株探米国株
エドガーで原本を確認する
6-K 1 form6-k.htm 6-K

 

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

FORM 6-K

 

REPORT OF FOREIGN PRIVATE ISSUER

PURSUANT TO RULE 13a-16 OR 15d-16

UNDER THE SECURITIES EXCHANGE ACT OF 1934

 

For the month of March 2026

 

Commission File No.: 001-43051

 

Santacruz Silver Mining Ltd.

(Translation of registrant’s name into English)

 

480 – 1140 West Pender Street

Vancouver, British Columbia

Canada V6E 4G1

(Address of principal executive office)

 

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F: Form 20-F ☐ Form 40-F ☒ Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

 

 

 

 

EXHIBIT INDEX

 

Exhibit   Description
99.1   Press Release dated January 26, 2026
99.2   Press Release dated February 18, 2026
99.3   Press Release dated February 27, 2026

 

 

 

SIGNATURE

 

 

  Santacruz Silver Mining Ltd.
   
Date: March 2, 2026 By: /s/ Andres Bedregal
  Name: Andres Bedregal
  Title: Chief Financial Officer

 

 

 

EX-99.1 2 ex99-1.htm EX-99.1

 

Exhibit 99.1

 

News Release

January 26, 2026

 

Santacruz Silver Produces 3,739,019 Silver Equivalent Ounces in Q4 2025, Comprised of 1,343,607 Ounces of Silver, 23,846 Tonnes of Zinc, 3,000 Tonnes of Lead, and 287 Tonnes of Copper

 

Vancouver, B.C. – Santacruz Silver Mining Ltd. (NASDAQ:SCZM) (TSX.V:SCZ) (“Santacruz” or the “Company”) reports its Q4 2025 production results from its Bolívar mine, Porco mine, Caballo Blanco Group of mines (“Caballo Blanco”) and the San Lucas Group which includes the Reserva Mina and the San Lucas feed sourcing business (“San Lucas”), all located in Bolivia, and the Zimapán mine located in Mexico.

 

Q4 2025 Production Highlights:

Silver Equivalent Production: 3,739,019 silver equivalent ounces

Silver Production: 1,343,607 ounces

Zinc Production: 23,846 tonnes

Lead Production: 3,000 tonnes

Copper Production: 287 tonnes

Underground Development: 11,558 meters

 

Arturo Préstamo, Executive Chairman and CEO of Santacruz, commented, “During Q4 2025, Santacruz delivered a solid quarter-over-quarter improvement in consolidated production, led by a meaningful recovery at the Bolívar mine, and supported by strong performance at Caballo Blanco, Zimapán, and San Lucas, reflecting the strength and diversification of our multi-asset operating portfolio. At Bolívar, we are beginning to see the benefits of the recovery efforts at the high silver-grade Pomabamba and Nané veins following the May 2025 flooding event, which resulted in higher production throughput, improved operating conditions, and a 34% increase in silver equivalent production compared to Q3 2025.”

 

Mr. Préstamo continued, “In Q4 2025, the recovery plan at Bolívar remained focused on restoring access to the affected mining areas, and continued to progress on schedule. Improvements achieved this quarter contributed to enhanced operational stability and stronger production performance. However, access to the highest-grade areas remained partially constrained, and recovery activities continued throughout Q4 2025. Our team at Bolívar is making steady progress each day, and we expect their efforts to drive a sustained quarter-over-quarter increase in silver production from these two veins this year. We continue to expect a full recovery from both areas by Q4 2026.”

 

1

 

Production Summary – Total

 

Production Table  

2025 Q4

   

2025 Q3

   

Change

Q4 vs Q3

    2025 YTD     2024 YTD    

Change

‘25 vs ‘24

 
Material Processed (tonnes milled)     506,040       486,585       4 %     1,945,261       1,955,905       (1 )%
Silver Equivalent Produced (ounces) (1)     3,739,019       3,424,817       9 %     14,399,019       16,173,293       (11 )%
                                                 
Production                                                
Silver (ounces)     1,343,607       1,241,929       8 %     5,598,680       6,718,380       (17 )%
Zinc (tonnes)     23,846       21,581       10 %     87,295       94,399       (8 )%
Lead (tonnes)     3,000       2,603       15 %     11,094       11,820       (6 )%
Copper (tonnes)     287       331       (13 )%     1,126       1,057       7 %

 

(1) Silver Equivalent Produced (ounces) have been calculated using prices of $31.41/oz, $2,775.53/t, $2,085.90/t and $9,762.69/t for silver, zinc, lead and copper respectively applied to the metal production divided by the silver price as stated here.

 

Year-over-year production (2025 vs 2024) was impacted by Bolívar’s May 2025 flooding event, which temporarily restricted access to certain mining areas and limited throughput from Q2 2025 to Q4 2025. Remediation measures have been implemented since the event in May 2025 and continued to advance as planned throughout Q4 2025, placing the Bolívar’s operation on a clear path toward resolution. As access has steadily improved, silver production has begun to recover. In addition, Santacruz experienced consistent quarter-over-quarter improvements in 2025, a trend the Company expects to continue as conditions normalize.

 

2

 

Bolívar Mine

 

Bolivar Production Table (1)   2025 Q4     2025 Q3    

Change

Q4 vs Q3

    2025 YTD     2024 YTD    

Change

‘25 vs ‘24

 
Material Processed (tonnes milled)     63,267       52,023       22 %     232,448       284,634       (18 )%
Silver Equivalent Produced (ounces) (2)     565,694       420,612       34 %     2,374,121       3,630,036       (35 )%
                                                 
Production                                                
Silver (ounces)     202,193       132,146       53 %     1,059,846       1,828,028       (42 )%
Zinc (tonnes)     3,973       3,186       25 %     14,367       19,395       (26 )%
Lead (tonnes)     187       104       80 %     674       1,326       (49 )%
                                                 
Average Grade                                                
Silver (g/t)     108       89       22 %     158       218       (28 )%
Zinc (%)     6.75       6.61       2 %     6.73       7.48       (10 )%
Lead (%)     0.40       0.31       28 %     0.41       0.64       (36 )%
                                                 
Metal Recovery                                                
Silver (%)     92       89       3 %     89       92       (2 )%
Zinc (%)     93       93       (0 )%     92       91       1 %
Lead (%)     74       64       16 %     71       73       (3 )%

 

(1) Bolivar is presented at 100% whereas the Company records 45% of revenues and expenses in its consolidated financial statements.
   
(2) Silver Equivalent Produced (ounces) have been calculated using prices of $31.41/oz, $2,775.53/t and $2,085.90/t for silver, zinc and lead respectively applied to the metal production divided by the silver price as stated here.

 

Q4 2025 vs Q3 2025

 

In Q4 2025, ore processed at Bolívar increased by 22% compared to Q3 2025, reflecting improved access and operating conditions as recovery activities advanced at the Pomabamba and Nané areas. Silver equivalent production increased by 34%, driven by higher throughput, a 22% increase in silver head grades and a 3% improvement in silver recoveries. Silver production increased by 53% quarter over quarter, while zinc and lead production rose by 25% and 80%, respectively, consistent with improved stope availability and the mining sequence.

 

Recovery efforts at the affected mining areas continued throughout Q4 2025 and advanced in line with the established recovery plan. While operating conditions improved materially compared to Q3 2025, access to the highest-grade portions of the Pomabamba and Nané veins remained partially restricted during Q4 2025. Notwithstanding these constraints, production from the Pomabamba and Nané veins increased month-over- month during Q4 2025, reflecting improved grades and silver recoveries, as a growing proportion of ore was sourced from these higher-silver-grade structures.

 

Q4 2025 vs Q4 2024

 

The high-grade areas at Pomabamba and Nane veins began to show solid progress toward the end of Q3 2025; however, their contribution to silver recoveries became more meaningful only during Q4 2025, which also affected the year-over-year comparison.

 

3

 

Porco Mine

 

Porco Production Table (1)   2025 Q4     2025 Q3    

Change

Q4 vs Q3

    2025 YTD     2024 YTD    

Change

‘25 vs ‘24

 
Material Processed (tonnes milled)     51,416       49,161       5 %     197,231       204,585       (4 )%
Silver Equivalent Produced (ounces) (2)     330,176       318,694       4 %     1,377,234       1,762,341       (22 )%
                                                 
Production                                                
Silver (ounces)     82,047       92,001       (11 )%     400,486       645,250       (38 )%
Zinc (tonnes)     2,727       2,488       10 %     10,675       12,044       (11 )%
Lead (tonnes)     108       103       5 %     504       795       (37 )%
                                                 
Average Grade                                                
Silver (g/t)     61       71       (14 )%     77       117       (34 )%
Zinc (%)     5.66       5.43       4 %     5.77       6.28       (8 )%
Lead (%)     0.28       0.30       (6 )%     0.36       0.51       (29 )%
                                                 
Metal Recovery                                                
Silver (%)     81       82       (1 )%     82       84       (2 )%
Zinc (%)     94       93       1 %     94       94       (0 )%
Lead (%)     74       69       7 %     70       76       (8 )%

 

(1) Porco is presented at 100% whereas the Company records 45% of revenues and expenses in its consolidated financial statements.
   
(2) Silver Equivalent Produced (ounces) have been calculated using prices of $31.41/oz, $2,775.53/t and $2,085.90/t for silver, zinc and lead respectively applied to the metal production divided by the silver price as stated here.

 

Q4 2025 vs Q3 2025

 

Porco reported a 10% increase in zinc production compared to the previous quarter, driven by higher head grades and stable throughput. Zinc recoveries remained strong at 94%, reflecting consistent metallurgical performance. Silver production declined as mining continued to focus on zinc-rich zones, consistent with the mine plan and Porco’s role as a predominantly zinc-producing underground operation.

 

Q4 2025 vs Q4 2024

 

On a year-over-year basis, Porco recorded a modest decrease in zinc production, reflecting slightly lower zinc grades while maintaining stable throughput and strong recoveries. The mine plan during 2025 prioritized zinc-dominant zones with lower silver content, resulting in lower silver output compared to the prior year. Porco continues to operate as a reliable zinc-producing asset with consistent operating performance.

 

4

 

Caballo Blanco Group

 

Caballo Blanco Group Production Table (1)  

2025 Q4

    2025 Q3    

Change

Q4 vs Q3

    2025 YTD     2024 YTD    

Change

‘25 vs ‘24

 
Material Processed (tonnes milled)     63,067       62,221       1 %     234,709       275,273       (15 )%
Silver Equivalent Produced (ounces) (2)     730,108       707,465       3 %     2,782,260       3,018,705       (8 )%
                                                 
Production                                                
Silver (ounces)     289,446       294,524       (2 )%     1,192,022       1,220,757       (2 )%
Zinc (tonnes)     4,409       4,131       7 %     16,063       18,606       (14 )%
Lead (tonnes)     769       722       7 %     2,573       2,316       11 %
                                                 
Average Grade                                                
Silver (g/t)     156       160       (2 )%     170       153       11 %
Zinc (%)     7.39       7.14       4 %     7.28       7.30       (0 )%
Lead (%)     1.51       1.45       4 %     1.34       1.11       21 %
                                                 
Metal Recovery                                                
Silver (%)     91       92       (1 )%     93       90       3 %
Zinc (%)     95       93       2 %     94       93       2 %
Lead (%)     81       80       1 %     82       76       7 %

 

(1) The Caballo Blanco Group consists of the Colquechaquita and Tres Amigos mines.
   
(2) Silver Equivalent Produced (ounces) have been calculated using prices of $31.41/oz, $2,775.53/t and $2,085.90/t for silver, zinc and lead respectively applied to the metal production divided by the silver price as stated here.

 

Q4 2025 vs Q3 2025

 

Caballo Blanco increased ore processed compared to Q3 2025, resulting in a 3% increase in silver equivalent production. Silver production remained stable, while zinc and lead output increased by 7% each, supported by higher head grades and strong recoveries. Results reflect solid operational performance and continued adherence to the mine plan.

 

Q4 2025 vs Q4 2024

 

Compared with Q4 2024, Caballo Blanco’s silver equivalent production increased, supported by higher head grades and improved recoveries. These results reflect ongoing operational optimization and continued focus on mining higher-quality zones within the mine plan.

 

5

 

San Lucas Group

 

San Lucas Group Production Table   2025 Q4     2025 Q3    

Change

Q4 vs Q3

    2025 YTD     2024 YTD    

Change

‘25 vs ‘24

 
Material Processed (tonnes milled)     105,587       100,550       5 %     387,805       341,649       14 %
Silver Equivalent Produced (ounces) (1)     1,095,945       986,403       11 %     3,881,319       3,949,992       (2 )%
                                                 
Production                                                
Silver (ounces)     366,600       326,873       12 %     1,308,128       1,344,242       (3 )%
Zinc (tonnes)     7,729       7,032       10 %     27,419       28,042       (2 )%
Lead (tonnes)     699       575       22 %     2,264       1,924       18 %
                                                 
Average Grade                                                
Silver (g/t)     135       126       7 %     127       147       (13 )%
Zinc (%)     8.20       7.86       4 %     7.89       9.01       (12 )%
Lead (%)     0.97       0.90       8 %     0.91       0.88       3 %
                                                 
Metal Recovery                                                
Silver (%)     80       80       (0 )%     83       83       (1 )%
Zinc (%)     89       89       (0 )%     90       91       (2 )%
Lead (%)     63       63       8 %     64       64       1 %

 

(1) Silver Equivalent Produced (ounces) have been calculated using prices of $31.41/oz, $2,775.53/t and $2,085.90/t for silver, zinc and lead respectively applied to the metal production divided by the silver price as stated here.

 

Q4 2025 vs Q3 2025

 

San Lucas continued to play a strategic role in Q4 2025, with ore processed up 5% from the prior quarter. Silver equivalent production increased by 11%, driven by higher throughput and improved head grades, while recoveries remained stable. The operation’s flexible, margin-based sourcing model continued to support group-level mill utilization.

 

Q4 2025 vs Q4 2024

 

On a year-over-year basis, San Lucas processed higher volumes, while silver equivalent production declined modestly due to lower head grades. Operational flexibility remained a key factor in supporting overall performance across the Bolivian operations.

 

6

 

Zimapán Mine

 

Zimapán Production Table  

2025 Q4

    2025 Q3    

Change

Q4 vs Q3

    2025 YTD     2024 YTD    

Change

‘25 vs ‘24

 
Material Processed (tonnes milled)     222,703       222,629       (0 )%     893,067       849,764       5 %
Silver Equivalent Produced (ounces) (1)     1,017,096       991,643       3 %     3,984,086       3,812,220       5 %
                                                 
Production                                                
Silver (ounces)     403,321       396,385       2 %     1,638,198       1,680,033       (2 )%
Zinc (tonnes)     5,008       4,744       6 %     18,771       16,311       15 %
Lead (tonnes)     1,237       1,099       13 %     5,080       5,458       (7 )%
Copper (tonnes)     287       331       (13 )%     1,126       1,057       7 %
                                                 
Average Grade                                                
Silver (g/t)     80       77       4 %     78       82       (4 )%
Zinc (%)     2.89       2.90       (0 )%     2.74       2.46       11 %
Lead (%)     0.72       0.67       8 %     0.73       0.75       (4 )%
Copper (%)     0.26       0.29       (10 )%     0.26       0.29       (11 )%
                                                 
Metal Recovery                                                
Silver (%)     70       72       (3 )%     73       75       (4 )%
Zinc (%)     78       73       6 %     77       78       (2 )%
Lead (%)     78       74       5 %     78       85       (8 )%
Copper (%)     50       52       (3 )%     49       43       14 %

 

(1) Silver Equivalent Produced (ounces) have been calculated using prices of $31.41/oz, $2,775.53/t, $2,085.90/t and $9,762.69/t for silver, zinc, lead and copper respectively applied to the metal production divided by the silver price as stated here.

 

Q4 2025 vs Q3 2025

 

Zimapán delivered strong results throughput in Q4 2025, with silver equivalent production increasing by 3% from Q3 2025. Zinc production increased by 6%, supported by higher head grades and improved recoveries. Silver production remained stable, reflecting consistent plant performance.

 

Q4 2025 vs Q4 2024

 

Year-over-year, Zimapán’s silver equivalent production declined slightly, primarily due to lower silver head grades and recoveries. This was partially offset by higher zinc production, reflecting the execution of the mine plan and improved feed quality from zinc-dominant stopes.

 

Qualified Person

 

Garth Kirkham, P.Geo., an independent consultant to the Company, is a qualified person under NI 43-101 and has approved the scientific and technical information contained within this news release.

 

7

 

About Santacruz Silver Mining Ltd.

 

Santacruz Silver is engaged in the operation, acquisition, exploration, and development of mineral properties across Latin America. In Bolivia, the Company operates the Bolivar, Porco, and Caballo Blanco mining complexes, with Caballo Blanco comprising the Tres Amigos and Colquechaquita mines. The Reserva mine, whose production is provided to the San Lucas ore sourcing and trading business, is also located in Bolivia. Additionally, the Company oversees the Soracaya exploration project. In Mexico, Santacruz operates the Zimapán mine.

 

‘signed’

Arturo Préstamo Elizondo,

Executive Chairman and CEO

 

For further information please contact:

 

Arturo Préstamo

Santacruz Silver Mining Ltd.

Email: info@santacruzsilver.com

Telephone: +52 81 83 785707

 

Andrés Bedregal

Santacruz Silver Mining Ltd.

Email: info@santacruzsilver.com

Telephone: +591 22444849

 

Eduardo Torrecillas

Santacruz Silver Mining Ltd.

Email: info@santacruzsilver.com

Telephone: +591 22444849

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) nor the Nasdaq Capital Market LLC accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

 

Forward Looking Information

 

This news release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements relate to future events or future performance and reflect the expectations or beliefs of management of the Company regarding future events. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as “intends”, “expects” or “anticipates”, or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “should”, “would” or will “potentially” or “likely” occur.

 

These forward-looking statements involve numerous risks and uncertainties and actual results might differ materially from results suggested in any forward-looking statements. These risks and uncertainties include, among other things, risks related to changes in general economic, business and political conditions, including changes in the financial markets, changes in applicable laws, and compliance with extensive government regulation, as well as those risk factors discussed or referred to in the Company’s disclosure documents filed with the securities regulatory authorities in certain provinces of Canada and available at www.sedarplus.ca.

 

In making the forward-looking statements in this news release, the Company has applied several material assumptions, including without limitation, the assumption that the Company’s capital investments will result in reduced costs and enhanced metallurgical recovery.

 

There can be no assurance that any forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, the reader should not place any undue reliance on forward-looking information or statements. The Company undertakes no obligation to update forward-looking information or statements, other than as required by applicable law.

 

8

 

EX-99.2 3 ex99-2.htm EX-99.2

 

Exhibit 99.2

 

News Release

 

February 18, 2026

 

Santacruz Silver Ranks 1st on 2026 TSX Venture 50 List of Top Performing Companies

 

Vancouver, B.C. – Santacruz Silver Mining Ltd. (NASDAQ:SCZM) (TSX.V:SCZ) (“Santacruz” or the “Company”) announces that it has ranked first overall on the 2026 TSX Venture 50 list, based on a 1103% share price appreciation and 1137% market capitalization growth in 2025.

 

Arturo Préstamo, Executive Chairman and CEO of Santacruz, commented, “To be named the #1 ranked company on the 2026 TSX Venture 50 is an extraordinary honour and marks a transformative year for Santacruz. This distinction recognizes the strength of our operations, the quality of our asset portfolio, and the dedication of our hardworking team. It also reflects the continued trust and support of our shareholders. We see this distinction as validation of our strategic direction and as momentum as we continue building a solid, growth-oriented mining company in Bolivia and Mexico.”

 

Andrew Creech, President of TSX Venture Exchange, commented, “The 2026 TSX Venture 50 reflects a clear inflection point for early-stage finance, with a return of liquidity and capital that reinforces Canada’s position as a world-leading centre for resource discovery, strategic innovation, and scale. This yearʼs ranking underscores the vital role TSXV plays in channeling capital to the mining sector and serving as the primary growth pipeline for the next generation of global mineral supply.”

 

The TSX Venture 50 is an annual ranking of the top-performing companies on TSX Venture Exchange over the last year. Companies are ranked based on three equally-weighted criteria of one-year share price appreciation, market capitalization growth, and Canadian consolidated trading value.

 

More details on the TSX Venture 50 and a video highlighting Santacruz are available at: www.tsx.com/Venture50.

 

About Santacruz Silver Mining Ltd.

 

Santacruz Silver is engaged in the operation, acquisition, exploration, and development of mineral properties across Latin America. In Bolivia, the Company operates the Bolivar, Porco, and Caballo Blanco mining complexes, with Caballo Blanco comprising the Tres Amigos and Colquechaquita mines. The Reserva mine, whose production is provided to the San Lucas ore sourcing and trading business, is also located in Bolivia. Additionally, the Company oversees the Soracaya exploration project. In Mexico, Santacruz operates the Zimapán mine.

 

For further information please contact:

 

Arturo Préstamo

 

Santacruz Silver Mining Ltd.

Email: info@santacruzsilver.com

Telephone: +52 81 83 785707

 

Andrés Bedregal

 

Santacruz Silver Mining Ltd.

Email: info@santacruzsilver.com

Telephone: +591 22444849

 

Eduardo Torrecillas

 

Santacruz Silver Mining Ltd. 

Email: info@santacruzsilver.com

Telephone: +591 22444849

 

1

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) nor the Nasdaq Capital Market LLC accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

 

Forward Looking Information

 

This news release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements relate to future events or future performance and reflect the expectations or beliefs of the management of the Company regarding future events. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as “intends”, “expects” or “anticipates”, or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “should”, “would” or will “potentially” or “likely” occur. This information and these statements, referred to herein as “forward-looking statements”, are not historical facts, are made as of the date of this news release and include without limitation, statements about the Company’s inclusion in the 2026 TSX Venture 50 List.

 

These forward-looking statements involve numerous risks and uncertainties, and actual results might differ materially from results suggested in any forward-looking statements. These risks and uncertainties include, among other things: changes in equity markets; inflation; and those risks set out in the Company’s public disclosure record on SEDAR+ (www.sedarplus.ca).

 

There can be no assurance that any forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, the reader should not place any undue reliance on forward-looking information or statements. The Company undertakes no obligation to update forward-looking information or statements, other than as required by applicable law.

 

2

 

 

EX-99.3 4 ex99-3.htm EX-99.3

 

Exhibit 99.3

 

News Release

 

February 27, 2026

 

Santacruz Silver Announces Issuance of Stock Options

 

Vancouver, B.C. – Santacruz Silver Mining Ltd. (NASDAQ:SCZM) (TSX.V:SCZ) ("Santacruz" or the “Company”) announces that it has granted stock options to Adelaide Capital ("Adelaide"), a leading investor relations and capital markets advisory firm.

 

Adelaide will continue to work closely with Santacruz to develop and deploy a comprehensive capital markets program, which includes assisting with non-deal roadshows, virtual campaigns, social media, conferences, and assisting with investor communication. In exchange for Adelaide's services, and pursuant to the agreement, the Company issued 45,000 stock options (the "Options") to Adelaide under the Company's omnibus incentive plan (the "Plan"). Subject to the policies of the TSX Venture Exchange (the "Exchange") and the terms and conditions of the Plan, the Options will have an exercise price of C$17.18 and shall expire five years from the date of issuance and shall vest in four equal proportions every three months after the grant date for a period of 12 months. The Company has been engaged with Adelaide since October 24, 2024. Please refer to the news release dated October 24, 2024, for more information.

 

About Santacruz Silver Mining Ltd.

 

Santacruz Silver is engaged in the operation, acquisition, exploration, and development of mineral properties across Latin America. In Bolivia, the Company operates the Bolivar, Porco, and Caballo Blanco mining complexes, with Caballo Blanco comprising the Tres Amigos and Colquechaquita mines. The Reserva mine, whose production is provided to the San Lucas ore sourcing and trading business, is also located in Bolivia. Additionally, the Company oversees the Soracaya exploration project. In Mexico, Santacruz operates the Zimapán mine.

 

For further information please contact:

 

Arturo Préstamo

 

Santacruz Silver Mining Ltd.

Email: info@santacruzsilver.com

Telephone: +52 81 83 785707

 

Andrés Bedregal

 

Santacruz Silver Mining Ltd.

Email: info@santacruzsilver.com

Telephone: +591 22444849

 

Eduardo Torrecillas

 

Santacruz Silver Mining Ltd.

Email: info@santacruzsilver.com

Telephone: +591 22444849

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) nor the Nasdaq Capital Market LLC accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

 