capital city. The property is approximately four kilometers northwest from the village of San Jose de Gracia. The Company has constructed gravel and paved roads from the village to the mine and processing facility, which provide adequate access to the property.

The climate of the Arista Mine area is dry and warm to very warm with most rainfall occurring in June through September, and annual precipitation averaging 423.7 mm. The average yearly temperature is 26.6 degrees centigrade. The area is very rocky with arid vegetation. Subsistence farming occurs, and the main agricultural crop is agave cactus that is cultivated for the production of mezcal.

Gold Resource Corporation

36

Table of Contents

Graphic

Geology and Mineralization: The Arista Mine is located in the San Jose de Gracia Mining District in Oaxaca. Multiple volcanic domes of various scales, and likely non-vented intrusive domes, dominate the district geology. These volcanogenic features are imposed on a pre-volcanic basement of sedimentary rocks. Gold and silver mineralization in this district is related to the manifestations of this classic volcanogenic system and is considered epithermal in character.

Historically, the Company has produced ore from two locations on the Arista Mine, the open pit mine and the underground mine. The open pit mineralization was considered low sulfidation epithermal-type consisting primarily of gold with some silver and no base metals. In 2011, mining activities were completed in the open pit, and it is now being backfilled and reclaimed by filtered dry stack tailings deposition. The Arista underground mine mineralization is considered intermediate epithermal-type consisting of gold, silver, copper, lead, and zinc. The host rock in the Arista vein system is primarily andesite.

Facilities: The processing facility and other infrastructure at the Arista Mine was constructed for approximately $35.0 million in 2009, and the processing facility was expanded in 2012 and 2013 for an additional $23.0 million. The flotation mill expansion, completed at the end of 2013, increased the number of flotation cells, added a second ball mill to allow for additional processing capacity, and added a Knelson gravity concentrator. In 2014, a doré processing facility was completed. In 2019, an increase in pumping capacity to the cyclones in the plant resulted in plant capacity increasing to nominal 2,000 tonnes per day. The DDGM processing facility is flexible in its ability to process several types of mineralization. It has a differential flotation section capable of processing polymetallic ore and producing up to three separate concentrate products. The facility also has an agitated leach circuit capable of producing gold and silver doré.

The Company obtained water rights from the Mexican government for an amount of water that it believes is sufficient to meet its operating requirements and pump it approximately five kilometers to the site from a permitted well located near the Totolapam River.

Gold Resource Corporation

37

Table of Contents

Additional improvements at the site include electrical power lines connecting to the Mexican national power grid, installation of backup diesel generation power plants and switch gear, paving a three-kilometer section of the road from the mine to the processing facility, construction of a surface maintenance garage and fuel station, construction of haul roads from the mine site to the processing facility, office space at the processing facility, an assay lab, an exploration office, tailings impoundment facilities and lift, a paste fill plant, mine camp facilities, the filtration plant, the dry stack facility, and other infrastructure.

Exploration Activities: In 2024, an underground diamond drilling campaign at the Arista Mine was successfully executed, completing 87 diamond drill holes totaling 12,761 meters. This program included 63 underground ore-control drill holes, totaling 4,974 meters, focused on upgrading Mineral Resources to Mineral Reserves in multiple veins within the Arista and Switchback vein systems. Additionally, 22 underground infill drill holes, totaling 7,348 meters, were completed to upgrade previously defined inferred Mineral Resources to measured and indicated Mineral Resources. This effort delineated and better defined multiple sub-parallel veins within the Three Sisters and North Arista vein systems. Drilling upgraded several high-grade zones up- and down-dip, as well as along strike from existing workings, both within and peripheral to existing Mineral Resources.

Underground expansion drilling activities at the Arista Mine during 2024 included the completion of one additional drill hole totaling 324 meters. This expansion drilling aimed to test the up-dip extent of the Sadie 2 vein within the Three Sisters vein system, successfully identifying additional inferred Mineral Resources an additional 80 meters vertically above previously defined limits. Additionally, although classified as infill, two of the drill holes confirmed the up-dip mineralized extensions of the Sandy 1 and Sandy 2 veins, approximately 40 meters up-dip and to the north-west of previous drilling. These newly identified mineralized up-dip extensions of the Three Sisters vein system remain open. Additionally, one geo-technical hole was drilled totaling 115 meters, in support of the construction of a ventilation raise. On August 1, 2024, infill and expansion drilling was suspended to conserve cash; however, diamond drilling for ore-control purposes at the Arista Mine continued uninterrupted throughout the year.

Both the Arista and Switchback vein systems extend over 1.5 kilometers in strike length and remain open along strike, as well as up- and down-dip. The Three Sisters vein system, currently comprising 10 veins, including the recently discovered Gloria vein, is located at the northern limit of the Arista Mine underground workings, between the Switchback and Arista vein systems. The Three Sisters vein system currently has a defined strike length of over 750 meters, and remains open along strike, as well as up- and down-dip. Infill and expansion drilling in 2025 will continue to focus on expanding resources in the Three Sisters vein system as well as in the Splay 31 vein in the northern extension of the Arista vein system.

Surface exploration activity during 2024 focused on evaluating and prioritizing advanced-stage projects within the 551 km2 land package controlled by DDGM surrounding the Arista Mine. This included re-processing historical geologic information consisting of mapping, sampling, and geophysics and drill data from various projects such as Rey, Alta Gracia, Margaritas, Chamizo, and Jabali. Additionally, prospects near the Arista Mine were re-evaluated for their near-term potential, aiming to define additional near-mine drill targets. The Company’s continued investment in exploration efforts demonstrates its commitment to long-term investment in Oaxaca, Mexico.

Please see Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations for additional information concerning mining operations at the Alta Gracia project.

Alta Gracia Mine

Background: In 2008, the Company was granted claims adjacent to the Margaritas property in the Alta Gracia Mining District by filing three mining concessions known as the David Fracción I, the David Fracción II, and La Herradura, totaling 5,175 hectares.

As of December 31, 2016, proven and probable Mineral Reserves had been established for the Mirador vein at the Alta Gracia Mine. In July 2017, mine development reached the economic ore zone of the Mirador vein, and mining began.

Gold Resource Corporation

38

Table of Contents

Location and Access: The Alta Gracia project is approximately 20 kilometers northeast of the village of San Pedro Totalapam, in the Municipality of San Pedro Totolapam. Access to the project is by a gravel road that departs the paved highway approximately 13 kilometers east of the village of San Pedro Totalapam. The haulage distance by road from Alta Gracia to the DDGM processing facility is approximately 32 kilometers.

Graphic

Geology and Mineralization: The sedimentary and volcanic units mapped at Alta Gracia are similar to those observed at the Arista Mine. The district is dominated by tertiary-age rhyolite flows and tuffs, which are underlain by andesite flows and tuffs. Granodiorite and felsic intrusives are observed to crop out to the north and east of the Mirador vein. Known vein occurrences at Alta Gracia are mainly hosted in andesite and rhyolite. The veins at Alta Gracia are considered low sulfidation epithermal mineralization with economic values only for gold and silver.

Facilities: During 2016, the Company received the operating permit to commence production from the Mirador vein at Alta Gracia. In 2017, two mine portals were developed to provide access to the Mirador vein. Mine site offices and a mobile equipment maintenance shop were established. Additionally, a diesel power generation plant, a compressed air system, and a mine water pumping station were developed and put into service. In 2018, old workings were improved to create a second access to the vein system called Independencia. The portal for this access is located approximately 500 meters southwest of the Mirador portal. Development was established to access the mineralization, delineated by drill campaigns completed during 2018 and 2019 on the Independencia vein.

Ore from the Alta Gracia Mine, primarily silver ore, was transported by contracted haul trucks to and processed at the agitated leach plant at the DDGM processing facility, with the final product being doré.

Exploration Activities: In 2024, surface exploration activity over the Alta Gracia property focused on reviewing and interpreting results from previous surface mapping and soil geochemical sampling campaigns. These recent campaigns were conducted in the Aguacatillo prospect, located to the south-west, west, and north-west of the Independencia and Mirador vein systems, as well as in the La Fundación prospect area, situated immediately south-southeast of the Independencia and Mirador vein systems.

Gold Resource Corporation

39

Table of Contents

Both programs successfully identified several gold- and silver-in-soil anomalous zones. These findings will guide follow-up detailed mapping and additional geochemical sampling to pinpoint potential near-mine targets for future surface drilling.

Exploration Properties

Margaritas Property

The Margaritas property is made up of the La Tehuana concession, which is approximately 925 hectares, located within the 55-kilometer San Jose structural corridor and adjacent to the Arista Mine.

In 2024, the Company continued to review results from previous surface drilling, surveying, detailed geological mapping, and rock chip channel sampling for the Margaritas property. The Company completed the work required to maintain the claims during 2024, with work focused on analysis of spectral and geophysical information to identify new targets of interest. The Company expects to target a similar amount of work in 2025, along with identifying opportunities to strengthen its relationship in the local communities.

Chamizo Property

In June 2011, the Company acquired the Chamizo exploration concession from the Mexican government, covering approximately 17,898 hectares. In March 2013, the Company acquired the San Pedro Fraccion 2 concession from Almaden Minerals, Ltd. (“Almaden”), consisting of approximately 1,860 hectares including the Cerro Colorado (also known as Jabali) prospect. The Cerro Colorado (Jabali) prospect is surrounded by the Chamizo concession, and the Company includes it as part of the Chamizo property. The Chamizo Property is adjacent to the Alta Gracia property. Any future production from the San Pedro Fraccion 2 concession is subject to a 2% net smelter return royalty in favor of Almaden.

In 2022, surface mapping and geochemical sampling commenced in the Jabali prospect area within the San Pedro Fraccion 2 concession. Results of this work were reviewed and analyzed in 2023 to plan further detailed follow-up geologic mapping and target evaluation. Different targets within the Chamizo property as a whole will continue to be evaluated in 2025, while also focusing on identifying opportunities to strengthen relationships in the local communities to facilitate future work.

Fuego Property

In March 2013, the Company acquired the San Pedro Fraccion 1 concession from Almaden, consisting of approximately 2,554 hectares including the Fuego property. Any future production from this concession is subject to a 2% net smelter return royalty in favor of Almaden. The Fuego property, located south of the Alta Gracia and Chamizo properties, was included in the property-wide airborne geophysical survey conducted in 2013. Geologic mapping and surface sampling have been conducted on the Fuego property, meeting the necessary work requirements to maintain the concession. While the Company does not anticipate significant exploration activities at Fuego in 2025, it plans to perform the required work to maintain the concession.

Rey Property

The Rey property consists of concessions on the far north-west end of the 55-kilometer San Jose structural corridor in the State of Oaxaca known as El Rey, El Virrey, La Reyna, and El Marquez, totaling approximately 2,335 hectares. The Company acquired the El Virrey concession from a third-party, which is subject to a 2% net smelter return royalty. The Company obtained the remaining concessions by staking claims and filing for concessions with the Mexican government.

The Rey property is located approximately 64 kilometers by road from the Arista Mine. Currently, there is no plant or equipment on the Rey property. If exploration proves successful, any ore extraction will likely require an underground mine, with the ore to be trucked to the DDGM facility for processing.

Gold Resource Corporation

40

Table of Contents

To date, the Company has drilled 48 core holes, totaling 5,273 meters, at the Rey property. In early 2012, the Company completed a small amount of work to finish refurbishing and extending an existing shaft on the property to facilitate underground exploratory drilling. However, work ceased later that year following a request to obtain additional approvals from local community agencies.

In 2025, the Company plans to continue working with local agencies to understand and address any concerns of the community, but otherwise the Company has no assurance that exploration activities will resume in the near term. Once community support is secured, the Company plans to conduct follow-up drilling and exploration based on the 2007 and 2008 drilling results. Meanwhile, the Company will complete the necessary work to maintain the claims in good standing.

Mining Concessions and Regulations in Mexico

Mineral rights in Mexico belong to the Mexican federal government and are administered pursuant to Article 27 of the Mexican Constitution. All of the mining concessions are exploitation concessions, which may be granted or transferred to Mexican citizens and corporations. The Company’s leases or concessions are held by the Mexican subsidiary DDGM. Exploitation concessions have a term of 50 years and can be renewed for another 50 years. Concessions grant the Company the right to explore and exploit all minerals found in the ground. Maintenance of concessions requires the semi-annual payment of mining duties (due in January and July) and the performance of assessment work, on a calendar year basis, with assessment work reports required to be filed in the month of May for the preceding calendar year. The amount of mining duties and annual assessments are set by regulation, may increase over the life of the concession, and include periodic adjustments for inflation. Failure to pay the mining duties can lead to the cancelation of the relevant concession.

Mexican mining law does not require payment of finder’s fees to the government, except for a discovery premium in connection with national Mineral Reserves, concessions and claims, or allotments contracted directly from the Mexican Geological Survey. None of the claims held by DDGM are under such a discovery premium regime.

Ejido Lands and Surface Right Acquisitions in Mexico

Surface lands within DDGM are Ejido lands (agrarian cooperative lands granted by the federal government to groups of Campesinos pursuant to Article 27 of the Mexican Constitution of 1917). Prior to January 1, 1994, Ejidos could not transfer Ejido lands into private ownership. Amendments to Article 27 of the Mexican Constitution in 1994 now allow individual property ownership within Ejidos and allow Ejidos to enter into commercial ventures with individuals or entities, including foreign corporations. The Company has an agreement with the local San Pedro Totolapam Ejido, allowing exploration and exploitation of mineralization at the Arista Mine and some of the surrounding properties.

Mexican law recognizes mining as a land use generally superior to agriculture. However, the law also recognizes the rights of the Ejidos to compensation in the event mining activity interrupts or discontinues their use of the agricultural lands. Compensation is typically made in the form of a cash payment to the holder of the agricultural rights. The amount of such compensation is generally related to the perceived value of the agricultural rights as negotiated in the first instance between the Ejidos and the owner of the mineral rights. If the parties are unable to reach an agreement on the amount of the compensation, the decision can be referred to the government.

The Company has established surface rights agreements with the San Pedro Totolapam Ejido and the individuals impacted by the proposed operations which allow disturbance of the surface where necessary for the exploration activities and mining operations.

Office Facilities

The Company constructed an administrative office building adjacent to the DDGM processing facility and a mine office adjacent to the Arista Mine portal. The Company also leases approximately 3,000 square feet of office space in Oaxaca City, Oaxaca. The lease commenced in 2012 and was renewed in December 2024 through the end of 2027.

Gold Resource Corporation

41

Table of Contents

Back Forty Project

The Back Forty Project is an advanced Exploration Stage Property located in Menominee County, Michigan, USA in the mineral rich Penokean Volcanic Belt. The property is made up of approximately 1,304 hectares (3,222 acres) of private and public (State of Michigan) mineral lands. The Back Forty Project is centered at latitude 46 degrees 27 North and longitude 87 degrees 51 West. Because of the exploratory nature of the property, the Company does not currently consider the Back Forty Project to be independently material to the Company.

Graphic

Background: On December 10, 2021, the Company successfully completed the acquisition of all the issued and outstanding common shares of Aquila. Aquila’s principal asset is its 100% interest in the Back Forty Project located in Menominee County, Michigan, USA. The Back Forty Project has a polymetallic (gold, silver, copper, lead, and zinc) Volcanogenic Massive Sulfide deposit. The Back Forty Project controls surface and mineral rights through ownership, leases with the State of Michigan, and royalties with private parties.

Optimization work related to the metallurgy and the economic model for the Back Forty Project was completed, and the Company released the Back Forty Project Technical Report Summary in October 2023. Results of the work indicate a more robust economic project with no planned impacts to wetlands that is more protective of the environment, which should facilitate a successful mine permitting process. The Board continues to evaluate options that could lead to the development of the Back Forty Project. Please see Item 2. Properties for additional information.

Permitting: The State of Michigan governs and regulates the permitting process as it relates to the Back Forty Project.

Community: Tribal engagement has been very important to the Back Forty Project, especially considering the cultural resources near the site. Outreach to local Tribes, including the Menominee Indian Tribe of Wisconsin, began as early as June of 2010.

Gold Resource Corporation

42

Table of Contents

Aquila conducted extensive archeological studies throughout the affected and unaffected areas. As agreed with the authorities, Aquila identified areas for permanent protection and established appropriate buffers.

Office Facilities: In Michigan, the Company owns and operates an administrative office building in Stephenson, MI and another field office close to the location of the potential future mine facilities.

ITEM 3.LEGAL PROCEEDINGS

In February 2020, a local Ejido community (who claim to be an indigenous community) filed an injunction against the Mexican federal government through which they demanded the cancelation of several concession titles, including concessions currently granted to DDGM. The federal government ordered a suspension to prevent work related to excavating, drilling, opening tunnels, and exploiting the Mineral Resources on the surface and subsoil of the concessions named in the injunction in the lands of the indigenous community. Presently, DDGM does not perform such works in the named concessions in lands of the indigenous community. The lawsuit filed in February 2020 at the First District Courthouse in the state of Oaxaca remains under review by the courts.

ITEM 4.MINE SAFETY DISCLOSURES

Not applicable.

Gold Resource Corporation

43

Table of Contents

PART II

ITEM 5.

MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS, AND ISSUER PURCHASES OF EQUITY SECURITIES

Market Information

The Company’s common stock trades on the NYSE American under the symbol “GORO”.

On April 4, 2025, there were 120,442,686 shares of Gold Resource Corporation, which were held by approximately 200 holders of record.

Transfer Agent

Computershare Trust Company, N.A. is the transfer agent for the common stock. The principal office of Computershare is located at 6200 S. Quebec St., Greenwood Village, CO 80111, and its telephone number is (303) 262-0600. Correspondence should be mailed to P.O. Box 43078, Providence, RI 02940-3078 or couriered to 150 Royall St., Suite 101, Canton, MA 0202.

Dividend Policy

Approximately $123.0 million in dividends have been returned to shareholders since commercial production began at DDGM in July 2010. As of February 13, 2023, to conserve cash for future development and exploration, thus maximizing shareholder value, the Company suspended the quarterly dividend payments until such time that it may become practicable to reinstate them.

ITEM 6.

RESERVED.

Gold Resource Corporation

44

Table of Contents

ITEM 7.

MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Except for the historical information, the following discussion contains forward-looking statements that are subject to risks and uncertainties. The Company cautions you not to put undue reliance on any forward-looking statements, which speak only as of the date of this report. See “Forward-Looking Statements” above. The Company’s actual future results or actions may differ materially from these forward-looking statements for many reasons, including but not limited to the risks described in “Item 1A. Risk Factors” and elsewhere in this annual report and other reports filed by the Company with the SEC. This discussion and analysis of the financial condition and results of operations should be read in conjunction with the audited consolidated financial statements and related notes included in this report and with the understanding that the actual future results may be materially different from what the Company currently expects.

Introduction

The Company is a mining company that pursues gold and silver projects that are expected to achieve both low operating costs and high returns on capital. DDGM holds six properties and includes mineral production primarily from the Arista underground mine. The Company produces gold and silver doré and metal concentrates which contain precious metals of gold and silver and base metals of copper, lead, and zinc.

The following discussion summarizes the results of operations for the two fiscal years ended December 31, 2024 and 2023 and the financial condition as of December 31, 2024 and 2023, with a particular emphasis on the year ended December 31, 2024.

The discussion also presents certain non-GAAP financial measures that are important to management in its evaluation of the operating results and which are used by management to compare the performance with what the Company perceives to be peer group mining companies and is relied on as part of management’s decision-making process. Management believes these measures may also be important to investors in evaluating the Company’s performance. For a detailed description of each of the non-GAAP financial measures, please see the discussion under Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations below.

In the financial statements, the Company reports the sale of all precious and base metals as revenue, and it periodically reviews revenue streams to ensure that this treatment remains appropriate. The Company considers precious metals to be the long-term primary driver of its economic decisions and believes that base metals are secondary products for non-GAAP financial measures.

Gold equivalent is determined by taking gold ounces produced and sold, plus silver ounces produced and sold, converted to gold equivalent ounces using the gold to silver average realized price ratio for the period.

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

45

Table of Contents

Results of Operations

Don David Gold Mine

Production Statistics

Mine activities during 2024 included development and ore extraction from the Arista Mine. The following table summarizes certain production statistics about the Don David Gold Mine for the periods indicated:

For the year ended December 31, 

2024

2023

Arista Mine

Milled

Tonnes Milled

356,633

458,111

Grade

Average Gold Grade (g/t)

1.13

1.73

Average Silver Grade (g/t)

92

85

Average Copper Grade (%)

0.26

0.36

Average Lead Grade (%)

1.10

1.52

Average Zinc Grade (%)

2.70

3.45

Recoveries

Average Gold Recovery (%)

76.6

79.6

Average Silver Recovery (%)

87.5

91.6

Average Copper Recovery (%)

68.5

77.5

Average Lead Recovery (%)

68.4

73.0

Average Zinc Recovery (%)

81.1

85.4

Combined

Tonnes Milled (1)

356,633

459,171

Tonnes Milled per Day (2)

1,277

1,436

Metal production

Gold (ozs.)

9,906

20,328

Silver (ozs.)

919,836

1,142,138

Copper (tonnes)

642

1,287

Lead (tonnes)

2,682

5,068

Zinc (tonnes)

7,805

13,513

Metal produced and sold

Gold (ozs.)

8,598

18,534

Silver (ozs.)

817,333

1,036,229

Copper (tonnes)

641

1,231

Lead (tonnes)

2,173

4,501

Zinc (tonnes)

6,286

10,954

Percentage payable metal (3)

Gold (%)

87

91

Silver (%)

89

91

Copper (%)

100

96

Lead (%)

81

89

Zinc (%)

81

81

(1) During the first quarter of 2023, tonnes milled includes 1,060 purchased tonnes, related to a collaborative initiative with a local community to ensure the proper environmental treatment and storage of the material.
(2) Based on actual days the mill operated during the period.
(3) The difference between what the Company reports as “ounces/tonnes produced” and “payable ounces/tonnes sold” is attributable to the difference between the quantities of metals contained in the concentrates it produces versus the portion of those metals actually paid for according to the terms of the sales contracts. Differences can also arise from inventory changes incidental to shipping schedules, or variances in ore grades and recoveries, which impact the amount of metals contained in concentrates produced and sold.

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

46

Table of Contents

Full-year 2024 compared to full-year 2023

Key drivers in the production and financial results for the year ended December 31, 2024, as compared to the same period in 2023, relate to the lower tonnes mined, lower metal grades, and lower recoveries. Although lower results were expected in accordance with the 2024 mine plan, additional factors included significant issues with equipment availability due to the age and condition of some of the critical mining equipment in use at the mine, and mechanical issues experienced within the mill and wet ore handling difficulties due to the unusually high rain fall this year.

Grades & Recoveries

During the year ended December 31, 2024, the Company processed ore with an average gold grade of 1.13 g/t, as compared to 1.73 g/t for the same period in 2023. Full-year average gold grade was approximately 35% lower than the prior year, due to approaching the extremities of the ore body and lower definition drilling. The average silver grade for the year ending 2024 increased 8% to 92 g/t. While silver grade increased, recovery was lower by 4%, compared to prior year, because of the unplanned mineralogy of the mineral, with higher silica-limestone contents. Recovery for gold declined 4% in 2024 due to lower grades. As shown in the DDGM Technical Report Summary, gold and silver grades are expected to decline over time, in line with the life of mine average shown in the Mineral Resources and Mineral Reserves tables. As grades decline, recoveries are expected to decline as well; however, there are other factors that may influence this general assumption.

The base metal average grades for the year ended December 31, 2024 were 0.26% for copper, 1.10% for lead, and 2.70% for zinc, compared to 0.36% for copper, 1.52% for lead, and 3.45% for zinc in 2023. Copper, lead and zinc grades for the year ended December 31, 2024 declined by 28%, 28% and 22%, respectively. Recoveries also decreased for all base metals due to the lower grades. As shown in the DDGM Technical Report, future recoveries and grades are expected to be in line with the life of mine average shown in the Mineral Resources and Mineral Reserves tables.

Production

For the year ended December 31, 2024, the Oaxaca operations processed 356,633 tonnes of ore, at an average rate of 1,277 daily tonnes, a decrease of 22% in material processed and a decrease of 11% in tonnes milled per day from prior year. 9,906 gold ounces and 919,836 silver ounces were produced, reflecting a decrease of 51% and 19%, respectively, from the same period in 2023. The production decrease for gold is directly related to the decrease in gold grade and recovery in 2024 as compared to the same periods in 2023. The production decrease for silver is also affected by the unplanned mineralogy of the mineral, with higher silica-limestone contents. Production for copper, lead, and zinc decreased by 50%, 47%, and 42%, respectively, for the year ended December 31, 2024, compared the same period in 2023. Production decreases are mostly related to the decrease in the remaining available mining areas in 2024 compared to the same periods in 2023.

Metals produced and sold is less than the amount of metals produced because a portion of the metals present in the materials shipped is withheld by the purchaser of concentrates under the terms of the Company’s sales contracts. The percentage payable metal—the amount of metal sold as a percent of the metal produced—were lower for all metals except copper for the year ended December 31, 2024, compared to same period in 2023, due to the minerology of the material mined.

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

47

Table of Contents

Sales Statistics

The following table summarizes certain sales statistics about the Don David Gold Mine operations for the periods indicated:

For the year ended December 31, 

2024

2023

Net sales (in thousands)

Gold

$

19,774

$

35,944

Silver

23,146

24,205

Copper

5,827

10,472

Lead

4,402

9,540

Zinc

17,313

29,225

Less: Treatment and refining charges

(5,706)

(11,630)

Realized and unrealized gain (loss) - embedded derivative, net

970

(28)

Total sales, net

$

65,726

$

97,728

Metal produced and sold

Gold (ozs.)

8,598

18,534

Silver (ozs.)

817,333

1,036,229

Copper (tonnes)

641

1,231

Lead (tonnes)

2,173

4,501

Zinc (tonnes)

6,286

10,954

Average metal prices realized (1)

Gold ($ per oz.)

$

2,354

$

1,955

Silver ($ per oz.)

$

28.75

$

23.68

Copper ($ per tonne)

$

9,223

$

8,513

Lead ($ per tonne)

$

2,034

$

2,158

Zinc ($ per tonne)

$

2,804

$

2,621

Gold equivalent ounces sold

Gold Ounces

8,598

18,534

Gold Equivalent Ounces from Silver

9,982

12,551

Total AuEq oz

18,580

31,085

(1) Average metal prices realized vary from the market metal prices due to final settlement adjustments from provisional invoices when they are settled. The average metal prices realized will therefore differ from the market average metal prices in most cases.

Full-year 2024 compared to full-year 2023

Metal Sold

During the year ended December 31, 2024, gold sales of 8,598 ounces, silver sales of 817,333 ounces, copper sales of 641 tonnes, lead sales of 2,173 tonnes, and zinc sales of 6,286 tonnes decreased by 54%, 21%, 48%, 52%, and 43%, respectively, as compared to the same period in 2023. Decreases were expected due to mine sequencing, but the lower amount of metals produced and available for sale were due to significant issues with equipment availability due to the age and condition of some of the critical mining equipment in use at the mine, and mechanical issues experienced within the mill and wet ore handling difficulties due to the unusually high rainfall during the wet season.

Average metal prices realized

During the year ended December 31, 2024, the average metal prices were $2,354 per ounce for gold, $28.75 per ounce for silver, $9,223 per tonne for copper, $2,034 per tonne for lead, and $2,804 per tonne for zinc. Compared to the same period in 2023, the average metal price for gold, silver, copper, and zinc increased by 20%, 21%, 8%, and 7% respectively, due to strong demand for these metals in the international markets. The average metal price for lead decreased by 6%.

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

48

Table of Contents

Graphic

Graphic

Graphic

Graphic

Graphic

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

49

Table of Contents

Financial Measures

The following table summarizes certain financial data of the Company for the periods indicated:

For the year ended December 31, 

2024

2023

 

Restated

(in thousands)

Doré and concentrate sales

$

70,462

$

109,386

Less: Treatment and refining charges

(5,706)

(11,630)

Realized/unrealized derivatives, net

970

(28)

Sales, net

65,726

97,728

Total cost of sales

86,217

102,952

Mine gross loss

(20,491)

(5,224)

Other costs and expenses, including taxes

36,010

18,920

Net loss

$

(56,501)

$

(24,144)

Full-year 2024 compared to full-year 2023

Sales, net

DDGM net sales of $65.7 million for the year ended December 31, 2024 decreased by $32.0 million, or 33%, when compared to 2023. The decrease in 2024 sales is the result of lower tonnes processed and lower grades realized for gold and base metals, coupled with lower recoveries for all metals, partially offset by higher gold, silver, copper, and zinc prices.

Treatment charges

Treatment charges for the year ended December 31, 2024, were $5.7 million, or $627 per tonne of base metal produced and sold, as compared to $11.6 million, or $697 per tonne of base metal produced and sold for the same period in 2023. This 10% cost decrease in the per tonne of base metal produced and sold is due to both lower base metals produced and sold in 2024 as compared to 2023 and lower treatment charges per metal tonne. The lower treatment charge per metal tonne sold was due to a 28% decrease in contractual rate for copper treatment charges and because of a 32% decrease in zinc treatment charges which are based on spot and benchmark rates. These were partially offset by a 17% increase in contractual rate for lead treatment charges.

Total cost of sales

Total cost of sales of $86.2 million for the year ended December 31, 2024 decreased by $16.7 million, or 16%, compared to 2023. The primary driver is the $10.6 million, or 14%, decrease in production costs from $76.1 million in 2023 to $65.6 million in 2024, and a $8.0 million, or 31%, decrease in depreciation expense. The decrease in production costs is related to lower production in 2024.

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

50

Table of Contents

Mine gross loss

For the year ended December 31, 2024, mine gross loss and mine gross loss percent totaled $20.5 million and 31% respectively, as compared to a mine gross loss and mine gross loss percent of $5.2 million and 5% for the same period in 2023. This is an increase in mine gross loss and mine gross loss percent of $15.3 million and 26%, respectively, when compared to the same period in 2023.

Graphic

The mine gross profit or loss maintains a limited correlation to tonnes of ore processed; however, multiple factors will impact the net sales and operating costs figures contained within the mine gross profit or loss in comparison to the tonnes of ore processed. For example, concerning net sales, attributes of the tonnes of ore processed (including ore grade and processing recoveries) along with metal commodity prices can result in lower or higher sales. Mine operating costs include variable costs that maintain a correlation to the tonnes both mined and processed (i.e., equipment usage, reagents, inventory consumables, royalties etc.) and further include fixed costs which maintain a lower correlation to the tonnes of ore processed (i.e. payroll, utilities, insurance, mining concessions, etc.).

The increase in the mine gross loss as shown in the table above between 2024 and 2023 is primarily explained by the impact of a 22% decrease in ore tonnes processed that results in lower net sales realized and partially offset by lower variable related mine operating costs. The lower net sales were further impacted by lower grades realized, including a 35% decrease in gold grade and base metal grade decreases for copper, lead, and zinc of 28%, 28%, and 22%, respectively. The decrease in mine operating costs as shown in the table above are due to lower variable related mining and processing costs as related to the lower volume of ore processed.

The Company expects grades to vary from period to period based on the annual mine plan. The gold grades are expected to trend downwards over time, toward the average grade of 1.26 g/t (exclusive of silver, copper, lead, and zinc contained grades), reflected in the Mineral Reserves estimate. However, as capital intensive mine development progresses and infill drilling occurs, opportunities to refine mining methods and eliminate dilution may have a favorable impact on future mined grades.

One component of gross profit or loss is the concentrate treatment charges, which are netted against concentrate sales. During 2024, the Company negotiated treatment charge agreements with buyers on both annual and spot terms. The 51% decrease in treatment charges, or 10% decrease in treatment and refining charges cost per tonne of base metal produced and sold in 2024 compared to 2023, was the result of lower metals production and therefore decreased revenue as compared to 2023 due to both reduced tonnes mined and processed, and lower grades realized on the tonnage.

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

51

Table of Contents

Net loss

For the year ended December 31, 2024, the Company recorded a net loss of $56.5 million, as compared to $24.1 million net loss during the same period in 2023. The change was attributable to the factors noted above.

Other Costs and Expenses, Including Taxes

For the year ended December 31, 

2024

2023

 

Restated

(in thousands)

Other costs and expenses:

General and administrative expenses

$

4,283

$

6,583

Mexico exploration expenses

1,959

4,167

Michigan Back Forty Project expenses

378

1,642

Stock-based compensation

677

681

Other expense, net

19,452

11,729

Total other costs and expenses

26,749

24,802

Income tax provision (benefit)

9,261

(5,882)

Total other costs and expenses, including taxes

$

36,010

$

18,920

Full-year 2024 compared to full-year 2023

General and administrative expenses: For the year ended December 31, 2024, general and administrative expenses totaled $4.3 million compared to $6.6 million for the same period of 2023. The $2.3 million decrease in the year ended December 31, 2024, as compared to the same period in 2023, is due to the cost-saving measures the Company implemented for 2024, which aimed to reduce travel and business meals, as well as updating existing contracts to find cost reductions.

DDGM Exploration expenses: For the year ended December 31, 2024, the DDGM exploration expenses totaled $2.0 million as compared to $4.2 million for the year ended December 31, 2023. Costs were lower in 2024, due to the suspension of exploration drilling beginning August 1, 2024, in order to preserve cash.

Back Forty Project expenses: For the year ended December 31, 2024, the Back Forty Project expenses totaled $0.4 million, as compared to $1.6 million for the year ended December 31, 2023. Costs were lower in 2024, as the optimization work was completed in October 2023.

Stock-based compensation: For both the years ended December 31, 2024 and 2023, stock-based compensation expense totaled $0.7 million.

Other expense, net: For the year ended December 31, 2024, the Company recorded other expense, net, of $19.5 million compared to $11.7 million during the year ended December 31, 2023. The $7.8 million increase from 2023 was mainly due to $3.3 million in higher interest on the streaming liabilities, $1.8 million in higher net realized and unrealized currency gains and losses, and a $2.6 million unrealized loss on the Green Light Metals investment in 2024. Please see Item 8. Financial Statements—Note 19. Other Expense, Net for additional information.

Provision for income taxes. For the year ended December 31, 2024, income tax expense was $9.3 million, an increase of $15.2 million in expenses from a $5.9 million income tax benefit for the same period in 2023. This increase is primarily driven by the valuation allowance recorded during 2024 on the deferred tax assets of DDGM. Please see Item 8. Financial Statements—Note 7. Income Taxes for additional information.

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

52

Table of Contents

Other Non-GAAP Financial Measures

Certain non-GAAP financial measures are discussed below. For a detailed description of each of these measures and a reconciliation to GAAP financial measures, please see the discussion under Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations—Non-GAAP Measures below.

The following table summarizes certain non-GAAP financial data of the Company for the periods indicated:

For the year ended December 31, 

2024

    

2023

 

Other Non-GAAP Financial Measures:

(in thousands)

Total cash cost after co-product credits per AuEq oz sold (1)

$

2,330

$

1,250

Total consolidated all-in sustaining cost after co-product credits per AuEq oz sold (1)

$

3,200

$

1,861

Total all-in cost after co-product credits per AuEq oz sold (1)

$

3,325

$

2,060

(1) For a detailed description of each of the non-GAAP financial measures and a reconciliation to GAAP financial measures, please see the discussion under Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations—Non-GAAP Measures below.

Full-year 2024 compared to full-year 2023

Total cash cost after co-product credits per AuEq oz sold: For the year ended December 31, 2024, the total cash cost after co-product credits per AuEq oz sold was $2,330 compared to $1,250 for the same period in 2023. This 86% increase is due to the 11% higher total cash cost after co-product credits and the 40% decrease in total number of AuEq ounces sold. The higher total cash cost after co-product credits is the result of the 43% lower amount of co-product credits the Company received during the year ended December 31, 2024. Although production costs were lower for the year ended December 31, 2024 compared to the same period last year, the increased energy costs negatively impacted production costs and, therefore, the cost per tonne processed and the total cash cost after co-product credits per AuEq oz sold.

Graphic

Total consolidated all-in sustaining cost after co-product credits per AuEq oz sold: For the year ended December 31, 2024, the total consolidated all-in sustaining cost after co-product credits per AuEq oz sold was $3,200 compared to $1,861 for the same period in 2023. The 72% increase is directly related to the higher cash costs per ounce discussed above, partially offset by lower sustaining capital expenditures, lower reclamation and remediation costs, and lower general and administrative expenses.

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

53

Table of Contents

Total all-in cost after co-product credits per AuEq oz sold: For the year ended December 31, 2024, the total all-in cost after co-product credits per AuEq oz sold was $3,325 compared to $2,060 for the same period in 2023. The 61% increase is due to the higher all-in sustaining costs discussed above, offset by lower Back Forty costs due to completion of the optimization work in October 2023.

For a detailed description of each of the non-GAAP financial measures and a reconciliation to GAAP financial measures, please see the discussion below under Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations—Non-GAAP Measures.

2024 Capital and Exploration Investment Summary

For the year ended December 31, 2024

2024 full year guidance

2024

2023

Sustaining Investments:

Underground Development

$

4,634

$

4,386

Other Sustaining Capital

2,970

1,420

Infill Drilling

977

4,096

Surface and Underground Exploration Development & Other

65

1,139

Subtotal of Sustaining Investments:

8,646

11,041

$

8.8 - 11.0 million

Growth Investments:

DDGM growth:

Surface Exploration / Other

1,921

2,240

Underground Exploration Drilling

38

1,927

Underground Exploration Development

-

357

Back Forty growth:

Back Forty Project Optimization & Permitting

378

1,642

Subtotal of Growth Investments:

2,337

6,166

$

3.2 - 5.2 million

Total Capital and Exploration:

$

10,983

$

17,207

$

12.0 - 16.2 million

The Company’s capital investment in Mexico totaled $8.6 million in 2024. The investment in Mexico is focused on favorably impacting the Company’s environmental, social, and governance programs while creating operational efficiencies and longevity. At the Back Forty Project, $1.6 million was spent in 2023 to wrap up the optimization work and to release the Back Forty Project Technical Report Summary, which is incorporated by reference as Exhibit 96.1 to this Form 10-K. In 2024, minimal work was done for the Back Forty Project.

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

54

Table of Contents

Graphic

DDGM Ore Transportation

Underground and Exploration Development: Mine development during 2024 included ramps and accesses to different areas of the deposit, vertical shafts, and exploration development drifts. A total of 1,922 meters of underground development and exploration development, at a cost of $4.7 million, was completed during the year, including access to new exploration drill stations for both infill and expansion programs.

Back Forty Feasibility and Permitting: Work on optimizing the Back Forty Project was completed during the third quarter of 2023, and the Company released the Back Forty Project Technical Report Summary in October 2023. Results of the work indicate a more robust economic project with no planned impacts to wetlands that is more protective of the environment, which should facilitate a successful mine permitting process. In 2024, work completed focused on maintaining the project in good standing. The Board continues to evaluate options that could lead to the development of the Back Forty Project as a result of the more favorable metal prices for copper and gold and the capital market interest in such projects.

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

55

Table of Contents

Non-GAAP Measures

Throughout this report, the Company has provided information prepared or calculated according to U.S. GAAP and has referenced some non-GAAP performance measures which the Company believes will assist with understanding the performance of the business. These measures are based on precious metal gold equivalent ounces sold and include cash cost before co-product credits per ounce, total cash cost after co-product credits per ounce, and total all-in sustaining cost per ounce (“AISC”). Because the non-GAAP performance measures do not have any standardized meaning prescribed by U.S. GAAP, they may not be comparable to similar measures presented by other companies. Accordingly, these measures should not be considered in isolation or as a substitute for measures of performance prepared in accordance with U.S. GAAP. These non-GAAP measures are not necessarily indicative of operating profit or cash flow from operations as determined under GAAP.

For financial reporting purposes, the Company reports the sale of base metals as part of its revenue. Revenue generated from the sale of base metals in concentrates is considered a co-product of gold and silver production for the purpose of the total cash cost after co-product credits for the Don David Gold Mine. The Company periodically reviews its revenues to ensure that the reporting of primary products and co-products remains appropriate. Because the Company considers copper, lead, and zinc to be co-products of its precious metal production, the value of these metals continues to be applied as a reduction to total cash costs in the calculation of total cash cost after co-product credits per gold equivalent ounce sold. Gold equivalent is determined by taking gold ounces produced and sold, plus silver ounces produced and sold, converted to gold equivalent ounces using the gold to silver average realized price ratio for the period. The Company believes the identification of copper, lead, and zinc as co-product credits is appropriate because of their lower individual economic value compared to gold and silver and due to the fact that gold and silver are the primary products the Company intends to produce.

Total cash cost, after co-product credits, is a measure developed by the Gold Institute in an effort to provide a uniform standard for comparison purposes. AISC is calculated based on the current guidance from the World Gold Council.

 Total cash cost before co-product credits includes all direct and indirect production costs related to the production of metals (including mining, milling, and other plant facility costs, royalties, and site general and administrative costs) less stock-based compensation allocated to production costs plus treatment and refining costs.

Total cash cost after co-product credits includes total cash cost before co-product credits, less co-product credits (revenues earned from base metals).

 AISC includes total cash cost after co-product credits plus other costs related to sustaining production, including sustaining allocated general and administrative expenses and sustaining capital expenditures. The Company determined sustaining capital expenditures as those capital expenditures that are necessary to maintain current production and execute the current mine plan.

 Cash cost before co-product credits per ounce, total cash cost after co-product credits per ounce, and AISC are calculated by dividing the relevant costs, as determined using the cost elements noted above, by precious metal gold equivalent ounces sold for the periods presented.

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

56

Table of Contents

Reconciliations to U.S. GAAP

The table below present reconciliations between the most comparable GAAP measure of Total cost of sales to the non-GAAP measures of Cash cost after co-product credits, All-in sustaining cost after co-product credits for DDGM and for the Company, and All-in Cost after co-product credits for the years ended December 31, 2024 and 2023:

Note

For the year ended December 31, 

2024

2023

Restated

Total cost of sales (1)

$

86,217

$

102,952

Less: Depreciation and amortization (1)

(18,120)

(26,126)

Less: Reclamation and remediation (1)

(2,545)

(683)

Refining charges for Doré sales

5

6

52

Treatment and refining charges for Concentrate sales

5

5,700

11,578

Co-product credits:

Concentrate sales - Copper

5

(5,827)

(10,472)

Concentrate sales - Lead

5

(4,402)

(9,540)

Concentrate sales - Zinc

5

(17,313)

(29,225)

Realized gain for embedded derivatives - Copper

21

(83)

(6)

Realized gain for embedded derivatives - Lead

21

(18)

(174)

Realized (gain) loss for embedded derivatives - Zinc

21

(316)

511

Total cash cost after co-product credits

$

43,299

$

38,867

Gold equivalent (AuEq) ounces sold (oz)

18,580

31,085

Total cash cost after co-product credits per AuEq oz sold

$

2,330

$

1,250

Total cash cost after co-product credits from above

$

43,299

$

38,867

Sustaining Investments - Capital:

Underground Development (2)

4,634

4,386

Other Sustaining Capital (2)

2,970

1,420

Sustaining Investments - Capitalized Exploration:

Infill Drilling (2)

977

4,096

Surface and Underground Exploration Development & Other (2)

65

1,139

Reclamation and remediation (1)

2,545

683

DDGM all-in sustaining cost after co-product credits

$

54,490

$

50,591

AuEq ounces sold (oz)

18,580

31,085

DDGM all-in sustaining cost after co-product credits per AuEq oz sold

$

2,933

$

1,628

DDGM all-in sustaining cost after co-product credits from above

$

54,490

$

50,591

Corporate Sustaining Expenses:

General and administrative expenses (1)

4,283

6,583

Stock-based compensation (1)

677

681

Consolidated all-in sustaining cost after co-product credits

$

59,450

$

57,855

AuEq ounces sold (oz)

18,580

31,085

Total consolidated all-in sustaining cost after co-product credits per AuEq oz sold

$

3,200

$

1,861

Consolidated all-in sustaining cost after co-product credits from above

$

59,450

$

57,855

Underground Exploration Development (2)

-

357

Growth Investments - Exploration:

Mexico exploration expenses (1)

1,959

4,167

Michigan Back Forty Project expenses (1)

378

1,642

Total all-in cost after co-product credits

$

61,787

$

64,021

AuEq ounces sold (oz)

18,580

31,085

Total all-in cost after co-product credits per AuEq oz sold

$

3,325

$

2,060

(1) Refer to Item 8—Financial Statements: Consolidated Statements of Operations.
(2) Refer to Item 7—Management’s Discussion and Analysis of Financial Condition and Results of Operations—2024 Capital and Exploration Investment Summary.

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

57

Table of Contents

Trending Highlights

2023

2024

Q1

Q2

Q3

Q4

Q1

Q2

Q3

Q4

Operating Data

Total tonnes milled

117,781

113,510

116,626

111,255

98,889

93,687

83,690

80,367

Average Grade

-

Gold (g/t)

2.33

1.59

1.52

1.44

1.89

1.27

0.54

0.64

Silver (g/t)

94

86

73

85

88

102

83

94

Copper (%)

0.37

0.37

0.32

0.39

0.37

0.26

0.19

0.20

Lead (%)

1.73

1.64

1.29

1.39

1.25

1.00

1.01

1.12

Zinc (%)

3.88

3.72

3.24

2.95

2.82

2.59

2.63

2.73

Metal production (before payable metal deductions)

Gold (ozs.)

7,171

4,637

4,443

4,077

4,757

2,947

944

1,258

Silver (ozs.)

322,676

289,816

247,159

282,487

251,707

263,023

194,525

210,581

Copper (tonnes)

336

334

276

341

280

181

93

88

Lead (tonnes)

1,559

1,389

1,048

1,072

812

616

576

678

Zinc (tonnes)

3,837

3,569

3,223

2,884

2,310

2,020

1,741

1,734

Metal produced and sold

Gold (ozs.)

6,508

4,287

3,982

3,757

3,557

2,724

1,357

960

Silver (ozs.)

294,815

274,257

208,905

258,252

216,535

234,560

181,434

184,804

Copper (tonnes)

332

327

245

327

264

197

98

82

Lead (tonnes)

1,417

1,317

947

820

667

491

467

548

Zinc (tonnes)

3,060

3,141

2,571

2,182

1,682

1,771

1,473

1,360

Average metal prices realized

Gold ($ per oz.)

$ 1,915

$ 2,010

$ 1,934

$ 1,985

$ 2,094

$ 2,465

$ 2,561

$ 2,706

Silver ($ per oz.)

$ 23.04

$ 24.93

$ 23.61

$ 23.14

$ 23.29

$ 30.49

$ 30.61

$ 31.11

Copper ($ per tonne)

$ 9,172

$ 8,397

$ 8,185

$ 8,205

$ 8,546

$ 10,428

$ 8,832

$ 8,969

Lead ($ per tonne)

$ 2,158

$ 2,153

$ 2,196

$ 2,122

$ 1,977

$ 2,235

$ 2,065

$ 1,897

Zinc ($ per tonne)

$ 3,195

$ 2,485

$ 2,195

$ 2,516

$ 2,483

$ 2,871

$ 2,854

$ 3,062

Gold equivalent ounces sold

Gold Ounces

6,508

4,287

3,982

3,757

3,557

2,724

1,357

960

Gold Equivalent Ounces from Silver

3,547

3,402

2,550

3,011

2,408

2,901

2,169

2,125

Total AuEq oz

10,055

7,689

6,532

6,768

5,965

5,625

3,526

3,085

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

58

Table of Contents

Liquidity and Capital Resources

As of December 31, 2024, working capital was $2.1 million, a decrease of $13.1 million from $15.2 million at December 31, 2023. The decrease in the Company’s working capital balance at December 31, 2024 is mainly attributable to the $4.6 million decrease in cash and cash equivalents, the $2.2 million lower accounts receivable, the $2.4 million lower inventory balance, and the $3.6 million higher accounts payable. The decrease of $4.6 million of cash and cash equivalents from December 31, 2023 is attributable to a cash outflow of $6.4 million for capital investments, and a cash outflow of $0.6 million from operating activities for 2024 that includes exploration investment of $2.0 million in DDGM, partially offset by $2.7 million in cash inflows from financing activities due to sales through the ATM Program, as reported in the Consolidated Statements of Cash Flows. The cash outflow from operating activities is partially the result of the relatively higher fixed costs related to lower production and the higher energy prices due to inflation. The working capital balance fluctuates as the Company uses cash to fund operations, financing, and investing activities, including exploration and mine development. Please see Item 8. Financial Statements—Note 15. Shareholders’ Equity in for additional information about the ATM.

The actual amount of cash receipts that the Company receives during the period from operations may vary significantly from the planned amounts due to, among other things: (i) unanticipated variations in grade, (ii) unexpected challenges associated with the proposed mining plan, (iii) decreases in commodity prices below those used in calculating the estimates shown above, (iv) variations in expected recoveries, or (v) interruptions in mining at DDGM. The actual amount of cash expenditures that the Company incurs during the twelve-month period ending December 31, 2025 may vary significantly from the planned amounts and will depend on a number of factors, including, among other things: (i) unexpected challenges in operations, including exploration and development, (ii) increases in operating costs above those used in calculating the estimates shown above, (iii) possible strategic transactions, and (iv) continued inflationary pressure. Likewise, if cash expenditures are greater than anticipated or if cash receipts are less than anticipated, the Company may need to take certain actions to adjust spending over the next twelve months.

Long-term liabilities assumed with the Aquila acquisition, capital requirements to develop the Back Forty Project, and potential project financing may have an impact on liquidity in the long term. These long-term liabilities are contingent upon the Back Forty Project securing project financing and achieving commercial production. Project financing requirements will not be determined until the Company’s Board of Directors approve a decision to proceed on the Back Forty Project. The Board continues to evaluate options that could lead to the development of the Back Forty Project.

Cash and cash equivalents as of December 31, 2024 decreased to $1.6 million from $6.3 million as of December 31, 2023, a net decrease in cash of $4.6 million. The decrease is primarily due to the $6.4 million cash spent on investing activities for capital investments and the $0.6 million cash outflows from operations.

Net cash used in operating activities for the year ended December 31, 2024 was $0.6 million, compared to net cash used in operating activities of $5.2 million in 2023. The decrease in the net cash used in operating activities is mainly attributable to the lower mining royalty and income taxes paid and the increase in accounts payable in 2024.

Net cash used in investing activities for the year ended December 31, 2024 was $6.4 million compared to $12.5 million during the same period in 2023. The decrease in investing activities is mainly attributed to planned reduction in investing activities to preserve cash, and in addition, the lower Back Forty expenses in 2024, due to completion of the optimization work in October 2023.

Net cash provided in financing activities for the year ended December 31, 2024 was $2.7 million compared $0.1 million in 2023. The increase in cash inflows from financing activities is attributable to the increased ATM sales in 2024.

While current macro risk factors, such as economic uncertainties and supply chain interruptions have not had a significant adverse impact on exploration plans, results of operations, financial position, and cash flows during the current fiscal year, future impacts are unknown.

Tonnes and grade, with respect to the Company’s mining operations at DDGM, declined during 2024 and were below forecasted, especially in the third quarter. There are several factors that caused these declines. The Company has encountered significant issues with equipment availability due to the age and condition of some of the critical mining equipment in use at the mine.

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

59

Table of Contents

Due to the continued challenges with equipment availability and the decreased cash due to prior production shortfalls, the Company has not been able to maintain its projected timeline for development of future production zones. As a result, the Company is currently mining only one face at a time in areas that are accessible. The current lack of other available production zones has placed additional pressure on the Company’s ability to achieve its production estimates, as any problems encountered at the current production zone cannot be offset by production elsewhere in the mine. In addition, the mill also experienced some mechanical issues and wet ore handling difficulties due to unusually high rain fall that resulted in lower throughput and a production shortfall. To minimize the mechanical issues and return the mine to a cash positive position, capital is necessary to replace some of the mining fleet and upgrade the mill.

The Company believes that the mine has significant potential to generate positive cash flow based on the information to date from the new areas of the Three Sisters vein system, as well as other areas that have been discovered near the existing mining zones. In order to develop access and better define these new areas, an investment must be made in the equipment and mine plan. Without the addition of these areas to the life-of-mine plan, the Company does not believe that the mine will generate sufficient free cash flow in the near term.

The Company’s inability to achieve its production estimates and lack of adequate liquidity has created substantial doubt about its ability to continue as a going concern. The Company previously announced that it would require approximately $7.0 million in working capital to obtain additional mining equipment and for mill upgrades. Management is currently looking to reduce the amount necessary for mining equipment purchases by using a contractor that will provide its own equipment. The Company also expects to require approximately $8.0 million in working capital over the next 12 months in order to fund the initial development to access the Three Sisters and Splay 31 systems, although not all of this capital will be required immediately. Due to the 2024 production challenges described above, the Company does not believe that the mine will generate sufficient cash flow to fund these improvements. The Company is evaluating various financing options in order to fund this development in the near term.

If the Company is unable to obtain this additional capital and successfully develop these new mining areas, the continued operation of the mine may not be possible beyond the first half of 2025. If continued operation of the mine is not possible, the Company may be compelled to place the mine on “care and maintenance” status, which would likely trigger significant severance and other costs which the Company may not be able to pay.

Off-Balance Sheet Arrangements

As of December 31, 2024, the Company has off-balance sheet arrangements related to equipment purchase obligations of $1.5 million.

Accounting Developments

For a discussion of recently adopted and recently issued accounting pronouncements, please see Item 8. Financial Statements —Note 3. New Accounting Pronouncements below.

Critical Accounting Estimates

The preparation of financial statements in conformity with U.S. GAAP requires management to make estimates and assumptions that affect the reported amount of assets, liabilities, and contingencies at the date of the financial statements, as well as the reported amounts of revenues and expenses during the reporting period. As a result, management is required to routinely make judgments and estimates about the effects of matters that are inherently uncertain. Actual results may differ from these estimates under different conditions or assumptions. The following discussion pertains to accounting estimates management believes are most critical to the presentation of the Company’s financial position and results of operations that require management’s most difficult, subjective, or complex judgments.

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

60

Table of Contents

Future Metals Prices

Metals prices are key components in estimates that determine the valuation of some of the Company’s significant assets and liabilities, including properties, plant and equipment, deferred tax assets, and certain accounts receivable. Metals prices are also an important component in the estimation of reserves. As shown above in Item 1. – Business, metals prices have historically been volatile. Gold demand arises primarily from investment and consumer demand. Silver demand arises from investment demand, particularly in exchange-traded funds, industrial demand, and consumer demand. Investment demand for gold and silver can be influenced by several factors, including: the value of the U.S. dollar and other currencies, changing U.S. budget deficits, widening availability of exchange-traded funds, interest rate levels, the health of credit markets, and inflationary expectations. The investments in the construction industry, rising electrical and electronics production, and demand for industrial equipment are some of the major factors driving the demand for base metals and their prices.

Mineral Resources and Mineral Reserves

Critical estimates are inherent in the process of determining Mineral Resources and Mineral Reserves. The Mineral Resources and Mineral Reserves are affected largely by the assessment of future metals prices, as well as by engineering and geological estimates of ore grade, accessibility, and production costs. Metals prices used in estimating Mineral Resources and Mineral Reserves approximate the average median consensus prices for each of the three years starting 2025 through 2027 as provided by Bloomberg’s consensus commodity price forecast as at January 7, 2025. The 2027 consensus was used for the remaining life of mine. The prices were subsequently compared to the actual 2025 closing spot price as at January 7, 2025 as per published exchanges (Comex for precious metals and London Metal Exchange (“LME”) for base metals) to ensure the prices used for the Mineral Resources and Mineral Reserves were still considered to be reasonably conservative estimates. The Company’s assessment of Mineral Resources and Mineral Reserves at producing locations occurs at least annually. Mineral Reserves are a key component in the valuation of property, equipment, mine development, and related depletion and depreciation rates.

Mineral Reserve estimates are used in determining appropriate rates of units-of-production depreciation, with net book value of many assets depreciated over remaining estimated reserves. Mineral Resources and Mineral Reserves are also key components in forecasts of estimated future cash flows, which the Company compares to current asset values in an effort to ensure that carrying values are reported appropriately, as well as assessment of the recoverability of deferred tax assets related to expectations of future taxable income. Mineral Resources and Mineral Reserves are a culmination of many estimates and are not guarantees that the Company will recover the indicated quantities of metals or that it will do so at a profitable level.

Revenue

Concentrate sales are initially recorded based on 100% of the provisional sales prices, net of treatment and refining charges, at the time of delivery to the customer, at which point the performance obligations are satisfied and control of the product is transferred to the customer. Adjustments to the provisional sales prices are made to take into account the mark-to-market changes based on the forward prices of metals until final settlement occurs. The changes in price between the provisional sales price and final sales price are considered an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of the concentrates at the quoted metal prices at the time of delivery. The embedded derivative, which does not qualify for hedge accounting, is adjusted to market through revenue each period prior to final settlement. Market changes in the prices of metals between the delivery and final settlement dates will result in adjustments to revenues related to previously recorded sales of concentrate. Sales are recorded net of charges for treatment charges, refining costs, smelting losses, and other charges negotiated with the buyer. These charges are estimated upon delivery of concentrates based on contractual terms and adjusted to reflect actual charges at final settlement. Historically, actual charges have not varied materially from the Company’s initial estimates.

Doré sales are recognized upon the satisfaction of performance obligations, which occurs when price and quantity are agreed upon with the customer. Doré sales are recorded using quoted metal prices, net of refining charges.

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

61

Table of Contents

Depreciation and Amortization

Capitalized costs are depreciated or amortized using the straight-line method or unit-of-production (“UOP”) method at rates sufficient to depreciate such costs over the shorter of estimated productive lives of such assets or the useful life of the individual assets. Significant judgment is involved in the determination of the estimated life of the assets. The Company’s estimates for Mineral Reserves is used in determining the UOP rates. The Company’s estimates of proven and probable ore reserves may change, possibly in the near term, resulting in changes to depreciation, depletion, and amortization rates in future reporting periods. Productive lives of the assets range from 1 to 10 years, but do not exceed the useful life of the individual asset. Please see Item 8. Financial Statements —Note 1. Nature of Operations and Summary of Significant Accounting Policies for depreciation rates of major asset categories.

Carrying Value of Stockpiles

Stockpiles represent ore that has been extracted from the mine and is available for further processing. Mine sequencing may result in mining material at a faster rate than can be processed. The Company generally processes the highest ore grade material first to maximize metal production; however, a blend of gold ore stockpiles may be processed to balance hardness and/or metallurgy in order to maximize throughput and recovery. Processing of lower grade stockpiled ore may continue after mining operations are completed. Stockpiles are measured by estimating the number of tonnes added and removed from the stockpile, the number of contained ounces (based on assay data), and the estimated metallurgical recovery rates. Stockpile ore tonnages are verified by periodic surveys. Costs are added to stockpiles based on current mining costs, including applicable overhead, depreciation, and amortization relating to mining operations and removed at each stockpile’s average cost per recoverable unit as material is processed.

The Company records stockpiles at the lower of average cost or net realizable value, and carrying values are evaluated at least quarterly. Net realizable value represents the estimated future sales price based on short-term and long-term metals price assumptions that are applied to expected short-term (12 months or less) and long-term sales from stockpiles, less estimated costs to complete production and bring the product to sale. The primary factors that influence the need to record write-downs of stockpiles include declines in short-term or long-term metals prices, increases in costs of production inputs such as labor, fuel and energy, materials and supplies, as well as realized ore grades and recovery rates.

Other assumptions include future operating and capital costs, metal recoveries, production levels, commodity prices, Mineral Resource and Mineral Reserve quantities, engineering data, and other factors unique to each operation based on the life of mine plans. If short-term and long-term commodity prices decrease, estimated future processing costs increase, or other negative factors occur, it may be necessary to record a write-down of ore on stockpiles. A high degree of judgment is involved in determining such assumptions and estimates and no assurance can be given that actual results will not differ significantly from those estimates and assumptions.

Impairment of Long-Lived Assets

The Company evaluates the carrying value of long-lived assets to be held and used using a fair-value based approach when events and circumstances indicate that the related carrying amount of its assets may not be recoverable, such as changes in future metals prices, production levels, and costs. The economic environment and commodity prices may be considered as impairment indicators for the purposes of these impairment assessments. In accordance with U.S. GAAP, the carrying value of a long-lived asset or asset group is considered impaired when the anticipated undiscounted cash flows from such asset or asset group are less than its carrying value. In that event, a loss will be recorded in the Consolidated Statements of Operations based on the difference between book value and the estimated fair value of the asset or asset group computed using discounted estimated future cash flows, or the application of an expected fair value technique in the absence of an observable market price. Future cash flows include estimates of recoverable quantities to be produced from estimated Mineral Resources and Mineral Reserves, commodity prices (considering current and historical prices, price trends, and related factors), production quantities, production costs, and capital expenditures, all based on life-of-mine plans and projections. In estimating future cash flows, assets are grouped at the lowest level for which identifiable cash flows exist that are largely independent of cash flows from other asset groups. It is possible that actual future cash flows will be significantly different than the estimates, as actual future quantities of recoverable minerals, gold and other commodity prices, production levels and costs, and capital are each subject to significant risks and uncertainties.

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

62

Table of Contents

Asset Retirement Obligation/Reclamation and Remediation Costs

The Company’s mining and exploration activities are subject to various laws and regulations, including legal and contractual obligations to reclaim, remediate, or otherwise restore properties at the time the property is removed from service. Accounting for reclamation and remediation obligations requires management to make estimates of the future costs that the Company will incur to complete the work required to comply with existing laws and regulations. Actual costs may differ from the amounts estimated. Reclamation costs are allocated to expense over the life of the related assets and are periodically adjusted to reflect changes in the estimated present value resulting from the passage of time and revisions to the estimates of either the timing or amount of the reclamation and remediation costs. Also, future changes to environmental laws and regulations could increase the extent of reclamation and remediation work required.

Income Taxes

In preparing the consolidated financial statements, the Company estimates the actual amount of taxes currently payable or receivable, as well as deferred tax assets and liabilities attributable to temporary differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax bases. Deferred income tax assets and liabilities are measured using enacted tax rates expected to apply to taxable income in the years in which these temporary differences are expected to be recovered or settled. Changes in deferred tax assets and liabilities generally have a direct impact on earnings in the period of the changes. Mining taxes represent federal and state taxes levied on mining operations. As the mining taxes are calculated as a percentage of mining profits, the Company classifies them as income taxes. Where applicable tax laws and regulations are either unclear or subject to varying interpretations, it is possible that changes in these estimates could occur that materially affect the amounts of deferred income tax assets and liabilities recorded in the consolidated financial statements.

Each period, the Company evaluates the likelihood of whether some portion or all of each deferred tax asset will be realized and provide a valuation allowance for those deferred tax assets for which it is more likely than not that the related benefits will not be realized. When evaluating the valuation allowance, the Company considers historical and future expected levels of taxable income, the pattern and timing of reversals of taxable temporary timing differences that give rise to deferred tax liabilities, and tax planning initiatives. Levels of future taxable income are affected by, among other things, market gold and silver prices, production costs, quantities of Mineral Resources and Mineral Reserves, interest rates, federal and local legislation, and foreign currency exchange rates. If the Company determines that all or a portion of the deferred tax assets will not be realized, a valuation allowance is recorded with a charge to income tax expense. Conversely, if the Company determines that it will ultimately be able to realize all or a portion of the related benefits for which a valuation allowance has been provided, all or a portion of the related valuation allowance will be reduced with a credit to income tax expense.

In addition, the calculation of income tax expense involves significant management estimation and judgment involving a number of assumptions. In determining these amounts, management interprets tax legislation in each of the jurisdictions in which the Company operates and makes estimates of the expected timing of the reversal of future tax assets and liabilities. The Company makes assumptions about future earnings, tax planning strategies, and the extent to which potential future tax benefits will be used. The Company is also subject to assessments by various taxation authorities, which may interpret tax legislation differently, which could affect the final amount or the timing of tax payments.

In October 2023, the Company received a notification from the Mexican Tax Administration Services (“SAT”) with a sanction of 331 million pesos (approximately $16.1 million) as the result of a 2015 tax audit that began in 2021. The 2015 tax audit performed by SAT encompassed various tax aspects, including but not limited to intercompany transactions, mining royalty tax, and extraordinary mining tax. Management is in process of disputing this tax notification and sent a letter of protest to the tax authorities along with providing all requested documentation. Management intends to use all legal avenues of protest, including filing a lawsuit with the Mexico court system if needed, to see that these adjustments are removed. Management believes the 2015 tax return was prepared correctly, and that as of December 31, 2024, the Company has no liability. Please also see Item 8. Financial Statements —Note 7. Income Taxes.

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

63

Table of Contents

ITEM 7A.

QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

The Company’s exposure to market risks includes, but is not limited to, the following risks: changes in commodity prices, foreign currency exchange rates, provisional sales contract risks, changes in interest rates, and equity price risks. Currently, the Company does not use derivative financial instruments as part of an overall strategy to manage market risk. However, the Company may consider such arrangements in the future as it evaluates its business and financial strategy.

Commodity Price Risk

The results of the Company’s operations, cash flows, and financial condition largely depend upon the market prices of gold, silver, copper, lead, and zinc. Metal prices fluctuate widely and are affected by numerous factors beyond the Company’s control. The level of interest rates, the rate of inflation, government fiscal and monetary policy, the stability of exchange rates, and the world supply of and demand for gold, silver, and other metals, among other factors, can all cause significant fluctuations in commodity prices. Such external economic factors are, in turn, influenced by changes in international investment patterns, monetary systems, and political developments. The metal price markets have fluctuated widely in recent years, and future price declines could cause a mineral project to become uneconomic, thereby having a material adverse effect on the Company’s business and financial condition. Currently, the Company is not utilizing derivative contracts to protect the selling price for gold, silver, copper, lead, or zinc. The Company may, in the future, more actively manage its exposure through additional derivative contracts, although the Company has no intention of doing so in the near term.

In addition to materially adversely affecting the Company’s reserve estimates, results of operations and/or its financial condition, declining gold and silver prices could require a reassessment of the feasibility of a project. Even if a project is ultimately determined to be economically viable, the need to conduct such a reassessment may cause delays in the implementation of a project.

Foreign Currency Risk

The Company’s foreign operation sells its gold, silver, copper, lead, and zinc production based on U.S. dollar metal prices. Fluctuations in foreign currency exchange rates do not have a material impact on the Company’s revenue since gold, silver, copper, lead, and zinc are sold worldwide in U.S. dollars.

Foreign currency exchange rate fluctuations can increase or decrease the Company’s costs to the extent that it pays costs in currencies other than the U.S. dollar. The Company is primarily impacted by Mexican peso rate changes relative to the U.S. dollar, as the Company incurs some costs in the Mexican peso. When the value of the peso rises in relation to the U.S. dollar, some of the Company’s costs in Mexico may increase, thus materially adversely affecting the Company’s operating results. Alternatively, when the value of the peso drops in relation to the U.S. dollar, peso-denominated costs in Mexico will decrease in U.S. dollar terms. Future fluctuations may give rise to foreign currency exposure, which may affect the Company’s financial results. Approximately 50% to 60% of expenses are paid in currencies other than the U.S. dollar.

As of December 31, 2024, the Company held approximately 0.8 million Mexican pesos (or $40,000) and approximately 300 Canadian dollars (“C$”) (or $200). The Company has not utilized market-risk sensitive instruments to manage its exposure to foreign currency exchange rates. However, the Company may, in the future, actively manage its exposure to foreign currency exchange rate risk.

Provisional Sales Contract Risk

The Company enters into concentrate sales contracts which, in general, provide for a provisional payment to it based upon provisional assays and prices. The provisionally priced sales contracts contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates determined at the quoted metal prices at the time of shipment. The embedded derivative, which does not qualify for hedge accounting, is adjusted to market through revenue each period prior to settlement. Changes in the prices of metals between the shipment and the final settlement date will result in adjustments to revenues related to the sales of concentrate previously recorded upon shipment.

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

64

Table of Contents

Please see Item 8. Financial Statements—Note 16. Derivatives for additional information.

Interest Rate Risk

The Company considers its interest rate risk exposure to be insignificant at this time, as the Company’s interest rate is related and embedded in immaterial payments for office leases.

 Equity Price Risk

The Company has, in the past, and may in the future, seek to acquire additional funding by sale of common stock and other equity. The price of the Company’s common stock has been volatile in the past and may also be volatile in the future. As a result, there is a risk that the Company may not be able to sell its common stock at an acceptable price should the need for new equity funding arise.

Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations

65

Table of Contents

ITEM 8.

FINANCIAL STATEMENTS

Page

Index to Financial Statements:

Report of Independent Registered Public Accounting Firm (BDO USA, P.C.; Spokane, Washington; PCAOB ID#243)

67

Consolidated Balance Sheets at December 31, 2024 and 2023

70

Consolidated Statements of Operations for the years ended December 31, 2024 and 2023

71

Consolidated Statements of Changes in Shareholders’ Equity for the years ended December 31, 2024 and 2023

72

Consolidated Statements of Cash Flows for the years ended December 31, 2024 and 2023

73

Notes to Consolidated Financial Statements

74

Gold Resource Corporation—Audited Consolidated Financial Statements and Notes

66

Table of Contents

Report of Independent Registered Public Accounting Firm

Shareholders and Board of Directors

Gold Resource Corporation

Denver, Colorado

Opinion on the Consolidated Financial Statements

We have audited the accompanying consolidated balance sheets of Gold Resource Corporation (the “Company”) as of December 31, 2024 and 2023, the related consolidated statements of operations, changes in shareholders’ equity, and cash flows for each of the years then ended, and the related notes (collectively referred to as the “consolidated financial statements”). In our opinion, the consolidated financial statements present fairly, in all material respects, the financial position of the Company at December 31, 2024 and 2023, and the results of its operations and its cash flows for the years then ended, in conformity with accounting principles generally accepted in the United States of America.

Restatement to Correct 2023 Misstatements

As discussed in Note 2 to the consolidated financial statements, the 2023 financial statements have been restated to correct misstatements.

Going Concern Uncertainty

The accompanying consolidated financial statements have been prepared assuming that the Company will continue as a going concern. As discussed in Note 4 to the consolidated financial statements, the Company has suffered recurring losses from operations and lacks adequate liquidity that raise substantial doubt about its ability to continue as a going concern. Management’s plans in regard to these matters are also described in Note 4. The consolidated financial statements do not include any adjustments that might result from the outcome of this uncertainty.

Basis for Opinion

These consolidated financial statements are the responsibility of the Company’s management. Our responsibility is to express an opinion on the Company’s consolidated financial statements based on our audits. We are a public accounting firm registered with the Public Company Accounting Oversight Board (United States) (PCAOB) and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the consolidated financial statements are free of material misstatement, whether due to error or fraud. The Company is not required to have, nor were we engaged to perform, an audit of its internal control over financial reporting. As part of our audits we are required to obtain an understanding of internal control over financial reporting but not for the purpose of expressing an opinion on the effectiveness of the Company’s internal control over financial reporting. Accordingly, we express no such opinion.

Our audits included performing procedures to assess the risks of material misstatement of the consolidated financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the consolidated financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements.

Gold Resource Corporation—Audited Consolidated Financial Statements and Notes

67

Table of Contents

We believe that our audits provide a reasonable basis for our opinion.

Critical Audit Matters

The critical audit matters communicated below are matters arising from the current period audit of the consolidated financial statements that were communicated or required to be communicated to the audit committee and that: (1) relate to accounts or disclosures that are material to the consolidated financial statements and (2) involved our especially challenging, subjective, or complex judgments. The communication of the critical audit matters does not alter in any way our opinion on the consolidated financial statements, taken as a whole, and we are not, by communicating the critical audit matters below, providing separate opinions on the critical audit matters or on the accounts or disclosures to which they relate.

Accounting for Gold and Silver Stream Agreements Liability

As described in Notes 1, 2 and 12 of the Company’s consolidated financial statements, the Company’s gold and silver stream agreements liability (“streaming liabilities”) were $74.4 million and $61.2 million as of December 31, 2024 and December 31, 2023, respectively. As discussed in the “Restatement to Correct 2023 Misstatements” section of our report, management identified that the streaming liabilities were incorrectly presented in the 2023 consolidated financial statements due to errors in the application of accounting principles generally accepted in the United States of America (“U.S. GAAP”). It was determined that the streaming liabilities should be accounted for under ASC 606, Revenue from Contracts with Customers, and that a significant financing component is present that should be accreted using the effective interest method. Periodic interest expense is based on a fixed market rate of interest, which is reviewed quarterly if there are any contractual amendments to the streaming agreements.

We identified the accounting for streaming liabilities as a critical audit matter due to the evaluation of whether the liabilities fell within the scope of ASC 470, Debt, or ASC 606, Revenue from Contracts with Customers. Specifically, the determination of the appropriate accounting treatment under U.S. GAAP required management to use significant judgment in evaluating the contracts and provisions within the contracts, and the determination of the fixed market rate of interest used to accrete the streaming liabilities is subjective. Auditing these elements involved especially complex auditor judgment due to the terms of the applicable agreements and the audit effort required to address these matters, including the extent of specialized skills and knowledge needed.

The primary procedures we performed to address this critical audit matter included:

Obtaining all contracts related to the streaming liabilities to identify all terms impacting the accounting of these liabilities.
Utilizing personnel with expertise in relevant technical accounting guidance to assist in evaluating the appropriateness of the Company’s application of U.S. GAAP.
Utilizing personnel with specialized skills and knowledge in valuation to assist in evaluating the appropriateness of management’s determination of the fixed market rate of interest applied to the streaming liabilities.

Gold Resource Corporation—Audited Consolidated Financial Statements and Notes

68

Table of Contents

Property, Plant and Mine Development, net - Assessment of Whether Indicators of Impairment Exist

As described in Notes 1 and 9 of the Company’s consolidated financial statements, the Company’s property, plant and mine development, net, balance was $128.4 million as of December 31, 2024. The Company evaluates its long-lived assets for impairment when events or changes in circumstances indicate that the related carrying amounts may not be recoverable, such as changes in future metals prices and production levels and costs.

We identified the assessment of whether indicators of impairment exist for property, plant and mine development assets as a critical audit matter due to the significant judgment and assumptions used by management in this process. Auditing these assumptions involved especially challenging auditor judgment due to the nature and extent of audit evidence and effort required to address this matter.

The primary procedures we performed to address this critical audit matter included:

Evaluating the future metals prices for silver, gold and copper by comparing management’s forecasts to published industry data.
Evaluating whether there were any significant changes in the extent or manner in which the assets are being utilized by assessing any significant decreases in production or changes in costs by considering the technical reports and production results compared to historical actual results.

/s/ BDO USA, P.C.

We have served as the Company's auditor since 2022.

Spokane, Washington

April 8, 2025

Gold Resource Corporation—Audited Consolidated Financial Statements and Notes

69

Table of Contents

GOLD RESOURCE CORPORATION

CONSOLIDATED BALANCE SHEETS

(U.S. dollars in thousands, except share and per share amounts)

As of

As of

December 31, 

December 31,

Note

2024

2023

Restated

ASSETS

Current assets:

Cash and cash equivalents

$

1,628

$

6,254

Accounts receivable, net

2,184

4,335

Inventories, net

6

6,940

9,294

Prepaid expenses and other current assets

8

5,828

6,612

Total current assets

16,580

26,495

Property, plant, and mine development, net

9

128,389

138,748

Deferred tax assets, net

7

-

13,267

Other non-current assets

10

905

5,464

Total assets

$

145,874

$

183,974

LIABILITIES AND SHAREHOLDERS’ EQUITY

Current liabilities:

Accounts payable

$

11,258

$

7,614

Mining royalty taxes payable, net

195

1,199

Accrued expenses and other current liabilities

11

3,031

2,512

Total current liabilities

14,484

11,325

Reclamation and remediation liabilities

13

10,669

11,795

Gold and silver stream agreements liability

12

74,432

61,187

Deferred tax liabilities, net

7

14,041

14,319

Contingent consideration

14

3,389

3,404

Other non-current liabilities

11

1,576

1,516

Total liabilities

118,591

103,546

Commitments and contingencies

14

Shareholders’ equity:

Common stock - $0.001 par value, 200,000,000 shares authorized:

95,324,949 and 88,694,038 shares outstanding at December 31, 2024 and December 31, 2023, respectively

96

89

Additional paid-in capital

115,319

111,970

Accumulated deficit

(81,077)

(24,576)

Treasury stock at cost, 336,398 shares

(5,884)

(5,884)

Accumulated other comprehensive loss

(1,171)

(1,171)

Total shareholders’ equity

27,283

80,428

Total liabilities and shareholders’ equity

$

145,874

$

183,974

The accompanying notes are an integral part of these consolidated financial statements.

Gold Resource Corporation—Audited Consolidated Financial Statements and Notes

70

Table of Contents

GOLD RESOURCE CORPORATION

CONSOLIDATED STATEMENTS OF OPERATIONS

for the years ended December 31, 2024 and 2023

(U.S. dollars in thousands, except share and per share amounts)

For the year ended

December 31, 

Note

2024

2023

Restated

Sales, net

5

$

65,726

$

97,728

Cost of sales:

Production costs

65,552

76,143

Depreciation and amortization

18,120

26,126

Reclamation and remediation

2,545

683

Total cost of sales

86,217

102,952

Mine gross loss

(20,491)

(5,224)

Costs and expenses:

General and administrative expenses

4,283

6,583

Mexico exploration expenses

1,959

4,167

Michigan Back Forty Project expenses

378

1,642

Stock-based compensation

18

677

681

Other expense, net

19

19,452

11,729

Total costs and expenses

26,749

24,802

Loss before income taxes

7

(47,240)

(30,026)

Income tax provision (benefit)

7

9,261

(5,882)

Net loss

$

(56,501)

$

(24,144)

Net loss per common share:

Basic and diluted net loss per common share

20

$

(0.61)

$

(0.27)

Weighted average shares outstanding:

Basic and diluted

20

91,949,110

88,514,243

The accompanying notes are an integral part of these consolidated financial statements.

Gold Resource Corporation—Audited Consolidated Financial Statements and Notes

71

Table of Contents

GOLD RESOURCE CORPORATION

CONSOLIDATED STATEMENTS OF CHANGES IN SHAREHOLDERS’ EQUITY

for the years ended December 31, 2024 and 2023

(U.S. dollars in thousands, except share amounts)

Number of
Common
Shares

Par Value of
Common
Shares

Additional Paid-
in Capital

Retained
Earnings (Accumulated Deficit)

Treasury
Stock

Accumulated
Other
Comprehensive
Loss

Total
Shareholders'
Equity

Balance, December 31, 2022 - Restated

88,734,507

$

89

$

111,024

$

(432)

$

(5,884)

$

(1,171)

$

103,626

Stock-based compensation

-

-

879

-

-

-

879

Common stock issued for vested restricted stock units

130,238

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

195,872

-

85

-

-

-

85

Surrender of common stock for taxes due on vesting

(30,181)

-

(18)

-

-

-

(18)

Net loss

-

-

-

(24,144)

-

-

(24,144)

Balance, December 31, 2023 - Restated

89,030,436

$

89

$

111,970

$

(24,576)

$

(5,884)

$

(1,171)

$

80,428

Stock-based compensation

-

-

647

-

-

-

647

Common stock issued for vested restricted stock units

196,991

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

6,510,914

7

2,733

-

-

-

2,740

Surrender of common stock for taxes due on vesting

(76,994)

-

(31)

-

-

-

(31)

Net loss

-

-

-

(56,501)

-

-

(56,501)

Balance, December 31, 2024

95,661,347

$

96

$

115,319

$

(81,077)

$

(5,884)

$

(1,171)

$

27,283

The accompanying notes are an integral part of these consolidated financial statements.

Gold Resource Corporation—Audited Consolidated Financial Statements and Notes

72

Table of Contents

GOLD RESOURCE CORPORATION

CONSOLIDATED STATEMENTS OF CASH FLOWS

for the years ended December 31, 2024 and 2023

(U.S. dollars in thousands)

For the year ended December 31, 

Note

2024

2023

Restated

Cash flows from operating activities:

Net loss

$

(56,501)

$

(24,144)

Adjustments to reconcile net loss to net cash used in operating activities:

Deferred income tax expense (benefit)

9,131

(6,835)

Depreciation and amortization

19,877

26,126

Stock-based compensation

677

681

Interest on streaming liabilities

13,245

9,974

Other operating adjustments, net

22

6,245

591

Changes in operating assets and liabilities:

Accounts receivable

2,151

750

Inventories

1,822

2,611

Prepaid expenses and other current assets

(470)

1,568

Other non-current assets

42

(863)

Accounts payable and other accrued liabilities

3,815

(8,723)

Cash settled liability awards

(67)

-

Mining royalty and income taxes payable, net

(594)

(6,955)

Net cash used in operating activities

(627)

(5,219)

Cash flows from investing activities:

Capital expenditures

(7,621)

(12,487)

Proceeds from the sale of investment in Maritime

1,178

-

Net cash used in investing activities

(6,443)

(12,487)

Cash flows from financing activities:

Proceeds from ATM Program sales, net of issuance costs

2,740

85

Other financing activities

(33)

(23)

Net cash provided by financing activities

2,707

62

Effect of exchange rate changes on cash and cash equivalents

(263)

223

Net decrease in cash and cash equivalents

(4,626)

(17,421)

Cash and cash equivalents at beginning of period

6,254

23,675

Cash and cash equivalents at end of period

$

1,628

$

6,254

Supplemental Cash Flow Information

Income and mining taxes paid

$

1,104

$

7,751

Non-cash investing or financing activities:

Value of common shares issued for RSU redemption

$

49

$

79

Balance of capital expenditures in accounts payable

$

495

$

214

Balance of equipment financing

$

744

$

-

Change in estimate for asset retirement costs

$

512

$

(1,221)

The accompanying notes are an integral part of these consolidated financial statements.

Gold Resource Corporation

73

Table of Contents

GOLD RESOURCE CORPORATION

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

December 31, 2024 and 2023

1. Nature of Operations and Summary of Significant Accounting Policies

Nature of Operations

Gold Resource Corporation (the “Company”) was organized under the laws of the State of Colorado on August 24, 1998. The Company is a producer of metal concentrates that contain gold, silver, copper, lead, and zinc in Oaxaca, Mexico. The Company also has 100% interest in the Back Forty Project, an advanced Exploration Stage Property, located in Menominee County, Michigan, USA.

Significant Accounting Policies

Basis of Presentation

The Consolidated Financial Statements included herein are expressed in United States dollars and conform to accounting principles generally accepted in the United States of America (“U.S. GAAP”). The Consolidated Financial Statements include the accounts of the Company, its Mexican subsidiary, Don David Gold Mexico S.A. de C.V., and Aquila Resources Inc (“Aquila”) and its subsidiaries. Intercompany accounts and transactions have been eliminated in consolidation.

Segment Reporting

The Company has two reporting segments, based on geographic regions. Oaxaca, Mexico represents the Company’s only operating segment with a production stage property. The Company’s other reporting segment is Michigan, U.S.A., with an advanced exploration stage property. The Company’s business activities that are not considered production stage or advanced exploration stage properties are included in Corporate and Other. Please see Item 8. Financial Statements—Note 23. Segment Reporting below for additional information.

Use of Estimates

The preparation of financial statements in conformity with U.S. GAAP requires management to make estimates and assumptions that affect the reported amount of assets and liabilities, the disclosure of contingent assets and liabilities at the date of the financial statements, and the reported amounts of revenues and expenses during the reporting periods. The more significant areas requiring the use of management estimates and assumptions relate to Mineral Resources and Mineral Reserves that are the basis for future cash flow estimates utilized in impairment calculations and units-of-production depreciation calculations; future ore grades, throughput, and recoveries; future metal prices; future capital and operating costs; environmental remediation, reclamation and closure obligations; the Back Forty Project Gold and Silver Stream Agreements with Osisko Bermuda Limited (“Osisko”); contingent consideration liabilities; permitting and other regulatory considerations; asset impairments; the valuation of the Company’s investments in equity securities; future foreign exchange rates, inflation rates, and applicable tax rates; and deferred tax asset valuation and allowances. Management routinely makes judgments and estimates about the effects of matters that are inherently uncertain and bases its estimates and judgments on historical experience and on various other factors that are believed to be reasonable under the circumstances. Actual results could differ from these estimates.

Gold Resource Corporation

74

Table of Contents

Cash and Cash Equivalents

Cash and cash equivalents consist of all cash balances and highly liquid investments with a remaining maturity of three months or less when purchased. Cash held in Mexican pesos or Canadian dollars is converted to U.S. dollars at the closing exchange rate at year end.

Accounts Receivable, net

Accounts receivable consists of trade receivables, which are recorded net of allowance for credit losses from the sale of doré and metals concentrates, as well as net of an embedded derivative based on mark-to-market adjustments for outstanding provisional invoices based on forward metal prices. Please see Item 8. Financial Statements—Note 16. Derivatives and Item 8. Financial Statements—Note 21. Fair Value Measurement for additional information related to the embedded derivative. As of both December 31, 2024 and 2023, the allowance for credit losses was nil.

Inventories

The major inventory categories are set forth below:

Stockpile Inventories: Stockpile inventories represent ore that has been mined and is available for further processing. Stockpiles are measured by estimating the number of tonnes added and removed from the stockpile, an estimate of the contained metals (based on assay data), and the estimated metallurgical recovery rates. Costs are allocated to stockpiles based on relative values of material stockpiled and processed using current mining costs incurred, including applicable overhead, depreciation, and amortization relating to mining operations. Material is removed at each stockpile’s average cost per tonne. Stockpiles are carried at the lower of average cost or net realizable value. Net realizable value represents the estimated future sales price of the product based on current and long-term metals prices, less the estimated costs to complete production and to bring the product to sale.

Concentrate Inventories: Concentrate inventories include metal concentrates located either at the Company’s facilities or in transit to its customer’s port. Inventories consist of copper, lead, and zinc metal concentrates, which also contain gold and silver mineralization. Concentrate inventories are carried at the lower of cost of production or net realizable value based on current metals prices.

Doré Inventory: Doré includes gold and silver doré bars held at the Company’s facility. Doré inventories are carried at the lower of cost of production or net realizable value based on current metals prices.

Materials and Supplies Inventories: Materials and supplies inventories consist of chemical reagents, parts, fuels, and other materials and supplies. Cost includes applicable taxes and freight. Materials and supplies inventory is carried at the lower of average cost or net realizable value.

Write-downs of inventory, when needed, are charged to production costs on the Consolidated Statements of Operations.

Property, Plant, and Mine Development

Land and Mineral Interests: The costs of acquiring land, mineral rights, and mineral interests are considered tangible assets. Administrative and holding costs to maintain an exploration property are expensed as incurred. If a mineable mineral deposit is discovered, such capitalized costs are amortized when production begins using the units of production (“UOP”) method. If no mineable mineral deposit is discovered, or such rights are otherwise determined to have diminished value, costs are expensed in the period in which this determination is made.

Gold Resource Corporation

75

Table of Contents

Mine Development: This includes the cost of engineering and metallurgical studies; drilling and other related costs to delineate an ore body; and the cost of building access ways, shafts, lateral access, drifts, ramps, and other infrastructure. Costs incurred before mineralization is classified as Mineral Resources are expensed and classified as exploration expenses. Capitalization of mine development project costs that meet the definition of an asset begins once mineralization is classified as Mineral Resources.

Drilling costs incurred during the production phase for operational ore control are recorded as mine development and amortized using UOP. All other drilling and related costs are expensed as incurred.

Mine development costs are amortized using the UOP method based on estimated recoverable ounces in Mineral Reserves.

Property and Equipment: All items of property and equipment are carried at cost. Normal maintenance and repairs are expensed as incurred, while expenditures for major maintenance and improvements are capitalized. Gains or losses on disposition are recognized in other expense, net.

Construction in Progress: Expenditures for new facilities or equipment are capitalized and recorded at cost. Once completed and ready for its intended use, the asset is transferred to property and equipment to be depreciated or amortized.

Depreciation and Amortization: Capitalized costs are depreciated or amortized using the straight-line or UOP method at rates sufficient to depreciate such costs over the shorter of estimated productive lives of such assets or the useful life of the individual assets. The estimates for Mineral Reserves are a key component in determining the UOP depreciation rates. The estimates of Mineral Reserves may change, possibly in the near term, resulting in significant changes to depreciation and amortization rates in future reporting periods. The following are the estimated economic lives of depreciable assets:

Range of Lives

Asset retirement costs

UOP

Furniture, computer and office equipment

3 to 10 years

Light vehicles and other mobile equipment

4 years

Machinery and equipment

UOP to 8 years

Mill facilities and related infrastructure

UOP

Mine development and mineral interests

UOP

Buildings and infrastructure

UOP to 4 years

Impairment of Long-Lived Assets

The Company evaluates its long-lived assets for impairment when events or changes in circumstances indicate that the related carrying amounts may not be recoverable. Asset impairment is considered to exist if the total estimated future cash flows on an undiscounted basis are less than the carrying amount of the asset. If an impairment is indicated, a determination is made whether an impairment has occurred. Impairment losses are measured either 1) as the excess of carrying value over the total discounted estimated future cash flows, or 2) as the excess of carrying value over the fair value, using the expected fair value technique in the absence of an observable market price. Losses are charged to expense on the Company’s Consolidated Statements of Operations. In estimating future cash flows, assets are grouped at the lowest level for which there are identifiable cash flows that are largely independent of future cash flows from other asset groups.

Existing Mineral Resources and Mineral Reserves are included when estimating the fair value in determining whether the assets are impaired. The Company’s estimates of future cash flows are based on numerous assumptions, including expected gold and other commodity prices, production levels and costs, processing recoveries, capital requirements, and estimated salvage values. It is possible that actual future cash flows will be significantly different from the estimates, as actual future quantities of recoverable minerals, gold and other commodity prices, production levels and costs, and capital requirements are each subject to significant risks and uncertainties.

Gold Resource Corporation

76

Table of Contents

Fair Value of Financial Instruments

The recorded amounts of cash and cash equivalents, receivables from provisional concentrate sales, and accounts payable approximate fair value because of the short maturity of those instruments. The recorded amount for the equity investment in the common shares of Maritime Resources Corp. at the end of 2023 is based on the closing share price of MAE.V on TSX-V. These investments were sold in 2024.The Company elected the fair value measurement option as the measurement basis for the equity investment in the common shares of Green Light Metals.

Treasury Stock

Treasury stock represents shares of the Company’s common stock which have been repurchased on the open market at the prevailing market price at the time of purchase and have not been canceled. Treasury stock is shown at cost as a separate component of shareholders’ equity.

Revenue Recognition 

The Company recognizes revenue from doré and concentrate sales.

Doré sales: Doré sales are recognized upon the satisfaction of performance obligations, which occurs upon delivery of doré and when the price and quantity are agreed with the customer. Doré sales are recorded using quoted metal prices, net of refining charges.

Concentrate sales: Concentrate sales are initially recorded based on 100% of the provisional sales prices, net of treatment and refining charges, at the time of delivery to the customer, at which point the performance obligations are satisfied and control of the product is transferred to the customer. Adjustments to the provisional sales prices are made to take into account the mark-to-market changes based on the forward prices of metals until final settlement occurs. The changes in price between the provisional sales price and final sales price are considered an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of the concentrates at the quoted metal prices at the time of delivery. The embedded derivative, which does not qualify for hedge accounting, is adjusted to market through revenue each period prior to final settlement. Market changes in the prices of metals between the delivery and final settlement dates will result in adjustments to revenues related to previously recorded sales of concentrate. Sales are recorded net of charges for treatment, refining, smelting losses, and other charges negotiated with the buyer. These charges are estimated upon delivery of concentrates based on contractual terms and adjusted to reflect actual charges at final settlement, which normally occurs within three months. Historically, actual charges have not varied materially from the Company’s initial estimates.

Production Costs

Production costs include labor and benefits, royalties, concentrate and doré shipping costs, mining costs, fuel and lubricants, legal and professional fees related to mine operations, stock-based compensation attributable to mine workers, materials and supplies, repairs and maintenance, explosives, site support, housing and food, insurance, reagents, travel, medical services, security equipment, office rent, tools, and other costs that support mining operations.

Exploration Costs

Exploration costs are charged to expense as incurred. Costs to identify new Mineral Resources and to evaluate potential Mineral Resources are considered exploration costs. Exploration activities conducted within the defined Mineral Resources are capitalized.

Stock-Based Compensation

The Company accounts for stock-based compensation under the fair value recognition and measurement provisions of U.S. GAAP.

Gold Resource Corporation

77

Table of Contents

Those provisions require all stock-based payments, including grants of stock options, restricted stock units (“RSUs”), performance share units (“PSUs”), and deferred share units (“DSUs”) to be measured based on the grant date fair value of the awards, with the resulting expense generally recognized on a straight-line basis in the Consolidated Statements of Operations over the period during which services are performed in exchange for the award. The majority of the awards are earned over a service period of three years. DSUs are earned immediately at grant and are expected to be paid out in cash in the future. PSUs and DSUs are considered liability instruments and marked-to-market each reporting period. The Company’s estimates may be impacted by certain variables including, but not limited to, stock price volatility, employee stock option exercise behaviors, additional stock option grants, and estimates of forfeitures.

Reclamation and Remediation Costs

Reclamation costs are allocated to expense over the life of the related assets and are periodically adjusted to reflect changes in the estimated present value resulting from the passage of time and revisions to the estimates of either the timing or amount of the reclamation and remediation costs. Reclamation obligations are based in part on when the spending for an existing environmental disturbance will occur. The Company reviews the reclamation obligation at least on an annual basis.

In 2014, the Company became a production stage company and therefore, started capitalizing asset retirement costs along with the asset retirement obligation. Please see Item 8. Financial Statements—Note 13. Reclamation and Remediation for additional information.

Accounting for reclamation and remediation obligations requires management to make estimates unique to each mining operation of the future costs expected to be incurred to complete the reclamation and remediation work required to comply with existing laws and regulations. Actual costs incurred in future periods could differ from the amounts estimated. Additionally, future changes to environmental laws and regulations could increase the extent of reclamation and remediation work required. Any such increases in future costs could materially impact the amounts charged to operations for reclamation and remediation.

Accumulated Other Comprehensive Loss

Accumulated other comprehensive loss is presented in the Consolidated Statements of Changes in Shareholders’ Equity. Accumulated other comprehensive loss is composed of foreign currency translation adjustment effects related to the historical adjustment when the functional currency was the Mexican peso for the Mexico subsidiary. This loss will remain on the Consolidated Balance Sheets until the sale or dissolution of the Mexico subsidiary.

Income and Mining Royalty Taxes

Income and Mining Royalty Taxes are computed using the asset and liability method. Deferred income taxes reflect the net tax effects of temporary differences between the carrying amounts of assets and liabilities for financial and tax reporting purposes and the effect of net operating loss and foreign tax credit carryforwards using enacted tax rates in effect in the years in which the differences are expected to reverse. Deferred tax assets and liabilities are evaluated to determine if it is more likely than not that they will be realized. Deferred tax liabilities and deferred tax assets attributable to different tax-paying components of the entity or to different tax jurisdictions are not netted against each other. Please see Item 8. Financial Statements—Note 7. Income Taxes for additional information.

Net Loss Per Share

Basic loss per share is calculated based on the weighted average number of common shares outstanding for the period. Diluted loss per share reflects the dilution that could occur if potentially dilutive securities, as determined using the treasury stock method, are converted into common stock. Potentially dilutive securities are excluded from the calculation when their inclusion would be anti-dilutive, such as periods when a net loss is reported or when the exercise price of the instrument exceeds the average fair market value of the underlying common stock.

Gold Resource Corporation

78

Table of Contents

Foreign Currency

The functional currency for all of the Company’s subsidiaries is the United States dollar (“U.S. dollar”).

Concentration of Credit Risk

The Company has considered and assessed the credit risk resulting from its concentrate sales and doré sales arrangements with its customers. In the event that the Company’s relationships with its customers are interrupted for any reason, the Company believes that it would be able to locate another entity to purchase its metals concentrates and doré bars; however, any interruption could temporarily disrupt the Company’s sale of its products and materially adversely affect operating results.

Currently 100% of the Company’s total net sales from operations are coming from the Arista and Alta Gracia Mines at DDGM, the Company’s Oaxaca, Mexico business segment. Sales revenues from significant customers as a percentage of sales for the years ended December 31, 2024 and 2023 were the following:

For the year ended

December 31, 

2024

2023

Customer A

48

%

48

%

Customer B

9

%

24

%

Customer C

19

%

25

%

Customer D

24

%

-

%

The following table shows accounts receivable from significant customers as a percentage of total accounts receivable as of December 31, 2024 and 2023:

As of

As of

December 31, 

December 31, 

2024

2023

Customer A

48

%

46

%

Customer B

-

%

33

%

Customer C

28

%

21

%

Customer D

24

%

-

%

Some of the Company’s operating cash balances are maintained in accounts that currently exceed federally insured limits. The Company believes that the financial strength of the depositing institutions mitigates the underlying risk of loss. To date, these concentrations of credit risk have not had a significant impact on the Company’s financial position or results of operations.

Streaming Liabilities

The Company presented the Back Forty Project gold and silver streaming liabilities initially at fair value and subsequently accreting it using a fixed market rate of interest, which is reviewed quarterly if there are any contractual amendments relating to the Osisko Stream Agreements. The interest rate is the Company’s estimated incremental borrowing rate and considers company specific factors, such as the probability for obtaining necessary permits and the completion of the mine facilities. Interest expense is recorded to the Consolidated Statements of Operations in other expense, net, and the accretion in the gold and silver stream agreements liability recorded on the Consolidated Balance Sheets.

Gold Resource Corporation

79

Table of Contents

2. Restatement of Consolidated Financial Statements

During the preparation of consolidated financial statements for the year ended December 31, 2024, management of the Company identified that liabilities related to the Company’s Back Forty Project with respect to the Gold and Silver Stream Agreements with Osisko (the “Osisko Stream Agreements”) were incorrectly presented in the Company’s financial statements due to errors in the application of U.S. GAAP. The error related to the calculation of interest accretion over the liabilities associated with the Osisko Stream Agreements (the “streaming liabilities”). It was determined that the streaming liabilities should be accounted for under financial accounting standards board’s accounting standards codification 606, Revenue from Contracts with Customers, and that a significant financing component is present that should be accreted using the effective interest method. The resulting errors understated the streaming liabilities and net loss for all the impacted periods noted below.

The correction to the Company’s consolidated statements of operations also impacts the Company’s consolidated balance sheets, consolidated statements of changes in shareholders’ equity, consolidated statements of cash flows, and certain notes to the consolidated financial statements (i) for the fiscal year ended December 31, 2023, as shown below; and (ii) for the interim periods ended September 30, 2024 and September 30, 2023, June 30, 2024 and June 30, 2023, and March 31, 2024 and March 31 2023, as shown in Item 8. Financial Statements—Note 24. Restatement of Unaudited Quarterly Financial Statements.

In the restated presentation, the Company also recorded previously uncorrected misstatements that were determined to be immaterial to the financial statements in prior periods.

Gold Resource Corporation

80

Table of Contents

The following table presents the Company’s restatement impact for the December 31, 2023 consolidated balance sheet:

CONSOLIDATED BALANCE SHEET

AS OF DECEMBER 31, 2023

As
Previously
Reported

Restatement
Impacts

Restated

(U.S. dollars in thousands, except share and per share amounts)

ASSETS

Current assets:

Cash and cash equivalents

$

6,254

$

-

$

6,254

Accounts receivable, net

4,335

-

4,335

Inventories, net

9,294

-

9,294

Prepaid expenses and other current assets

6,612

-

6,612

Total current assets

26,495

-

26,495

Property, plant, and mine development, net

138,626

122

138,748

Deferred tax assets, net

13,301

(34)

13,267

Other non-current assets

5,464

-

5,464

Total assets

$

183,886

$

88

$

183,974

LIABILITIES AND SHAREHOLDERS' EQUITY

Current liabilities:

Accounts payable

$

7,614

$

-

$

7,614

Mining royalty taxes payable, net

1,199

-

1,199

Accrued expenses and other current liabilities

2,512

-

2,512

Total current liabilities

11,325

-

11,325

Reclamation and remediation liabilities

11,795

-

11,795

Gold and silver stream agreements liability

44,932

16,255

61,187

Deferred tax liabilities, net

14,077

242

14,319

Contingent consideration

3,548

(144)

3,404

Other non-current liabilities

1,516

-

1,516

Total liabilities

87,193

16,353

103,546

Shareholders' equity:

Common stock - $0.001 par value, 200,000,000 shares authorized:

88,694,038 shares outstanding at December 31, 2023

89

-

89

Additional paid-in capital

111,970

-

111,970

Accumulated deficit

(8,311)

(16,265)

(24,576)

Treasury stock at cost, 336,398 shares

(5,884)

-

(5,884)

Accumulated other comprehensive loss

(1,171)

-

(1,171)

Total shareholders' equity

96,693

(16,265)

80,428

Total liabilities and shareholders' equity

$

183,886

$

88

$

183,974

Gold Resource Corporation

81

Table of Contents

The following table presents the Company’s restatement impact for the year ended December 31, 2023 consolidated statement of operations:

CONSOLIDATED STATEMENT OF OPERATIONS

For the year ended December 31, 2023

As Previously
Reported

Restatement
Impacts

Restated

(U.S. dollars in thousands, except share and per share amounts)

Sales, net

$

97,728

$

-

$

97,728

Cost of sales:

Production costs

76,143

-

76,143

Depreciation and amortization

26,126

-

26,126

Reclamation and remediation

774

(91)

683

Total cost of sales

103,043

(91)

102,952

Mine gross loss

(5,315)

91

(5,224)

Costs and expenses:

General and administrative expenses

6,583

-

6,583

Mexico exploration expenses

4,167

-

4,167

Michigan Back Forty Project expenses

1,642

-

1,642

Stock-based compensation

681

-

681

Other expense, net

3,364

8,365

11,729

Total costs and expenses

16,437

8,365

24,802

Loss before income taxes

(21,752)

(8,274)

(30,026)

Income tax benefit

(5,735)

(147)

(5,882)

Net loss

$

(16,017)

$

(8,127)

$

(24,144)

Net loss per common share:

Basic and diluted net loss per common share

$

(0.18)

$

(0.09)

$

(0.27)

Weighted average shares outstanding:

Basic and diluted

88,514,243

-

88,514,243

Gold Resource Corporation

82

Table of Contents

The following table presents the Company’s restatement impact for the year ended December 31, 2023 consolidated statement of changes in shareholders’ equity:

CONSOLIDATED STATEMENT OF CHANGES IN SHAREHOLDERS' EQUITY

As Previously Reported

For the year ended December 31, 2023

Number of
Common
Shares

Par Value of
Common
Shares

Additional Paid-
in Capital

Retained
Earnings (Accumulated Deficit)

Treasury
Stock

Accumulated
Other
Comprehensive
Loss

Total
Shareholders'
Equity

(U.S. dollars in thousands, except share amounts)

Balance, December 31, 2022

88,734,507

$

89

$

111,024

$

7,706

$

(5,884)

$

(1,171)

$

111,764

Stock-based compensation

-

-

879

-

-

-

879

Common stock issued for vested restricted stock units

130,238

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

195,872

-

85

-

-

-

85

Surrender of common stock for taxes due on vesting

(30,181)

-

(18)

-

-

-

(18)

Net loss

-

-

-

(16,017)

-

-

(16,017)

Balance, December 31, 2023

89,030,436

$

89

$

111,970

$

(8,311)

$

(5,884)

$

(1,171)

$

96,693

Restatement Impacts

Balance, December 31, 2022

-

$

-

$

-

$

(8,138)

$

-

$

-

$

(8,138)

Stock-based compensation

-

-

-

-

-

-

-

Common stock issued for vested restricted stock units

-

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

-

-

-

-

-

-

-

Surrender of common stock for taxes due on vesting

-

-

-

-

-

-

-

Net loss

-

-

-

(8,127)

-

-

(8,127)

Balance, December 31, 2023

-

$

-

$

-

$

(16,265)

$

-

$

-

$

(16,265)

Restated

Balance, December 31, 2022

88,734,507

$

89

$

111,024

$

(432)

$

(5,884)

$

(1,171)

$

103,626

Stock-based compensation

-

-

879

-

-

-

879

Common stock issued for vested restricted stock units

130,238

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

195,872

-

85

-

-

-

85

Surrender of common stock for taxes due on vesting

(30,181)

-

(18)

-

-

-

(18)

Net loss

-

-

-

(24,144)

-

-

(24,144)

Balance, December 31, 2023

89,030,436

$

89

$

111,970

$

(24,576)

$

(5,884)

$

(1,171)

$

80,428

Gold Resource Corporation

83

Table of Contents

The following table presents the Company’s restatement impact for the year ended December 31, 2023 consolidated statement of cash flows:

CONSOLIDATED STATEMENT OF CASH FLOWS

For the year ended December 31, 2023

As Previously
Reported

Restatement
Impacts

Restated

(U.S. dollars in thousands)

Cash flows from operating activities:

Net loss

$

(16,017)

$

(8,127)

$

(24,144)

Adjustments to reconcile net loss to net cash used in operating activities:

Deferred income tax benefit

(6,638)

(197)

(6,835)

Depreciation and amortization

26,217

(91)

26,126

Stock-based compensation

681

-

681

Interest on streaming liabilities

-

9,974

9,974

Other operating adjustments

591

-

591

Changes in operating assets and liabilities:

Accounts receivable

750

-

750

Inventories

2,611

-

2,611

Prepaid expenses and other current assets

1,568

-

1,568

Other non-current assets

(863)

-

(863)

Accounts payable and other accrued liabilities

(7,113)

(1,610)

(8,723)

Mining royalty and income taxes payable, net

(7,006)

51

(6,955)

Net cash used in operating activities

(5,219)

-

(5,219)

Cash flows from investing activities:

Capital expenditures

(12,487)

-

(12,487)

Net cash used in investing activities

(12,487)

-

(12,487)

Cash flows from financing activities:

Proceeds from the ATM sales

85

-

85

Other financing activities

(23)

-

(23)

Net cash provided by financing activities

62

-

62

Effect of exchange rate changes on cash and cash equivalents

223

-

223

Net decrease in cash and cash equivalents

(17,421)

-

(17,421)

Cash and cash equivalents at beginning of period

23,675

-

23,675

Cash and cash equivalents at end of period

$

6,254

$

-

$

6,254

Supplemental Cash Flow Information

Income and mining taxes paid

$

7,751

$

-

$

7,751

Non-cash investing or financing activities

Value of Common Shares issued for RSU Redemption

79

$

-

$

79

Balance of capital expenditures in accounts payable

$

214

$

-

$

214

Change in estimate for asset retirement costs

$

(1,221)

$

-

$

(1,221)

Gold Resource Corporation

84

Table of Contents

3. New Accounting Pronouncements

Recently adopted accounting pronouncements

The FASB issued ASU 2023-07, Segment Reporting (Topic 280): Improvements to Reportable Segment Disclosures in November 2023, amending reportable segment disclosure requirements to include disclosure of incremental segment information on an annual and interim basis. Among the disclosure enhancements are new disclosures regarding significant segment expenses that are regularly provided to the chief operating decision-maker and included within each reported measure of segment profit or loss, as well as other segment items bridging segment revenue to each reported measure of segment profit or loss. The amendments in ASU 2023-07 are effective for fiscal years beginning after December 15, 2023, and for interim periods within fiscal years beginning after December 15, 2024, and are applied retrospectively. The Company has retrospectively adopted the segment disclosures required under this amendment in the year ended December 31, 2024 financial statements.

Recently issued Accounting Standards Updates to become effective in future periods

The FASB issued ASU 2023-09, Income Taxes (Topic 740): Improvement to Income Tax Disclosures in December 2023, amending income tax disclosure requirements for the effective tax rate reconciliation and income taxes paid. The amendments in ASU 2023-09 are effective for fiscal years beginning after December 15, 2024, and are applied prospectively with retrospective application permitted. The Company is evaluating the impact this guidance will have on the disclosures in the consolidated financial statements.

In November 2024, the FASB issued ASU 2024-03, Income Statement—Reporting Comprehensive Income—Expense Disaggregation Disclosures (Subtopic 220-40) to improve the disclosures about a public business entity’s expense and provide more detailed information about the types of expenses included in certain expense captions in the consolidated financial statements. The amendments in this update are effective for annual reporting periods beginning after December 15, 2026, and interim reporting periods beginning after December 15, 2027. Early adoption is permitted and the amendments in this update should be applied either prospectively or retrospectively. The Company is evaluating the impact this guidance will have on the disclosures in the consolidated financial statements.

Gold Resource Corporation

85

Table of Contents

4. Going Concern

The accompanying financial statements have been prepared assuming that the Company will continue as a going concern. The Company’s inability to achieve its planned production estimates and lack of adequate liquidity has created substantial doubt about the Company’s ability to continue as a going concern, as reflected by the net losses of $56.5 million and the net cash used in operating activities of $0.6 million for the year ended December 31, 2024, as well as the cash and cash equivalents balance of $1.6 million as of December 31, 2024. The financial statements do not include any adjustments that might be necessary if the Company is unable to continue as a going concern. Management continues to seek and consider financing alternatives to raise additional funds for equipment purchases, development costs, and working capital. Failure to raise additional funds through either equity or debt will cause the Company to further reduce its working capital, and the Company may be compelled to place the mine on “care and maintenance” status and cease operations until sufficient capital is available. Additionally, even if the Company does raise sufficient capital to support its operating expenses and generate revenues, there can be no assurances that the revenue will be sufficient to enable it to achieve a level where it will generate profits and positive cash flows from operations.

5. Revenue

The Company derives its revenue from the sale of doré and concentrates. The following table presents the Company’s net sales disaggregated by source:

For the year ended December 31, 

2024

2023

(in thousands)

Doré sales, net

Gold

$

24

$

3,079

Silver

1

139

Less: Refining charges

(6)

(52)

Total doré sales, net

19

3,166

Concentrate sales

Gold

19,750

32,865

Silver

23,145

24,066

Copper

5,827

10,472

Lead

4,402

9,540

Zinc

17,313

29,225

Less: Treatment and refining charges

(5,700)

(11,578)

Total concentrate sales, net

64,737

94,590

Realized gain - embedded derivative, net (1)

1,231

298

Unrealized loss - embedded derivative, net

(261)

(326)

Total sales, net

$

65,726

$

97,728

(1) Copper, lead, and zinc are co-products. In the realized gain - embedded derivative, net, there are $0.4 million and $0.3 million gains, respectively, related to these co-products for the years ended December 31, 2024 and 2023.

Gold Resource Corporation

86

Table of Contents

6. Inventories, net

At December 31, 2024 and 2023, inventories consisted of the following:

As of

As of

December 31, 

December 31, 

2024

2023

(in thousands)

Stockpiles - underground mine

$

73

$

534

Concentrates

902

1,768

Doré, net

169

169

Subtotal - product inventories

1,144

2,471

Materials and supplies (1)

5,796

6,823

Total

$

6,940

$

9,294

(1) Net of reserve for obsolescence of $0.7 million and $0.5 million as of December 31, 2024 and 2023, respectively.

7. Income Taxes

The Company accounts for income taxes in accordance with the provisions of ASC 740, “Income Taxes” (“ASC 740”) on a tax jurisdictional basis. The Company and its U.S. subsidiaries file U.S. tax returns and the Company’s foreign subsidiaries file tax returns in Mexico and Canada.

For financial reporting purposes, total loss before income taxes includes the following components.

Years Ended December 31, 

2024

2023

Restated

Restated

(in thousands)

U.S. Operations

$

(8,257)

$

(8,958)

Foreign Operations (1)

(38,983)

(21,068)

Total loss before income taxes

$

(47,240)

$

(30,026)

(1) Foreign operations are predominantly in Mexico, as activities in Canada are minimal.

The Company’s total income tax provision (benefit) consists of the following:

Years ended December 31, 

2024

2023

Restated

(in thousands)

Current taxes:

State

$

-

$

48

Foreign

138

906

Total current taxes

$

138

$

954

Deferred taxes:

Federal

$

(663)

$

(856)

Foreign

9,786

(5,980)

Total deferred tax provision (benefit)

$

9,123

$

(6,836)

Total income tax provision (benefit)

$

9,261

$

(5,882)

Gold Resource Corporation

87

Table of Contents

The provision (benefit) for income taxes for the years ended December 31, 2024 and 2023 differs from the amount of income tax determined by applying the applicable United States statutory federal income tax rate to pre-tax income from operations as a result of the following differences:

For the year ended December 31, 

2024

2023

Restated

(in thousands)

(in thousands)

Tax at statutory rates

$

(9,946)

$

(6,305)

Foreign rate differential

(4,950)

(1,458)

Changes in valuation allowance

23,702

(1,470)

Tax losses subject to limitation and expiration

(24)

2,708

Mexico mining tax

686

306

Foreign exchange adjustments

286

(913)

Stock based compensation

158

237

Mexico withholding tax

53

102

Deduction for inflation in Mexico

(1,217)

(1,043)

U.S. state income tax

(316)

(237)

Foreign tax credit expirations

-

2,118

Non-deductible expenses

964

569

Other

(135)

(496)

Tax provision (benefit)

$

9,261

$

(5,882)

In 2024, the Company recorded a valuation allowance on the Mexico Income Tax net deferred tax assets for $18.9 million. In the fourth quarter of 2023, the Company completed a study of the Internal Revenue Code section 382 (“382”) net operating loss limitations related to ownership changes in connection with the Back Forty Project acquisition. The study found that approximately $45.1 million of federal net operating losses and $12.3 million of Michigan net operating losses would be subject to potential limitation under 382. The study also concluded that $30.8 million of federal losses and $33.7 million of Michigan losses would be unable to offset future taxable income by the Company due to loss limitations under 382 and loss carryforward expirations. The annual limitation for the Company under 382 is $1.3 million.

Gold Resource Corporation

88

Table of Contents

The following table sets forth deferred tax assets and liabilities:

As of December 31, 

2024

    

2023

Restated

(in thousands)

Deferred tax assets:

Tax loss carryforward

$

34,073

$

28,888

Property, plant, and mine development

8,221

5,880

Share-based compensation

90

131

Foreign tax credits

1,971

1,971

Inventory

230

197

Foreign Mining Tax

-

264

Accrued Expenses

1,442

1,223

Gold and silver stream agreements liability

11,248

7,742

Asset retirement obligations

4,082

4,272

Accounts payable

497

100

Unrealized loss on investments

675

-

Other

211

220

Total deferred tax assets

$

62,740

$

50,888

Valuation allowance

(56,510)

(32,809)

Deferred tax assets after valuation allowance

$

6,230

$

18,079

Deferred tax liability – Property, plant and mine development

(19,426)

(17,713)

Deferred tax liability – Unbilled revenue

(834)

(1,150)

Deferred tax liability – Other

(11)

(268)

Total deferred tax liabilities

$

(20,271)

$

(19,131)

Net deferred tax liability

$

(14,041)

$

(1,052)

In accordance with ASC 740, the Company presents deferred tax assets net of its deferred tax liabilities on its Consolidated Balance Sheets on a jurisdictional basis. The net deferred tax liability of $14.0 million as of December 31, 2024 shown in the table above is comprised of a $13.5 million deferred tax liability related to the U.S. entities and a $0.5 million deferred tax liability related to Don David Gold Mine S.A. de C.V. (“DDGM”) in Mexico. No net deferred tax balances exist in Canada due to the existence of a full valuation allowance.

The Company evaluates the evidence available to determine whether a valuation allowance is required on deferred tax assets. As of December 31, 2024, the Company determined that a valuation allowance of $56.5 million was necessary due to the uncertain utilization of specific deferred tax assets, primarily net operating loss carryforwards, with $20.2 million in U.S., $18.9 million in Mexico and $17.4 million in Canada; $28.0 million of the total valuation allowance of the $56.5 million is related to Aquila in the U.S. and Canada. As of December 31, 2023, the Company determined that a valuation allowance of $32.8 million was necessary due to the uncertain utilization of specific deferred tax assets, primarily net operating loss carryforwards, with $19.0 million in U.S. and $13.8 million in Canada; $24.0 million of the valuation allowance is related to Aquila. The net change in the Company’s valuation allowance was an increase of $23.7 million for the year ended December 31, 2024. The increase in valuation allowance is primarily explained by recognition of a valuation allowance in Mexico for Mexico income tax purposes during the year and also due to continuing losses subject to a valuation allowance in the U.S. and Canada.

At December 31, 2024, the Company has available U.S. federal loss carryforwards of $81.6 million, of which $61.0 million have no expiration date, and $20.6 million that expire at various dates between 2027 and 2037; U.S. Foreign Tax Credits of $2.0 million that expire at various dates between 2025 and 2026; state of Colorado tax loss carryforwards of $55.9 million, of which $29.5 million expire at various dates between 2025 and 2037 and $26.4 million that have no expiration; available state of Michigan tax loss carryforwards of $18.8 million expiring at various dates between 2025 and 2034; Wisconsin tax loss carryforwards of $4.0 million expiring in 2042; and Canadian tax loss carryforwards of $22.9 million that expire between 2026 and 2044.

Gold Resource Corporation

89

Table of Contents

Mexico Valuation Allowance

The Company recorded a valuation allowance on the Mexico Income Tax net deferred tax assets in 2024 for $18.9 million. In accordance with applicable accounting rules, a valuation allowance is recorded when it is more likely than not that some portion of the deferred tax assets will not be realized, after considering all available evidence, both positive and negative. The Company determined a valuation allowance on Mexico income tax deferred tax assets was necessary due primarily to the recent losses at the Mexico mine.

Mexico Mining Taxation

Mining entities in Mexico are subject to two mining duties, in addition to the 30% Mexico corporate income tax: (i) a “special” mining duty of 7.5% of taxable income as defined under Mexican tax law (also referred to as “mining royalty tax”) on extraction activities performed by concession holders, and (ii) the “extraordinary” mining duty of 0.5% on gross revenue from the sale of gold, silver, and platinum. The mining royalty tax is generally applicable to earnings before income tax, depreciation, depletion, amortization, and interest. In calculating the mining royalty tax, there are no deductions related to depreciable costs from operational fixed assets, but prospecting and exploration expenses are amortized at 10% rate in a straight line. Both duties are tax deductible for income tax purposes. As a result, the effective tax rate applicable to the Company’s Mexican operations is substantially higher than Mexico’s statutory rate.

On November 15, 2024, the Mexican government signed into law a rate increase of the “special” mining duty from 7.5% to 8.5% of the applicable taxable income, and for the “extraordinary” mining duty an increase from 0.5% to 1% on applicable gross revenue. The new tax rates became effective January 1, 2025. Going forward, the Company adjusted its deferred tax liabilities to reflect the new 8.5% rate for the “special” mining duty.

The Company periodically transfers funds from its Mexican wholly owned subsidiary to the U.S. in the form of dividends. Mexico requires a 10% withholding tax on dividends on all post-2013 earnings. The Company began distributing post-2013 earnings from Mexico in 2018. According to the existing U.S. – Mexico tax treaty, the dividend withholding tax between these countries is reduced to 5% if certain requirements are met. The Company determined that it had met such requirements and paid a 5% withholding tax on dividends received from Mexico, and as a result, paid $0.1 million and $0.1 million for years ending December 31, 2024 and 2023, respectively. At the end of 2024, the Company reviewed the tax treaty and believes that it qualifies for a 0% tax withholding. Going forward, the Company will apply this rate on any intercompany dividend payment from Mexico.

Other Tax Disclosures

The Company files U.S. and various state income tax returns, as well as foreign income tax returns in Canada and Mexico, with varying statutes of limitations. In general, the statute of limitations is three years in the United States and in Canada. However, the Company has net operating loss and tax credit carryforward balances beginning in the tax year ended December 31, 2007 for the United States and in the tax year ended December 31, 2006 for Canada. As a result, all tax years since 2007 remain open to examination in the United States and all tax years since 2006 remain open to examination in Canada. In Mexico, the statute of limitations is generally five years, which currently is 2018 and forward. The Company is under audit for the tax year ended December 31, 2015. All other years are closed to inspection outside of the standard statute of limitations window in Mexico.

In October 2023, the Company received a notification from the Mexican Tax Administration Services (“SAT”) with a sanction of 331 million pesos (approximately $16.1 million as of December 31, 2024) as the result of a 2015 tax audit that began in 2021. The 2015 tax audit performed by SAT encompassed various tax aspects, including but not limited to intercompany transactions, mining royalty tax, and extraordinary mining tax. Management is in process of disputing this tax notification and sent a letter of protest to the tax authorities along with providing all requested documentation. If necessary, management intends to pursue legal avenues of protest, including filing a lawsuit with the Mexico court system, if necessary, to ensure that these adjustments are removed.

Gold Resource Corporation

90

Table of Contents

Management believes the position taken on the 2015 income tax return meets the more likely than not threshold and that as of December 31, 2024 and December 31, 2023, the Company has no liability for uncertain tax positions. If the Company were to determine there was an unrecognized tax benefit, the Company would recognize the liability and related interest and penalties within income tax (benefit) provision.

8. Prepaid Expenses and Other Current Assets

At December 31, 2024 and 2023, prepaid expenses and other current assets consisted of the following:

As of

As of

December 31, 

December 31, 

2024

2023

(in thousands)

Advances to suppliers

$

46

$

266

Prepaid insurance

1,121

1,103

Prepaid income tax

3,906

4,589

Other current assets

755

654

Total

$

5,828

$

6,612

IVA taxes receivable, net is a value added (“IVA”) tax in Mexico assessed on purchases of materials and services and sales of products. Likewise, businesses owe IVA taxes as the business sells a product and collects IVA taxes from its customers. Businesses are generally entitled to recover the taxes they have paid related to purchases of materials and services, either as a refund or credit to IVA tax payable. Amounts recorded as IVA taxes in the consolidated financial statements represent the net estimated IVA tax receivable or payable, since there is a legal right of offset of IVA taxes. As of December 31, 2024 and 2023, this resulted in an asset balance of $0.5 million and $0.4 million, respectively, which is included in other current assets in the table above.

9. Property, Plant and Mine Development, net

At December 31, 2024 and 2023, property, plant and mine development consisted of the following:

As of

As of

December 31, 

December 31, 

2024

2023

Restated

(in thousands)

Asset retirement costs (“ARO asset”)

$

6,740

$

6,227

Construction-in-progress

1,165

243

Furniture and office equipment

1,722

1,781

Land

9,033

9,033

Mineral interest

79,543

79,543

Light vehicles and other mobile equipment

2,118

2,126

Machinery and equipment

44,858

42,887

Mill facilities and infrastructure

36,463

36,396

Mine development

120,906

115,230

Software and licenses

1,554

1,554

Subtotal

304,102

295,020

Accumulated depreciation and amortization

(175,713)

(156,272)

Total

$

128,389

$

138,748

Asset retirement credits of $0.5 million were recognized on December 31, 2024 due to changes in estimates in the reclamation model, also decreasing the asset retirement obligations. Please see Item 8. Financial Statements —Note 13. Reclamation and Remediation for additional information.

Gold Resource Corporation

91

Table of Contents

10. Other Non-current Assets

At December 31, 2024 and 2023, other non-current assets consisted of the following:

As of

As of

December 31, 

December 31, 

2024

2023

(in thousands)

Investment in Maritime

$

-

$

1,596

Investment in Green Light Metals

852

3,698

Other non-current assets

53

170

Total

$

905

$

5,464

Investment in Maritime

On September 22, 2022, the Company invested C$2.4 million (or $1.7 million) in 47 million common shares of Maritime Resources Corp (“Maritime”); the shares purchased represented 9.9% of the issued and outstanding shares of Maritime at the time. On September 23, 2024, all the common shares of Maritime were sold in a private placement transaction for C$0.034 per share to a related party, Dundee Corporation, for total proceeds of C$1.6 million (or $1.2 million). As of December 31, 2023, the fair value of the investment was $1.6 million.

Investment in Green Light Metals

On December 28, 2022, the Company received approximately 12.3 million common shares of Green Light Metals as a settlement for a promissory note receivable acquired with the Aquila Resources Inc. (“Aquila”) acquisition. This represented approximately 28.5% ownership in Green Light Metals at the time. As of December 31, 2024 and 2023, the fair value of this equity investment was $0.9 million and $3.7 million, respectively.

11. Accrued Expenses and Other Liabilities

At December 31, 2024 and 2023, accrued expenses and other current and non-current liabilities consisted of the following:

As of

As of

December 31, 

December 31, 

2024

2023

Restated

(in thousands)

Accrued royalty payments

$

650

$

726

Accrual for short-term incentive plan

701

764

Liability for Aquila drillhole capping

8

-

Share-based compensation liability - current

33

67

Equipment financing

744

-

Employee profit sharing obligation

5

67

Other payables

890

888

Total accrued expenses and other current liabilities

$

3,031

$

2,512

Accrued non-current labor obligation

$

1,251

$

1,167

Share-based compensation liability

318

320

Other long-term liabilities

7

29

Total other non-current liabilities

$

1,576

$

1,516

Under Mexican law, employees are entitled to receive statutory profit sharing (Participacion a los Trabajadores de las Utilidades or “PTU”) payments. The required cash payment to employees in the aggregate is equal to 10% of their employer’s profit subject to PTU, which differs from profit determined under U.S. GAAP.

Gold Resource Corporation

92

Table of Contents

As of December 31, 2024, $5 thousand was recorded for PTU payments in current liabilities and production costs, as well as $1.3 million for statutory employee severance benefits in other long-term liabilities and other expenses. As of December 31, 2023, $0.1 million was recorded for PTU payments in current liabilities and production costs, as well as $1.2 million for statutory employee severance benefits in other long-term liabilities and other expenses.

PSU and DSU awards contain a cash settlement feature and are therefore classified as liability instruments and are marked to fair value each reporting period. Please see Item 8. Financial Statements —Note 18. Stock-Based Compensation for additional information.

12. Gold and Silver Stream Agreements

The following table presents the Company’s liabilities related to the Osisko Stream Agreements as of December 31, 2024 and 2023:

As of

As of

December 31, 

December 31, 

2024

2023

Restated

(in thousands)

Liability related to the Osisko Gold Stream Agreement

$

33,067

$

27,183

Liability related to the Osisko Silver Stream Agreement

41,365

34,004

Total liability

$

74,432

$

61,187

As discussed in Item 8. Financial Statements —Note 2. Restatement of Consolidated Financial Statements, the Company has corrected errors in the streaming liabilities balance as of December 31, 2023.

The Osisko Stream Agreements contain customary provisions regarding default and security. In the event that the Company defaults under the Osisko Stream Agreements, including by failing to achieve commercial production by an agreed upon date, it may be required to repay the deposit plus accumulated interest at a rate agreed with Osisko. If the Company fails to do so, Osisko may elect to enforce its remedies as a secured party and take possession of the assets that comprise the Back Forty Project.

Gold Streaming Agreement

In November 2017, Aquila entered into a stream agreement with Osisko, pursuant to which Osisko agreed to commit approximately $55.0 million to Aquila through a gold stream purchase agreement (the “Osisko Gold Stream Agreement”). In June 2020, Aquila amended the Osisko Gold Stream Agreement, reducing the total committed amount to $50.0 million, as well as adjusting certain milestone dates under the gold stream to align with the current project development timeline. Aquila had received a total of $20.0 million of the committed funds at the time of the Company’s acquisition. Remaining deposits from Osisko are $5.0 million upon receipt of permits required for the development and operation of the Back Forty Project and $25.0 million upon the first drawdown of an appropriate project debt finance facility. Osisko has been provided a general security agreement over the Back Forty Project, which consists of the subsidiaries of Gold Resource Acquisition Sub. Inc., a 100% owned subsidiary of the Company. The initial term of the Osisko Gold Stream Agreement is for 40 years, automatically renewable for successive ten-year periods. The Osisko Gold Stream Agreement is subject to certain operating and financial covenants, which are in good standing as of December 31, 2024. In March 2024, the Company secured an amendment to the Osisko Gold Stream Agreement that deferred the required completion of certain operational milestones related to permitting from 2024 to 2026.

The $20.0 million received from Osisko pursuant to the Osisko Gold Stream Agreement through December 31, 2024 is shown as a long-term liability on the Consolidated Balance Sheets. A periodic interest expense is calculated based on a fixed market rate of interest, which is reviewed quarterly if there are any contractual amendments relating to the Osisko Stream Agreements. The fixed interest rate is applied on the Osisko advance payments and calculated on the total expected life-of-mine production to be deliverable and was 22.2% per annum and 19.5% per annum at December 31, 2024 and 2023, respectively.

Gold Resource Corporation

93

Table of Contents

As the remaining $30.0 million deposit is subject to the completion of specific milestones and the satisfaction of certain other conditions, this amount is not reflected on the Consolidated Balance Sheets

Per the terms of the Osisko Gold Stream Agreement, Osisko will purchase 18.5% of the refined gold from Back Forty (the “Threshold Stream Percentage”) until the Company has delivered 105,000 gold ounces (the “Production Threshold”). Upon satisfaction of the Production Threshold, the Threshold Stream Percentage will be reduced to 9.25% of the refined gold (the “Tail Stream”). In exchange for the refined gold delivered under the Stream Agreement, Osisko will pay the Company ongoing payments equal to 30% of the spot price of gold on the day of delivery, subject to a maximum payment of $600 per ounce. Where the market price of gold is greater than the price paid, the difference realized from the sale of the gold will be applied against the deposit received from Osisko. Please see Item 8. Financial Statements —Note 14. Commitments and Contingencies for additional information.

Silver Stream Agreement

Through a series of contracts, Aquila executed a silver stream agreement with Osisko to purchase 85% of the silver produced and sold at the Back Forty Project (the “Osisko Silver Stream Agreement”). A total of $17.2 million has been advanced under the Osisko Silver Stream Agreement as of December 31, 2024. There are no future deposits remaining under the Osisko Silver Stream Agreement. The initial term of the Osisko Silver Stream Agreement is for 40 years, automatically renewable for successive ten-year periods. The Osisko Silver Stream Agreement is subject to certain operating and financial covenants, which are in good standing as of December 31, 2024. In March 2024, the Company secured an amendment to the Osisko Silver Stream Agreement that deferred the required completion of certain operational milestones related to permitting from 2024 to 2026.

Per the terms of the Osisko Silver Stream Agreement, Osisko will purchase 85% of the silver produced from the Back Forty Project at a fixed price of $4 per ounce of silver. Where the market price of silver is greater than $4 per ounce, the difference realized from the sale of the silver will be applied against the deposit received from Osisko.

The $17.2 million received from Osisko pursuant to the Osisko Silver Stream Agreement through December 31, 2024 is shown as a long-term liability on the Consolidated Balance Sheets. A periodic interest expense is calculated based on a fixed market rate of interest, which is reviewed quarterly if there are any contractual amendments relating to the Osisko Stream Agreements. The fixed interest rate is applied on the Osisko advance payments and calculated on the total expected life-of-mine production to be deliverable and was 22.2% per annum and 19.5% per annum at December 31, 2024 and 2023, respectively. Please see Item 8. Financial Statements—Note 14. Commitments and Contingencies for additional information.

Gold Resource Corporation

94

Table of Contents

13. Reclamation and Remediation

The following table presents the changes in the Company’s reclamation and remediation obligations for the years ended December 31, 2024 and 2023:

    

2024

    

2023

(in thousands)

Reclamation liabilities – balance at beginning of period

$

2,233

$

1,949

Foreign currency exchange (gain) loss

(394)

284

Reclamation liabilities – balance at end of period

1,839

2,233

Asset retirement obligation – balance at beginning of period

9,562

8,417

Changes in estimate (1)

512

(1,221)

Liability for Aquila drillhole capping (2)

(329)

404

Accretion

793

689

Foreign currency exchange (gain) loss

(1,700)

1,273

Asset retirement obligation – balance at end of period

8,838

9,562

Total period end balance

$

10,677

$

11,795

(1) In 2024, the Company updated its closure plan study, which resulted in a $0.5 million increase in the estimated liability and ARO asset. In 2023, the Company updated its closure plan study to include current disturbances, which resulted in a $1.2 million decrease in the estimated liability and ARO asset.
(2) As of March 31, 2023, a liability of $0.4 million was reclassified to non-current reclamation and remediation liabilities. In 2024, the Company used a portion of this liability for well capping activities. As of December 31, 2024 the Company has $67 thousand in non-current liability and $8 thousand in current liability related to drill hole capping in Aquila.

The following table presents the reclamation and remediation obligations as of December 31, 2024 and December 31, 2023:

As of

As of

December 31, 

December 31,

2024

2023

(in thousands)

Current reclamation and remediation liabilities (1)

$

8

$

-

Non-current reclamation and remediation liabilities

10,669

11,795

Total

$

10,677

$

11,795

(1) The current portion of reclamation and remediation liabilities related to drill hole capping in Aquila, Michigan, are included in Accrued expenses and other current liabilities. Please see Item 8. Financial Statements—Note 11. Accrued Expenses and Other Liabilities for additional information.

The Company’s undiscounted reclamation liabilities of $1.8 million and $2.2 million as of December 31, 2024 and 2023, respectively, are related to DDGM in Mexico. These represent reclamation liabilities that were expensed through 2013 before proven and probable Mineral Reserves were established and the Company was considered to be a development stage entity; therefore, most of the costs, including asset retirement costs, were not allowed to be capitalized as part of the property, plant, and mine development.

 The Company’s asset retirement obligations reflect the additions to the asset for reclamation and remediation costs in property, plant & mine development, post-2013 development stage status, which were discounted using a credit adjusted risk-free rate of 10%. As of December 31, 2024 and 2023, the Company’s asset retirement obligation was $8.8 million and $9.6 million, respectively.

Gold Resource Corporation

95

Table of Contents

14. Commitments and Contingencies

As of December 31, 2024 and 2023, the Company had equipment purchase commitments aggregating approximately $1.5 million and $0.8 million, respectively.

Contingent Consideration

With the Aquila acquisition, the Company assumed a contingent consideration. On December 30, 2013, Aquila’s shareholders approved the acquisition of 100% of the shares of HudBay Michigan Inc. (“HMI”), a subsidiary of HudBay Minerals Inc. (“HudBay”), effectively giving Aquila 100% ownership in the Back Forty Project (the “HMI Acquisition”). Pursuant to the HMI Acquisition, HudBay’s 51% interest in the Back Forty Project was acquired in consideration for the issuance of common shares of Aquila, future milestone payments tied to the development of the Back Forty Project and a 1% net smelter return royalty on production from certain land parcels in the Back Forty Project. The issuance of shares and 1% net smelter obligations were settled before the Company acquired Aquila.

The contingent consideration is composed of the following:

The value of future installments is based on C$9.0 million tied to the development of the Back Forty Project as follows:

a. C$3.0 million payable on completion of any form of financing for purposes including the commencement of construction of Back Forty, up to 50% of the C$3 million can be paid, at the Company’s option in Gold Resource Corporation shares with the balance payable in cash;
b. C$2.0 million payable in cash 90 days after the commencement of commercial production;
c. C$2.0 million payable in cash 270 days after the commencement of commercial production, and;
a. C$2.0 million payable in cash 450 days after the commencement of commercial production.

Initially, the Company intended to pay the first C$3.0 million in 2023 to prevent HudBay’s 51% buy-back option in the Back Forty Project. Management later decided that it was more likely than not that HudBay would not exercise its buy-back option, and consequently, this amount was not paid. Additionally, since financing of the Back Forty Project was not expected in 2024, this liability was reclassified to long-term. As of the end of January 2024, by the contractual deadline, HudBay did not exercise its buy-back option, and thus, it is forfeited.

The total value of the contingent consideration as of December 31, 2024 and 2023 was $3.4 million and $3.5 million, respectively. The contingent consideration is adjusted for the time value of money and the likelihood of the milestone payments. Any future change in the value of the contingent consideration is recognized in other expense, net, in the Consolidated Statements of Operations.

Gold Resource Corporation

96

Table of Contents

The following table shows the change in the balance of the contingent consideration for the year ended December 31, 2024 and for the year ended December 31, 2023:

2024

2023

Restated

(in thousands)

Beginning Balance of contingent consideration:

Current contingent consideration

$

-

$

2,211

Non-current contingent consideration

3,404

2,179

$

3,404

$

4,390

Change in value of contingent consideration - Current

$

-

$

(2,211)

Change in value of contingent consideration - Non-current

$

(15)

$

1,225

Ending Balance of contingent consideration:

Current contingent consideration

$

-

$

-

Non-current contingent consideration

3,389

3,404

$

3,389

$

3,404

Other Contingencies

The Company has certain other contingencies resulting from litigation, claims, and other commitments and is subject to a variety of environmental and safety laws and regulations incident to the ordinary course of business. The Company currently has no basis to conclude that any or all of such contingencies will materially affect its financial position, results of operations, or cash flows. However, in the future, there may be changes to these contingencies, or additional contingencies may occur, any of which might result in an accrual or a change in current accruals recorded by the Company, and there can be no assurance that their ultimate disposition will not have a material adverse effect on the Company’s financial position, results of operations or cash flow.

With the acquisition of Aquila Resources Inc. on December 10, 2021, the Company assumed substantial liabilities that relate to the Osisko Stream Agreements. Under the agreements, Osisko deposited a total of $37.2 million upfront in exchange for a portion of the future gold and silver production from the Back Forty Project. The Osisko Stream Agreements contain customary provisions regarding default and security. In the event that the Company’s subsidiary defaults under the Osisko Stream Agreements, including failing to achieve commercial production at a future date, it may be required to repay the deposit plus accumulated interest at a rate agreed with Osisko. If it fails to do so, Osisko may be entitled to enforce its remedies as a secured party and take possession of the assets that comprise the Back Forty Project.

15. Shareholders’ Equity

The Company’s At-The-Market Offering (“ATM”) Agreement with H.C. Wainwright & Co., LLC (the “Agent”), which was entered into in November 2019, was renewed in June 2023, pursuant to which the Agent agreed to act as the Company’s sales agent with respect to the offer and sale from time to time of the Company’s common stock having an aggregate gross sales price of up to $75.0 million (the “ATM Program”). During the year ended December 31, 2024, an aggregate of 6,510,914 shares of the Company’s common stock were sold and settled through the ATM Program for net proceeds to the Company of $2.7 million after deducting agent’s commissions and other fees. During the year ended December 31, 2023, 195,872 shares of the Company’s common stock were sold through the ATM Program for net proceeds to the Company of $0.1 million, after deducting agent’s commissions and other fees.

Gold Resource Corporation

97

Table of Contents

16. Derivatives

Embedded Derivatives

Concentrate Sales

Concentrate sales contracts contain embedded derivatives due to the provisional pricing terms for shipments pending final settlement. At the end of each reporting period, the Company records an adjustment to accounts receivable and revenue to reflect the mark-to-market adjustments for outstanding provisional invoices based on forward metal prices. Please see Item 8. Financial Statements —Note 21. Fair Value Measurement for additional information.

The following table summarizes the Company’s unsettled sales contracts at December 31, 2024, with the quantities of metals under contract subject to final pricing occurring through March 2025:

Gold

Silver

Copper

Lead

Zinc

Total

(ounces)

(ounces)

(tonnes)

(tonnes)

(tonnes)

Under contract

999

203,009

67

796

2,027

Average forward price (per ounce or tonne)

$

2,641

$

30.95

$

8,905

$

2,001

$

3,006

Unsettled sales contracts value (in thousands)

$

2,638

$

6,283

$

597

$

1,593

$

6,093

$

17,204

The Company manages credit risk by entering into arrangements with counterparties believed to be financially strong, and by requiring other credit risk mitigants, as appropriate. The Company actively evaluates the implicit creditworthiness of its counterparties, and monitors credit exposures.

17. Employee Benefits

Effective October 2012, the Company adopted a profit-sharing plan (the “Plan”) which covers all U.S. employees. The Plan meets the requirements of a qualified retirement plan pursuant to the provisions of Section 401(k) of the Internal Revenue Code. The Plan also provides eligible employees the opportunity to make tax deferred contributions to a retirement trust account up to 90% of their qualified wages, subject to the IRS annual maximums.

On April 23, 2021, a decree that reforms labor outsourcing in Mexico was published in the Federation’s Official Gazette. This decree amended the outsourcing provisions, whereby operating companies can no longer source their labor resources used to carry out the core business functions from service entities or third-party providers. Under Mexican law, employees are entitled to receive statutory profit sharing (Participacion a los Trabajadores de las Utilidades or “PTU”) payments. The required cash payment to employees in the aggregate is equal to 10% of their employer’s profit subject to PTU, which differs from profit determined under U.S. GAAP. Please see Item 8. Financial Statements —Note 11. Accrued Expenses and Other Liabilities for additional information.

18. Stock-Based Compensation

The Company’s compensation program comprises three main elements: base salary, an annual short-term incentive plan (“STIP”) cash award, and long-term equity-based incentive compensation (“LTIP”) in the form of stock options, RSUs, PSUs, and DSUs.

The Gold Resource Corporation 2016 Equity Incentive Plan (the “Incentive Plan”) allows for the issuance of up to 5.0 million shares of common stock in the form of incentive and non-qualified stock options, stock appreciation rights, RSUs, stock grants, stock units, performance shares, PSUs, and performance cash. Effective January 1, 2021, the Company’s Board of Directors, on the recommendation of the Compensation Committee, implemented a program to issue DSUs, which are qualifying instruments under the terms of the Company’s Incentive Plan, to eligible directors. Additionally, pursuant to the terms of the Incentive Plan, any award outstanding under the prior plan that is terminated, expired, forfeited, or canceled for any reason, will be available for grant under the Incentive Plan.

Gold Resource Corporation

98

Table of Contents

The Company’s STIP provides for an annual cash bonus payable upon achievement of specified performance metrics for its management team. As of December 31, 2024, the Company accrued $0.7 million in accrued expenses and other current liabilities related to the STIP program, payable in cash related to the STIP program. As of December 31, 2023, the Company accrued $0.8 million in accrued expenses and other current liabilities related to the program.

Stock-Based Compensation Expense

Stock-based compensation expense for stock options, RSUs, PSUs, and DSUs is as follows:

For the year ended December 31, 

2024

2023

(in thousands)

Stock options

$

22

$

342

Restricted stock units

625

537

Performance stock units

50

(168)

Deferred stock units

(20)

(30)

Total

$

677

$

681

The estimated unrecognized stock-based compensation expense from unvested RSUs, as of December 31, 2024, was $0.8 million and is expected to be recognized over the weighted average remaining periods of 1.78 years. As DSUs are vested immediately at grant, the full amount of fair value is recognized as expense at the time of grant. In addition, a mark-to-market adjustment due to fluctuation of share price is recognized at the end of each period related to the DSUs. The fair value of the PSUs is recognized over their vesting period of three years, and similarly to the DSUs, a mark-to-market adjustment due to fluctuation of the share price, as well as due to changes in the performance, is recognized at the end of each period related to the proportionate number of units based on passage of time.

Stock Options

A summary of stock option activity under the Incentive Plan for the years ended December 31, 2024 and 2023 is presented below:

Stock
Options

Weighted
Average Exercise
Price (per share)

Weighted Average
Remaining
Contractual Term
(in years)

Aggregate
Intrinsic
Value
(in thousands)

Outstanding as of December 31, 2022

1,475,316

$

2.90

7.38

$

18

Expired or Forfeited

(634,704)

2.79

Outstanding as of December 31, 2023

840,612

$

2.99

7.36

$

-

Grant / Exercise / Forfeiture

-

-

Outstanding as of December 31, 2024

840,612

$

2.99

6.37

$

-

Vested and exercisable as of December 31, 2024

840,612

$

2.99

6.37

$

-

During the years ended December 31, 2024 and 2023, no stock options were granted or exercised.

The following table summarizes information about stock options outstanding as of December 31, 2024:

Outstanding

Exercisable

Range of Exercise Prices

Number of
Options

Weighted Average
Remaining
Contractual Term
(in years)

Weighted
Average Exercise
Price (per share)

Number of
Options

Weighted
Average Exercise
Price (per share)

$0.00 - $2.50

240,612

7.22

$

2.41

240,612

$

2.41

$2.51 -$5.00

600,000

6.03

$

3.22

600,000

$

3.22

840,612

6.37

$

2.99

840,612

$

2.99

Gold Resource Corporation

99

Table of Contents

Restricted Stock Units

A summary of RSU activity under the Incentive Plan for the years ended December 31, 2024 and 2023 is presented below:

Restricted
Stock
Units

Fair
Value
(in thousands)

Weighted Average
Remaining
Contractual Term
(in years)

Weighted Average
Grant Date
Fair Value

Nonvested as of December 31, 2022

575,548

$

881

1.04

$

2.12

Granted

779,192

0.92

Vested but not redeemed (deferred)

(106,955)

1.97

Vested and redeemed

(100,057)

2.63

Vested and forfeited for net settlement

(30,181)

2.86

Forfeited

(270,292)

1.42

Nonvested as of December 31, 2023

847,255

$

319

1.93

$

1.17

Granted

832,091

0.56

Granted in lieu of bonus

637,929

0.56

Vested but not redeemed (deferred)

(134,257)

1.46

Vested and redeemed

(119,997)

1.21

Vested and forfeited for net settlement

(76,994)

1.26

Forfeited

(54,769)

0.95

Nonvested as of December 31, 2024

1,931,258

$

444

1.78

$

0.69

RSUs of 1,470,020 and 779,192, respectively, were granted during the years ended December 31, 2024 and 2023. The weighted-average grant date fair value per share of RSUs granted during the years ended December 31, 2024 and 2023 was $0.56 and $0.92, respectively. The grant date fair value of RSUs is determined by the 20-day volume weighted average price of the Company’s common shares at grant date. During the years ended December 31, 2024 and 2023, 0.1 million and 0.1 million RSUs were deferred, respectively.

Performance Stock Units

A summary of PSU activity under the Incentive Plan for the years ended December 31, 2024 and 2023 is presented below:

Performance
Share
Units

Liability Balance
(in thousands)

Weighted Average
Grant Date
Fair Value

Outstanding as of December 31, 2022

695,041

$

332

$

1.99

Granted

534,890

0.90

Forfeited

(349,005)

1.69

Outstanding as of December 31, 2023

880,926

$

164

$

1.45

Granted

682,367

0.56

Forfeited

(33,113)

0.90

Redeemed

(201,258)

2.10

Outstanding as of December 31, 2024

1,328,922

$

148

$

0.91

Starting in 2022, the Company’s Board of Directors approved granting PSUs to the Company’s management team. PSUs cliff vest in three years based on the relative total shareholder return of a predetermined peer group and are expected to be settled in cash. These awards contain a cash settlement feature and are therefore classified as liability and are marked to fair value each reporting period based on the relative total shareholder return of a predetermined peer group and the Company’s stock price. As of December 31, 2024 and 2023, the Company has liability of $0.1 million and $0.2 million, respectively, related to PSUs.

Gold Resource Corporation

100

Table of Contents

As of December 31, 2024, of the $0.1 million liability, $33 thousand is short-term and expected to be paid out in 2025 according to the terms of the grant agreements.

PSUs of 682,367 and 534,890, respectively, were granted during the years ended December 31, 2024 and 2023, with weighted-average grant date fair value of $0.56 and $0.90 per unit, respectively. The grant date fair value of PSUs is determined by the 20-day volume weighted average price of the Company’s common shares at grant date. During the year ended December 31, 2024, 201,258 PSUs were vested and redeemed, with a cash payout of $0.1 million. No PSUs were vested nor redeemed during the year ended December 31, 2023. PSUs of 33,113 and 349,005, respectively, were forfeited during the years ended December 31, 2024 and 2023.

Deferred Stock Units

A summary of DSU activity under the Incentive Plan for the years ended December 31, 2024 and 2023 are presented below:

Deferred
Stock
Units

Liability Balance
(in thousands)

Weighted Average
Grant Date
Fair Value

Outstanding as of December 31, 2022

360,699

$

552

$

2.49

Granted

278,663

0.90

Granted in lieu of board fees

108,011

0.51

Granted in lieu of executive bonus

212,407

0.90

Redeemed

(373,489)

1.61

Outstanding as of December 31, 2023

586,291

$

223

$

1.36

Granted in lieu of board fees

297,093

0.32

Outstanding as of December 31, 2024

883,384

$

203

$

1.01

Effective January 1, 2021, the Company’s Board of Directors, on the recommendation of the Compensation Committee, implemented a program to issue deferred stock units to members of the Company’s Board of Directors. Additionally, members of the Board may elect, at the beginning of each year, that a portion of their board fees be paid in DSUs rather than in cash. DSUs are qualifying instruments under the terms of the Company’s Incentive Plan, and therefore, do not require additional shareholder approval. The vesting and settlement terms of the DSUs are determined by the Compensation Committee at the time the DSUs are awarded.

DSUs are vested immediately at grant and are redeemable in cash or shares—at the discretion of the Company—at the earlier of 10 years or upon the eligible directors’ termination and expected to be paid in cash. Termination is deemed to occur on the earliest of (1) the date of voluntary resignation or retirement of the director from the Board; (2) the date of death of the director; or (3) the date of removal of the director from the Board whether by shareholder resolution, failure to achieve re-election, or otherwise; and on which date the director is not a director or employee of the Company or any of its affiliates. These awards contain a cash settlement feature and are therefore classified as a liability and are marked to fair value each reporting period. As of both December 31, 2024 and 2023, the Company has $0.2 million of other non-current liability related to the DSUs, based on the fair value of the Company’s stock price.

Gold Resource Corporation

101

Table of Contents

DSUs of nil and 278,663 were granted to the Board of Directors during the years ended December 31, 2024 and 2023, respectively. Additionally, DSUs of 297,093 and 108,011 were granted to the Board of Directors in lieu of board fees at their request during the years ended December 31, 2024 and 2023, respectively. DSUs of nil and 212,407, respectively, were granted in lieu of executive bonuses during the years ended December 31, 2024 and 2023. The weighted-average grant date fair value per share of DSUs granted during the years ended December 31, 2024 and 2023 was $0.32 and $0.83, respectively. The grant date fair value of DSUs is determined by the 20-day volume weighted average price of the Company’s common shares at grant date. During the year ended December 31, 2024, no DSUs were redeemed, and 373,489 DSUs were redeemed during the year ended December 31, 2023.

19. Other Expense, net

During the years ended December 31, 2024 and 2023, other expense, net consisted of the following:

For the year ended December 31, 

2024

2023

Restated

(in thousands)

Unrealized currency exchange loss (1)

$

2,225

$

(174)

Realized currency exchange loss (gain)

245

860

Realized and unrealized (gain) loss from gold and silver rounds, net

(34)

(12)

Realized loss from sale of investments (2)

555

-

Loss (Gain) on disposal of fixed assets

4

13

Interest on streaming liabilities (3)

13,245

9,974

Severance

674

1,619

Other (income) expense

2,538

(551)

Total

$

19,452

$

11,729

(1) Gains and losses due to changes in fair value are non-cash in nature until such time that they are realized through cash transactions.
(2) On September 23, 2024, all the common shares of Maritime were sold in a private placement transaction for C$0.034 per share to a related party, Dundee Corporation, for total proceeds of C$1.6 million (or $1.2 million). As of December 31, 2023, the fair value of the investment was $1.6 million.
(3) Periodic interest expense is based on a fixed market rate of interest which is reviewed quarterly if there are any contractual amendments relating to the Osisko Stream Agreements.

20. Net Loss per Common Share

Basic loss per common share is calculated based on the weighted average number of shares of common stock outstanding for the period. Diluted Loss per common share is calculated based on the assumption that stock options outstanding, which have an exercise price less than the average market price of the Company’s common stock during the period, would have been exercised on the later of the beginning of the period or the date granted and that the funds obtained from the exercise were used to purchase common shares at the average market price during the period. All of the Company’s restricted stock units are considered to be anti-dilutive because of the net loss.

The effect of the Company’s dilutive securities is calculated using the treasury stock method, and only those instruments that result in a reduction in net income per common share are included in the calculation. Options to purchase 0.8 million shares of common stock at weighted average exercise prices of $2.99 were outstanding as of December 31, 2024 but had no dilutive effect due to the net loss. Options to purchase 0.8 million shares of common stock at weighted average exercise prices of $2.99 were outstanding as of December 31, 2023 but had no dilutive effect due to the net loss.

Gold Resource Corporation

102

Table of Contents

Basic and diluted net loss per common share is calculated as follows:

For the year ended

December 31, 

2024

2023

Restated

Numerator:

Net loss (in thousands)

$

(56,501)

$

(24,144)

Denominator:

Basic and diluted weighted average common shares outstanding

91,949,110

88,514,243

Basic and diluted net loss per common share

$

(0.61)

$

(0.27)

21. Fair Value Measurement

Fair value accounting establishes a fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value. The hierarchy gives the highest priority to unadjusted quoted prices in active markets for identical assets or liabilities (Level 1 measurements) and the lowest priority to unobservable inputs (Level 3 measurements). The three levels of the fair value hierarchy are described below:

Level 1

Unadjusted quoted prices in active markets that are accessible at the measurement date for identical, unrestricted assets or liabilities;

Level 2

Quoted prices in markets that are not active, or inputs that are observable, either directly or indirectly, for substantially the full term of the asset or liability; and

Level 3

Prices or valuation techniques that require inputs that are both significant to the fair value measurement and unobservable (supported by little or no market activity.)

As required by accounting guidance, assets and liabilities are classified in their entirety based on the lowest level of input that is significant to the fair value measurement. These assets and liabilities are remeasured for each reporting period. The following tables set forth certain of the Company’s assets and liabilities measured at fair value by level within the fair value hierarchy as of December 31, 2024 and 2023:

As of

As of

December 31, 

December 31,

Input Hierarchy Level

2024

2023

(in thousands)

Cash and cash equivalents

$

1,628

$

6,254

Level 1

Accounts receivable, net

$

2,184

$

4,335

Level 2

Investment in equity securities-Maritime

$

-

$

1,596

Level 1

Investment in equity securities-Green Light Metals

$

852

$

3,698

Level 3

The following methods and assumptions were used to estimate the fair value of each class of financial instrument:

Cash and cash equivalents: Cash and cash equivalents consist primarily of cash deposits and are valued at cost, which approximates fair value.

Accounts receivable, net: Accounts receivable, net include amounts due to the Company for deliveries of concentrates and doré sold to customers. Concentrate sales contracts provide for provisional pricing as specified in such contracts. These sales contain an embedded derivative related to the provisional pricing mechanism which is bifurcated and accounted for as a derivative. At the end of each reporting period, the Company records an adjustment to sales to reflect the mark-to-market of outstanding provisional invoices based on the forward price curve. Because these provisionally priced sales have not yet settled as of the reporting date, the mark-to-market adjustment related to these invoices is included in accounts receivable as of each reporting date.

Gold Resource Corporation

103

Table of Contents

At December 31, 2024 and 2023, the Company had an unrealized loss of $7 thousand and an unrealized gain of $0.3 million, respectively, included in its accounts receivable on the accompanying Consolidated Balance Sheets related to mark-to-market adjustments. Please see Item 8. Financial Statements —Note 16. Derivatives for additional information.

Investment in equity securities—Maritime: On September 22, 2022, the Company invested C$2.4 million (or $1.7 million) in the common shares of Maritime Resources Corp., ticker symbol MAE.V on TSX-V, in a private placement. On September 23, 2024, all the common shares of Maritime were sold in a private placement transaction for C$0.034 per share to a related party, Dundee Corporation, for total proceeds of C$1.6 million (or $1.2 million). As of December 31, 2023, the fair value of the investment was $1.6 million.

Investment in equity securities—Green Light Metals: Upon maturity on December 28, 2022, the Company received approximately 12.3 million common shares of Green Light Metals as a settlement for a promissory note receivable acquired with the Aquila acquisition. This represented approximately 28.5% ownership in Green Light Metals at the time. As of December 31, 2024 and 2023, the fair value of this equity investment was $0.9 and $3.7 million, respectively. The Company is using significant unobservable inputs to value this investment, including published and unpublished prices at which Green Light Metals is raising additional capital.

Gains and losses related to changes in the fair value of embedded derivates in accounts receivable were included in the Company’s Consolidated Statements of Operations as shown in the following:

For the year ended December 31, 

Statements of Operations Classification

2024

2023

Note

Realized and unrealized derivative (loss) gain, net

16

$

970

$

(28)

Sales, net

Realized/Unrealized Derivatives, net

The following tables summarize the Company’s realized/unrealized derivatives, net (in thousands):

Gold

Silver

Copper

Lead

Zinc

Total

For the year ended December 31, 2024

Realized gain

$

463

$

351

$

83

$

18

$

316

$

1,231

Unrealized (loss) gain

(46)

(47)

(29)

8

(147)

(261)

Total realized/unrealized derivatives, net

$

417

$

304

$

54

$

26

$

169

$

970

Gold

Silver

Copper

Lead

Zinc

Total

For the year ended December 31, 2023

Realized gain (loss)

$

295

$

334

$

6

$

174

$

(511)

$

298

Unrealized (loss) gain

(40)

(241)

4

(186)

137

(326)

Total realized/unrealized derivatives, net

$

255

$

93

$

10

$

(12)

$

(374)

$

(28)

Gold Resource Corporation

104

Table of Contents

22. Supplementary Cash Flow Information

During the years ended December 31, 2024 and 2023, other operating adjustments and write-downs within the net cash provided by operations on the Consolidated Statements of Cash Flows consisted of the following:

For the year ended December 31, 

2024

2023

(in thousands)

Unrealized gain on gold and silver rounds

$

(31)

$

(14)

Unrealized foreign currency exchange loss (gain)

2,225

(174)

Unrealized loss (gain) on investments

2,446

(4)

Loss on disposition of fixed assets

4

13

Increase in reserve for inventory

168

382

Other, net

1,433

388

Total other operating adjustments, net

$

6,245

$

591

23. Segment Reporting

As of December 31, 2024, the Company has organized its operations into two operating segments: Oaxaca, Mexico, and Michigan, U.S.A. Oaxaca, Mexico represents the Company’s only operating segment with a production stage property that produces copper, lead, and zinc concentrates that also contain gold and silver. Michigan, U.S.A. is an advanced exploration stage property with no current metal production. Intercompany revenue and expense amounts have been eliminated within each segment in order to report the net income (loss) before income taxes on the basis that the chief operating decision maker (“CODM”) uses internally for evaluating segment performance. The Company’s business activities that are not considered distinct segments are included in the reconciliation under the title Corporate and Other.

The Company’s operating segments reflect the way in which internally-reported financial information is used to make decisions and allocate resources. The Chief Executive Officer, who is considered to be the CODM, reviews financial information presented on both a consolidated and an operating segment basis for purposes of making decisions and assessing financial performance. Net income or loss before income taxes is the measure of segment profit or loss that is regularly reviewed and is most consistent with the measurement principles used in the consolidated financial statements. The most significant expenses reviewed by the CODM are production costs and exploration expenses. Please refer to the table below for other expenses reviewed by the CODM. The CODM uses this information to assess current and/or future performance expectations, and the result of this assessment may be a reallocation of financial and/or non-financial resources among the reportable segments.

Gold Resource Corporation

105

Table of Contents

The following table shows selected information from the Consolidated Statements of Operations relating to the Company’s segments (in thousands):

Oaxaca,
Mexico

Michigan,
USA

Corporate
and Other

Total

For the year ended December 31, 2024

Sales, net

$

65,726

$

-

$

-

$

65,726

Production costs

65,552

-

-

65,552

Depreciation and amortization

17,982

109

29

18,120

Reclamation and remediation

2,545

-

-

2,545

Mine gross loss

(20,353)

(109)

(29)

(20,491)

Exploration expense

1,959

378

-

2,337

G&A expenses, including Stock-based compensation

-

-

4,960

4,960

Other segment items (1)

3,013

16,078

361

19,452

Loss before income taxes

(25,325)

(16,565)

(5,350)

(47,240)

Income tax provision

9,261

Net loss

$

(56,501)

Expenditures for long-lived assets

$

8,646

$

-

$

-

8,646

Oaxaca,
Mexico

Michigan,
USA

Corporate
and Other

Total

Restated

Restated

Restated

Restated

For the year ended December 31, 2023

Sales, net

$

97,728

$

-

$

-

$

97,728

Production costs

76,143

-

-

76,143

Depreciation and amortization

25,996

92

38

26,126

Reclamation and remediation

683

-

-

683

Mine gross loss

(5,094)

(92)

(38)

(5,224)

Exploration expense

4,167

1,642

-

5,809

G&A expenses, including Stock-based compensation

-

31

7,233

7,264

Other segment items (1)

2,693

8,863

173

11,729

Loss before income taxes

(11,954)

(10,628)

(7,444)

(30,026)

Income tax benefit

(5,882)

Net loss

$

(24,144)

Expenditures for long-lived assets

$

10,964

$

407

$

27

11,398

(1) Please see Item 8. Financial Statements—Note 2. Other Expense, net for additional information.

The following table shows selected information from the Consolidated Balance Sheets relating to the Company’s segments (in thousands):

Oaxaca,
Mexico

Michigan,
USA

Corporate
and Other

Total

As of December 31, 2024

Total current assets

$

16,073

$

50

$

457

$

16,580

Total non-current assets (1)

38,926

90,328

40

129,294

Total assets

$

54,999

$

90,378

$

497

$

145,874

As of December 31, 2023

Total current assets

$

25,155

$

116

$

1,224

$

26,495

Total non-current assets (1)

62,456

93,287

1,736

157,479

Total assets

$

87,611

$

93,403

$

2,960

$

183,974

(1) In 2024, the total non-current assets included capital investments of $8.6 million in Oaxaca, Mexico, and nil in both Michigan, USA and Corporate and Other. In 2023, the total non-current assets included capital investments of $11.0 million in Oaxaca, Mexico, $0.4 million in Michigan, USA, and nil in Corporate and Other.

Gold Resource Corporation

106

Table of Contents

24. Restatement of Unaudited Quarterly Financial Statements

The tables included below for the interim periods ended September 30, 2024 and September 30, 2023, June 30, 2024 and June 30, 2023, and March 31, 2024 and March 31 2023 reflect the impacts of the restatement discussed in Item 8. Financial Statements —Note 2. Restatement of Consolidated Financial Statement information.

The following tables show the restatement impact for each quarterly unaudited condensed consolidated financial statement:

UNAUDITED CONDENSED CONSOLIDATED BALANCE SHEETS

AS OF MARCH 31,

2024

2023

  

As
Previously
Reported

  

Restatement
Impacts

  

Restated

  

As
Previously
Reported

  

Restatement
Impacts

  

Restated

(U.S. dollars in thousands, except share and per share amounts)

ASSETS

Current assets:

Cash and cash equivalents

$

5,662

$

-

$

5,662

$

21,420

$

-

$

21,420

Accounts receivable, net

4,161

-

4,161

5,134

-

5,134

Inventories, net

9,849

-

9,849

11,179

-

11,179

Prepaid expenses and other current assets

6,033

-

6,033

2,983

-

2,983

Total current assets

25,705

-

25,705

40,716

-

40,716

Property, plant, and mine development, net

135,775

122

135,897

148,997

(329)

148,668

Deferred tax assets, net

15,569

(34)

15,535

7,300

(16)

7,284

Other non-current assets

5,669

-

5,669

5,488

-

5,488

Total assets

$

182,718

$

88

$

182,806

$

202,501

$

(345)

$

202,156

LIABILITIES AND SHAREHOLDERS’ EQUITY

Current liabilities:

Accounts payable

$

9,082

$

(772)

$

8,310

$

8,616

$

(481)

$

8,135

Mining royalty taxes payable, net

1,462

-

1,462

744

-

744

Contingent consideration

-

-

-

2,215

-

2,215

Accrued expenses and other current liabilities

1,555

825

2,380

5,058

481

5,539

Total current liabilities

12,099

53

12,152

16,633

-

16,633

Reclamation and remediation liabilities

12,128

-

12,128

11,669

(392)

11,277

Gold and silver stream agreements liability

46,341

17,714

64,055

43,740

9,803

53,543

Deferred tax liabilities, net

13,926

242

14,168

15,019

241

15,260

Contingent consideration

3,598

-

3,598

2,144

-

2,144

Other non-current liabilities

1,851

-

1,851

2,305

-

2,305

Total liabilities

89,943

18,009

107,952

91,510

$

9,652

101,162

Shareholders’ equity:

Common stock - $0.001 par value, 200,000,000 shares authorized:

88,790,474 and 88,468,542 shares issued and outstanding at March 31, 2024 and March 31, 2023, respectively

89

-

89

89

-

89

Additional paid-in capital

112,073

-

112,073

111,286

-

111,286

Accumulated deficit

(12,332)

(17,921)

(30,253)

6,671

(9,997)

(3,326)

Treasury stock at cost, 336,398 shares

(5,884)

-

(5,884)

(5,884)

-

(5,884)

Accumulated other comprehensive loss

(1,171)

-

(1,171)

(1,171)

-

(1,171)

Total shareholders’ equity

92,775

(17,921)

74,854

110,991

(9,997)

100,994

Total liabilities and shareholders’ equity

$

182,718

$

88

$

182,806

$

202,501

$

(345)

$

202,156

Gold Resource Corporation

107

Table of Contents

UNAUDITED CONDENSED CONSOLIDATED BALANCE SHEETS

AS OF JUNE 30,

2024

2023

  

As
Previously
Reported

  

Restatement
Impacts

  

Restated

  

As
Previously
Reported

  

Restatement
Impacts

  

Restated

(U.S. dollars in thousands, except share and per share amounts)

ASSETS

Current assets:

Cash and cash equivalents

$

5,342

$

-

$

5,342

$

17,957

$

-

$

17,957

Accounts receivable, net

4,577

-

4,577

4,355

-

4,355

Inventories, net

8,979

-

8,979

10,874

-

10,874

Prepaid expenses and other current assets

7,703

(1,304)

6,399

6,776

-

6,776

Total current assets

26,601

(1,304)

25,297

39,962

-

39,962

Property, plant, and mine development, net

131,791

122

131,913

145,645

(299)

145,346

Deferred tax assets, net

269

-

269

9,951

(30)

9,921

Other non-current assets

4,069

-

4,069

5,465

-

5,465

Total assets

$

162,730

$

(1,182)

$

161,548

$

201,023

$

(329)

$

200,694

LIABILITIES AND SHAREHOLDERS’ EQUITY

Current liabilities:

Accounts payable

$

10,284

$

(1,635)

$

8,649

$

13,114

$

(762)

$

12,352

Mining royalty taxes payable, net

433

-

433

1,130

-

1,130

Contingent consideration

-

-

-

2,263

-

2,263

Accrued expenses and other current liabilities

1,550

331

1,881

2,608

762

3,370

Total current liabilities

12,267

(1,304)

10,963

19,115

-

19,115

Reclamation and remediation liabilities

11,212

-

11,212

12,541

(392)

12,149

Gold and silver stream agreements liability

50,028

17,314

67,342

44,015

11,964

55,979

Deferred tax liabilities, net

16,883

-

16,883

14,625

243

14,868

Contingent consideration

3,392

-

3,392

2,191

-

2,191

Other non-current liabilities

1,927

-

1,927

1,835

-

1,835

Total liabilities

95,709

16,010

111,719

94,322

11,815

106,137

Shareholders’ equity:

Common stock - $0.001 par value, 200,000,000 shares authorized:

92,292,848 and 88,468,542 shares outstanding at June 30, 2024 and June 30, 2023, respectively

93

-

93

89

-

89

Additional paid-in capital

114,049

-

114,049

111,580

-

111,580

Accumulated deficit

(40,066)

(17,192)

(57,258)

2,087

(12,144)

(10,057)

Treasury stock at cost, 336,398 shares

(5,884)

-

(5,884)

(5,884)

-

(5,884)

Accumulated other comprehensive loss

(1,171)

-

(1,171)

(1,171)

-

(1,171)

Total shareholders’ equity

67,021

(17,192)

49,829

106,701

(12,144)

94,557

Total liabilities and shareholders’ equity

$

162,730

$

(1,182)

$

161,548

$

201,023

$

(329)

$

200,694

Gold Resource Corporation

108

Table of Contents

UNAUDITED CONDENSED CONSOLIDATED BALANCE SHEETS

AS OF SEPTEMBER 30,

2024

2023

  

As
Previously
Reported

  

Restatement
Impacts

  

Restated

  

As
Previously
Reported

  

Restatement
Impacts

  

Restated

(U.S. dollars in thousands, except share and per share amounts)

ASSETS

Current assets:

Cash and cash equivalents

$

1,352

$

-

$

1,352

$

6,706

$

-

$

6,706

Accounts receivable, net

5,413

-

5,413

4,714

-

4,714

Inventories, net

7,824

-

7,824

10,442

-

10,442

Prepaid expenses and other current assets

7,383

(1,046)

6,337

7,038

-

7,038

Total current assets

21,972

(1,046)

20,926

28,900

-

28,900

Property, plant, and mine development, net

130,888

122

131,010

144,194

(269)

143,925

Deferred tax assets, net

239

-

239

11,589

(45)

11,544

Other non-current assets

2,347

-

2,347

5,009

-

5,009

Total assets

$

155,446

$

(924)

$

154,522

$

189,692

$

(314)

$

189,378

LIABILITIES AND SHAREHOLDERS’ EQUITY

Current liabilities:

Accounts payable

$

12,374

$

(308)

$

12,066

$

10,240

$

(995)

$

9,245

Mining royalty taxes payable, net

159

-

159

1,015

-

1,015

Contingent consideration

-

-

-

2,209

-

2,209

Accrued expenses and other current liabilities

3,346

(358)

2,988

1,637

995

2,632

Total current liabilities

15,879

(666)

15,213

15,101

-

15,101

Reclamation and remediation liabilities

10,681

(404)

10,277

12,349

(392)

11,957

Gold and silver stream agreements liability

51,288

19,511

70,799

44,703

13,822

58,525

Deferred tax liabilities, net

14,922

9

14,931

14,269

242

14,511

Contingent consideration

3,336

-

3,336

2,138

-

2,138

Other non-current liabilities

2,031

-

2,031

1,618

-

1,618

Total liabilities

98,137

18,450

116,587

90,178

13,672

103,850

Shareholders’ equity:

Common stock - $0.001 par value, 200,000,000 shares authorized:

93,523,028 and 88,628,365 shares outstanding at September 30, 2024 and September 30, 2023, respectively

94

-

94

89

-

89

Additional paid-in capital

114,831

-

114,831

111,734

-

111,734

Accumulated deficit

(50,561)

(19,374)

(69,935)

(5,254)

(13,986)

(19,240)

Treasury stock at cost, 336,398 shares

(5,884)

-

(5,884)

(5,884)

-

(5,884)

Accumulated other comprehensive loss

(1,171)

-

(1,171)

(1,171)

-

(1,171)

Total shareholders’ equity

57,309

(19,374)

37,935

99,514

(13,986)

85,528

Total liabilities and shareholders’ equity

$

155,446

$

(924)

$

154,522

$

189,692

$

(314)

$

189,378

Gold Resource Corporation

109

Table of Contents

UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF OPERATIONS

For the three months ended March 31, 2024

For the three months ended March 31, 2023

As Previously
Reported

Restatement
Impacts

Restated

As Previously
Reported

Restatement
Impacts

Restated

(U.S. dollars in thousands, except share and per share amounts)

Sales, net

$

18,702

$

-

$

18,702

$

31,228

$

-

$

31,228

Cost of sales:

Production costs

16,108

-

16,108

19,850

-

19,850

Depreciation and amortization

4,210

-

4,210

7,254

-

7,254

Reclamation and remediation

553

-

553

195

(31)

164

Total cost of sales

20,871

-

20,871

27,299

(31)

27,268

Mine gross (loss) profit

(2,169)

-

(2,169)

3,929

31

3,960

Costs and expenses:

General and administrative expenses

901

54

955

1,193

-

1,193

Mexico exploration expenses

899

-

899

1,389

-

1,389

Michigan Back Forty Project expenses

205

-

205

450

-

450

Stock-based compensation

219

-

219

597

-

597

Other expense, net

1,515

1,602

3,117

1,469

2,054

3,523

Total costs and expenses

3,739

1,656

5,395

5,098

2,054

7,152

Loss before income taxes

(5,908)

(1,656)

(7,564)

(1,169)

(2,023)

(3,192)

Income tax benefit

(1,887)

-

(1,887)

(134)

(164)

(298)

Net loss

$

(4,021)

$

(1,656)

$

(5,677)

$

(1,035)

$

(1,859)

$

(2,894)

Net loss per common share:

Basic and diluted net loss per common share

$

(0.05)

$

(0.01)

$

(0.06)

$

(0.01)

$

(0.02)

$

(0.03)

Weighted average shares outstanding:

Basic and diluted

88,707,430

-

88,707,430

88,405,935

-

88,405,935

UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF OPERATIONS

For the three months ended June 30, 2024

For the six months ended June 30, 2024

As Previously
Reported

Restatement
Impacts

Restated

As Previously
Reported

Restatement
Impacts

Restated

(U.S. dollars in thousands, except share and per share amounts)

Sales, net

$

20,782

$

-

$

20,782

$

39,484

$

-

$

39,484

Cost of sales:

Production costs

17,768

-

17,768

33,876

-

33,876

Depreciation and amortization

5,833

-

5,833

10,043

-

10,043

Reclamation and remediation

773

-

773

1,326

-

1,326

Total cost of sales

24,374

-

24,374

45,245

-

45,245

Mine gross loss

(3,592)

-

(3,592)

(5,761)

-

(5,761)

Costs and expenses:

General and administrative expenses

781

(54)

727

1,682

-

1,682

Mexico exploration expenses

184

-

184

1,083

-

1,083

Michigan Back Forty Project expenses

142

-

142

347

-

347

Stock-based compensation

225

-

225

444

-

444

Other expense, net

6,354

(400)

5,954

7,869

1,202

9,071

Total costs and expenses

7,686

(454)

7,232

11,425

1,202

12,627

Loss before income taxes

(11,278)

454

(10,824)

(17,186)

(1,202)

(18,388)

Income tax provision

16,456

(275)

16,181

14,569

(275)

14,294

Net loss

$

(27,734)

$

729

$

(27,005)

$

(31,755)

$

(927)

$

(32,682)

Net loss per common share:

Basic and diluted net loss per common share

$

(0.30)

$

-

$

(0.30)

$

(0.35)

$

(0.01)

$

(0.36)

Weighted average shares outstanding:

Basic and diluted

91,004,348

-

91,004,348

89,855,890

-

89,855,890

Gold Resource Corporation

110

Table of Contents

UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF OPERATIONS

For the three months ended June 30, 2023

For the six months ended June 30, 2023

As Previously
Reported

Restatement
Impacts

Restated

As Previously
Reported

Restatement
Impacts

Restated

(U.S. dollars in thousands, except share and per share amounts)

Sales, net

$

24,807

$

-

$

24,807

$

56,035

$

-

$

56,035

Cost of sales:

Production costs

20,302

-

20,302

40,152

-

40,152

Depreciation and amortization

6,474

-

6,474

13,728

-

13,728

Reclamation and remediation

200

(30)

170

395

(61)

334

Total cost of sales

26,976

(30)

26,946

54,275

(61)

54,214

Mine gross (loss) profit

(2,169)

30

(2,139)

1,760

61

1,821

Costs and expenses:

General and administrative expenses

2,130

-

2,130

3,323

-

3,323

Mexico exploration expenses

1,045

-

1,045

2,434

-

2,434

Michigan Back Forty Project expenses

395

-

395

845

-

845

Stock-based compensation

7

-

7

604

-

604

Other expense, net

711

2,162

2,873

2,180

4,217

6,397

Total costs and expenses

4,288

2,162

6,450

9,386

4,217

13,603

Loss before income taxes

(6,457)

(2,132)

(8,589)

(7,626)

(4,156)

(11,782)

(Benefit) provision for income taxes

(1,873)

15

(1,858)

(2,007)

(150)

(2,157)

Net loss

$

(4,584)

$

(2,147)

$

(6,731)

$

(5,619)

$

(4,006)

$

(9,625)

Net loss per common share:

Basic and diluted net loss per common share

$

(0.05)

$

(0.05)

$

(0.10)

$

(0.06)

$

(0.05)

$

(0.11)

Weighted average shares outstanding:

Basic and diluted

88,468,542

-

88,468,542

88,437,413

-

88,437,413

UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF OPERATIONS

For the three months ended September 30, 2024

For the nine months ended September 30, 2024

As Previously
Reported

Restatement
Impacts

Restated

As Previously
Reported

Restatement
Impacts

Restated

(U.S. dollars in thousands, except share and per share amounts)

Sales, net

$

13,272

$

-

$

13,272

$

52,756

$

-

$

52,756

Cost of sales:

-

-

Production costs

17,198

-

17,198

51,074

-

51,074

Depreciation and amortization

4,178

-

4,178

14,221

-

14,221

Reclamation and remediation

566

-

566

1,892

-

1,892

Total cost of sales

21,942

-

21,942

67,187

-

67,187

Mine gross loss

(8,670)

-

(8,670)

(14,431)

-

(14,431)

Costs and expenses:

General and administrative expenses

1,293

-

1,293

2,975

-

2,975

Mexico exploration expenses

767

-

767

1,850

-

1,850

Michigan Back Forty Project expenses

202

(25)

177

549

(25)

524

Stock-based compensation

203

-

203

647

-

647

Other expense, net

2,977

2,198

5,175

10,846

3,400

14,246

Total costs and expenses

5,442

2,173

7,615

16,867

3,375

20,242

Loss before income taxes

(14,112)

(2,173)

(16,285)

(31,298)

(3,375)

(34,673)

Income tax (benefit) provision

(3,617)

9

(3,608)

10,952

(266)

10,686

Net loss

$

(10,495)

$

(2,182)

$

(12,677)

$

(42,250)

$

(3,109)

$

(45,359)

Net loss per common share:

Basic and diluted net loss per common share

$

(0.11)

$

(0.03)

$

(0.14)

$

(0.46)

$

(0.04)

$

(0.50)

Weighted average shares outstanding:

Basic and diluted

93,279,750

-

93,279,750

91,005,507

-

91,005,507

Gold Resource Corporation

111

Table of Contents

UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF OPERATIONS

For the three months ended September 30, 2023

For the nine months ended September 30, 2023

As Previously
Reported

Restatement
Impacts

Restated

As Previously
Reported

Restatement
Impacts

Restated

(U.S. dollars in thousands, except share and per share amounts)

Sales, net

$

20,552

$

-

$

20,552

$

76,587

$

-

$

76,587

Cost of sales:

Production costs

18,957

-

18,957

59,109

-

59,109

Depreciation and amortization

5,790

-

5,790

19,518

-

19,518

Reclamation and remediation

216

(31)

185

611

(92)

519

Total cost of sales

24,963

(31)

24,932

79,238

(92)

79,146

Mine gross loss

(4,411)

31

(4,380)

(2,651)

92

(2,559)

Costs and expenses:

General and administrative expenses

1,764

-

1,764

5,087

-

5,087

Mexico exploration expenses

1,540

-

1,540

3,974

-

3,974

Michigan Back Forty Project expenses

420

-

420

1,265

-

1,265

Stock-based compensation

(102)

-

(102)

502

-

502

Other expense, net

1,967

1,858

3,825

4,147

6,075

10,222

Total costs and expenses

5,589

1,858

7,447

14,975

6,075

21,050

Loss before income taxes

(10,000)

(1,827)

(11,827)

(17,626)

(5,983)

(23,609)

Income tax benefit

(2,659)

15

(2,644)

(4,666)

(135)

(4,801)

Net loss

$

(7,341)

$

(1,842)

$

(9,183)

$

(12,960)

$

(5,848)

$

(18,808)

Net loss per common share:

Basic and diluted net loss per common share

$

(0.08)

$

(0.02)

$

(0.10)

$

(0.15)

$

(0.06)

$

(0.21)

Weighted average shares outstanding:

Basic and diluted

88,499,327

-

88,499,327

88,458,276

-

88,458,276

Gold Resource Corporation

112

Table of Contents

UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF CHANGES IN SHAREHOLDERS' EQUITY

As Previously Reported

For the three months ended March 31, 2023

  

Number of
Common
Shares

  

Par Value of
Common
Shares

  

Additional Paid-
in Capital

  

Retained
Earnings (Accumulated Deficit)

  

Treasury
Stock

  

Accumulated
Other
Comprehensive
Loss

  

Total
Shareholders'
Equity

(U.S. dollars in thousands, except share amounts)

Balance, December 31, 2022

88,734,507

$

89

$

111,024

$

7,706

$

(5,884)

$

(1,171)

$

111,764

Stock-based compensation

-

-

273

-

-

-

273

Common stock issued for vested restricted stock units

88,570

-

-

-

-

-

-

Surrender of common stock for taxes due on vesting

(18,137)

-

(11)

-

-

-

(11)

Net loss

-

-

-

(1,035)

-

-

(1,035)

Balance, March 31, 2023

88,804,940

$

89

$

111,286

$

6,671

$

(5,884)

$

(1,171)

$

110,991

Restatement Impacts

Balance, December 31, 2022

-

$

-

$

-

$

(8,138)

$

-

$

-

$

(8,138)

Stock-based compensation

-

-

-

-

-

-

-

Common stock issued for vested restricted stock units

-

-

-

-

-

-

-

Surrender of common stock for taxes due on vesting

-

-

-

-

-

-

-

Net loss

-

-

-

(1,859)

-

-

(1,859)

Balance, March 31, 2023

-

$

-

$

-

$

(9,997)

$

-

$

-

$

(9,997)

Restated

Balance, December 31, 2022

88,734,507

$

89

$

111,024

$

(432)

$

(5,884)

$

(1,171)

$

103,626

Stock-based compensation

-

-

273

-

-

-

273

Common stock issued for vested restricted stock units

88,570

-

-

-

-

-

-

Surrender of common stock for taxes due on vesting

(18,137)

-

(11)

-

-

-

(11)

Net loss

-

-

-

(2,894)

-

-

(2,894)

Balance, March 31, 2023

88,804,940

$

89

$

111,286

$

(3,326)

$

(5,884)

$

(1,171)

$

100,994

UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF CHANGES IN SHAREHOLDERS' EQUITY

As Previously Reported

For the three months ended June 30, 2023

  

Number of
Common
Shares

  

Par Value of
Common
Shares

  

Additional Paid-
in Capital

  

Retained
Earnings (Accumulated Deficit)

  

Treasury
Stock

  

Accumulated
Other
Comprehensive
Loss

  

Total
Shareholders'
Equity

(U.S. dollars in thousands, except share amounts)

Balance, March 31, 2023

88,804,940

$

89

$

111,286

$

6,671

$

(5,884)

$

(1,171)

$

110,991

Stock-based compensation

-

-

294

-

-

-

294

Net loss

-

-

-

(4,584)

-

-

(4,584)

Balance, June 30, 2023

88,804,940

$

89

$

111,580

$

2,087

$

(5,884)

$

(1,171)

$

106,701

Restatement Impacts

Balance, March 31, 2023

-

$

-

$

-

$

(9,997)

$

-

$

-

$

(9,997)

Stock-based compensation

-

-

-

-

-

-

-

Net loss

-

-

-

(2,147)

-

-

(2,147)

Balance, June 30, 2023

-

$

-

$

-

$

(12,144)

$

-

$

-

$

(12,144)

Restated

Balance, March 31, 2023

88,804,940

$

89

$

111,286

$

(3,326)

$

(5,884)

$

(1,171)

$

100,994

Stock-based compensation

-

-

294

-

-

-

294

Net loss

-

-

-

(6,731)

-

-

(6,731)

Balance, June 30, 2023

88,804,940

$

89

$

111,580

$

(10,057)

$

(5,884)

$

(1,171)

$

94,557

Gold Resource Corporation

113

Table of Contents

UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF CHANGES IN SHAREHOLDERS' EQUITY

As Previously Reported

For the six months ended June 30, 2023

  

Number of
Common
Shares

  

Par Value of
Common
Shares

  

Additional Paid-
in Capital

  

Retained
Earnings (Accumulated Deficit)

  

Treasury
Stock

  

Accumulated
Other
Comprehensive
Loss

  

Total
Shareholders'
Equity

(U.S. dollars in thousands, except share amounts)

Balance, December 31, 2022

88,734,507

$

89

$

111,024

$

7,706

$

(5,884)

$

(1,171)

$

111,764

Stock-based compensation

-

-

567

-

-

-

567

Common stock issued for vested restricted stock units

88,570

-

-

-

-

-

-

Surrender of common stock for taxes due on vesting

(18,137)

-

(11)

-

-

-

(11)

Net loss

-

-

-

(5,619)

-

-

(5,619)

Balance, June 30, 2023

88,804,940

$

89

$

111,580

$

2,087

$

(5,884)

$

(1,171)

$

106,701

Restatement Impacts

Balance, December 31, 2022

-

$

-

$

-

$

(8,138)

$

-

$

-

$

(8,138)

Stock-based compensation

-

-

-

-

-

-

-

Common stock issued for vested restricted stock units

-

-

-

-

-

-

-

Surrender of common stock for taxes due on vesting

-

-

-

-

-

-

-

Net loss

-

-

-

(4,006)

-

-

(4,006)

Balance, June 30, 2023

-

$

-

$

-

$

(12,144)

$

-

$

-

$

(12,144)

Restated

Balance, December 31, 2022

88,734,507

$

89

$

111,024

$

(432)

$

(5,884)

$

(1,171)

$

103,626

Stock-based compensation

-

-

567

-

-

-

567

Common stock issued for vested restricted stock units

88,570

-

-

-

-

-

-

Surrender of common stock for taxes due on vesting

(18,137)

-

(11)

-

-

-

(11)

Net loss

-

-

-

(9,625)

-

-

(9,625)

Balance, June 30, 2023

88,804,940

$

89

$

111,580

$

(10,057)

$

(5,884)

$

(1,171)

$

94,557

Gold Resource Corporation

114

Table of Contents

UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF CHANGES IN SHAREHOLDERS' EQUITY

As Previously Reported

For the three months ended September 30, 2023

  

Number of
Common
Shares

  

Par Value of
Common
Shares

  

Additional Paid-
in Capital

  

Retained
Earnings (Accumulated Deficit)

  

Treasury
Stock

  

Accumulated
Other
Comprehensive
Loss

  

Total
Shareholders'
Equity

(U.S. dollars in thousands, except share amounts)

Balance, June 30, 2023

88,804,940

$

89

$

111,580

$

2,087

$

(5,884)

$

(1,171)

$

106,701

Stock-based compensation

-

-

105

-

-

-

105

Common stock issued for vested restricted stock units

41,668

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

130,199

-

56

-

-

-

56

Surrender of common stock for taxes due on vesting

(12,044)

-

(7)

-

-

-

(7)

Net loss

-

-

-

(7,341)

-

-

(7,341)

Balance, September 30, 2023

88,964,763

$

89

$

111,734

$

(5,254)

$

(5,884)

$

(1,171)

$

99,514

Restatement Impacts

Balance, June 30, 2023

-

$

-

$

-

$

(12,144)

$

-

$

-

$

(12,144)

Stock-based compensation

-

-

-

-

-

-

-

Common stock issued for vested restricted stock units

-

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

-

-

-

-

-

-

-

Surrender of common stock for taxes due on vesting

-

-

-

-

-

-

-

Net loss

-

-

-

(1,842)

-

-

(1,842)

Balance, September 30, 2023

-

$

-

$

-

$

(13,986)

$

-

$

-

$

(13,986)

Restated

Balance, June 30, 2023

88,804,940

$

89

$

111,580

$

(10,057)

$

(5,884)

$

(1,171)

$

94,557

Stock-based compensation

-

-

105

-

-

-

105

Common stock issued for vested restricted stock units

41,668

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

130,199

-

56

-

-

-

56

Surrender of common stock for taxes due on vesting

(12,044)

-

(7)

-

-

-

(7)

Net loss

-

-

-

(9,183)

-

-

(9,183)

Balance, September 30, 2023

88,964,763

$

89

$

111,734

$

(19,240)

$

(5,884)

$

(1,171)

$

85,528

Gold Resource Corporation

115

Table of Contents

UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF CHANGES IN SHAREHOLDERS' EQUITY

As Previously Reported

For the nine months ended September 30, 2023

  

Number of
Common
Shares

  

Par Value of
Common
Shares

  

Additional Paid-
in Capital

  

Retained
Earnings (Accumulated Deficit)

  

Treasury
Stock

  

Accumulated
Other
Comprehensive
Loss

  

Total
Shareholders'
Equity

(U.S. dollars in thousands, except share amounts)

Balance, December 31, 2022

88,734,507

$

89

$

111,024

$

7,706

$

(5,884)

$

(1,171)

$

111,764

Stock-based compensation

-

-

672

-

-

-

672

Common stock issued for vested restricted stock units

130,238

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

130,199

-

56

-

-

-

56

Surrender of common stock for taxes due on vesting

(30,181)

-

(18)

-

-

-

(18)

Net loss

-

-

-

(12,960)

-

-

(12,960)

Balance, September 30, 2023

88,964,763

$

89

$

111,734

$

(5,254)

$

(5,884)

$

(1,171)

$

99,514

Restatement Impacts

Balance, December 31, 2022

-

$

-

$

-

$

(8,138)

$

-

$

-

$

(8,138)

Stock-based compensation

-

-

-

-

-

-

-

Common stock issued for vested restricted stock units

-

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

-

-

-

-

-

-

-

Surrender of common stock for taxes due on vesting

-

-

-

-

-

-

-

Net loss

-

-

-

(5,848)

-

-

(5,848)

Balance, September 30, 2023

-

$

-

$

-

$

(13,986)

$

-

$

-

$

(13,986)

Restated

Balance, December 31, 2022

88,734,507

$

89

$

111,024

$

(432)

$

(5,884)

$

(1,171)

$

103,626

Stock-based compensation

-

-

672

-

-

-

672

Common stock issued for vested restricted stock units

130,238

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

130,199

-

56

-

-

-

56

Surrender of common stock for taxes due on vesting

(30,181)

-

(18)

-

-

-

(18)

Net loss

-

-

-

(18,808)

-

-

(18,808)

Balance, September 30, 2023

88,964,763

$

89

$

111,734

$

(19,240)

$

(5,884)

$

(1,171)

$

85,528

Gold Resource Corporation

116

Table of Contents

UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF CHANGES IN SHAREHOLDERS' EQUITY

As Previously Reported

For the three months ended March 31, 2024

  

Number of
Common
Shares

  

Par Value of
Common
Shares

  

Additional Paid-
in Capital

  

Retained
Earnings (Accumulated Deficit)

  

Treasury
Stock

  

Accumulated
Other
Comprehensive
Loss

  

Total
Shareholders'
Equity

(U.S. dollars in thousands, except share amounts)

Balance, December 31, 2023

89,030,436

$

89

$

111,970

$

(8,311)

$

(5,884)

$

(1,171)

$

96,693

Stock-based compensation

-

-

128

-

-

-

128

Common stock issued for vested restricted stock units

160,736

-

-

-

-

-

-

Surrender of common stock for taxes due on vesting

(64,300)

-

(25)

-

-

-

(25)

Net loss

-

-

-

(4,021)

-

-

(4,021)

Balance, March 31, 2024

89,126,872

$

89

$

112,073

$

(12,332)

$

(5,884)

$

(1,171)

$

92,775

Restatement Impacts

Balance, December 31, 2023

-

$

-

$

-

$

(16,265)

$

-

$

-

$

(16,265)

Stock-based compensation

-

-

-

-

-

-

-

Common stock issued for vested restricted stock units

-

-

-

-

-

-

-

Surrender of common stock for taxes due on vesting

-

-

-

-

-

-

-

Net loss

-

-

-

(1,656)

-

-

(1,656)

Balance, March 31, 2024

-

$

-

$

-

$

(17,921)

$

-

$

-

$

(17,921)

Restated

Balance, December 31, 2023

89,030,436

$

89

$

111,970

$

(24,576)

$

(5,884)

$

(1,171)

$

80,428

Stock-based compensation

-

-

128

-

-

-

128

Common stock issued for vested restricted stock units

160,736

-

-

-

-

-

-

Surrender of common stock for taxes due on vesting

(64,300)

-

(25)

-

-

-

(25)

Net loss

-

-

-

(5,677)

-

-

(5,677)

Balance, March 31, 2024

89,126,872

$

89

$

112,073

$

(30,253)

$

(5,884)

$

(1,171)

$

74,854

Gold Resource Corporation

117

Table of Contents

UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF CHANGES IN SHAREHOLDERS' EQUITY

As Previously Reported

For the three months ended June 30, 2024

  

Number of
Common
Shares

  

Par Value of
Common
Shares

  

Additional Paid-
in Capital

  

Retained
Earnings (Accumulated Deficit)

  

Treasury
Stock

  

Accumulated
Other
Comprehensive
Loss

  

Total
Shareholders'
Equity

(U.S. dollars in thousands, except share amounts)

Balance, March 31, 2024

89,126,872

$

89

$

112,073

$

(12,332)

$

(5,884)

$

(1,171)

$

92,775

Stock-based compensation

-

-

151

-

-

-

151

Common stock issued for vested restricted stock units

36,255

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

3,478,813

4

1,831

-

-

-

1,835

Surrender of common stock for taxes due on vesting

(12,694)

-

(6)

-

-

-

(6)

Net loss

-

-

-

(27,734)

-

-

(27,734)

Balance, June 30, 2024

92,629,246

$

93

$

114,049

$

(40,066)

$

(5,884)

$

(1,171)

$

67,021

Restatement Impacts

Balance, March 31, 2024

-

$

-

$

-

$

(17,921)

$

-

$

-

$

(17,921)

Stock-based compensation

-

-

-

-

-

-

-

Common stock issued for vested restricted stock units

-

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

-

-

-

-

-

-

-

Surrender of common stock for taxes due on vesting

-

-

-

-

-

-

-

Net loss

-

-

-

729

-

-

729

Balance, June 30, 2024

-

$

-

$

-

$

(17,192)

$

-

$

-

$

(17,192)

Restated

Balance, March 31, 2024

89,126,872

$

89

$

112,073

$

(30,253)

$

(5,884)

$

(1,171)

$

74,854

Stock-based compensation

-

-

151

-

-

-

151

Common stock issued for vested restricted stock units

36,255

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

3,478,813

4

1,831

-

-

-

1,835

Surrender of common stock for taxes due on vesting

(12,694)

-

(6)

-

-

-

(6)

Net loss

-

-

-

(27,005)

-

-

(27,005)

Balance, June 30, 2024

92,629,246

$

93

$

114,049

$

(57,258)

$

(5,884)

$

(1,171)

$

49,829

Gold Resource Corporation

118

Table of Contents

UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF CHANGES IN SHAREHOLDERS' EQUITY

As Previously Reported

For the six months ended June 30, 2024

  

Number of
Common
Shares

  

Par Value of
Common
Shares

  

Additional Paid-
in Capital

  

Retained
Earnings (Accumulated Deficit)

  

Treasury
Stock

  

Accumulated
Other
Comprehensive
Loss

  

Total
Shareholders'
Equity

(U.S. dollars in thousands, except share amounts)

Balance, December 31, 2023

89,030,436

$

89

$

111,970

$

(8,311)

$

(5,884)

$

(1,171)

$

96,693

Stock-based compensation

-

-

279

-

-

-

279

Common stock issued for vested restricted stock units

196,991

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

3,478,813

4

1,831

-

-

-

1,835

Surrender of common stock for taxes due on vesting

(76,994)

-

(31)

-

-

-

(31)

Net loss

-

-

-

(31,755)

-

-

(31,755)

Balance, June 30, 2024

92,629,246

$

93

$

114,049

$

(40,066)

$

(5,884)

$

(1,171)

$

67,021

Restatement Impacts

Balance, December 31, 2023

-

$

-

$

-

$

(16,265)

$

-

$

-

$

(16,265)

Stock-based compensation

-

-

-

-

-

-

-

Common stock issued for vested restricted stock units

-

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

-

-

-

-

-

-

-

Surrender of common stock for taxes due on vesting

-

-

-

-

-

-

-

Net loss

-

-

-

(927)

-

-

(927)

Balance, June 30, 2024

-

$

-

$

-

$

(17,192)

$

-

$

-

$

(17,192)

Restated

Balance, December 31, 2023

89,030,436

$

89

$

111,970

$

(24,576)

$

(5,884)

$

(1,171)

$

80,428

Stock-based compensation

-

279

-

-

-

279

Common stock issued for vested restricted stock units

196,991

-

-

-

-

-

Issuance of common stock, net of issuance costs

3,478,813

4

1,831

-

-

-

1,835

Surrender of common stock for taxes due on vesting

(76,994)

-

(31)

-

-

-

(31)

Net loss

-

(32,682)

-

-

(32,682)

Balance, June 30, 2024

92,629,246

$

93

$

114,049

$

(57,258)

$

(5,884)

$

(1,171)

$

49,829

Gold Resource Corporation

119

Table of Contents

UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF CHANGES IN SHAREHOLDERS' EQUITY

As Previously Reported

For the three months ended September 30, 2024

  

Number of
Common
Shares

  

Par Value of
Common
Shares

  

Additional Paid-
in Capital

  

Retained
Earnings (Accumulated Deficit)

  

Treasury
Stock

  

Accumulated
Other
Comprehensive
Loss

  

Total
Shareholders'
Equity

(U.S. dollars in thousands, except share amounts)

Balance, June 30, 2024

92,629,246

$

93

$

114,049

$

(40,066)

$

(5,884)

$

(1,171)

$

67,021

Stock-based compensation

-

-

184

-

-

-

184

Issuance of common stock, net of issuance costs

1,230,180

1

598

-

-

-

599

Net loss

-

-

-

(10,495)

-

-

(10,495)

Balance, September 30, 2024

93,859,426

$

94

$

114,831

$

(50,561)

$

(5,884)

$

(1,171)

$

57,309

Restatement Impacts

Balance, June 30, 2024

-

$

-

$

-

$

(17,192)

$

-

$

-

$

(17,192)

Stock-based compensation

-

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

-

-

-

-

-

-

-

Net loss

-

-

-

(2,182)

-

-

(2,182)

Balance, September 30, 2024

-

$

-

$

-

$

(19,374)

$

-

$

-

$

(19,374)

Restated

Balance, June 30, 2024

92,629,246

$

93

$

114,049

$

(57,258)

$

(5,884)

$

(1,171)

$

49,829

Stock-based compensation

-

-

184

-

-

-

184

Issuance of common stock, net of issuance costs

1,230,180

1

598

-

-

-

599

Net loss

-

-

-

(12,677)

-

-

(12,677)

Balance, September 30, 2024

93,859,426

$

94

$

114,831

$

(69,935)

$

(5,884)

$

(1,171)

$

37,935

Gold Resource Corporation

120

Table of Contents

UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF CHANGES IN SHAREHOLDERS' EQUITY

As Previously Reported

For the nine months ended September 30, 2024

  

Number of
Common
Shares

  

Par Value of
Common
Shares

  

Additional Paid-
in Capital

  

Retained
Earnings (Accumulated Deficit)

  

Treasury
Stock

  

Accumulated
Other
Comprehensive
Loss

  

Total
Shareholders'
Equity

(U.S. dollars in thousands, except share amounts)

Balance, December 31, 2023

89,030,436

$

89

$

111,970

$

(8,311)

$

(5,884)

$

(1,171)

$

96,693

Stock-based compensation

-

-

463

-

-

-

463

Common stock issued for vested restricted stock units

196,991

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

4,708,993

5

2,429

-

-

-

2,434

Surrender of common stock for taxes due on vesting

(76,994)

-

(31)

-

-

-

(31)

Net loss

-

-

-

(42,250)

-

-

(42,250)

Balance, September 30, 2024

93,859,426

$

94

$

114,831

$

(50,561)

$

(5,884)

$

(1,171)

$

57,309

Restatement Impacts

Balance, December 31, 2023

-

$

-

$

-

$

(16,265)

$

-

$

-

$

(16,265)

Stock-based compensation

-

-

-

-

-

-

-

Common stock issued for vested restricted stock units

-

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

-

-

-

-

-

-

-

Surrender of common stock for taxes due on vesting

-

-

-

-

-

-

-

Net loss

-

-

-

(3,109)

-

-

(3,109)

Balance, September 30, 2024

-

$

-

$

-

$

(19,374)

$

-

$

-

$

(19,374)

Restated

Balance, December 31, 2023

89,030,436

$

89

$

111,970

$

(24,576)

$

(5,884)

$

(1,171)

$

80,428

Stock-based compensation

-

-

463

-

-

-

463

Common stock issued for vested restricted stock units

196,991

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

4,708,993

5

2,429

-

-

-

2,434

Surrender of common stock for taxes due on vesting

(76,994)

-

(31)

-

-

-

(31)

Net loss

-

-

-

(45,359)

-

-

(45,359)

Balance, September 30, 2024

93,859,426

$

94

$

114,831

$

(69,935)

$

(5,884)

$

(1,171)

$

37,935

Gold Resource Corporation

121

Table of Contents

UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS

For the three months ended March 31, 2024

For the three months ended March 31, 2023

As Previously
Reported

    

Restatement
Impacts

    

Restated

    

As Previously
Reported

    

Restatement
Impacts

    

Restated

(U.S. dollars in thousands)

Cash flows from operating activities:

Net loss

$

(4,021)

$

(1,656)

$

(5,677)

$

(1,035)

$

(1,859)

$

(2,894)

Adjustments to reconcile net loss to net cash provided by operating activities:

Deferred income tax benefit

(2,132)

-

(2,132)

(715)

(216)

(931)

Depreciation and amortization

4,582

-

4,582

7,276

(30)

7,246

Stock-based compensation

219

-

219

597

-

597

Interest on streaming liabilities

-

2,868

2,868

-

2,330

2,330

Other operating adjustments, net

(230)

-

(230)

631

-

631

Changes in operating assets and liabilities:

Accounts receivable

174

-

174

(49)

-

(49)

Inventories

(211)

-

(211)

1,741

-

1,741

Prepaid expenses and other current assets

596

-

596

1,390

-

1,390

Other non-current assets

104

-

104

(42)

-

(42)

Accounts payable and other accrued liabilities

2,229

(1,212)

1,017

(4,514)

(276)

(4,790)

Cash settled liability awards

(67)

-

(67)

-

-

-

Mining royalty and income taxes payable, net

239

-

239

(4,256)

51

(4,205)

Net cash provided by operating activities

1,482

-

1,482

1,024

-

1,024

Cash flows from investing activities:

Capital expenditures

(1,994)

-

(1,994)

(3,136)

-

(3,136)

Net cash used in investing activities

(1,994)

-

(1,994)

(3,136)

-

(3,136)

Cash flows from financing activities:

Other financing activities

(25)

-

(25)

(16)

-

(16)

Net cash used in financing activities

(25)

-

(25)

(16)

-

(16)

Effect of exchange rate changes on cash and cash equivalents

(55)

-

(55)

(127)

-

(127)

Net decrease in cash and cash equivalents

(592)

-

(592)

(2,255)

-

(2,255)

Cash and cash equivalents at beginning of period

6,254

-

6,254

23,675

-

23,675

Cash and cash equivalents at end of period

$

5,662

$

-

$

5,662

$

21,420

$

-

$

21,420

Supplemental Cash Flow Information

Income and mining taxes paid

$

66

$

-

$

66

$

4,501

$

-

$

4,501

Non-cash investing or financing activities

Value of Common Shares issued for RSU Redemption

$

37

$

-

$

37

-

-

-

Balance of capital expenditures in accounts payable

$

295

$

-

$

295

$

1,303

$

-

$

1,303

Gold Resource Corporation

122

Table of Contents

UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS

For the six months ended June 30, 2024

For the six months ended June 30, 2023

As Previously
Reported

    

Restatement
Impacts

    

Restated

    

As Previously
Reported

    

Restatement
Impacts

    

Restated

(U.S. dollars in thousands)

Cash flows from operating activities:

Net loss

$

(31,755)

$

(927)

$

(32,682)

$

(5,619)

$

(4,006)

$

(9,625)

Adjustments to reconcile net loss to net cash provided by operating activities:

Deferred income tax expense (benefit)

14,045

(276)

13,769

(2,965)

(202)

(3,167)

Depreciation and amortization

11,010

-

11,010

13,772

(61)

13,711

Stock-based compensation

444

-

444

604

-

604

Interest on streaming liabilities

5,096

1,059

6,155

549

4,217

4,766

Other operating adjustments, net

2,841

-

2,841

616

-

616

Changes in operating assets and liabilities:

Accounts receivable

(242)

-

(242)

730

-

730

Inventories

436

-

436

1,762

-

1,762

Prepaid expenses and other current assets

(1,344)

1,304

(40)

(594)

-

(594)

Other non-current assets

(101)

-

(101)

(72)

-

(72)

Accounts payable and other accrued liabilities

1,802

(1,160)

642

(2,943)

-

(2,943)

Cash settled liability awards

(67)

-

(67)

-

-

-

Mining royalty and income taxes payable, net

(746)

-

(746)

(5,367)

52

(5,315)

Net cash provided by operating activities

1,419

-

1,419

473

-

473

Cash flows from investing activities:

Capital expenditures

(4,008)

-

(4,008)

(6,001)

-

(6,001)

Net cash used in investing activities

(4,008)

-

(4,008)

(6,001)

-

(6,001)

Cash flows from financing activities:

Proceeds from the ATM sales, net of issuance costs

1,835

-

1,835

-

-

-

Other financing activities

(33)

-

(33)

(16)

-

(16)

Net cash provided by (used in) financing activities

1,802

-

1,802

(16)

-

(16)

Effect of exchange rate changes on cash and cash equivalents

(125)

-

(125)

(174)

-

(174)

Net decrease in cash and cash equivalents

(912)

-

(912)

(5,718)

-

(5,718)

Cash and cash equivalents at beginning of period

6,254

-

6,254

23,675

-

23,675

Cash and cash equivalents at end of period

$

5,342

$

-

$

5,342

$

17,957

$

-

$

17,957

Supplemental Cash Flow Information

Income and mining taxes paid

$

1,072

$

-

$

1,072

$

6,068

$

-

$

6,068

Non-cash investing or financing activities:

Value of common shares issued for RSU redemption

$

49

$

-

$

49

62

-

62

Balance of capital expenditures in accounts payable

$

502

$

-

$

502

$

508

$

-

$

508

Gold Resource Corporation

123

Table of Contents

UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS

For the nine months ended September 30, 2024

For the nine months ended September 30, 2023

As Previously
Reported

    

Restatement
Impacts

    

Restated

    

As Previously
Reported

    

Restatement
Impacts

    

Restated

(U.S. dollars in thousands)

Cash flows from operating activities:

Net loss

$

(42,250)

$

(3,109)

$

(45,359)

$

(12,960)

$

(5,848)

$

(18,808)

Adjustments to reconcile net loss to net cash used in operating activities:

Deferred income tax expense (benefit)

10,775

(266)

10,509

(5,520)

(187)

(5,707)

Depreciation and amortization

15,589

-

15,589

19,586

(92)

19,494

Stock-based compensation

647

-

647

502

-

502

Interest on streaming liabilities

6,356

3,256

9,612

1,237

6,075

7,312

Other operating adjustments, net

4,446

-

4,446

1,210

-

1,210

Changes in operating assets and liabilities:

Accounts receivable

(1,078)

-

(1,078)

371

-

371

Inventories

1,185

-

1,185

1,580

-

1,580

Prepaid expenses and other current assets

(1,291)

1,045

(246)

300

-

300

Other non-current assets

(154)

-

(154)

-

-

-

Accounts payable and other accrued liabilities

4,937

(926)

4,011

(6,856)

-

(6,856)

Cash settled liability awards

(67)

-

(67)

-

-

-

Mining royalty and income taxes payable, net

(1,048)

-

(1,048)

(6,452)

52

(6,400)

Net cash used in operating activities

(1,953)

-

(1,953)

(7,002)

-

(7,002)

Cash flows from investing activities:

Capital expenditures

(6,353)

-

(6,353)

(9,751)

-

(9,751)

Proceeds from the sale of investment in Maritime

1,178

-

1,178

-

-

-

Net cash used in investing activities

(5,175)

-

(5,175)

(9,751)

-

(9,751)

Cash flows from financing activities:

Proceeds from the ATM sales, net of issuance costs

2,434

-

2,434

56

-

56

Other financing activities

(33)

-

(33)

(23)

-

(23)

Net cash provided by financing activities

2,401

-

2,401

33

-

33

Effect of exchange rate changes on cash and cash equivalents

(175)

-

(175)

(249)

-

(249)

Net decrease in cash and cash equivalents

(4,902)

-

(4,902)

(16,969)

-

(16,969)

Cash and cash equivalents at beginning of period

6,254

-

6,254

23,675

-

23,675

Cash and cash equivalents at end of period

$

1,352

$

-

$

1,352

$

6,706

$

-

$

6,706

Supplemental Cash Flow Information

Income and mining taxes paid

$

1,088

$

-

$

1,088

$

7,064

$

-

$

7,064

Non-cash investing or financing activities:

Value of common shares issued for RSU redemption

$

49

$

-

$

49

79

-

79

Balance of capital expenditures in accounts payable

$

385

$

1

$

386

$

392

$

-

$

392

Balance of equipment financing

$

1,041

$

-

$

1,041

-

$

-

$

-

Gold Resource Corporation

124

Table of Contents

25. Subsequent Events

On January 21, 2025, the Company closed on a registered direct offering with certain investors for the purchase of 15,625,000 shares of the Company’s common stock at a price of $0.16 per share, resulting in total gross proceeds to the Company of approximately $2.5 million.

Subsequent to year-end, through its subsidiary, Aquila Resources USA Inc., the Company entered into a Share Purchase Agreement with multiple purchasers to sell all of its interest in the Green Light Metals shares, for C$0.10 per share, for total net proceeds of C$1.2 million ($0.9 million), which was received on February 11, 2025.

Subsequent to the end of the year, during January and February 2025, an aggregate of 9,278,601 shares of the Company’s common stock were sold and settled through the ATM Program for net proceeds to the Company of $3.0 million, after deducting the Agent’s commissions and other expenses.

Gold Resource Corporation

125

Table of Contents

ITEM 9.

CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE

None. 

ITEM 9A.CONTROLS AND PROCEDURES

Evaluation of Disclosure Controls and Procedures

The Company’s disclosure controls and procedures are designed to ensure that information required to be disclosed in the reports that the Company files under the Securities Exchange Act of 1934, as amended (the “Exchange Act”), is recorded, processed, summarized, and reported within the time periods specified in the rules and forms of the Securities and Exchange Commission, and that such information is accumulated and communicated to management, including the Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure. The Chief Executive Officer and the Chief Financial Officer, with assistance from management, have evaluated the effectiveness of disclosure controls and procedures as of December 31, 2024. Based on that evaluation, the Chief Executive Officer and the Chief Financial Officer have concluded that the disclosure controls and procedures were not effective as of December 31, 2024 as a result of a material weakness in internal control over financial reporting described below.

Management’s Report on Internal Control over Financial Reporting

Management is responsible for establishing and maintaining adequate internal control over financial reporting and for the assessment of the effectiveness of internal control over financial reporting as defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act. Because of its inherent limitations, any system of internal control over financial reporting, no matter how well designed, may not prevent or detect misstatements due to the possibility that a control can be circumvented or overridden or that misstatements due to error or fraud may occur that are not detected. Also, because of changes in conditions, internal control effectiveness may vary over time. A material weakness is a deficiency, or a combination of deficiencies, in internal control over financial reporting, such that there is a reasonable possibility that a material misstatement of our annual or interim financial statements will not be prevented or detected on a timely basis.

Management, with the participation the Chief Executive Officer and the Chief Financial Officer, assessed the effectiveness of the Company’s internal control over financial reporting as of December 31, 2024 based on the framework set forth by the Committee of Sponsoring Organizations of the Treadway Commission (“COSO”) in Internal Control-Integrated Framework (2013). Based on this assessment, management has concluded that the Company did not maintain effective internal control over financial reporting as of December 31, 2024 due to the material weakness described below.

As of December 31, 2024, the Company has identified the following new material weakness in internal control over financial reporting:

The Company did not have adequate policies and procedures to maintain effective internal control over the accounting treatment related to complex areas.

Remediation Plan

The Company is in the process of implementing the following measures designed to improve its internal control over financial reporting and to remediate the deficiencies that led to the material weakness, including designing and implementing new controls activities, and enhancing existing control activities:

The Company will continue to evaluate and analyze in consultation with outside third-party accounting experts on non-routine, unusual, or complex transactions that are subject to technical accounting standards and significant judgement or differences in interpretation, in reaching technical accounting conclusions.

Gold Resource Corporation

126

Table of Contents

The Company will subject its technical accounting conclusions to various quality control reviews prior to finalization for non-routine, unusual, or complex transactions that are subject to significant judgment or differences in interpretation.

The Company has begun to remediate the material weakness and will continue to remediate the matter as efficiently and effectively as possible. However, management will not be able to conclude that it has remediated the material weakness until the applicable controls are fully implemented, operate for a sufficient period of time, and management has concluded, through formal testing, that these controls are operating effectively. The Company will continue to monitor the design and effectiveness of these and other processes, procedures, and controls and make any further changes management deems appropriate.

Changes in Internal Control over Financial Reporting

Except for the material weakness disclosed above, there have been no changes in internal control over financial reporting (as defined in Rule 13a-15(f) under the Exchange Act) which occurred during the fourth quarter of the year ended December 31, 2024 that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.

ITEM 9B.OTHER INFORMATION

Rule 10b5-1 Trading Arrangements

During the three months ended December 30, 2024, no director or Section 16 officer of the Company adopted, modified or terminated a “Rule 10b5-1 trading arrangement” or “non-Rule 10b5-1 trading arrangement,” as each term is defined in Item 408(a) of Regulation S-K.

ITEM 9C.

DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS

None.

Gold Resource Corporation

127

Table of Contents

PART III

ITEM 10.DIRECTORS, EXECUTIVE OFFICERS, AND CORPORATE GOVERNANCE

The information required by this item is incorporated by reference from the information to be contained in the Proxy Statement for the 2025 Annual Meeting of Shareholders (“2025 Proxy Statement”), which the Company will file within 120 days after the end of the fiscal year ended December 31, 2024.

Code of Ethics

The Company has adopted a code of ethics that applies to all of employees, including the principal executive officer, principal financial officer, principal accounting officer, and those of officers performing similar functions. The full text of the code of ethics can be found on the Corporate Governance page on the Company’s website. In the event the Board of Directors approves an amendment to or waiver from any provision of the code of ethics, the Company will disclose the required information pertaining to such amendment or waiver on its website.

Insider Trading Policy

The Company has also adopted an insider trading policy, which is available on the Company’s website and filed as Exhibit 19.1 to this Form 10-K. The Company’s insider trading policy specifically prohibits all directors and employees from engaging in short sales, publicly traded options, puts and calls, forward sale contracts, and other swap, hedging and derivative transactions relating to securities of the Company. The policy also specifically prohibits the Company’s executive officers and directors from holding securities of the Company in margin accounts or pledging securities of the Company as collateral for loans.

ITEM 11. EXECUTIVE COMPENSATION

The information required by this item is incorporated by reference from the information to be contained in the 2025 Proxy Statement.

ITEM 12.

SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS

The information required by this item is incorporated by reference from the information to be contained in the 2025 Proxy Statement.

ITEM 13.

CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE

The information required by this item is incorporated by reference from the information to be contained in the 2025 Proxy Statement.

ITEM 14.PRINCIPAL ACCOUNTING FEES AND SERVICES

The information required by this item is incorporated by reference from the information to be contained in the 2025 Proxy Statement.

Gold Resource Corporation

128

Table of Contents

PART IV

ITEM 15.

EXHIBITS AND FINANCIAL STATEMENT SCHEDULES

The following exhibits are filed with or incorporated by referenced in this report:

Item No.

Description

3.1

Articles of Incorporation of the Company as filed with the Colorado Secretary of State on August 24, 1998 (incorporated by reference from Exhibit 3.1 to the Company’s Registration Statement on Form SB-2 filed with the SEC on October 28, 2005).

3.1.1

Articles of Amendment to the Articles of Incorporation as filed with the Colorado Secretary of State on September 16, 2005 (incorporated by reference from Exhibit 3.1.1 to the Company’s Registration Statement on Form SB-2 filed with the SEC on October 28, 2005).

3.1.2

Articles of Amendment to the Articles of Incorporation as filed with the Colorado Secretary of State on November 8, 2010 (incorporated by reference from Exhibit 3.1 to the Company’s Quarterly Report on Form 10-Q filed with the SEC on November 10, 2010).

3.1.3

Articles of Amendment to the Articles of Incorporation as filed with the Colorado Secretary of State on June 4, 2021 (incorporated by reference from Exhibit 3.1.3 to the Company’s Annual Report on Form 10-K filed with the SEC on March 13, 2023).

3.1.4

Articles of Amendment to the Articles of Incorporation as filed with the Colorado Secretary of State on August 6, 2024 (incorporated by reference from Exhibit 3.1 to the Company’s Current Report on Form 8-K filed with the SEC on August 7, 2024).

3.2

Amended and Restated Bylaws of the Company dated August 9, 2010 (incorporated by reference from Exhibit 3.2 to the Company’s Current Report on Form 8-K filed with the SEC on August 12, 2010).

3.2.1

Amendment dated March 25, 2013 to Amended and Restated Bylaws of the Company dated August 9, 2010 (incorporated by reference from Exhibit 3.2 to the Company’s Current Report on Form 8-K filed with the SEC on March 27, 2013).

3.2.2

Amendment dated April 3, 2018 to the Amended and Restated Bylaws of the Company dated August 9, 2010 (incorporated by reference from Exhibit 3.2 to the Company’s Current Report on Form 8-K filed with the SEC on April 3, 2018).

4.1

Description of Capital Stock (incorporated by reference from Exhibit 4.1 to the Company’s Form 10-K filed with the SEC on March 10, 2022).

10.1

Exploitation and Exploration Agreement between the Company and Jose Perez Reynoso dated October 14, 2002 (incorporated by reference from Exhibit 10.1 to the Company’s Registration Statement on Form SB-2 filed with the SEC on October 28, 2005).

10.2

Mining Exploration and Exploitation Agreement between Don David Gold, S.A. de C.V. and Jose Perez Reynoso effective November 21, 2002 (incorporated by reference from Exhibit 10.15 to the Company’s Quarterly Report on Form 10-Q filed with the SEC on August 9, 2012).

10.3

Amendment to Mining Exploration and Exploitation Agreement between Don David Gold Mexico, S.A. de C.V. and Jose Perez Reynoso effective August 3, 2012 (incorporated by reference Exhibit 10.17 to the Company’s Quarterly Report on Form 10-Q filed with the SEC on August 9, 2012).

Gold Resource Corporation

129

Table of Contents

10.4#

Gold Resource Corporation 2016 Equity Incentive Plan (incorporated by reference from Exhibit 4.1 to the Company’s Registration Statement on Form S-8 filed with the SEC on December 7, 2016).

10.5#

Form of Stock Option Agreement (incorporated by reference from Exhibit 10.5 to the Company’s Annual Report on Form 10-K filed with the SEC on March 2, 2020).

10.6#

Form of RSU Agreement (incorporated by reference from Exhibit 10.6 to the Company’s Annual Report on Form 10-K filed with the SEC on March 2, 2020).

10.7#

Form of RSU Agreement (incorporated by reference from Exhibit 10.7 to the Company’s Annual Report on Form 10-K filed with the SEC on March 2, 2020).

10.8#

Form of Indemnification Agreement between the Company and its directors and officers (incorporated by reference from Exhibit 10.1 to the Company’s Current Report on Form 8-K filed with the SEC on December 18, 2013).

10.9

At-The-Market Offering Agreement dated November 29, 2019 between the Company and H.C. Wainwright & Co., LLC (incorporated by reference from Exhibit 1.1 to the Company’s Registration Statement on Form S-3 filed with the SEC on November 29, 2019).

10.10#

Employment Agreement dated December 31, 2020 between Gold Resource Canada Corporation and Allen Palmiere (incorporated by reference from Exhibit 10.1 to the Company’s Current Report on Form 8-K filed with the SEC on December 31, 2020).

10.11#

Employment Agreement dated May 12, 2021 between Gold Resource Canada Corporation and Alberto Reyes (incorporated by reference from Exhibit 10.1 to the Company’s Current Report on Form 8-K filed with the SEC on May 18, 2021).

10.12#

Employment Agreement dated August 2, 2023 between Gold Resource Corporation and Chet Holyoak (incorporated by reference from Exhibit 10.12 to the Company’s Annual Report on Form 10-K filed with the SEC on March 28, 2024).

10.13

Arrangement Agreement by and among Gold Resource Corporation, Gold Resource Acquisition Sub, Inc. and Aquila Resources Inc. dated October 5, 2021 (incorporated by reference from Exhibit 2.1 to the Company’s Current Report on Form 8-K filed with the SEC on October 12, 2021).

10.14

Aquila and Osisko - Amended and Restated Gold Purchase Agreement (incorporated by reference from Exhibit 10.15 to the Company’s Annual Report on Form 10-K filed with the SEC on March 10, 2022).

10.15

Aquila and Osisko - Amended and Restated Silver Purchase Agreement (incorporated by reference from Exhibit 10.16 to the Company’s Annual Report on Form 10-K filed with the SEC on March 10, 2022).

19.1*

Insider Trading Policy

21*

Subsidiaries of the Company.

23.1*

Consent of BDO USA, P.C., Independent Registered Public Accounting Firm.

23.2*

Consent of Qualified Person.

23.3*

Consent of Qualified Person.

23.4*

Consent of Qualified Person.

23.5*

Consent of Qualified Person.

Gold Resource Corporation

130

Table of Contents

23.6*

Consent of Qualified Person.

31.1*

Certification pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 of Chief Executive Officer.

31.2*

Certification pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 of Chief Financial Officer.

32*

Certification pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 of Chief Executive Officer and Chief Financial Officer.

96.1

Technical Report Summary for the Back Forty Mine Project dated September 30, 2023 (incorporated by reference from Exhibit 96 to the Company’s Current Report on Form 8-K filed with the SEC on October 27, 2023).

96.2

Technical Report Summary for the Don David Gold Mine dated December 31, 2024 (incorporated by reference from Exhibit 96.1 to the Company’s Current Report on Form 8-K filed with the SEC on March 5, 2025).

97.1

Policy for Recoupment of Executive Compensation effective July 26, 2023 (incorporated by reference from Exhibit 97.1 to the Company’s Annual Report on Form 10-K filed with the SEC on March 28, 2024).

101*

The following items from the Annual Report on Form 10-K for the year ended December 31, 2024 are furnished herewith, formatted in inline XBRL: (A) Cybersecurity; (B) the following financial statements: (i) the Consolidated Balance Sheets, (ii) the Consolidated Statements of Operations, (iii) the Consolidated Statements of Changes in Shareholders’ Equity, (iv) the Consolidated Statements of Cash Flows, and (v) the Notes to the Consolidated Financial Statements; (C) Insider Trading Policy; and (D) Rule 10b5-1 Trading Arrangements.

104

Cover Page Interactive Data File (embedded within the XBRL document).

*

Filed herewith

#

Indicates management contract or compensatory plan, contract or arrangement.

ITEM 16.

FORM 10-K SUMMARY

None.

Gold Resource Corporation

131

Table of Contents

SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

GOLD RESOURCE CORPORATION

Date: April 8, 2025

/s/ Allen Palmiere

By: Allen Palmiere, Chief Executive Officer,
President and Director

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities and on the dates indicated.

/s/ Allen Palmiere

Chief Executive Officer, President and Director

April 8, 2025

Allen Palmiere

(Principal Executive Officer)

/s/ Chet Holyoak

Chief Financial Officer

April 8, 2025

Chet Holyoak

(Principal Financial and Accounting Officer)

/s/ Ron Little

Director

April 8, 2025

Ron Little

/s/ Lila Murphy

Director

April 8, 2025

Lila Murphy

Gold Resource Corporation

132

EX-19.1 2 goro-20241231xex19d1.htm EX-19.1

Exhibit 19.1

INSIDER TRADING POLICY AND GUIDELINES WITH RESPECT TO

CERTAIN TRANSACTIONS IN COMPANY SECURITIES

Confirmed April 12, 2022

This Policy provides guidelines to employees, officers and members of the Board of Directors of GOLD RESOURCE CORPORATION and its wholly-owned subsidiaries (the “Company”) with respect to transactions in the Company’s securities. In the discretion of the Insider Trading Compliance Officer (the “Compliance Officer”), it may also apply to consultants and contractors to the Company. The Company’s Chief Executive Officer, or such other individual as may be designated by the Board of Directors, is its Compliance Officer.

I. Applicability of Policy

This Policy applies to all transactions in the Company’s securities, including common stock, options for common stock and any other securities the Company may issue from time to time, such as preferred stock, warrants and convertible debentures, as well as to derivative securities relating to the Company’s stock, whether or not issued by the Company, such as exchange-traded options. It applies to all employees, officers and members of the Board of Directors of the Company. In the discretion of the Compliance Officer, it may also apply to consultants and contractors to the Company who receive or have access to such information.

Basis for determining what constitutes such Material Nonpublic Information is discussed in Section III of this policy. This group of people, members of their immediate families, and members of their households are sometimes referred to in this Policy as “Insiders.” This Policy also applies to any person who receives Material Nonpublic Information from any Insider.

Any person who possesses Material Nonpublic Information regarding the Company is an Insider for so long as the Information is not publicly known. Any employee can be an Insider from time to time and would at those times be subject to this Policy.

II. Statement of Policy

It is the policy of the Company to prohibit the unauthorized disclosure of any nonpublic information and the misuse of Material Nonpublic Information in securities trading. Every officer, director and employee has the individual responsibility to comply with this Policy against insider trading. Appropriate judgment should be exercised in connection with any trade in the Company’s securities.

A.

Restrictions on Trading. No employee, officer, or member of the Board of Directors


of, or (as determined by the Compliance Officer) consultant or contractor to, the Company and no member of the immediate family or household of any such person, shall engage in any transaction involving a purchase or sale of the Company’s securities, including any offer to purchase or offer to sell, during any period commencing with the date that he or she possesses Material Nonpublic Information concerning the Company, and ending at the close of business on the second Trading Day following the date of public disclosure of that information, or at such time as such nonpublic information is no longer material. The term “Trading Day” shall mean a day on which national stock exchanges are open for trading.

During a period in which a person possesses Material Nonpublic Information, such Insider often will have to forego a proposed transaction in the Company’s shares, even though he or she planned to make the transaction before learning of the Material Nonpublic Information and even though the failure to execute such transaction may result in an economic loss or the non-realization of anticipated profit.

B. Tipping. No Insider shall disclose (“tip”) Material Nonpublic Information to any

other person (including family members) where such information may be used by such person to his or her profit by trading in the securities of companies to which such information relates, nor shall such Insider or related person make recommendations or express opinions on the basis of Material Nonpublic Information as to trading in the Company’s securities.

C. Confidentiality of Nonpublic Information. Any nonpublic information relating to the Company is the property of the Company and the unauthorized disclosure of such information is forbidden.

D. Trading Window. To ensure compliance with applicable federal and state securities

laws, the Company’s policy is as follows: All directors, officers and other individuals designated from time to time by the Compliance Officer (collectively, “Covered Persons”) may not conduct transactions involving the purchase or sale of the Company’s securities during periods of time in which the “trading window” is closed due to a “Blackout Period.” In the absence of such Covered Person’s possession of Material Nonpublic Information, the Blackout Period begins two weeks prior to the scheduled quarterly Audit Committee meeting for the reporting period and ends at the close of business on the second Trading Day following the date of public disclosure of the financial results for a particular fiscal quarter or year.

The Blackout Period may be extended or otherwise apply at any time due to the existence of Material Nonpublic Information not related to the public disclosure of financial results. In this case a notification from the Compliance Officer will be issued.

From time to time, the Company may also recommend that Covered Persons suspend trading because of developments known to the Company and not yet disclosed to the public.


In such event, such persons are advised not to engage in any transaction involving the purchase or sale of the Company’s securities during such period and should not disclose to others the fact of such suspension of trading.

It should be noted, however, that even during an open trading window, any person possessing Material Nonpublic Information concerning the Company should not engage in any transactions in the Company’s securities until such information has been known publicly for at least two Trading Days, whether or not the Company has recommended a suspension of trading to that person. Trading in the Company’s securities during the trading window should not be considered a “safe harbor,” and all directors, officers and other persons should use good judgment at all times.

E. Preclearance of Trades. All Covered Persons must refrain from trading in the Company’s securities, even during the trading window, without first complying with the Company’s “preclearance” process. Each such person should contact the Company’s Insider Trading Compliance Officer prior to commencing any trade in the Company’s securities. The Company may find it necessary, from time to time, to require compliance with the preclearance process from other employees, consultants and contractors.

III. Definition of “Material Nonpublic Information”

It is not possible to define all categories of material information. However, information should be regarded as material if there is a reasonable likelihood that it would be considered important to an investor in making an investment decision regarding the purchase or sale of stock or other securities. Either positive or negative information may be material. Nonpublic information is information that has not been previously disclosed to the general public and is otherwise not available to the general public.

While it may be difficult under this standard to determine whether particular information is material, there are various categories of information that are particularly sensitive and, as a general rule, should always be considered material. Examples of such information may include:

Mine production amounts, grades, recoveries and cash costs
sales figures or other financial results
significant new purchase orders or contracts
cancellation or modification of significant purchase orders or contracts
mergers and acquisitions
public offerings and other financings
advances in mine development or exploration
pending or threatened litigation
major personnel changes

IV. Potential Criminal and Civil Liability and/or Disciplinary Action

A. Liability for Insider Trading. Insiders may be subject to significant monetary penalties and/or jail terms for engaging in transactions in the Company’s securities at a time when they have knowledge of Material Nonpublic Information regarding the Company.

B. Liability for Tipping. Insiders may also be liable for improper transactions by any person (commonly referred to as a “tippee”) to whom they have disclosed Material Nonpublic information regarding the Company or to whom they have made recommendations or expressed opinions on the basis of such information as to trading in the Company’s securities. The Securities and Exchange Commission (the “SEC”) has imposed large penalties even when the disclosing person did not profit from the trading. The SEC, the stock exchanges and the National Association of Securities Dealers, Inc. use sophisticated electronic surveillance techniques to uncover insider trading.

C. Possible Disciplinary Actions. Employees of the Company who violate this Policy shall also be subject to disciplinary action by the Company, which may include immediate termination of employment.

V. Additional Information

A. Exceptions. For purposes of this Policy, the Company considers that the exercise of stock options for cash under the Company’s stock option plans (but not the sale of any such shares) is exempt from this Policy, since the other party to the transaction is the Company and the price does not vary with the market but is fixed by the terms of the option agreement or the plan. The purchase of any shares pursuant to an automatic reinvestment feature of an Insider’s brokerage account (but not the subsequent sale of any such shares) is also exempt from this Policy. Any individual trading plan that conforms with Rule 10b5-1 promulgated by the U.S. SEC is also exempt from this policy.

B. Applicability of Policy to Inside Information Regarding Other Companies. This Policy and the foregoing guidelines also apply to Material Nonpublic Information relating to other companies, including the Company’s customers, vendors or suppliers (“business partners”), when that information is obtained in the course of employment with, or other services performed on behalf of, the Company. Civil and criminal penalties, and termination of employment, may result from trading on inside information regarding the Company’s business partners. All employees should treat Material Nonpublic

Information about the Company’s business partners with the same care required with respect to information related directly to the Company.


C. Section 16 Compliance. Directors and officers of the Company must also comply with the reporting obligations and limitations on short-swing transactions set forth in Section 16 of the Securities Exchange Act of 1934, as amended. The practical effect of these provisions is that officers and directors who purchase and sell the Company’s securities within a six-month period must disgorge all profits to the Company whether or not they had knowledge of any Material Nonpublic Information. Under these provisions, and so long as certain other criteria are met, neither the receipt of an option under the Company’s option plans nor the exercise of that option (so long as it is not “under

water”) is deemed a purchase under Section 16; however, the sale of any such shares is a sale under Section 16. Moreover, no officer or director may ever make a short sale of the Company’s stock. In addition to following the pre-clearance rules stated above, the Company’s officers and directors shall assist the Compliance Officer to ensure compliance with Section 16 and its related rules and reporting requirements, as applicable.

D. Inquiries. Please direct your questions as to any of the matters discussed in this Policy to the Company’s Insider Trading Compliance Officer at (720) 459-3851.

REPORTING CONTACTS FOR QUESTIONS ABOUT INSIDER TRADING:

th Street, Suite 500 Denver, CO USA 80202

To Policy Compliance Officer:

Gold Resource Corporation

Attn: Allen Palmiere

7900 East Union Ave. Suite 320

Denver, CO 80237

1-720-459-3851

allen.palmiere@grc-usa.com

To our outside legal counsel:

Davis Graham & Stubbs LLP

Attn: Brian Boonstra

1550 17th Street, Suite 500 Denver, CO USA 80202

1-303-892-7348

brian.boonstra@dgslaw.com


EX-21 3 goro-20241231xex21.htm EX-21

Exhibit 21

Gold Resource Corporation and Subsidiaries

Graphic


EX-23.1 4 goro-20241231xex23d1.htm EX-23.1

Exhibit 23.1

Consent of Independent Registered Public Accounting Firm

We hereby consent to the incorporation by reference in the Registration Statements on Form S-3 (No. 333-271913) and Form S-8 (No. 333-214958 and 333-171779) of Gold Resource Corporation of our report dated April 8, 2025, relating to the consolidated financial statements which appears in this Annual Report on Form 10-K. Our report contains an explanatory paragraph regarding the Company’s ability to continue as a going concern.

/s/ BDO USA, P.C.

Spokane, Washington

April 8, 2025


EX-23.2 5 goro-20241231xex23d2.htm EX-23.2

Exhibit 23.2

CONSENT OF QUALIFIED PERSON

I, Rodrigo Simidu, in connection with the Current Report on Form 10-K for the year ended December 31, 2024 and any amendments or supplements and/or exhibits thereto (collectively, the Form 10-K), consent to:

the filing and use of the Technical Report Summary for the Don David Gold Mine with an effective date of December 31, 2024, as an exhibit to the Form 10-K;
the use of and references to my name, including my status as an expert or “qualified person” (as defined in Subpart 1300 of Regulation S-K promulgated by the U.S. Securities and Exchange Commission), in connection with the Form 10-K and the Technical Report Summary; and
the use of information derived, summarized, quoted, or referenced from the Technical Report Summary, or portions thereof, that was prepared by me, that I supervised the preparation of and/or that was reviewed and approved by me, that is included or incorporated by reference in the Form 10-K.

I am the qualified person responsible for authoring the following sections of the Technical Report Summary:   1, 4, 5, 12, 13, 15, 16, 17, 22, and 23.

I also consent to the incorporation by reference of the above items in the registration statements of Gold Resource Corporation filed on Form S-3 (No. 333-235312) and Form S-8 (Nos. 333-214958 and 333-171779).

Dated April 8, 2025

By:

/s/ Rodrigo Simidu

Name:

Rodrigo Simidu, P.Eng.

Title:

Principal Mining Engineer


EX-23.3 6 goro-20241231xex23d3.htm EX-23.3

Exhibit 23.3

CONSENT OF QUALIFIED PERSON

I, Marcelo Zangrandi, in connection with the Current Report on Form 10-K for the year ended December 31, 2024 and any amendments or supplements and/or exhibits thereto (collectively, the Form 10-K), consent to:

the filing and use of the Technical Report Summary for the Don David Gold Mine with an effective date of December 31, 2024, as an exhibit to the Form 10-K;
the use of and references to my name, including my status as an expert or “qualified person” (as defined in Subpart 1300 of Regulation S-K promulgated by the U.S. Securities and Exchange Commission), in connection with the Form 10-K and the Technical Report Summary; and
the use of information derived, summarized, quoted, or referenced from the Technical Report Summary, or portions thereof, that was prepared by me, that I supervised the preparation of and/or that was reviewed and approved by me, that is included or incorporated by reference in the Form 10-K.

I am the qualified person responsible for authoring the following sections of the Technical Report Summary: 1, 8, 9, 11, 22, and 23. 

I also consent to the incorporation by reference of the above items in the registration statements of Gold Resource Corporation filed on Form S-3 (No. 333-235312) and Form S-8 (Nos. 333-214958 and 333-171779).

Dated April 8, 2025

By:

/s/ AMBA Consultoria do Brasil Ltda.

/s/ Marcelo Zangrandi

Name:

AMBA Consultoria do Brasil Ltda.

Marcelo Zangrandi, AIG Member

Title:

B.Geologist


EX-23.4 7 goro-20241231xex23d4.htm EX-23.4

Exhibit 23.4

CONSENT OF QUALIFIED PERSON

I, Patrick Frenette, P. Eng., in connection with the Current Report on Form 10-K for the year ended December 31, 2024 and any amendments or supplements and/or exhibits thereto (collectively, the Form 10-K), consent to:

the filing and use of the Technical Report Summary for the Don David Gold Mine with an effective date of December 31, 2024, as an exhibit to the Form 10-K;
the use of and references to my name, including my status as an expert or “qualified person” (as defined in Subpart 1300 of Regulation S-K promulgated by the U.S. Securities and Exchange Commission), in connection with the Form 10-K and the Technical Report Summary; and
the use of information derived, summarized, quoted, or referenced from the Technical Report Summary, or portions thereof, that was prepared by me, that I supervised the preparation of and/or that was reviewed and approved by me, that is included or incorporated by reference in the Form 10-K.

I am the qualified person responsible for authoring the following sections of the Technical Report Summary:   1, 2, 18, 19, 22, 23, 24, and 25.

I also consent to the incorporation by reference of the above items in the registration statements of Gold Resource Corporation filed on Form S-3 (No. 333-235312) and Form S-8 (Nos. 333-214958 and 333-171779).

Dated April 8, 2025

By:

/s/ Patrick Frenette

Name:

Patrick Frenette, P. Eng.

Title:

VP Technical Services


EX-23.5 8 goro-20241231xex23d5.htm EX-23.5

Exhibit 23.5

CONSENT OF QUALIFIED PERSON

I, Christian Laroche, P. Eng., in connection with the Current Report on Form 10-K for the year ended December 31, 2024 and any amendments or supplements and/or exhibits thereto (collectively, the Form 10-K), consent to:

the filing and use of the Technical Report Summary for the Don David Gold Mine with an effective date of December 31, 2024, as an exhibit to the Form 10-K;
the use of and references to my name, including my status as an expert or “qualified person” (as defined in Subpart 1300 of Regulation S-K promulgated by the U.S. Securities and Exchange Commission), in connection with the Form 10-K and the Technical Report Summary; and
the use of information derived, summarized, quoted, or referenced from the Technical Report Summary, or portions thereof, that was prepared by me, that I supervised the preparation of and/or that was reviewed and approved by me, that is included or incorporated by reference in the Form 10-K.

I am the qualified person responsible for authoring the following sections of the Technical Report Summary:  1, 10, 14, 22, and 23.

I also consent to the incorporation by reference of the above items in the registration statements of Gold Resource Corporation filed on Form S-3 (No. 333-235312) and Form S-8 (Nos. 333-214958 and 333-171779).

Dated April 8, 2025

By:

/s/ Synectiq

/s/ Christian Laroche

Name:

Synectiq

Christian Laroche, P. Eng.

Title:

VP Metallurgy


EX-23.6 9 goro-20241231xex23d6.htm EX-23.6

Exhibit 23.6

CONSENT OF QUALIFIED PERSON

I, David Turner, P. Geo., in connection with the Current Report on Form 10-K for the year ended December 31, 2024 and any amendments or supplements and/or exhibits thereto (collectively, the Form 10-K), consent to:

the filing and use of the Technical Report Summary for the Don David Gold Mine with an effective date of December 31, 2024, as an exhibit to the Form 10-K;
the use of and references to my name, including my status as an expert or “qualified person” (as defined in Subpart 1300 of Regulation S-K promulgated by the U.S. Securities and Exchange Commission), in connection with the Form 10-K and the Technical Report Summary; and
the use of information derived, summarized, quoted, or referenced from the Technical Report Summary, or portions thereof, that was prepared by me, that I supervised the preparation of and/or that was reviewed and approved by me, that is included or incorporated by reference in the Form 10-K.

I am the qualified person responsible for authoring the following sections of the Technical Report Summary:  1, 3, 5, 6, 7, 8, 9, 20, 21, 22, and 23.

I also consent to the incorporation by reference of the above items in the registration statements of Gold Resource Corporation filed on Form S-3 (No. 333-235312) and Form S-8 (Nos. 333-214958 and 333-171779).

Dated April 8, 2025

By:

/s/ David Turner

Name:

David Turner, P. Geo.

Title:

Director of Geology


EX-31.1 10 goro-20241231xex31d1.htm EX-31.1

Exhibit 31.1

CERTIFICATION

PURSUANT TO SECTION 302 OF THE SARBANES-OXLEY ACT OF 2002

I, Allen Palmiere, certify that:

1. I have reviewed this Form 10-K of Gold Resource Corporation;

2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;

3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;

4. The registrant’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:

a. Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;

b. Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;

c. Evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and

d. Disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting; and

5. The registrant’s other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):

a. All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and

b. Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting.

 

 

Date: April 8, 2025

/s/ Allen Palmiere

Allen Palmiere

Chief Executive Officer, President and Director I, Chet Holyoak, certify that:

(Principal Executive Officer)



EX-31.2 11 goro-20241231xex31d2.htm EX-31.2

Exhibit 31.2

CERTIFICATION

PURSUANT TO SECTION 302 OF THE SARBANES-OXLEY ACT OF 2002

1. I have reviewed this Form 10-K of Gold Resource Corporation;

2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;

3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;

4. The registrant’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:

a. Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;

b. Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;

c. Evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and

d. Disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting; and

5. The registrant’s other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):

a. All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which could adversely affect the registrant’s ability to record, process, summarize and report financial information; and

b. Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting.

 

 

Date: April 8, 2025

 /s/ Chet Holyoak

Chet Holyoak

Chief Financial Officer

(Principal Financial and Accounting Officer)



EX-32 12 goro-20241231xex32.htm EX-32

Exhibit 32

CERTIFICATION

PURSUANT TO SECTION 906 OF THE SARBANES-OXLEY ACT OF 2002

I, Allen Palmiere, Chief Executive Officer, President and Director, and I, Chet Holyoak, Chief Financial Officer of Gold Resource Corporation (the “Company”) certify that:

1. The Report complies fully with the requirements of Section 13(e) or 15(d) of the Securities Exchange Act of 1934; and

2. Based on my knowledge, the financial statements, and other financial information included in this annual report, fairly present in all material respects the financial condition, results of operations and cash flows of the Company as of, and for, the period presented in this annual report.

 

 

Date: April 8, 2025

 

 /s/ Allen Palmiere

Allen Palmiere

Chief Executive Officer, President and Director

(Principal Executive Officer)

 

Date: April 8, 2025

 

 /s/ Chet Holyoak

Chet Holyoak

Chief Financial Officer

(Principal Financial and Accounting Officer)