UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

FORM 40-F

 

☐ REGISTRATION STATEMENT PURSUANT TO SECTION 12 OF THE SECURITIES EXCHANGE ACT OF 1934

 

OR

 

☒ ANNUAL REPORT PURSUANT TO SECTION 13(a) OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the fiscal year ended December 31, 2023

 

Commission file number: 001-32135

 

Seabridge Gold Inc.

(Exact name of Registrant as specified in its charter)

 

Canada    1040   Not Applicable
(Province or other jurisdiction of
incorporation or organization)
  (Primary Standard Industrial
Classification Code Number)
  (I.R.S. Employer
Identification No.)

 

106 Front Street East, Suite 400

Toronto, Ontario Canada M5A 1E1

(416) 367-9292

(Address and telephone number of Registrant’s principal executive offices)

 

Corporation Service Company

1180 Sixth Avenue

New York, New York 10036

(212) 299-5656

(Name, address and telephone number of agent for service in the United States)

 

Securities registered or to be registered pursuant to Section 12(b) of the Act:

 

Title of each class   Trading Symbol(s)   Name of each exchange on which registered
Common Shares   SA   New York Stock Exchange

 

Securities registered pursuant to Section 12(g) of the Act.

None

(Title of Class)

 

Securities for which there is a reporting obligation pursuant to Section 15(d) of the Act.

None

(Title of Class)

 

For annual reports, indicate by check mark the information filed with this form:

 

☒ Annual Information Form ☒ Audited Annual Financial Statements

 

Indicate the number of outstanding shares of the issuer’s classes of capital or common stock as of the close of the period covered by the annual report: 86,108,019 Common Shares (as at December 31, 2023).

 

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Exchange Act during the preceding 12 months (or for such shorter period that the Registrant was required to file such reports) and (2) has been subject to such filing requirements for the past 90 days. Yes ☒ No ☐

 

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes ☒ No ☐

 

Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 12b-2 of the Exchange Act.

 

Emerging growth company ☐

 

If an emerging growth company that prepares its financial statements in accordance with U.S. GAAP, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards† provided pursuant to Section 13(a) of the Exchange Act. ☐

 

The term “new or revised financial accounting standard” refers to any update issued by the Financial Accounting Standards Board to its Accounting Standards Codification after April 5, 2012.

 

Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report. ☒

 

If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements. ☒

 

Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to §240.10D-1(b). ☐

 

The annual report on Form 40-F shall be incorporated by reference into or as an exhibit to, as applicable, the Registrant’s Registration Statements under the Securities Act of 1933, as amended: Form F-10 (File No. 333-268485) and Form S-8 (File No. 333-211331).

 

 

 

 


 

EXPLANATORY NOTE

 

Seabridge Gold Inc. (the “Registrant” or “we” or “us”) is a Canadian issuer eligible to file its annual report pursuant to Section 13 of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), on Form 40-F (“Form 40-F”) pursuant to the multi-jurisdictional disclosure system of the Exchange Act. We are a “foreign private issuer” as defined in Rule 3b-4 under the Exchange Act. Accordingly, our equity securities are exempt from Sections 14(a), 14(b), 14(c), 14(f) and 16 of the Exchange Act pursuant to Rule 3a12-3.

  

PRINCIPAL DOCUMENTS

 

The following documents have been filed as part of this Annual Report on Form 40-F and incorporated by reference herein:

 

A. Annual Information Form

 

For our Annual Information Form (the “AIF”) for the year ended December 31, 2023, see Exhibit 99.1 of this Annual Report on Form 40-F.

 

B. Audited Annual Financial Statements

 

For our audited annual financial statements (“Audited Financial Statements”), for the years ended December 31, 2023 and December 31, 2022, including the Report of Independent Registered Public Accounting Firm, see Exhibit 99.2 of this Form 40-F. The Audited Financial Statements are stated in Canadian Dollars (CDN$) and are prepared in accordance with International Financial Reporting Standards (IFRS) as issued by the International Accounting Standards Board (IASB).

 

C. Management’s Discussion and Analysis

 

For our management’s discussion and analysis (the “MD&A”) for the year ended December 31, 2023, see Exhibit 99.3 of this Form 40-F.

 

1


 

FORWARD-LOOKING STATEMENTS

 

This Form 40-F and the exhibits attached hereto contain “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Exchange Act, and forward-looking information within the meaning of Canadian securities laws concerning our projects, business approach and plans, including estimated production, capital, operating and cash flow estimates and other matters at our projects. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as “expects”, “anticipates”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategy”, “goals”, “objectives” or variations thereof or stating that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements and forward-looking information (collectively referred to in the following information simply as “forward-looking statements”). In addition, statements concerning mineral reserve and mineral resource estimates constitute forward-looking statements to the extent that they involve estimates of the mineralization expected to be encountered if a mineral property is developed and the economics of developing a property and producing minerals.

 

Forward-looking statements are necessarily based on estimates and assumptions made by us in light of our experience and perception of historical trends, current conditions and expected future developments. In making the forward-looking statements in this Form 40-F and the exhibits attached hereto, we have applied several material assumptions including, but not limited to, the assumption that: (i) any additional financing needed will be available on reasonable terms; (ii) the potential for production at our mineral projects will continue operationally, legally, economically and socially; (iii) market fundamentals will result in sustained demand and prices for gold and copper, and to a much lesser degree, silver and molybdenum; and (iv) estimated resources at our projects have merit and there is continuity of mineralization as reflected in such estimates.

 

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking statements, including, without limitation:

 

our history of net losses and negative cash flows from operations and expectation of future losses and negative cash flows from operations;

 

risks related to our ability to continue its exploration activities and future advancement activities, and to continue to maintain corporate office support of these activities, which are dependent on our ability to enter into joint ventures, to sell property interests or to obtain suitable financing;

 

our indebtedness requires payment of quarterly interest, a lump sum payment at the end of 2025 and, in certain circumstances, may require repayment of principal, and our principal sources for funds for repayment are capital markets and asset sales;

 

risks related to fluctuations in the market price of gold, copper and other metals;

 

the risk that our EAC might expire before the KSM Project is declared to be “substantially started”;

 

uncertainty whether we can secure a joint venture partner for its KSM Project or Courageous Lake Project and whether reserves estimated on our mineral properties will be brought into production;

 

risks related to unsettled First Nations rights and title and settled Treaty Nations’ rights and uncertainties relating to the process of making Canadian laws consistent with the United Nations Declaration on the Rights of Indigenous Peoples;

 

2


 

risks related to obtaining and maintaining all necessary permits and governmental approvals, or extensions/renewals thereof, for exploration, construction and operations activities, including rights of access over or through lands subject to third party rights, interests and mineral tenures;

 

risks regarding satisfying current and increasing regulatory requirements for exploration, construction and operation of mineral projects;

 

uncertainties regarding evolving environmental standards and risks of failing to meet such standards;

 

uncertainties relating to the assumptions underlying our reserve and resource estimates;

 

uncertainty of estimates of capital costs, operating costs, production and economic returns;

 

risks relating to the commencement of early access and site preparation construction activities at the KSM Project;

 

risks related to commercially producing precious metals and copper from our mineral properties;

 

risks related to fluctuations in foreign exchange rates;

 

mining, exploration and construction risks that could result in damage to mineral properties, plant and equipment, personal injury, environmental damage and delays in mining, which may be uninsurable or not insurable in adequate amounts;

 

uncertainty related to title to our mineral properties;

 

risks related to increases in demand for exploration, advancement and construction services and equipment, and related cost increases;

 

increased competition for prospective mineral properties;

 

regulatory and societal concerns regarding carbon emissions and the impacts of measures taken to induce or mandate lower carbon emissions on the ability to secure permits, finance projects and realize profitability at a project;

 

our current and proposed operations are subject to risks relating to climate and climate change that may adversely impact its ability to conduct operations, raise capital, increase operating costs, interfere with materials and equipment supply, delay execution or reduce the profitability of a future mining operation;

 

risks that regulatory measures directed at climate change issues adversely affect our business;

 

our need to retain key executives and attract qualified personnel;

 

risks associated with the use of information technology systems and cybersecurity;

 

risks related to some of our directors’ and officers’ involvement with other natural resource companies;

 

uncertainty surrounding an audit by the Canada Revenue Agency (“CRA”) of Canadian exploration expenses incurred by the Registrant during the 2014, 2015 and 2016 financial years which the Registrant has renounced to subscribers of flow-through share offerings and the CRA’s decision to reassess such subscribers;

 

the reassessment by the CRA of our refund claim for the 2010 and 2011 financial years in respect of the British Columbia Mining Exploration Tax Credit;

 

our classification as a "passive foreign investment company" under the United States tax code; and

 

risks related to the pro-environmental groups anti-mining efforts, and sometimes focused efforts on specific projects impacting the Company’s share price.

 

This list is not exhaustive of the factors that may affect any of our forward-looking statements. Forward-looking statements are statements about the future and are inherently uncertain, and actual achievements or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in our AIF attached hereto as Exhibit 99.1 under the heading “Risk Factors” and elsewhere in the AIF, and in the documents incorporated by reference in this Form 40-F and the AIF. In addition, although we have attempted to identify important factors that could cause actual achievements, events or conditions to differ materially from those identified in the forward-looking statements, there may be other factors that cause achievements, events or conditions not to be as anticipated, estimated or intended. It is also noted that while we engage in exploration and development of our properties, we will not undertake production activities by ourselves.

 

These forward-looking statements are based on the beliefs, expectations and opinions of management on the date the statements are made and we do not assume any obligation to update forward-looking statements, except as required by applicable securities laws, if circumstances or management’s beliefs, expectations or opinions should change. For the reasons set forth above, persons should not place undue reliance on forward-looking statements.

 

3


 

CURRENCY

 

Unless otherwise indicated, all dollar amounts in this Form 40-F are in Canadian dollars.

 

NOTE TO UNITED STATES READERS-
DIFFERENCES IN UNITED STATES AND CANADIAN REPORTING PRACTICES

 

We are permitted under the multi-jurisdictional disclosure system adopted by the United States Securities and Exchange Commission (the “SEC”), to prepare this Form 40-F in accordance with Canadian disclosure requirements, which differ from those of the SEC. We have prepared our financial statements, which are filed as Exhibit 99.2 to this Form 40-F, in accordance with International Financial Reporting Standards as issued by the International Accounting Standards Board, and they are not comparable with financial statements of U.S. and other companies prepared in accordance with U.S. generally accepted accounting principles.

 

RESOURCE AND RESERVE ESTIMATES

 

The Registrant’s AIF, attached as Exhibit 99.1 to this annual report on Form 40-F, and the MD&A, attached as Exhibit 99.3 to this annual report on Form 40-F, have been prepared in accordance with the requirements of the securities laws in effect in Canada, which differ from the requirements of United States securities laws. Mineral resource estimates included in this annual report on Form 40-F and in any document incorporated by reference herein or therein have been prepared in accordance with, and use terms that comply with, the reporting standards in accordance with Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”). NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. In accordance with NI 43-101, the Registrant uses the terms mineral reserves and resources as they are defined in accordance with the CIM Definition Standards on mineral reserves and resources (the “CIM Definition Standards”) adopted by the Canadian Institute of Mining, Metallurgy and Petroleum. 

 

For United States reporting purposes, the SEC has adopted amendments to its disclosure rules (the “SEC Modernization Rules”) to modernize the mining property disclosure requirements for issuers whose securities are registered with the SEC under the U.S. Securities Exchange Act of 1934, as amended (the “U.S. Exchange Act”). The SEC Modernization Rules more closely align the SEC’s disclosure requirements and policies for mining properties with current industry and global regulatory practices and standards, including NI 43-101, and replace the historical property disclosure requirements for mining registrants that were included in Industry Guide 7 under the U.S. Securities Act. As a foreign private issuer that is eligible to file reports with the SEC pursuant to the MJDS, the Registrant is not required to provide disclosure on its mineral properties under the SEC Modernization Rules and provides disclosure under NI 43-101 and the CIM Definition Standards. Accordingly, mineral reserve and mineral resource information contained or incorporated by reference herein may not be comparable to similar information disclosed by United States companies.

 

As a result of the adoption of the SEC Modernization Rules, the SEC recognizes estimates of “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources.” In addition, the SEC has amended its definitions of “proven mineral reserves” and “probable mineral reserves” to be “substantially similar” to the corresponding CIM Definition Standards that are required under NI 43-101. While the above terms are “substantially similar” to CIM Definitions, there are differences in the definitions under the SEC Modernization Rules and the CIM Definition Standards. There is no assurance any mineral reserves or mineral resources that the Registrant may report as “proven mineral reserves”, “probable mineral reserves”, “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had the Registrant prepared the reserve or resource estimates under the standards adopted under the SEC Modernization Rules.

 

Accordingly, information contained in this annual report on Form 40-F and the portions of documents incorporated by reference herein contain descriptions of the Registrant’s mineral deposits that may not be comparable to similar information made public by U.S. companies who prepare their disclosure in accordance with U.S. federal securities laws and the rules and regulations thereunder.

 

4


 

DISCLOSURE CONTROLS AND PROCEDURES

 

Evaluation of Disclosure Controls and Procedures

 

At the end of the period covered by this annual report on Form 40-F, an evaluation was carried out under the supervision of, and with the participation of our management, including the Chief Executive Officer (“CEO”) and the Chief Financial Officer (“CFO”), of the effectiveness of the design and operation of our disclosure controls and procedures (as defined in Rule 13a-15(e) and Rule 15d-15(e) under the Exchange Act). Based on that evaluation, the CEO and the CFO have concluded that as of the end of the period covered by this annual report, our disclosure controls and procedures were adequately designed and effective in ensuring that: (i) information required to be disclosed by us in reports that we file or submit to the SEC under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in applicable SEC rules and forms and (ii) material information required to be disclosed in our reports filed under the Exchange Act is accumulated and communicated to our management, including the CEO and the CFO, as appropriate, to allow for accurate and timely decisions regarding required disclosure.

 

Management’s Annual Report on Internal Control over Financial Reporting

 

For management’s report on internal control over financial reporting, see “Internal Controls over Financial Reporting” in our MD&A attached as Exhibit 99.3 to this annual report on Form 40-F and incorporated by reference herein.

 

Attestation Report of the Independent Registered Public Accounting Firm

 

Our independent registered public accounting firm has issued an attestation report on our internal control over financial reporting as of December 31, 2023, which immediately precedes the audited consolidated financial statements included as part of Exhibit 99.2 to this annual report on Form 40-F and incorporated by reference herein.

 

Changes in Internal Controls over Financial Reporting

 

During the fiscal year ended December 31, 2023, no changes occurred in our internal control over financial reporting that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

 

Certifications

 

See Exhibits 31.1, 31.2, 32.1 and 32.2 to this Form 40-F.

 

5


 

CORPORATE GOVERNANCE

 

We are subject to a variety of corporate governance guidelines and requirements of the Toronto Stock Exchange, the New York Stock Exchange (the “NYSE”), the Canadian Securities Administrators and the SEC. We believe that we meet or exceed the applicable corporate governance requirements. According to the NYSE Rules, a listed company must adopt and disclose a set of corporate governance guidelines with respect to specified topics. Such guidelines are required to be posted on the registrant’s website. Although we are listed on the NYSE, we are not required to comply with all of that exchange’s corporate governance rules which are applicable to U.S. corporations. The significant ways in which the NYSE governance rules differ for us, as a foreign company, are a reduced quorum requirement for shareholder meetings, shareholder approval for issuance of common shares that could result in a 20% increase in the number of outstanding common shares and shareholder approval of certain compensation plans. The guidelines are available for viewing on our website at http://www.seabridgegold.com/company/governance and are available without charge in print to any shareholder who requests them. Requests for copies of the guidelines should be made to the Secretary of our company at 106 Front Street East, Suite 400, Toronto, Ontario, Canada M5A 1E1, Telephone (416) 367-9292.

 

We review our governance practices and monitor developments in Canada and the United States on an on-going basis to ensure we remain in compliance with applicable rules and standards. The Board is committed to sound corporate governance practices which are both in the interest of our shareholders and contribute to effective and efficient decision making.

 

AUDIT COMMITTEE

Audit Committee

 

The Board has a separately designated standing Audit Committee established in accordance with Section 3(a)(58)(A) of the Exchange Act. The members of our Audit Committee are identified under the heading “Audit Committee Information” in the AIF which is attached as Exhibit 99.1 to this annual report on Form 40-F and incorporated by reference herein. In the opinion of the Board, all members of the Audit Committee are financially literate and independent, as such terms are defined by the NYSE’s corporate governance listing standards applicable to us and as determined by Rule 10A-3 under the Exchange Act.

 

Audit Committee Financial Expert

 

The Board has determined that Ms. Carol Willson, the Audit Committee Chair, and Ms. Julie Robertson , another member of the Audit Committee, have the necessary qualifications to be designated as an “audit committee financial expert” within the meaning of applicable SEC Rules and each is an “independent director”, as defined pursuant to Item 407(d)(5) of SEC Regulation S-K and Section 303A.02 of the New York Stock Exchange Listed Company Manual.

 

Ms. Carol Willson retired from EY in 2021 after a 28-year career where she was engagement partner for Internal Audit of clients which included multi-year internal audit outsourced projects and related internal audit transformations and reviews, fraud investigations, and in various assurance and advisory capacities including capital projects, ESG, finance function-related improvements, and cybersecurity. During Ms. Willson’s career as an experienced internal audit and risk professional, she was retained to lead risk, internal audit and SOX functions for a variety of public corporations including several major mining companies. She served for three years as the global head of internal audit and SOX for Kinross Gold Corporation where her key audit areas included: supply chain, capital projects, procure to pay, ERP/cybersecurity, sustainability, budgeting & forecasting, fixed assets, and treasury. Ms. Willson currently has her own consulting business where she serves as a senior risk advisor for clients. She holds a Bachelor of Arts degree from the University of Western Ontario and an MBA-Accounting degree from the University of Toronto.

 

Ms. Julie Robertson brings extensive experience in various finance roles, including the development of capital projects finance framework. She was most recently the Chief Financial Officer of Marathon Gold Corp. and currently serves as chair of the audit and risk management committee of Quebec Precious Metals Corp.

 

The SEC has indicated that the designation of an audit committee financial expert does not make that person an “expert” for any purpose, impose any duties, obligations, or liability on that person that are greater than those imposed on members of the audit committee and board of directors who do not carry this designation, or affect the duties, obligations, or liabilities of any other member of the audit committee or board of directors.

 

6


 

Audit Committee Charter

 

Our Audit Committee Charter is available on our website at www.seabridgegold.com, and is provided in Schedule A to the AIF, which is attached as Exhibit 99.1 to this annual report on Form 40-F and incorporated by reference herein. The Charter also is available in print to any shareholder that provides us with a written request. Requests for copies should be made to the Secretary of our company at 106 Front Street East, Suite 400, Toronto, Ontario, Canada M5A 1E1, Telephone (416) 367-9292.

 

PRINCIPAL ACCOUNTING FEES AND SERVICES - INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

 

Our independent registered public accounting firm is KPMG LLP, Toronto, ON, Canada, Auditor Firm ID: 85.

 

KPMG LLP acted as our independent registered public accounting firm for the fiscal years ended December 31, 2023 and 2022. For a description of the total amount billed by KPMG LLP to us for services performed in the last two fiscal years by category of service (audit fees, audit-related fees, tax fees and all other fees), see Item 9 “Audit Committee Information - External Auditor Service Fees (by Category)” in the AIF, which is attached as Exhibit 99.1 to this Form 40-F and incorporated by reference herein.

 

AUDIT COMMITTEE PRE-APPROVAL POLICIES AND PROCEDURES

 

For a description of our pre-approval policies and procedures related to the provision of non-audit services, see Item 9 “Audit Committee Information- Pre-Approval of Audit and Non-Audit Services Provided by Independent Auditors” in the AIF, which is attached as Exhibit 99.1 to this Form 40-F and incorporated by reference herein.

 

RECOVERY OF ERRONEOUSLY AWARDED COMPENSATION

 

The Registrant has adopted a compensation recovery policy (referred to as the “Incentive Compensation Clawback Policy”) as required by NYSE listing standards and pursuant to Rule 10D-1 of the Exchange Act. The Executive Compensation Clawback Policy is filed as Exhibit 97.1 to this Form 40-F.  At no time during or after the fiscal year ended December 31, 2023 (as of the date of this Annual Report), was the Registrant required to prepare an accounting restatement that required recovery of erroneously awarded compensation pursuant to the Incentive Compensation Clawback Policy and, as of December 31, 2023, there was no outstanding balance of erroneously awarded compensation to be recovered from the application of the Incentive Compensation Clawback Policy to a prior restatement.

 

OFF-BALANCE SHEET ARRANGEMENTS

 

The Registrant does not have any commitments or obligations, including contingent obligations, arising from arrangements with unconsolidated entities or persons (which are not otherwise discussed in the Registrant’s Management’s Discussion and Analysis for the fiscal year ended December 31, 2023, filed as Exhibit 99.3 to this annual report on Form 40-F), that have or are reasonably likely to have a material current or future effect on its financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, cash requirements or capital resources.

 

CODE OF BUSINESS ETHICS

 

We have adopted a Code of Business Ethics (the “Code”) covering our executive officers and directors. The Code is available on our website at http://www.seabridgegold.com/company/governance under and from our office at the address listed on the cover of this Form 40-F.

 

All amendments and all waivers of the Code to the officers covered by it will be posted on our website, furnished to the SEC as required, and provided to any shareholder who requests them. During the fiscal year ended December 31, 2023, we did not grant any waiver, including an implicit waiver, from a provision of the Code to any executive officer or director.

 

7


 

CONTRACTUAL OBLIGATIONS

 

The disclosure is included under the heading “Contractual Obligations” in our MD&A attached as Exhibit 99.3 to this annual report on Form 40-F and incorporated by reference herein. Amounts shown for mining leases include estimates of option payments, mineral lease payments, work commitments and tax levies that are required to maintain our interest in the mineral projects.

 

MINE SAFETY DISCLOSURE

 

Pursuant to Section 1503(a) of the Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010, issuers that are operators, or that have a subsidiary that is an operator, of a coal or other mine in the United States are required to disclose in their periodic reports filed with the SEC information regarding specified health and safety violations, orders and citations, related assessments and legal actions, and mining-related fatalities under the regulation of the Federal Mine safety and Health Administration under the Federal Mine Safety and Health Act of 1977. During the fiscal year ended December 31, 2023, we were not an operator, of a coal or other mine in the United States.

 

NOTICES PURSUANT TO REGULATION BTR

 

We did not send any notices required by Rule 104 of Regulation BTR during the fiscal year ended December 31, 2023 concerning any equity security subject to a blackout period under Rule 101 of Regulation BTR.

 

ADDITIONAL INFORMATION

 

Additional information relating to us, including the Audited Financial Statements, the MD&A and the AIF, can be found on SEDAR+ www.sedarplus.ca, on the SEC website at www.sec.gov, or on our website at www.seabridgegold.com. Shareholders may also contact the Assistant Corporate Secretary of our company by phone at (416) 367-9292 or by e-mail at info@seabridgegold.com to request copies of these documents and this annual report on Form 40-F.

 

DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS

 

Not applicable.

 

DISCLOSURE PURSUANT TO SECTION 13(r) OF THE EXCHANGE ACT

 

In accordance with Section 13(r) of the Exchange Act, the Registrant is required to include certain disclosures in its periodic reports if it or any of its affiliates knowingly engaged in certain specified activities during the period covered by the report. Neither the Registrant nor its affiliates have knowingly engaged in any transaction or dealing reportable under Section 13(r) of the Exchange Act during the year ended December 31, 2023.

 

UNDERTAKING AND CONSENT TO SERVICE OF PROCESS

 

A. Undertaking

 

We undertake to make available, in person or by telephone, representatives to respond to inquiries made by the SEC staff, and to furnish promptly, when requested to do so by the SEC staff, information relating to: the securities registered pursuant to Form 40-F; the securities in relation to which the obligation to file an annual report on Form 40-F arises; or transactions in said securities.

 

B. Consent to Service of Process

 

We have previously filed with the SEC a written consent to service of process and power of attorney on Form F-X. Any change to the name or address of our agent for service shall be communicated promptly to the SEC by amendment to the Form F-X referencing our file number.

 

8


 

SIGNATURES

 

Pursuant to the requirements of the Exchange Act, the Registrant certifies that it meets all of the requirements for filing on Form 40-F and has duly caused this annual report to be signed on its behalf by the undersigned, thereto duly authorized.

 

  Seabridge Gold Inc.
     
  By: /s/ Rudi P. Fronk
    Rudi P. Fronk
    Chairman and Chief Executive Officer

 

Date: March 27, 2024

 

9


 

EXHIBITS

 

Consents
23.1   Consent of KPMG LLP, Independent Registered Public Accounting Firm
23.2   Consent of Tetra Tech, under the direction of Hassan Ghaffari P.Eng (surface infrastructure, capital estimate and financial analysis)
23.3   Consent of Tetra Tech, under the direction of John Huang P.Eng. (metallurgical testing review, permanent water treatment, mineral process design and operating cost estimation for process, general and administrative (“G&A”) and site services, and overall report preparation)
23.4   Consent of Wood Canada Limited, under the direction of Henry Kim P.Geo. (Mineral Resources)
23.5   Consent of Moose Mountain Technical Services under the direction of Jim Gray P.Eng. (open pit Mineral Reserves, open pit mining operations, mine capital and mine operating costs, MTT and rail ore conveyance design, tunnel capital costs)
23.6   Consent of W.N. Brazier Associates Inc. under the direction of W.N. Brazier P.Eng. (Electrical power supply, energy recovery plants)
23.7   Consent of ERM (Environmental Resources Management) under the direction of Rolf Schmitt P.Geo. (environment and permitting)
23.8   Consent of Klohn Crippen Berger Ltd. under the direction of David Willms P.Eng. (design of surface water diversions, diversion tunnels, tailings management facility, water storage dam and RSF and tunnel geotechnical).
23.9   Consent of BGC Engineering Inc. under the direction of Derek Kinakin P.Geo., P.L.Eng., P.G. (rock mechanics, geohazards and mining pit slopes)
23.10   Consent of WSP Golder, under the direction of Ross Hammett P.Eng. (block cave mining).

 

Certifications
31.1   Certification of Chief Executive Officer required by Rule 13a-14(a) or Rule 15d-14(a), pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
31.2   Certification of Chief Financial Officer required by Rule 13a-14(a) or Rule 15d-14(a), pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
32.1   Certification of Chief Executive Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
32.2   Certification of Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
97.1   Incentive Compensation Recovery Policy

 

Annual Information
99.1   Annual Information Form for the year ended December 31, 2023
99.2   Audited Financial Statements for the year ended December 31, 2023
99.3   Management’s Discussion and Analysis for the year ended December 31, 2023
101   Interactive Data File
104   Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101).

 

 

10

 

 

EX-23.1 2 ea020236101ex23-1_seabri.htm CONSENT OF KPMG LLP, INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

Exhibit 23.1

 

KPMG LLP  
Bay Adelaide Centre  
333 Bay Street, Suite 4600  
Toronto, ON M5H 2S5  

 

Consent of Independent Registered Public Accounting Firm

 

The Board of Directors of Seabridge Gold Inc.

 

We consent to the use of:

 

our report dated March 27, 2024 on the consolidated financial statements of Seabridge Gold Inc. (the “Entity”) which comprise the consolidated statements of financial position as of December 31, 2023 and 2022, the related consolidated statements of operations and comprehensive income (loss), changes in shareholders’ equity and cash flows for each of the years then ended, and the related notes (collectively the “consolidated financial statements”); and

 

our report dated March 27, 2024 on the effectiveness of the Entity’s internal control over financial reporting as of December 31, 2023,

 

each of which is included in the Annual Report on Form 40-F of the Entity for the fiscal year ended December 31, 2023.

 

We also consent to the incorporation by reference of such reports in the Registration Statement (No. 333-268485) on Form F-10, and the Registration Statement (No. 333-211331) on Form S-8 of the Entity.

 

/s/ KPMG LLP

 

Chartered Professional Accountants, Licensed Public Accountants

 

March 27, 2024

Toronto, Canada

 

 

 

KPMG LLP, an Ontario limited liability partnership and a member firm of the KPMG global organization of independent
member firms affiliated with KPMG International Limited, a private English company limited by guarantee. All rights reserved.

 

 

EX-23.2 3 ea020236101ex23-2_seabri.htm CONSENT OF TETRA TECH, UNDER THE DIRECTION OF HASSAN GHAFFARI P.ENG. (SURFACE INFRASTRUCTURE, CAPITAL ESTIMATE AND FINANCIAL ANALYSIS)

Exhibit 23.2

 

Tetra Tech Canada Inc.

 

March 27, 2024

 

To: Seabridge Gold Inc.

United States Securities and Exchange Commission

 

Re: Seabridge Gold Inc. (the “Company”)

Consent of Expert

 

Ladies and Gentlemen:

 

Reference is made to the technical report titled “KSM (Kerr-Sulphurets-Mitchell) Prefeasibility Study and Preliminary Economic Assessment, NI 43-101 Technical Report” dated August 8, 2022 (the “Technical Report”) prepared for the Company.

 

In connection with the Company’s Annual Report on Form 40-F (the “40-F”) in respect of the financial year ended December 31, 2023, to be filed with the U.S. Securities and Exchange Commission (“SEC”) pursuant to the Securities Exchange Act of 1934, as amended, I, Hassan Ghaffari, P.Eng., on behalf of Tetra Tech Canada Inc. hereby:

 

1. consent to the public filing of the Technical Report and the use of any extracts from or a summary of the Technical Report in the 40-F;

 

2. consent to the use of Tetra Tech Canada Inc.’s name and references to the Technical Report, or portions thereof, in the 40-F and to the inclusion or incorporation by reference of information derived from the Technical Report in the 40-F;

 

3. confirm that I have read the 40-F and that it fairly and accurately represents the information in the sections of the Technical Report for which I am responsible; and

 

4. confirm that I have read the 40-F and have no reason to believe that there are any misrepresentations in the information contained therein that are derived from the Technical Report or that are within my knowledge as a result of the services performed by Tetra Tech Canada Inc. in connection with the Technical Report.

 

  Yours Truly,
   
  /s/ Hassan Ghaffari, P.Eng.
  Hassan Ghaffari, P.Eng.
  Director of Metallurgy
  Tetra Tech Canada Inc.

 

EX-23.3 4 ea020236101ex23-3_seabri.htm CONSENT OF TETRA TECH, UNDER THE DIRECTION OF JOHN HUANG P.ENG. (METALLURGICAL TESTING REVIEW, PERMANENT WATER TREATMENT, MINERAL PROCESS DESIGN AND OPERATING COST ESTIMATION FOR PROCESS, GENERAL AND ADMINISTRATIVE

Exhibit 23.3

 

Tetra Tech Inc.

 

March 27, 2024

 

To: Seabridge Gold Inc.

United States Securities and Exchange Commission

 

Re: Seabridge Gold Inc. (the “Company”) Consent of Expert

 

Ladies and Gentlemen:

 

Reference is made to the technical report titled “KSM (Kerr-Sulphurets-Mitchell) Prefeasibility Study and Preliminary Economic Assessment, NI 43-101 Technical Report” dated August 8, 2022 (the “Technical Report”) prepared for the Company.

 

In connection with the Company’s Annual Report on Form 40-F (the “40-F”) in respect of the year ended December 31, 2023, to be filed with the U.S. Securities and Exchange Commission (“SEC”) pursuant to the Securities Exchange Act of 1934, as amended, I, Dr. Jianhui Huang P. Eng, on behalf of Tetra Tech Inc. hereby:

 

1. consent to the public filing of the Technical Report and the use of any extracts from or a summary of the Technical Report in the 40-F;

 

2. consent to the use of Tetra Tech Inc.’s name and references to the Technical Report, or portions thereof, in the 40-F and to the inclusion or incorporation by reference of information derived from the Technical Report in the 40-F;

 

3. confirm that I have read the 40-F and that it fairly and accurately represents the information in the sections of the Technical Report for which I am responsible; and

 

4. confirm that I have read the 40-F and have no reason to believe that there are any misrepresentations in the information contained therein that are derived from the Technical Report or that are within my knowledge as a result of the services performed by Tetra Tech Inc. in connection with the Technical Report.

 

  Yours Truly,
   
  /s/ Dr. Jianhui (John) Huang, P. Eng.
  Dr. Jianhui (John) Huang, P. Eng.
  Senior Metallurgist
  Tetra Tech Canada Inc.

  

EX-23.4 5 ea020236101ex23-4_seabri.htm CONSENT OF WOOD CANADA LIMITED, UNDER THE DIRECTION OF HENRY KIM P.GEO. (MINERAL RESOURCES)

Exhibit 23.4

 

March 27, 2024

 

TO: Seabridge Gold Inc.
  United States Securities and Exchange Commission

 

Re: Seabridge Gold Inc. (the “Company”) Consent of Expert

 

Ladies and Gentlemen:

 

Reference is made to:

 

the technical report titled “KSM (Kerr-Sulphurets-Mitchell) Prefeasibility Study and Preliminary Economic Assessment, NI 43-101 Technical Report” dated August 8, 2022 (the “Technical Report”) prepared for the Company; and

 

the 2024 updated resource estimates for the Iron Cap and Kerr deposits at the KSM Project, effective January 10, 2024 (such disclosure collectively, the “Estimates”).

 

In connection with the Company’s Annual Report on Form 40-F (the “40-F”) in respect of the financial year ended December 31, 2023, to be filed with the U.S. Securities and Exchange Commission (“SEC”) pursuant to the Securities Exchange Act of 1934, as amended, the undersigned hereby:

 

1. consents to being named directly or indirectly in the Form 40-F; and

 

2. consents to:

 

(a) the use of the content in the Technical Report that I am responsible for preparing; and

 

(b) the inclusion of the Estimates in the 40-F;

 

  Yours Truly,
   
  /s/ Henry Kim, P. Geo.
  Henry Kim, P. Geo.
  Principal Resource Geologist Wood Canada Limited

 

 

EX-23.5 6 ea020236101ex23-5_seabri.htm CONSENT OF MOOSE MOUNTAIN TECHNICAL SERVICES UNDER THE DIRECTION OF JIM GRAY P.ENG. (OPEN PIT MINERAL RESERVES, OPEN PIT MINING OPERATIONS, MINE CAPITAL AND MINE OPERATING COSTS, MTT AND RAIL ORE CONVEYANCE DESIGN, TUNNEL CAPITAL COSTS)

Exhibit 23.5

 

March 27, 2024

 

TO: Seabridge Gold Inc.  
  United States Securities and Exchange Commission  

 

Re:

Seabridge Gold Inc. (the “Company”)

Consent of Expert

 

Ladies and Gentlemen:

 

Reference is made to the technical report titled “KSM (Kerr-Sulphurets-Mitchell) Prefeasibility Study and Preliminary Economic Assessment, NI 43-101 Technical Report” dated August 8, 2022 (the “Technical Report”) prepared for the Company.

 

In connection with the Company’s Annual Report on Form 40-F (the “40-F”) in respect of the financial year ended December 31, 2023, to be filed with the U.S. Securities and Exchange Commission (“SEC”) pursuant to the Securities Exchange Act of 1934, as amended, I, James H. Gray, P.Eng., on behalf of myself and Moose Mountain Technical Services, hereby:

 

1. consent to the public filing of the Technical Report and the use of any extracts from or a summary of the Technical Report in the 40-F;

 

2. consent to the use of my name and Moose Mountain Technical Services’s name and references to the Technical Report, or portions thereof, in the 40-F and to the inclusion or incorporation by reference of information derived from the Technical Report in the 40-F;

 

3. confirm that I have read the 40-F and that it fairly and accurately represents the information in the sections of the Technical Report for which I am responsible; and

 

4. confirm that I have read the 40-F and have no reason to believe that there are any misrepresentations in the information contained therein that are derived from the Technical Report or that are within my knowledge as a result of the services performed by me in connection with the Technical Report.

 

    Yours Truly
     
    /s/ James H. Gray, P. Eng.
    James H. Gray, P. Eng.
    Principal Mining Engineer
    Moose Mountain Technical Services

 

 

EX-23.6 7 ea020236101ex23-6_seabri.htm CONSENT OF W.N. BRAZIER ASSOCIATES INC. UNDER THE DIRECTION OF W.N. BRAZIER P.ENG. (ELECTRICAL POWER SUPPLY, ENERGY RECOVERY PLANTS)

Exhibit 23.6

 

March 27, 2024

 

TO:   Seabridge Gold Inc.  
  United States Securities and Exchange Commission  

 

Re: Seabridge Gold Inc. (the “Company”)

 

Ladies and Gentlemen:

 

Reference is made to the technical report titled “KSM (Kerr-Sulphurets-Mitchell) Prefeasibility Study and Preliminary Economic Assessment, NI 43-101 Technical Report” dated August 8, 2022 (the “Technical Report”) prepared for the Company.

 

In connection with the Company’s Annual Report on Form 40-F (the “40-F”) in respect of the financial year ended December 31, 2023, to be filed with the U.S. Securities and Exchange Commission (“SEC”) pursuant to the Securities Exchange Act of 1934, as amended, I, Neil Brazier, P.Eng., on behalf of myself and W.N. Brazier Associates Inc., hereby:

 

1. consent to the public filing of the Technical Report and the use of any extracts from or a summary of the Technical Report in the 40-F;

 

2. consent to the use of my name and W.N. Brazier Associates lnc.’s name and references to the Technical Report, or portions thereof, in the 40-F and to the inclusion or incorporation by reference of information derived from the Technical Report in the 40-F;

 

3. confirm that I have read the 40-F and that it fairly and accurately represents the information in the sections of the Technical Report for which I am responsible; and

 

4. confirm that I have read the 40-F and have no reason to believe that there are any misrepresentations in the information contained therein that are derived from the Technical Report or that are within my knowledge as a result of the services performed by me in connection with the Technical Report.

 

    Yours Truly,
     
    /s/ Neil Brazier, P. Eng.
    Neil Brazier, P. Eng.
    Principal
    WN Brazier Associates Inc.

 

 

EX-23.7 8 ea020236101ex23-7_seabri.htm CONSENT OF ERM (ENVIRONMENTAL RESOURCES MANAGEMENT) UNDER THE DIRECTION OF ROLF SCHMITT P.GEO. (ENVIRONMENT AND PERMITTING)

Exhibit 23.7

 

March 27, 2024

 

TO: Seabridge Gold Inc.

United States Securities and Exchange Commission

 

Re: Seabridge Gold Inc. (the “Company”)

Consent of Expert

 

Ladies and Gentlemen:

 

Reference is made to the technical report titled “KSM (Kerr-Sulphurets-Mitchell) Prefeasibility Study and Preliminary Economic Assessment, NI 43-101 Technical Report” dated August 8, 2022 (the “Technical Report”) prepared for the Company.

 

In connection with the Company’s Annual Report on Form 40-F (the “40-F”) in respect of the financial year ended December 31, 2023, to be filed with the U.S. Securities and Exchange Commission (“SEC”) pursuant to the Securities Exchange Act of 1934, as amended, I, Rolf Schmitt, M.Sc., P.Geo., on behalf of ERM Consultants Canada Ltd., hereby:

 

1. consent to the public filing of the Report and the use of any extracts from or a summary of the Technical Report in the 40-F;

 

2. consent to the use of ERM Consultants Canada Ltd.’s name and references to the Technical Report, or portions thereof, in the 40-F and to the inclusion or incorporation by reference of information derived from the Technical Report in the 40-F;

 

3. confirm that I have read the 40-F and that it fairly and accurately represents the information in the sections of the Report for which I am responsible; and

 

4. confirm that I have read the 40-F and have no reason to believe that there are any misrepresentations in the information contained therein that are derived from the Technical Report or that are within my knowledge as a result of the services performed by ERM Consultants Canada Ltd. in connection with the Technical Report.

 

  Yours Truly,
   
  /s/ Rolf Schmitt, P. Geo.
  Rolf Schmitt, P. Geo.
  Technical Director – Permitting
   
  ERM Consultants Canada Ltd

 

EX-23.8 9 ea020236101ex23-8_seabri.htm CONSENT OF KLOHN CRIPPEN BERGER LTD. UNDER THE DIRECTION OF DAVID WILLMS P.ENG. (DESIGN OF SURFACE WATER DIVERSIONS, DIVERSION TUNNELS, TAILINGS MANAGEMENT FACILITY, WATER STORAGE DAM AND RSF AND TUNNEL GEOTECHNICAL)

Exhibit 23.8

 

March 27, 2024

 

TO: Seabridge Gold Inc.
  United States Securities and Exchange Commission

 

Re: Seabridge Gold Inc. (the “Company”)
  Consent of Expert

 

Ladies and Gentlemen:

 

Reference is made to the technical report titled “KSM (Kerr-Sulphurets-Mitchell) Prefeasibility Study and Preliminary Economic Assessment, NI 43-101 Technical Report” dated August 8, 2022 (the “Technical Report”) prepared for the Company.

 

In connection with the Company’s Annual Report on Form 40-F (the “40-F”) in respect of the financial year ended December 31, 2023, to be filed with the U.S. Securities and Exchange Commission (“SEC”) pursuant to the Securities Exchange Act of 1934, as amended, I, David A. Willms, P. Eng., hereby:

 

1. consent to the public filing of the Technical Report and the use of any extracts from or a summary of the Technical Report in the 40-F;

 

2. consent to the use of Klohn Crippen Berger Ltd.’s name and references to the Technical Report, or portions thereof, in the 40-F and to the inclusion or incorporation by reference of information derived from the Technical Report in the 40-F;

 

3. confirm that I have read the 40-F and that it fairly and accurately represents the information in the sections of the Technical Report for which I am responsible; and

 

4. confirm that I have read the 40-F and have no reason to believe that there are any misrepresentations in the information contained therein that are derived from the Technical Report or that are within my knowledge as a result of the services performed by Klohn Crippen Berger Ltd. in connection with the Technical Report.

 

  Yours Truly,
   
  /s/ David A. Willms, P. Eng.
  David A. Willms, P. Eng.
  Senior Geotechnical Engineer
  Klohn Crippen Berger Ltd.

 

EX-23.9 10 ea020236101ex23-9_seabri.htm CONSENT OF BGC ENGINEERING INC. UNDER THE DIRECTION OF DEREK KINAKIN P.GEO., P.L.ENG., P.G. (ROCK MECHANICS, GEOHAZARDS AND MINING PIT SLOPES)

Exhibit 23.9

 

BGC Engineering Inc.

 

March 27, 2024

 

To: Seabridge Gold Inc.
  United States Securities and Exchange Commission

 

Re: Seabridge Gold Inc. (the “Company”)
  Consent of Expert

 

Ladies and Gentlemen:

 

Reference is made to the technical report titled “KSM (Kerr-Sulphurets-Mitchell) Prefeasibility Study and Preliminary Economic Assessment, NI 43-101 Technical Report” dated August 8, 2022 (the “Technical Report”) prepared for the Company.

 

In connection with the Company’s Annual Report on Form 40-F (the “40-F”) in respect of the financial year ended December 31, 2023, to be filed with the U.S. Securities and Exchange Commission (“SEC”) pursuant to the Securities Exchange Act of 1934, as amended, I, Derek Kinakin, M.Sc., P.Geo., P.G., on behalf of myself and BGC Engineering Inc., hereby:

 

1. consent to the public filing of the Technical Report and the use of any extracts from or a summary of the Technical Report in the 40-F;

 

2. consent to the use of my name and BGC Engineering Inc.’s name and references to the Technical Report, or portions thereof, in the 40-F and to the inclusion or incorporation by reference of information derived from the Technical Report in the 40-F;

 

3. confirm that I have read the 40-F and that it fairly and accurately represents the information in the sections of the Technical Report for which I am responsible; and

 

4. confirm that I have read the 40-F and have no reason to believe that there are any misrepresentations in the information contained therein that are derived from the Technical Report or that are within my knowledge as a result of the services performed by me in connection with the Technical Report.

 

  Yours Truly,
   
  /s/ Derek Kinakin, M.Sc., P.Geo., P.G.
  Derek Kinakin, M.Sc., P.Geo., P.G.

 

EX-23.10 11 ea020236101ex23-10_seabri.htm CONSENT OF WSP GOLDER, UNDER THE DIRECTION OF ROSS HAMMETT P.ENG. (BLOCK CAVE MINING)

Exhibit 23.10

 

 

Consent of Ross D. Hammett

WSP Canada Inc.

Annual Report on Form 40-F

 

March 27, 2024

 

To: Seabridge Gold Inc.
  United States Securities and Exchange Commission

 

Re: Seabridge Gold Inc. (the “Company”)
  Consent of Expert

 

Reference is made to the technical report titled “KSM (Kerr-Sulphurets-Mitchell) Prefeasibility Study and Preliminary Economic Assessment, NI 43-101 Technical Report” dated August 8, 2022 (the “Technical Report”) prepared for the Company.

 

In connection with the Company’s Annual Report on Form 40-F (the “40-F”) in respect of the financial year ended December 31, 2023, to be filed with the U.S. Securities and Exchange Commission (“SEC”) pursuant to the Securities Exchange Act of 1934, as amended, I, Ross D. Hammett, Ph.D., P.Eng., hereby:

 

1. consent to the quotation, inclusion or summary of those portions of the Technical Report prepared by me in the 40-F;

 

2. consent to the use of my name and references to my name in the 40-F, where used or referenced in the 40-F.

 

in each case above, where used or incorporated by reference into the 40-F.

 

  Yours truly,
   
  /s/ Ross D. Hammett, Ph.D., P.Eng.
  Ross D. Hammett, Ph.D., P.Eng.
  WSP Canada Inc.

 

EX-31.1 12 ea020236101ex31-1_seabri.htm CERTIFICATION

Exhibit 31.1

 

CERTIFICATIONS PURSUANT TO SECTION 302

OF

THE SARBANES-OXLEY ACT OF 2002

 

I, Rudi P. Fronk, Chairman and CEO, certify that:

 

1. I have reviewed this Annual Report on Form 40-F of Seabridge Gold Inc. (the “Issuer”):

 

2. Based on my knowledge, this annual report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;

 

3. Based on my knowledge, the financial statements, and other financial information included in this annual report, fairly present in all material respects the financial condition, results of operations and cash flows of the Issuer as of, and for, the periods presented in this report;

 

4. The Issuer’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the Issuer and have:

 

a) Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the Issuer, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this annual report is being prepared;

 

b) Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;

 

c) Evaluated the effectiveness of the Issuer’s disclosure controls and procedures and presented in this annual report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this annual report based on such evaluation; and

 

d) Disclosed in this annual report any change in the Issuer’s internal control over financial reporting that occurred during the period covered by the annual report that has materially affected, or is reasonably likely to materially affect, the Issuer’s internal control over financial reporting; and

 

5. The Issuer’s other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the Issuer’s auditors and the audit committee of the Issuer’s board of directors (or persons performing the equivalent functions):

 

a) All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the Issuer’s ability to record, process, summarize and report financial information; and

 

b) Any fraud, whether or not material, that involves management or other employees who have a significant role in the Issuer’s internal control over financial reporting.

 

Date: March 27, 2024 By: /s/ Rudi P. Fronk
    Rudi P. Fronk
    Chairman and CEO

 

EX-31.2 13 ea020236101ex31-2_seabri.htm CERTIFICATION

Exhibit 31.2

 

CERTIFICATIONS PURSUANT TO SECTION 272

OF

THE SARBANES-OXLEY ACT OF 2002

 

I, Christopher J. Reynolds, VP Finance and CFO, certify that:

 

1. I have reviewed this Annual Report on Form 40-F of Seabridge Gold Inc. (the “Issuer”):

 

2. Based on my knowledge, this annual report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;

 

3. Based on my knowledge, the financial statements, and other financial information included in this annual report, fairly present in all material respects the financial condition, results of operations and cash flows of the Issuer as of, and for, the periods presented in this report;

 

4. The Issuer’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the Issuer and have:

 

a) Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the Issuer, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this annual report is being prepared;

 

b) Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;

 

c) Evaluated the effectiveness of the Issuer’s disclosure controls and procedures and presented in this annual report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this annual report based on such evaluation; and

 

d) Disclosed in this annual report any change in the Issuer’s internal control over financial reporting that occurred during the period covered by the annual report that has materially affected, or is reasonably likely to materially affect, the Issuer’s internal control over financial reporting; and

 

5. The Issuer’s other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the Issuer’s auditors and the audit committee of the Issuer’s board of directors (or persons performing the equivalent functions):

 

a) All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the Issuer’s ability to record, process, summarize and report financial information; and

 

b) Any fraud, whether or not material, that involves management or other employees who have a significant role in the Issuer’s internal control over financial reporting.

 

Date: March 27, 2024 By: /s/ Christopher J. Reynolds
    Christopher J. Reynolds
    VP Finance and CFO

  

EX-32.1 14 ea020236101ex32-1_seabri.htm CERTIFICATION

Exhibit 32.1

 

CERTIFICATION PURSUANT TO 18 U.S.C. §1350, AS ADOPTED PURSUANT TO

SECTION 906 OF THE SARBANES-OXLEY ACT OF 2002

 

In connection with this Annual Report of Seabridge Gold Inc. (the “Company”) on Form 40 -F for the period ended December 31, 2023, as filed with the Securities and Exchange Commission on the date hereof (the “Annual Report”), I, Rudi P. Fronk, Chief Executive Officer of the Company, certify, pursuant to U.S.C. §1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, that:

 

(1) The Annual Report fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934; and

 

(2) The information contained in this Annual Report fairly presents, in all material respects, the financial condition and results of operations of the Company.

 

Date: March 27, 2024 By: /s/ Rudi P. Fronk
    Rudi P. Fronk
    Chief Executive Officer

 

This certification accompanies the Annual Report pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 and may not be used or relied upon for any other purpose including Section 18 of the Securities Exchange Act of 1934. A signed original of this written statement required by Section 906 has been provided to the Company and will be retained by the Company and furnished to the Securities and Exchange Commission or its staff upon request.

 

EX-32.2 15 ea020236101ex32-2_seabri.htm CERTIFICATION

Exhibit 32.2

 

CERTIFICATION PURSUANT TO 18 U.S.C. §1350, AS ADOPTED PURSUANT TO

SECTION 906 OF THE SARBANES-OXLEY ACT OF 2002

 

In connection with this Annual Report of Seabridge Gold Inc. (the “Company”) on Form 40-F for the period ended December 31, 2023, as filed with the Securities and Exchange Commission on the date hereof (the “Annual Report”), I, Christopher J. Reynolds, Vice President Finance and Chief Financial Officer of the Company, certify, pursuant to U.S.C. §1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, that:

 

(1) The Annual Report fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934; and

 

(2) The information contained in this Annual Report fairly presents, in all material respects, the financial condition and results of operations of the Company.

 

Date: March 27, 2024 By: /s/ Christopher J. Reynolds
    Christopher J. Reynolds
    Vice President Finance and CFO

 

This certification accompanies the Annual Report pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 and may not be used or relied upon for any other purpose including Section 18 of the Securities Exchange Act of 1934. A signed original of this written statement required by Section 906 has been provided to the Company and will be retained by the Company and furnished to the Securities and Exchange Commission or its staff upon request.

 

EX-97.1 16 ea020236101ex97-1_seabri.htm INCENTIVE COMPENSATION RECOVERY POLICY

Exhibit 97.1 

 

SEABRIDGE GOLD INC.

INCENTIVE-BASED COMPENSATION RECOVERY POLICY 

EFFECTIVE NOVEMBER 13, 2023

 

1. Policy Purpose. The purpose of this Seabridge Gold Inc. (the “Company”) Incentive-Based Compensation Recovery Policy (this “Policy”) is to enable the Company to recover Erroneously Awarded Compensation in the event that the Company is required to prepare an Accounting Restatement. This Policy is intended to comply with the requirements set forth in Section 303A.14 of the NYSE Listed Company Manual (the “Listing Rule”) and shall be construed and interpreted in accordance with such intent. Unless otherwise defined in this Policy, capitalized terms shall have the meaning ascribed to such terms in Section 7.

 

2. Policy Administration. This Policy shall be administered by the Compensation Committee of the Board (the “Committee”) unless the Board determines to administer this Policy itself. The Committee has full and final authority to make all determinations under this Policy, in each case to the extent permitted under the Listing Rule and in compliance with (or pursuant to an exemption from the application of) Section 409A of the Code. All determinations and decisions made by the Committee pursuant to the provisions of this Policy shall be final, conclusive and binding on all persons, including the Company, its affiliates, its stockholders and Executive Officers. Any action or inaction by the Committee with respect to an Executive Officer under this Policy in no way limits the Committee’s actions or decisions not to act with respect to any other Executive Officer under this Policy or under any similar policy, agreement or arrangement, nor shall any such action or inaction serve as a waiver of any rights the Company may have against any Executive Officer other than as set forth in this Policy.

 

3. Policy Application. This Policy applies to all Incentive-Based Compensation received by a person: (a) after beginning service as an Executive Officer; (b) who served as an Executive Officer at any time during the performance period for such Incentive-Based Compensation; (c) while the Company had a class of securities listed on a national securities exchange or a national securities association; and (d) during the three completed fiscal years immediately preceding the Accounting Restatement Date. In addition to such last three completed fiscal years, the immediately preceding clause (d) includes any transition period that results from a change in the Company’s fiscal year within or immediately following such three completed fiscal years; provided, however, that a transition period between the last day of the Company’s previous fiscal year end and the first day of its new fiscal year that comprises a period of nine to twelve months shall be deemed a completed fiscal year. For purposes of this Section 3, Incentive-Based Compensation is deemed received in the Company’s fiscal period during which the Financial Reporting Measure specified in the Incentive-Based Compensation award is attained, even if the payment or grant of the Incentive-Based Compensation occurs after the end of that period. For the avoidance of doubt, Incentive-Based Compensation that is subject to both a Financial Reporting Measure vesting condition and a service-based vesting condition shall be considered received when the relevant Financial Reporting Measure is achieved, even if the Incentive-Based Compensation continues to be subject to the service-based vesting condition.

 

 


 

4. Policy Recovery Requirement. In the event of an Accounting Restatement, the Company must recover, reasonably promptly, Erroneously Awarded Compensation, in amounts determined pursuant to this Policy. The Company’s obligation to recover Erroneously Awarded Compensation is not dependent on if or when the Company files restated financial statements. Recovery under this Policy with respect to an Executive Officer shall not require the finding of any misconduct by such Executive Officer or such Executive Officer being found responsible for the accounting error leading to an Accounting Restatement. In the event of an Accounting Restatement, the Company shall satisfy the Company’s obligations under this Policy to recover any amount owed from any applicable Executive Officer by exercising its sole and absolute discretion in how to accomplish such recovery, to the extent permitted under the Listing Rule and in compliance with (or pursuant to an exemption from the application of) Section 409A of the Code. The Company’s recovery obligation pursuant to this Section 4 shall not apply to the extent that the Committee, or in the absence of the Committee, a majority of the independent directors serving on the Board, determines that such recovery would be impracticable and:

 

a. The direct expense paid to a third party to assist in enforcing this Policy would exceed the amount to be recovered. Before concluding that it would be impracticable to recover any amount of Erroneously Awarded Compensation based on expense of enforcement, the Company must make a reasonable attempt to recover such Erroneously Awarded Compensation, document such reasonable attempt(s) to recover, and provide that documentation to the Stock Exchange;

 

b. Recovery would violate the laws in the country and province or state which apply to the relevant Executive Officer where that law was adopted prior to November 28, 2022. Before concluding that it would be impracticable to recover any amount of Erroneously Awarded Compensation based on violation of the law applicable to the relevant Executive Officer, the Company must obtain an opinion of counsel, acceptable to the Stock Exchange, that recovery would result in such a violation, and must provide such opinion to the Stock Exchange; or

 

c. Recovery would likely cause an otherwise tax-qualified retirement plan, under which benefits are broadly available to employees of the registrant, to fail to meet the requirements of Section 401(a)(13) or Section 411(a) of the Code.

 

5. Policy Prohibition on Indemnification and Insurance Reimbursement. The Company is prohibited from indemnifying any Executive Officer or former Executive Officer against the loss of Erroneously Awarded Compensation. Further, the Company is prohibited from paying or reimbursing an Executive Officer for purchasing insurance to cover any such loss.

 

6. Required Policy-Related Filings. The Company shall file all disclosures with respect to this Policy in accordance with the requirements of the federal securities laws, including disclosures required by U.S. Securities and Exchange Commission filings.

 

7. Definitions.

 

a. “Accounting Restatement” means an accounting restatement due to the material noncompliance of the Company with any financial reporting requirement under the securities laws, including any required accounting restatement to correct an error in previously issued financial statements that is material to the previously issued financial statements, or that would result in a material misstatement if the error were corrected in the current period or left uncorrected in the current period.

 

2


 

b. “Accounting Restatement Date” means the earlier to occur of: (i) the date the Board, a committee of the Board, or the officer or officers of the Company authorized to take such action if the Board action is not required, concludes, or reasonably should have concluded, that the Company is required to prepare an Accounting Restatement; and (ii) the date a court, regulator, or other legally authorized body directs the Company to prepare an Accounting Restatement.

 

c. “Board” means the board of directors of the Company.

 

d. “Code” means the U.S. Internal Revenue Code of 1986, as amended. Any reference to a section of the Code or regulation thereunder includes such section or regulation, any valid regulation or other official guidance promulgated under such section, and any comparable provision of any future legislation or regulation amending, supplementing, or superseding such section or regulation.

 

e. “Erroneously Awarded Compensation” means, in the event of an Accounting Restatement, the amount of Incentive-Based Compensation previously received that exceeds the amount of Incentive-Based Compensation that otherwise would have been received had it been determined based on the restated amounts in such Accounting Restatement, and must be computed without regard to any taxes paid by the relevant Executive Officer; provided, however, that for Incentive-Based Compensation based on stock price or total stockholder return, where the amount of Erroneously Awarded Compensation is not subject to mathematical recalculation directly from the information in an Accounting Restatement: (i) the amount of Erroneously Awarded Compensation must be based on a reasonable estimate of the effect of the Accounting Restatement on the stock price or total stockholder return upon which the Incentive-Based Compensation was received; and (ii) the Company must maintain documentation of the determination of that reasonable estimate and provide such documentation to the Stock Exchange.

 

f. “Executive Officer” means the Company’s chief executive officer, chief operating officer, president, principal financial officer, principal accounting officer (or if there is no such accounting officer, the controller), any vice-president of the Company in charge of a principal business unit, division, or function (such as sales, administration, or finance), any other officer who performs a policy-making function, or any other person who performs similar policy-making functions for the Company. An executive officer of the Company’s parent or subsidiary is deemed an “Executive Officer” if the executive officer performs such policy making functions for the Company.

 

g. “Financial Reporting Measure” means any measure that is determined and presented in accordance with the accounting principles used in preparing the Company’s financial statements, and any measure that is derived wholly or in part from such measure; provided, however, that a Financial Reporting Measure is not required to be presented within the Company’s financial statements or included in a filing with the U.S. Securities and Exchange Commission to qualify as a “Financial Reporting Measure.” For purposes of this Policy, “Financial Reporting Measure” includes, but is not limited to, stock price and total stockholder return.

 

3


 

h. “Incentive-Based Compensation” means any compensation that is granted, earned, or vested based wholly or in part upon the attainment of a Financial Reporting Measure.

 

i. “Stock Exchange” means the U.S. national stock exchange on which the Company’s Common shares are listed (e.g., NYSE).

 

8. Acknowledgement. Each Executive Officer shall sign and return to the Company, within 30 calendar days following the later of (i) the effective date of this Policy first set forth above or (ii) the date the individual becomes an Executive Officer, the Acknowledgement Form attached hereto as Exhibit A, pursuant to which the Executive Officer agrees to be bound by, and to comply with, the terms and conditions of this Policy.

 

9. Severability. The provisions in this Policy are intended to be applied to the fullest extent of the law. To the extent that any provision of this Policy is found to be unenforceable or invalid under any applicable law, such provision shall be applied to the maximum extent permitted and shall automatically be deemed amended in a manner consistent with its objectives to the extent necessary to conform to any limitations required under applicable law.

 

10. Amendment; Termination. The Board may amend this Policy from time to time in its sole and absolute discretion and shall amend this Policy as it deems necessary to reflect the Listing Rule, to comply with (or maintain an exemption from the application of) Section 409A of the Code. The Board may terminate this Policy at any time.

 

11. Other Recovery Obligations; General Rights. To the extent that the application of this Policy would provide for recovery of Incentive-Based Compensation that the Company recovers pursuant to Section 304 of the Sarbanes-Oxley Act or other recovery obligations, the amount the relevant Executive Officer has already reimbursed the Company will be credited to the required recovery under this Policy. This Policy shall not limit the rights of the Company to take any other actions or pursue other remedies that the Company may deem appropriate under the circumstances and under applicable law, in each case to the extent permitted under the Listing Rule and in compliance with (or pursuant to an exemption from the application of) Section 409A of the Code. Nothing contained in this Policy shall limit the Company’s ability to seek recoupment, in appropriate circumstances (including circumstances beyond the scope of this Policy) and as permitted by applicable law, of any amounts from any individual, in each case to the extent permitted under the Listing Rule and in compliance with (or pursuant to an exemption from the application of) Section 409A of the Code.

 

12. Successors. This Policy is binding and enforceable against all Executive Officers and their beneficiaries, heirs, executors, administrators or other legal representatives.

 

4


 

EXHIBIT A

 

SEABRIDGE GOLD INC.

 

INCENTIVE-BASED COMPENSATION RECOVERY POLICY

 

ACKNOWLEDGEMENT FORM

 

By signing below, the undersigned acknowledges and confirms that the undersigned has received and reviewed a copy of Seabridge Gold Inc. (the “Company”) Incentive-Based Compensation Recovery Policy (the “Policy”).

 

By signing this Acknowledgement Form, the undersigned acknowledges and agrees that the undersigned is and will continue to be subject to the Policy and that the Policy will apply both during and after the undersigned’s employment with the Company. Further, by signing below, the undersigned agrees to abide by the terms of the Policy, including, without limitation, by returning any Erroneously Awarded Compensation (as defined in the Policy) to the Company to the extent required by, and in a manner consistent with, the Policy.

 

  EXECUTIVE OFFICER
   
   
  Signature
   
   
  Print Name
   
   
  Date

 

 

5

 

 

EX-99.1 17 ea020236101ex99-1_seabri.htm ANNUAL INFORMATION FORM FOR THE YEAR ENDED DECEMBER 31, 2023

Exhibit 99.1

  

 

 

ANNUAL

 

INFORMATION

 

FORM

 

FOR THE YEAR ENDED

DECEMBER 31, 2023

 

DATED MARCH 27, 2024

 

 


 

TABLE OF CONTENTS

 

Contents

   
PRELIMINARY NOTES i
Date of Information i
Reporting Currency i
Units of Measure i
Cautionary Note to United States Investors Regarding Resource Estimates i
ITEM 1: CORPORATE STRUCTURE 1
Incorporation of the Issuer 1
Intercorporate Relationships 1
ITEM 2: GENERAL DEVELOPMENT OF THE BUSINESS 2
Overview 2
Three Year History 5
ITEM 3: DESCRIPTION OF THE ISSUER’S BUSINESS 10
General 10
Sustainability (Environmental, Social, and Governance Matters) 11
Cautionary Note Regarding Forward-Looking Statements 14
KSM Project 16
Courageous Lake Project 50
Iskut Project 52
3 Aces Project 54
Snowstorm and Goldstorm Projects 56
Glossary of Technical Terms 58
ITEM 4: RISK FACTORS 62
Risks Related to the Issuer and its Industry 62
Risks Related to the Common Shares 80
ITEM 5: DIVIDENDS 81
ITEM 6: GENERAL DESCRIPTION OF CAPITAL STRUCTURE 82
Share Capital 82
Secured Notes 82
ITEM 7: MARKET FOR SECURITIES 84
Trading Price and Volume 84
ITEM 8: DIRECTORS AND OFFICERS 85
ITEM 9: AUDIT COMMITTEE INFORMATION 89
Audit Committee Charter 89
Composition of the Audit Committee 89
Relevant Education and Experience 89
External Auditor Services Fees (by Category) 90
Pre-Approval of Audit and Non-Audit Services Provided by Independent Auditors 90
ITEM 10: CONFLICTS OF INTEREST 90
ITEM 11: LEGAL PROCEEDINGS AND REGULATORY ACTIONS 90
Legal Proceedings 90
Regulatory Actions 91
ITEM 12: INFORMATION TECHNOLOGY AND CYBERSECURITY 91
ITEM 13: INTEREST OF MANAGEMENT AND OTHERS IN MATERIAL TRANSACTIONS 92
ITEM 14: TRANSFER AGENTS AND REGISTRARS 92
ITEM 15: MATERIAL CONTRACTS 92
ITEM 16: INTERESTS OF EXPERTS 93
ITEM 17: ADDITIONAL INFORMATION 93

 

I


 

PRELIMINARY NOTES

 

Date of Information

 

The information in this Annual Information Form (“AIF”) is presented as of December 31, 2023 unless specified otherwise.

 

Reporting Currency

 

All dollar amounts are expressed in Canadian dollars unless otherwise indicated. The Issuer’s quarterly and annual financial statements are presented in Canadian dollars.

 

Units of Measure

 

In this AIF a combination of Imperial and metric measures are used with respect to the Issuer’s mineral properties. Conversion rates from Imperial measure to metric and from metric to Imperial are provided below:

 

Imperial Measure = Metric Unit Metric Measure = Imperial Unit
2.47 acres 1 hectare (h) 0.4047 hectares 1 acre
3.28 feet 1 meter (m) 0.3048 meters 1 foot
0.62 miles 1 kilometer (km) 1.609 kilometers 1 mile
0.032 ounces (troy) (oz) 1 gram (g) 31.1035 grams 1 ounce (troy)
1.102 tons (short) 1 tonne (t) 0.907 tonnes 1 ton
0.029 ounces (troy)/ton 1 gram/tonne (g/t) 34.28 grams/tonne 1 ounce (troy/ton)

 

Abbreviations of unit measures are used in this AIF in addition to those in brackets in the table above as follows:

 

Bt - Billion tonnes Ga – Giga-annum kWh - Kilowatt hours Mlb - Million pounds
Mm³ - Million cubic meters Moz - Million ounces m/s - Meters per second Mt - Million tonnes
MWh - Megawatt hours ppm - Parts per million tpd – tonnes per day W/m² - Watt per square meter

 

See “Glossary of Technical Terms” for a description of some important technical terms used in this AIF.

 

Cautionary Note to United States Investors Regarding Resource Estimates

 

 

This AIF has been prepared in accordance with the requirements of the securities laws in effect in Canada, which differ from the requirements of United States securities laws. Mineral resource estimates included in this AIF and in any document incorporated by reference herein or therein have been prepared in accordance with, and use terms that comply with, the reporting standards in accordance with Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”). NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. In accordance with NI 43-101, the Issuer uses the terms mineral reserves and resources as they are defined in accordance with the CIM Definition Standards on mineral reserves and resources (the “CIM Definition Standard”) adopted by the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”).

 

i


 

The U.S. Securities and Exchange Commission (the “SEC”) has adopted amendments to its disclosure rules to modernize the mineral property disclosure requirements for issuers whose securities are registered with the SEC under the Exchange Act. These amendments became effective February 25, 2019 (the “SEC Modernization Rules”) and have replaced the historical property disclosure requirements for mining registrants that were included in SEC Industry Guide 7. As a foreign private issuer that files its annual report on Form 40-F with the SEC pursuant to the multi-jurisdictional disclosure system (“MJDS”), the Issuer is not required to provide disclosure on its mineral properties under the SEC Modernization Rules and will continue to provide disclosure under NI 43-101 and the CIM Definition Standards. However, if the Issuer either ceases to be a “foreign private issuer” or ceases to be entitled to file reports under the MJDS, then the Issuer will be required to provide disclosure on its mineral properties under the SEC Modernization Rules.

 

Accordingly, United States investors are cautioned that the disclosure the Issuer provides on its mineral properties in this AIF and under its continuous disclosure obligations under the Exchange Act may be different from the disclosure that the Issuer would otherwise be required to provide as a U.S. domestic issuer or a non-MJDS foreign private issuer under the SEC Modernization Rules.

 

The SEC Modernization Rules include the adoption of terms describing mineral reserves and mineral resources that are substantially similar to the corresponding terms under the CIM Definition Standards. As a result of the adoption of the SEC Modernization Rules, the SEC will now recognize estimates of “measured mineral resources,” “indicated mineral resources” and “inferred mineral resources.” In addition, the SEC has amended its definitions of “proven mineral reserves” and “probable mineral reserves” to be substantially similar to the corresponding CIM Definition Standards.

 

United States investors are cautioned that while the above terms are substantially similar to CIM Definition Standards, there are differences in the definitions under the SEC Modernization Rules and the CIM Definition Standards. Accordingly, there is no assurance any mineral reserves or mineral resources that the Issuer may report as “proven reserves,” “probable reserves,” “measured mineral resources,” “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had the Issuer prepared the reserve or resource estimates under the standards adopted under the SEC Modernization Rules.

 

United States investors are also cautioned that while the SEC will now recognize “measured mineral resources,” “indicated mineral resources” and “inferred mineral resources,” investors should not assume that any part or all of the mineralization in these categories will ever be converted into a higher category of mineral resources or into mineral reserves. Mineralization described using these terms has a greater amount of uncertainty as to their existence and feasibility than mineralization that has been characterized as reserves. Accordingly, investors are cautioned not to assume that any “measured mineral resources,” “indicated mineral resources,” or “inferred mineral resources” that the Issuer reports are or will be economically or legally mineable.

 

Further, “inferred resources” have a greater amount of uncertainty as to their existence and as to whether they can be mined legally or economically. Therefore, United States investors are also cautioned not to assume that all or any part of the inferred resources exist. In accordance with Canadian rules, estimates of “inferred mineral resources” cannot form the basis of feasibility or other economic studies, except in limited circumstances where permitted under NI 43-101.

 

Accordingly, information contained in this AIF and the portions of documents incorporated by reference herein contain descriptions of the Issuer’s mineral deposits that may not be comparable to similar information made public by U.S. companies who prepare their disclosure in accordance with U.S. federal securities laws and the rules and regulations thereunder.

 

ii


 

Seabridge Gold Inc.

 

ANNUAL INFORMATION FORM

 

ITEM 1: CORPORATE STRUCTURE

 

Incorporation of the Issuer

 

Seabridge Gold Inc. (the “Issuer” or “Seabridge”) was incorporated under the Company Act (British Columbia) on September 14, 1979 under the name of Chopper Mines Ltd., which was subsequently changed to Dragoon Resources Ltd. on November 9, 1984, and then changed again to Seabridge Resources Inc. on May 20, 1998. On June 20, 2002, the Issuer changed its name to “Seabridge Gold Inc.” and on October 31, 2002, the Issuer was continued under the Canada Business Corporations Act.

 

The Issuer’s corporate offices are located at 106 Front Street East, 4th Floor, Toronto, Ontario, Canada M5A 1E1. The Issuer’s telephone number is (416) 367-9292. The Issuer’s Shares are currently listed for trading on the Toronto Stock Exchange (the “TSX”) under the symbol “SEA” and on the New York Stock Exchange (the “NYSE”) under the symbol “SA”. The Issuer’s registered office is located at 10th Floor, 595 Howe Street, Vancouver, British Columbia, Canada V6C 2T5.

 

Intercorporate Relationships

 

 

The Issuer presently has twelve wholly-owned subsidiaries: KSM Mining ULC, Seabridge Gold (KSM) Inc., SnipGold Corp., Hattrick Resources Corp. (“Hattrick”) and Tuksi Mining & Development Company Ltd. (“Tuksi”), each companies incorporated under the laws of British Columbia, Canada; Seabridge Gold (NWT) Inc., a company incorporated under the laws of the Northwest Territories of Canada; Seabridge Gold (Yukon) Inc., a company incorporated under the laws of Yukon; Seabridge Gold Corporation, Pacific Intermountain Gold, Corporation, 5555 Gold Inc. and 5555 Silver Inc., each Nevada Corporations; and Snowstorm Exploration LLC, a Delaware limited liability corporation. The following diagram illustrates the inter-corporate relationship between the Issuer, its active subsidiaries and its projects as of December 31, 2023.

 

1


 

 

 

Notes:
1. Certain of the Issuer’s subsidiaries have been omitted from the chart as they own no property and are inactive.
2. SnipGold, through Hattrick, owns 95% of 12 of the claims covering an area of approximately 4,339 ha. The Bronson Slope and Quartz Rise areas of the Iskut Project are 100% owned by SnipGold. The exploration targets at Snip North lie in areas that lie approximately 50% on claims owned 100% by SnipGold and 50% on claims in which SnipGold’s ownership interest is 95%.
3. The Issuer has entered into an option agreement under which a 100% interest in the Quartz Mountain Project may be acquired by a third party.

 

ITEM 2: GENERAL DEVELOPMENT OF THE BUSINESS

 

Overview

 

 

Since 1999, Seabridge has taken steps to achieve its goal of providing strong returns to shareholders by maximizing leverage to the price of gold. The Issuer’s strategy to achieve this goal is to optimize gold ownership per Common share by increasing gold resources more rapidly than shares outstanding. This ratio of gold ownership per Common share has provided a simple but effective measure for evaluating dollars spent on behalf of shareholders.

 

In 1999, management decided that Seabridge’s strategic focus would be on acquiring, exploring and advancing gold deposits. Seabridge determined it would not build or operate mines, but that it would look to partner or sell assets that were advancing toward production. In the Issuer’s view, building mines adds considerable technical and financial risks and requires a different set of skills and resources. Seabridge also decided it would prioritize exploration projects with known gold deposits with exploration upside to reduce risk in terms of trying to achieve a growing ratio of gold ownership per Common share. The Issuer therefore narrowed the activities it would undertake to the following three phases, which phases it planned to progress through in the order set forth below and in response to increases in the price of gold: (i) acquiring known gold deposits, (ii) expanding the deposits, and (iii) advancing its deposits towards a construction decision by defining the economic parameters of the deposits through engineering studies, upgrading mineral resources to reserves, securing permits for undertaking mining operations and building relationships with local communities and Indigenous groups. The Issuer believed this was a relatively lower-risk and less capital-intensive strategy consistent with the goal of optimizing gold ownership per Common share. The Issuer continues to follow this strategy today.

 

2


 

From 1999 to 2002, Seabridge acquired eight deposits with gold resources in North America, paying less than US$1.00 per ounce of resource (using aggregate ounces from all resource categories). Previous owners had spent an estimated US$300 million exploring and developing these deposits.

 

By 2002, with the gold price on the rise, the Issuer believed that it was becoming more expensive to acquire existing resources, and the cost-benefit equation tilted in favor of increasing gold ownership through exploration. Seabridge’s strategy entered its second phase, which was to expand the Issuer’s resource base by carefully targeted exploration.

 

By 2008, the gold price had risen sufficiently to make Seabridge think that a number of its projects might be economic. In response, Seabridge began work on the third phase of its strategy: defining the economics of its projects through engineering studies, upgrading resources to reserves, securing permits and building support for its projects in local communities. This effort focused on the KSM Project, which, during the exploration phase, had emerged as the Issuer’s most important asset. Work was also undertaken to advance the Issuer’s Courageous Lake Project. As it advanced its core KSM and Courageous Lake Projects, it also optioned and sold its non-core projects, including the Noche Buena, Red Mountain, Grassy Mountain, Quartz Mountain and Castle Blackrock Projects and used the proceeds to explore and advance its core Projects as part of its strategy for minimizing shareholder dilution. The Issuer has also continued exploration of the Projects and significantly expanded their mineral resources.

 

The price of gold hit a peak in 2012 and then declined for several years. When the Issuer believed it had declined sufficiently to make property acquisition attractive once again, it entered into another phase of property acquisition with the purchase of the Iskut Project in 2016, the Snowstorm Project in 2017, the Goldstorm Project in 2019, the 3 Aces Project in 2020 and the East Mitchell (formerly Snowfield) property in 2020. It remains interested in additional acquisitions when it sees properties with potential that is meaningful to the size of the Issuer and at an appealing price. In the course of searching for new properties, the Issuer has accepted that reasonably priced properties that satisfied its size objective may have limited, or no, mineral resources. The Issuer intends to continue following its phased strategy with respect to these newly acquired properties.

 

Even after it moved to the third phase, the Issuer has continued exploring the KSM and Courageous Lake Projects in conjunction with advancing them. These efforts have resulted in the significant expansion of its existing Kerr and Iron Cap deposits at KSM and the discovery of additional mineralized zones at Courageous Lake. Its exploration programs proved highly successful, with measured and indicated gold resources now totaling 103.5 million ounces with an additional 76.4 million ounces of gold in the inferred resource category (see Mineral Resources Table on page 11) against a backdrop of only 86.1 million shares outstanding. With the KSM mineral resource sufficiently large to provide decades of production, the Issuer has now shifted its exploration activities to its Iskut, 3 Aces and Snowstorm Projects where it believes it has the potential to generate more value for shareholders.

 

3


 

From 2012 through 2021, most of the Issuer’s activities have focused on expanding the mineral resource at and advancing its KSM Project, which at this point is by far the Issuer’s most significant asset. The Issuer has completed a succession of prefeasibility studies of its KSM Project in June, 2012, November, 2016, November 2020 and August 2022, each incorporating the most recent resource estimates at KSM and presenting improvements to the KSM Project design and economics. As a result of its search for higher grade core zones at the KSM Project from 2013 to 2020, the Issuer has broadened the Project’s economic profile. Before finding the higher grade mineralized zones below the Kerr deposit and the Iron Cap deposit, KSM was a gold project with a robust copper credit that would appeal primarily to gold miners as prospective partners. Now, KSM has a much stronger copper profile which opens up the potential for a joint venture with a large base metal producer. The Issuer’s acquisition of the East Mitchell property, which lies adjacent to the Mitchell deposit at KSM, has improved the KSM Project’s economic projections and provides the possibility of many years of open pit production before it is necessary to build block caves for the Iron Cap and Kerr deposits.

 

The Issuer submitted its Environmental Impact Statement/Environmental Assessment Application (the “EA Application and EIS”) for its KSM Project in the first quarter of 2013, it was accepted for formal review by British Columbia in August, 2013 and it was approved by both the federal and provincial authorities in 2014. In conjunction with advancing the EA Application and EIS, the Issuer worked to build its relationships with the Nisga’a Nation, the Tahltan Nation and other Indigenous groups, including pursuing impacts and benefits agreements. In June, 2014, the Issuer and the Nisga’a Nation entered into a Benefits Agreement. In September, 2013, the Gitxsan Treaty Society, representing the Gitxsan Hereditary Chiefs, delivered a letter to regulators expressing its support of Seabridge Gold’s KSM Project. In June, 2014, the Issuer entered into an environmental agreement with the Gitanyow Hereditary Chiefs Office and the wilps represented by Gitanyow Hereditary Chiefs Office. In addition, in 2019, the Issuer entered into an impacts and benefits agreement with the Tahltan Nation.

 

In September, 2014, the Issuer received early-stage construction permits for its KSM Project from the Province of British Columbia. The permits issued include: (1) authority to construct and use roadways along Coulter Creek and Treaty Creek; (2) a licence to occupy the area of the proposed Mitchell-Treaty tunnels connecting project facilities; (3) permits for constructing and operating numerous camps required to support constructions activities; and (4) permits authorizing early-stage construction activities at the mine site and tailings management facility.

 

In order to put the KSM Project on course for achieving a “substantially started” designation (needed by July, 2026 to avoid expiry of the KSM Project’s Provincial environmental assessment certificate (the “EAC”)), the Issuer commenced early construction activities at KSM in 2021. The focus of this work is on establishing site access and camps, building compensating fish habitat and site access to hydro power, all of which will also reduce construction timelines and Project risk. By the end of 2023 the Issuer had constructed the Bell-Irving River bridge, the first 17.7 km of the Treaty Creek Access Road (“TCAR”), the first 3.2 km of the Coulter Creek Access Road, a 210-person camp near the beginning of the TCAR, and the Glacier Creek Fish Habitat offsetting ponds, had cleared and graded the camp site (Camp 9) in the Mitchell valley, had cleared the initial 17.5 km of the powerline route and constructed access and prepared the structure sites for the first 4.1 km of the transmission line route and carried out geotechnical drilling for the structures to km 17 of the 287 kV transmission line and cleared several other areas where mine infrastructure will be located. In addition, in 2023 British Columbia Hydro and Power Authority (“BC Hydro”) completed the earthworks and grading and began construction of the buildings for the Treaty Creek Terminal Substation, which is required to enable the powerline for the KSM Project to draw power from the Northwest Transmission Line. In January, 2024, the Issuer submitted its application for a “substantially started” determination from the BC Environmental Assessment Office.

 

4


 

Seabridge is seeking a sale or joint venture of its principal asset, the KSM Project, and intends to seek a sale or joint venture of the Courageous Lake Project, or a sale of the Issuer. At KSM in 2024, the issuer is continuing but has slowed the pace of its early construction activities on roads, camps and power and is collecting data to support work on a feasibility study. It also completed an updated prefeasibility study (“PFS”) for its Courageous Lake Project, that presented a smaller, higher grade and more profitable mining development. Realizing value for the Issuer’s shareholders depends on the potential financial return for a prospective purchaser or partner, success in addressing project risks, regulatory issues and Indigenous peoples’ concerns, market conditions and gold and copper prices. The timing of a joint venture, partnership or sales agreements, if any, cannot be determined.

 

The continuing success of the Issuer is dependent on (1) its ability to continue to raise capital as needed, (2) strength in the price of gold and copper, (3) it securing a partner to advance the KSM Project or a sale of the KSM Project, (4) retention of the social license to operate its projects, (5) exploration success on projects, and/or (6) advancement of its projects through optimization work, success in regulatory reviews and in obtaining and retaining permits.

 

Three Year History

 

 

In 2021, the Issuer continued to advance its KSM Project and further exploration at its other projects. However, the scale of work programs at the KSM site was reduced on account of the COVID-19 pandemic and related restrictions and the pace of advancement slowed, in part due to a slowdown in permitting timelines. All of the Issuer’s active projects are located in remote areas of northern Canada, except for its Snowstorm Project and nearby Goldstorm Project in Nevada. In 2020 and 2021 Canadian provinces and territories adopted restrictive operating regulations for exploration camps as well as travel restrictions to address COVID-19 concerns. Such travel restrictions were not only applied to those entering Canada but also to certain internal travel between certain provinces or territories. Indigenous communities were particularly vulnerable to COVID-19 risks for various reasons, including housing shortages resulting in close living conditions as well as the absence of close access to the healthcare facilities needed to treat more serious COVID-19 illness. Accordingly, the Issuer was very careful in how it conducted its programs with the goal of not permitting any spread of COVID-19 at its operations, and this goal was achieved in 2021.

 

At the KSM Project, the work for 2021 involved:

 

advancing development of on site-capture construction to maintain the Project on course for achieving “substantially started” before expiry of its EAC;

 

completing data collection in respect of the East Mitchell Property and commencing work on a study of the integration of the East Mitchell Property into the KSM Project;

 

continuing work to meet the Issuer’s obligation under the EAC and collect additional data required for a feasibility study on the KSM Project; and

 

working with the BC government to secure a further extension to the EAC due to the impacts of the COVID-19 pandemic.

 

The Issuer drilled 3,484 m on the East Mitchell Property in 2021. The results of this drilling confirmed the geological model and block grades and that the East Mitchell deposit is the sheared-off upper Mitchell deposit. This confirmation permits a better understanding of the vertical zonation of metals and hydrothermal alteration in the nearly 3 km vertical Mitchell/East Mitchell gold-copper-porphyry system.

 

Work towards achieving the “substantially started” designation in 2021 included building construction camps at the beginning of the Coulter Creek Access Road (the “CCAR”) (Camp 3), beside Highway 37 (Hodder Camp), and near the beginning of the Treaty Creek access Road, preparing the site for construction of its camp facilities in the Mitchell Valley (Camp 9), starting an initial segment of the CCAR and beginning construction of the Glacier Creek fish habitat offsetting program.

 

5


 

In November, 2021, the Issuer received a two-year extension to its EAC in recognition of the impact that COVID-19 measures had on its schedule for completing work to achieve the “substantially started” designation. The deadline for achieving “substantially started” is now July 29, 2026. In addition, the Issuer was issued authorizations from the Department of Fisheries and Oceans for the Glacier, Taft and Treaty Creek fish habitat offsetting programs.

 

In connection with its commencement of these early construction activities at KSM the Issuer increased its personnel. It started building a construction management team, expanded its environmental/permitting team and brought in human resources professionals. Over the course of 2021, the Issuer grew from 7 officers and 28 employees to 10 officers and 41 employees.

 

In April, 2021, the Issuer announced that it had sold its residual interests in the Red Mountain Project for US$18 million. The interests sold were the right to a $1.5 million payment due upon achievement of commercial production and a gold stream interest entitling it to purchase, at US$1,000/oz, 10% of annual gold production up to a maximum of 50,000 ounces.

 

At the Iskut Project, the Issuer’s 2021 program focused on the corridor of porphyritic intrusive rock endowed with gold and copper identified in 2020 drilling and started with a magnetotelluric survey. Drilling began in August on the target emerging from its analysis of collected data which pointed to a coherent zone for the gold-copper porphyry source below the Quartz Rise Lithocap. The regional geophysical surveys of the property show a distinct structural feature that connects Quartz Rise, Bronson Slope and Snip North. All the prospective intrusions fall along this regional trend and each surveyed intrusion on this trend has a coherent resistivity anomaly at depth like those recognized at the KSM Project. The Issuer also continued its reclamation work at the old Johnny Mountain Mine site on its Iskut Project.

 

The 2021 exploration program at 3 Aces commenced with line cutting to support a geophysical survey. A CSAMT geophysical program was also completed. This work was designed to allow the Issuer to build a 3-D earth image to integrate with historical drilling. The aim of this initial work is to expand high-grade gold targets previously identified and detect new targets for initial drill testing. Drill testing was planned for later in 2021 but permitting delays resulted in the Issuer not being able to start this planned drill program.

 

The 2021 exploration program at Snowstorm commenced in August, 2021 and followed-up on the gold bearing structures identified in 2020. The program was designed to off-set these previous intersections toward a structure with a topographic expression which is projected into the Paleozoic section using magnetotelluric (MT) geophysical readings. The surface expression of this structure has produced a significant arsenic in soil anomaly. The program was completed by April, 2022.

 

In December, 2021, the Issuer also filed its first comprehensive Sustainability Report detailing the Issuer’s approach and progress towards integrating sustainability into its business between 2020 and Q3 of 2021. The report was prepared with select disclosures and guidance from the Sustainability Standards Accounting Board (SASB) Metals and Mining Industry Standards and the Global Reporting Initiative (GRI) Standards, as well as other metrics developed for its purposes. The Sustainability Report is posted on the Issuer’s website.

 

In early March, 2022, the Issuer announced it had entered into a Facilities Agreement with BC Hydro covering the design and construction of BC Hydro’s Treaty Creek Terminal Substation (“TCT”) which will supply construction phase hydro-sourced electricity to the KSM project. The KSM Project will be connected to BC Hydro’s existing Northwest Transmission Line (“NTL”) at the TCT. The TCT will be located opposite where KSM’s Treaty Creek access road meets Highway 37, south of Bell 2. The terms of the Facilities Agreement are described below under “General Description of the Issuer’s Business – KSM Project – BC Hydro and TCT Construction”.

 

6


 

In March, 2022, KSM Mining ULC (“KSMCo”), a wholly-owned subsidiary of the Issuer, sold a US$225,000,000 secured note (the “2022 Note”) and Seabridge sold concurrently a Contingent Right, to Sprott Private Resource Streaming and Royalty (B) Corp. (“Sprott”) for US$225 million (approximately C$285 million at the exchange rate at the time). Ontario Teachers Pension Plan was a significant investor in the 2022 Note through Sprott. At maturity, the principal repayable under the 2022 Note will be used by Sprott to purchase a silver royalty on the KSM Project. The proceeds of this sale will be used to fund a significant portion of the works required to advance the KSM Project towards the designation of “substantially started”. The terms of the agreements relating to this financing are described below under “General Description of Capital Structure – Secured Notes – The 2022 Note”.

 

In April, 2022, Seabridge reported updated resource estimates for its KSM Project incorporating the results of the drilling at East Mitchell from 2021 and integrating the East Mitchell deposit into the KSM Project (see “Description of the Issuer’s Business – KSM Project - The Current KSM PFS and PEA – Mineral Resources”.

 

In August, 2022, the Issuer announced the completion of a new Preliminary Feasibility Study and a Preliminary Economic Assessment Report for the KSM Project (defined below as the “2022 KSM PFS and PEA Report”). This PFS shows a considerably more sustainable and profitable mining operation than its 2016 predecessor, now consisting of an all open pit mine plan that includes only the Mitchell, East Mitchell and Sulphurets deposits. The primary reasons for the improvements in the plan compared to the 2016 study arise from the acquisition of the East Mitchell open pit resource and an expansion to planned mill throughput. Other design improvements over the 2016 PFS include a smaller environmental footprint, reduced waste rock production, reduced greenhouse gas emissions by partial electrification of the mine haul fleet, a 50% increase in mill throughput, and the elimination of capital intensive block cave mining. The mine plan was simplified to bring total capital down below the 2016 estimates, despite inflation, by eliminating sustaining capital associated with block cave development. Important steps were also taken to make the project less dependent on oil, especially diesel fuel, by maximizing the use of low cost, green hydroelectric energy. The PEA presents a stand-alone mine plan showing a potential future expansion of the KSM Project to the copper rich Iron Cap and Kerr deposits after the 33-year 2022 PFS mine plan has been completed. The 2022 PEA is primarily an underground block cave mining operation supplemented with a small open pit and is planned to operate for 39 years with a peak mill feed production of 170,000 tpd, demonstrating that the KSM Project has multigenerational long-life mining potential with flexibility to vary metal output. Details of the PFS and PEA are set forth below under “Description of the Issuer’s Business – KSM Project – The Current KSM PFS and PEA”.

 

As part of its work to advance the KSM Project to a feasibility study, in 2022 Seabridge completed 6,183 m of drilling for geotechnical and geohydrological rock characterization.

 

In 2022 the Issuer also increased the scope of the early construction works at the KSM Project that were started in 2021. On the eastern side of the KSM Project, the Issuer commenced construction of the TCAR and advanced it to the 17 km mark, including completing construction of the Bell-Irving River bridge (“BIRB”) just beyond the turnoff from Highway 17. Just off the TCAR, not far beyond the BIRB, the Issuer completed construction of a 99-person camp (Camp 11) with surrounding laydown and infrastructure areas for future use. On the other side of Highway 37, BC Hydro established access to the site for the TCT and made significant progress on building the pad for the TCT. On the western side of the KSM Project, the Issuer constructed the first 3.2 km of the CCAR and built the site for the Mitchell valley camp (Camp 9) to the point it is ready to receive camp infrastructure. In addition, the Issuer largely completed earthworks for the first of the three fish habitat sites (located at Glacier Creek) to compensate for the KSM Project’s disturbance of fish bearing habitat.

 

7


 

Work at the Iskut Project in 2022 focused on drill testing gold-copper targets at Bronson Slope and Quartz Rise. At the Snip North target, geophysical surveying, surface sampling and relogging historical drill holes were performed. The 2022 core drilling included 10 drill holes totaling 10,162 m and discovered an unusually large, well-mineralized breccia pipe beneath the historic Bronson Slope skarn deposit. The extensive quartz-magnetite pipe, which has been identified as the source of the Bronson Slope deposit, holds broadly disseminated gold and copper mineralization from multiple hydrothermal eruptive events believed to originate from a major porphyry intrusive source.

 

In May, 2022, the Issuer entered into a Contribution Agreement in respect of the 3 Aces Project with the Liard First Nation (“LFN”). The agreement provides a framework for Seabridge and the LFN to build positive working relationships and enable LFN’s meaningful review and analysis of Seabridge’s activities at the 3 Aces Project. In particular, the agreement will support LFN in preparing for and participating in assessment and regulatory processes and community engagement.

 

In September, 2022, the Issuer received its Class 4 Quartz Exploration Permit from the Yukon Government Department of Energy, Mines, and Resources which allows the Issuer to conduct a gold focused exploration program at the 3 Aces Project. With just a limited portion of the exploration season remaining after the issuance of the permit, the Issuer reduced its original plans and focused on beginning the testing of its 3-dimensional model of the Hearts zone. One drill hole was used to confirm that gold-bearing structures are hosted within secondary anticlinal folds and thrust faults as predicted by the model. The assays from this hole were consistent with previous intersections. Three additional holes were used to test for controls on down dip extensions to the high grade. These holes determined that the gold-bearing structures are pronounced as they continue down plunge but only carry coherent high grades where they exhibit flexures that enhance permeability.

 

In September, 2022, the Issuer also issued its Q4 2021 Sustainability Report providing insight to the Issuer’s commitment to local communities, environment and sustainability. The report captures the last quarter of 2021, picking up from the initial Sustainability Report issued in 2021, to highlight progress towards integrating sustainability into all aspects of our business. The Sustainability Report may be viewed at https://www.seabridgegold.com/sustainability.

 

In connection with the growth in its activities, in particular the early construction activities at the KSM Project, the Issuer continued to expand its construction management and permitting teams. As its workforce grew, the Issuer also implemented new policies to promote a healthy, safe and supportive work environment, including a Respectful Workplace Policy, a Health and Safety Policy and Sustainability Policy.

 

8


 

Work to renew the Issuer’s at-the-market offering commenced at the end of 2022 and was completed by January 6, 2023. The Issuer has found that the at-the-market offerings have enabled it to raise funds when needed at lower costs and with greater flexibility than more traditional financing methods. On January 6, 2023, the Issuer entered into a Controlled Equity OfferingSM Sales Agreement under which it may sell its common shares through the lead agent, Cantor Fitzgerald & Co. Sales only take place on the New York Stock Exchange.

 

In May, 2023, the Issuer published its 2022 Sustainability Report as well as its inaugural Climate Strategy Report. The 2022 Sustainability Report highlights the Issuer’s work in community development funding and engagement, its ongoing commitment to Indigenous partners and gender diversity at all levels of the organization, and its programs to support effective inclusion in the workplace, among other matters. The Climate Strategy Report represents the Issuer’s first expression of its understanding of the short-term and long-term climate risks facing its business, and sets forth its commitment to understanding and managing its climate risks and the carbon emissions tied to its business activities. The Climate Strategy Report is aligned to TCFD and details the Issuer’s Scope 1, 2 and material components of its Scope 3 carbon emissions.

 

In June, 2023, KSMCo sold a US$150,000,000 secured note (the “2023 Note”) and Seabridge sold concurrently a Contingent Right, to Sprott Private Resource Streaming and Royalty (B) Corp. for US$150 million (approximately C$200 million at the exchange rate at the time). At maturity, the principal repayable under the 2023 Note will be used by Sprott to purchase a net smelter returns royalty on the KSM Project. The proceeds of this sale were used to fund the remainder of the works to advance the KSM Project towards the designation of “substantially started”. The terms of the agreements relating to this financing are described below under “General Description of Capital Structure – Secured Notes – The 2023 Note”.

 

The early construction activities at the KSM Project in 2023 included: completing the Glacier Creek Fish Habitat offsetting ponds, extending the TCAR, increasing the capacity of Camp 11 from 99 to 210 people, clearing the initial 17.5 km of the powerline route, constructing access and preparing the structure sites for the first 4.1 km of the transmission line route, carrying out geotechnical drilling for the structures to km 17 of the 287 kV transmission line and clearing several other areas where mine infrastructure will be located. In addition, in 2023 BC Hydro completed the earthworks and grading and began construction of the buildings for the TCT. Towards the end of 2023 the Issuer reduced the work on early construction activities at its KSM Project. The work completed to the end of 2023 was considered sufficient to warrant the Issuer seeking a determination that the KSM Project had been “substantially started”. In mid-January, 2024, the Issuer applied to the BC Environmental Assessment Office to have the KSM Project declared to have been “substantially started” and thereby causing the EAC to remain in effect for the life of the KSM Project.

 

In July, 2023, Tudor Gold Corp. (“Tudor”) submitted an application to two British Columbia government Ministries requesting the cancellation of two approvals in respect of the KSM Project: the Licence of Occupation, which entitles the Issuer to occupy and use a corridor of land through which the Issuer plans to construct its Mitchell Treaty Tunnels (the “MTT”); and the Mines Act Permit, which authorizes the Issuer, among other things, to build the MTT portals and the first 100m of the MTT beyond the portals. Approximately 12.5 km of the Issuer’s MTT would pass through mineral claims in which Tudor holds a 60% interest. Tudor’s application was unsuccessful and both the Licence of Occupation and the Mines Act Permit remain in effect. In its response to Tudor’s submission, the BC Ministry of Energy, Mines and Low Carbon Innovation confirmed that the mineral reserve, which covers the area in which the Issuer plans to construct the MTT, prohibits the obstruction, endangerment, or interference, with the construction, operation and maintenance of the MTT by any free miner, including Tudor.

 

9


 

The 2023 drill program at the Iskut Project was planned to (1) target an increase in the Bronson Slope gold-copper resource, (2) search for the intrusive source of the Bronson breccia pipe, and (3) investigate the Snip North target where historical drill data coincides with the structural trend identified at the property and where nearly all the significant mineral targets at the Iskut Project occur. The program at Snip North discovered a new gold-copper porphyry mineral system. Drilling at Bronson Slope confirmed the existence of a larger epithermal mineral deposit and enhanced the potential for a porphyry copper-gold occurrence at depth. The 2024 program will focus on the porphyry potential at Bronson Slope and include work at Snip North to evaluate the scale of that mineral system. The Issuer’s hypothesis of a regional, structurally-controlled porphyry district encompassing the entire Iskut project continues to be supported by the data and ongoing evaluation of the Project. The Issuer continues to investigate unrecognized potential on new targets that could be pursued in the future.

 

Drilling completed at the 3 Aces Project in 2023, around the historical Spades, Hearts, and Clubs zones, has successfully confirmed the key parameters controlling gold deposition on the property and provided a clear set of directions for follow-up evaluation and resource delineation. At contacts between thick phyllite sequences and coarse interbedded sandstone and conglomerate, second generation folding (F2) has produced discrete dilation zones on F2 synforms and antiforms where continuous gold mineralization and locally high-grade intervals are found. The 2023 program completed 7,759 meters of core and reverse circulation drilling within the Central Core Area of the 3 Aces project.

 

During 2023 the Issuer also advanced a study of the Issuer’s Courageous Lake Project, resulting in the announcement in January, 2024 of a new prefeasibility study (“PFS”) for the Project with a further preliminary economic assessment evaluating a potential expansion of the mine presented in the PFS. The new Courageous Lake PFS (the “2024 CL PFS”) shows a more sustainable and profitable mining operation than the previous PFS prepared in 2012, with reduced initial capital, lower strip ratio, higher grade and smaller mine footprint.

 

At the date of this AIF, the Issuer plans exploration work at each of its Iskut and 3 Aces Projects in 2024. The Issuer will also continue with the next year of its planned reclamation and closure plan for the Johnny Mountain Mine.

 

At the KSM Project, the Issuer is principally directing its efforts in 2024 towards further work to advance towards a feasibility study, with limited additional early construction planned. BC Hydro’s work on the TCT will also continue.

 

ITEM 3: DESCRIPTION OF THE ISSUER’S BUSINESS

 

General

 

 

The Issuer is in the business of acquiring, exploring and advancing gold prospective properties. The Issuer pursues a strategy that reduces its exposure to some of the largest risks of investing in gold exploration companies. Its goal is to provide strong returns to shareholders by maximizing leverage to the price of gold. Its strategy to achieve this goal is to try to optimize gold ownership per Common share by increasing gold resources more rapidly than shares outstanding. It has limited itself to properties in the United States of America and Canada. Seabridge also decided it would not build or operate mines, but that it would look to partner or sell assets that were advancing toward production.

 

The Issuer owns 7 properties, 4 of which have gold resources, and it has one material property; the KSM Project. Today, the KSM Project hosts the largest publicly disclosed undeveloped gold resource in the world, with measured and indicated gold resources totaling more than 88 million ounces. The Issuer’s exploration success at KSM has also defined a world class copper and silver deposit containing 19.4 billion pounds of copper and 414 million ounces of silver in the measured and indicated resource categories. The combined gold, copper and silver, resources constitute a significant economic opportunity, and environmental approvals and certain permits are in place to advance early construction.

 

10


 

The Issuer holds a 100% interest in each of its properties other than a portion of the Snip North target to the north of the Iskut Project, in which it owns a 95% interest. The Quartz Mountain project is subject to an option agreement under which the optionee may acquire a 100% interest in such project. At the date of this AIF, the estimated gold resources at the Issuer’s properties are set forth in the following table and are broken down by project and resource category.

 

The measured and indicated mineral resources at the KSM Project and Courageous Lake Project are inclusive of mineral reserves. Mineral resources which are not mineral reserves do not have demonstrated economic viability.

 

Mineral Resources (Gold and Copper)

 

PROJECT Cut-Off
Grade
(g/t)
Measured Indicated Inferred
Tonnes
(000’s)
Gold
Grade
(g/t)
Gold
(million ozs)
Copper
Grade
(%)
Copper
(million
lbs)
Tonnes
(000’s)
Gold
Grade
(g/t)

Gold
(million ozs)
Copper
Grade
(%)
Copper
(million
lbs)
Tonnes
(000’s)
Gold
Grade
(g/t)

Gold
(million ozs)
Copper
Grade
(%)
Copper
(million
lbs)
KSM                                
Mitchell See Note 1 692,000 0.68 15.1 0.19 2,876 1,667,000 0.48 25.9 0.14 5,120 1,283,000 0.29 11.8 0.14 3,832
East Mitchell See Note 1 1,013,000 0.65 21.1 0.11 2,514 746,000 0.42 10.0 0.08 1,390 281,000 0.37 3.3 0.07 403
Iron Cap See Note 1 -- -- -- -- -- 471,000 0.38 5.8 0.21 2,206 2,309,000 0.41 30.3 0.27 13,755
Sulphurets See Note 1 -- -- -- -- -- 446,000 0.55 7.9 0.21 2,064 223,000 0.44 3.2 0.13 639
Kerr See Note 1 -- -- -- -- -- 384,200 0.22 2.7 0.41 3,456 2,589,000 0.27 22.8 0.35 19,852
KSM Total² --  1,705,000 0.66 36.2 0.14 5,390 3,714,000 0.44 52.3 0.17 14,236 6,685,000 0.33 71.5 0.26 38,481

Courageous Lake:

CL Deposit

Walsh Lake

 

0.8

0.8

 

6,007

--

 

2.84

--

 

0.548

--

 

--

--

 

--

--

 

139,167

--

 

2.34

--

 

10.4

--

 

--

--

 

--

--

 

40,603

4,134

 

2.52

4.18

 

3.3

0.6

 

--

--

 

--

--

Quartz
Mountain3
0.34 3,480 0.98 0.1 -- -- 54,330 0.91 1.6 -- -- 44,800 0.72 1.0 -- --
Iskut (Bronson Slope) See Note 4 84,150 0.42 1.1 0.15 280 102,740 0.31 1.0 0.10 222 -- -- -- -- --

 

Note: The resource estimates have been prepared in accordance with the standards and guidance referenced in NI 43-101. See “Cautionary Note to United States Investors Regarding Resource Estimates” in the Preliminary Notes.
1. The cut-off grade for KSM is CDN$10.75/t in net smelter return (NSR) for the Mitchell, East Mitchell and Sulphurets open pits and CDN$9/t in NSR for the Kerr open pit. Total operating costs for the block cave shut-off for the Iron Cap and Kerr deposits are CDN$16.5/t and CDN$18/t, respectively.
2. The effective dates of the KSM and Courageous Lake resource estimates above are as follows: KSM (Mitchell and East Mitchell), March 31, 2022, KSM (Iron Cap and Kerr), January 10, 2024; KSM (Sulphurets), December 31, 2019; Courageous Lake (Courageous Lake and Walsh Lake), January 16, 2024.
3. Seabridge has entered into an option agreement under which a 100% interest in the Quartz Mountain project may be acquired.
4. The cut-off grade for the Iskut Project resource is CDN$9.00 in NSR.

 

Sustainability (Environmental, Social, and Governance Matters)

 

 

The Issuer is committed to following good Environmental, Social, Governance (“ESG”) practices, including climate-related practices and Diversity, Equity and Inclusion (“DEI”) initiatives in a way that builds value for shareholders, stakeholders and partners. It is not just a one-time action or a single phase in project design. Pursuing sustainability entails creating a corporate culture and approach to business that is mindful of the impacts of the Issuer’s activities and decisions, and its ability to affect positive change over time. Sustainability involves optimizing protection for environmental values in the areas of the Issuer’s projects, contributing to the health, economic, and social well-being of its employees and local communities, and acting on national and global priorities.  

 

11


 

In December 2021 the Issuer published its inaugural Sustainability Report detailing its approach, efforts and progress in respect of ESG matters and the integration of sustainability into all aspects of the Issuer’s business. The reporting period for the inaugural Sustainability Report was January 1, 2020 to September 30, 2021. In September 2022, the Issuer published its Sustainability Report Supplement in respect of the final quarter of 2021. In May, 2023, the Issuer released its 2022 Sustainability Report, which aligned with the reporting requirements of the Task Force on Climate-related Financial Disclosure (“TCFD”) and the Climate Disclosure Project (“CDP”). The report also incorporates guidance from the Sustainability Accounting Standards Board (“SASB”) Metals and Mining Industry Standards, the Global Reporting Initiative (“GRI”) Standards, as well as metrics designed specifically for the Issuer.

 

The Issuer has adopted numerous policies furthering different aspects of ESG, including: an Environmental Policy, a Sustainability Policy, a Health and Safety Policy, a Diversity Policy, a Local Procurement Policy, a Workplace Employment Policy, and a Respectful Workplace Policy and Program.

 

Highlights of the Issuer’s ESG activities are set forth below and more detail is provided in its 2022 Sustainability Report, which is available in the “Sustainability” tab of the Issuer’s website (www.seabridgegold.com). The 2023 Sustainability Report, expected to be release in May 2024 will incorporate the inclusion of nature related risks and opportunities as well.

 

Environment

 

Through the implementation of responsible design, a design approach which places a greater emphasis on the protection of air, water quality, fish, wildlife and vegetation, the Issuer works to minimize the footprints and environmental impacts of its project designs. The Issuer performs ongoing evaluations of material risks and opportunities associated with climate change and nature at the Board, executive management and operational level aligned to the TCFD and CDP. The Issuer successfully captured and reported on its Scope 1 and 2 carbon emissions for the first time. Since January 1, 2023, the Issuer has also implemented various measures to start collecting data for the purposes of being able to calculate Scope 3 emissions, commencing with the process of identifying purchased goods for which emissions can be calculated in the future, tracking the details of a bus transport service the Issuer used to move personnel to and from the KSM Project and calculating emissions for a contractor-owned incinerator used for waste management. Scope 3 emissions are not produced by the Issuer itself and are not the result of activities with assets owned or controlled by it, but are emissions by third parties that the Issuer is indirectly responsible for up and down its value chain.

 

Social Responsibility

 

The majority of the Issuer’s projects are located within or near Indigenous territories. Its approach to project planning emphasizes early, frequent, and transparent communication and providing timely responses to requests and queries. Through engagement and dialogue, the Issuer develops plans that consider and incorporate Indigenous feedback to address their needs and concerns. The Issuer maintains a focus on promoting employment and contracting opportunities for members of Indigenous groups. Its efforts include direct community outreach, participation in career fairs, providing bursaries and educational programs for capacity building and career development, working with local Indigenous businesses and their partners, implementing commitments in Impact and Benefit Agreements with the Nisga’a Nation and the Tahltan Nation, and encouraging contractors to follow suit.

 

12


 

The Issuer is also committed to local employment and procurement. In 2023, across all its significant locations of operation:

 

approximately $150.3 million was spent on local procurement (with $170.7 million spent on local procurement in 2022)

 

71.7% of the total procurement budget was spent on local suppliers.

 

Governance

 

The Board is responsible for oversight and management of risks, including environmental and climate-change related risks. In 2021, the Board established a Sustainability Committee and broadened the scopes of other Board Committees’ responsibilities to include relevant ESG and DEI matters. The Board and its Sustainability Committee are responsible for the Issuer’s environmental and climate-related risk management and strategy. All members of the Sustainability Committee are directors. The Committee is currently led by the designated Chief Sustainability Officer, who oversees the performance of climate change commitments within the Issuer. Climate change is a standing agenda item for Sustainability Committee meetings, whereby concerns, data, targets, and strategy are discussed and reviewed. This is supplemented by work undertaken by the senior executive team. The outcomes of the Sustainability Committee’s work is reported to the Board of Directors at each meeting and an in depth strategic review at the Board level occurs on an annual basis.

 

The Issuer is committed to embedding ESG and climate-related risk into the performance evaluation and renumeration process. Each year, the Issuer establishes a set of objectives to be accomplished for the year. In 2023, 4 of the Issuer’s 14 objectives related to ESG and they had a collective weighting for incentive compensation of the Issuer’s officers of 23% and all of them were achieved. For 2023, these four objectives were:

 

1) Continue to strengthen the Issuer’s social license by responding effectively to the needs and concerns of Treaty and First Nations and local communities. (Weighting: 10%)

 

2) Continue to implement the Issuer’s ESG commitments as set out in its Sustainability Report and update its sustainability strategy by capturing 2 - 3 year climate change, diversity and governance targets. (Weighting: 7%)
     
3) Continue to build the Issuer’s risk management system by capturing climate risks. (Weighting: 3%)
     
4) Promote a positive culture of Health and Safety through continuous improvement in key leading indicators and initiatives. (Weighting: 3%)

 

The Issuer began a formal risk management process several years ago, which was expanded in 2022 to include a review of climate related risks and in 2023 nature-related risks. In 2023 the Issuer’s executive and Board also undertook an enterprise level key risk review and further developed its risk management approach, including climate-related risks. The Issuer will continue to advance its risk management process in future years.

 

The Issuer has adopted a Diversity Policy and has achieved its goals of having a minimum of 30% of its directors and 30% of its executive officers be women and each of its Board and its executive team includes one person that is a member of a Canadian First Nation. In 2023 the Issuer adopted a Say-on-Pay Policy and its shareholders had the opportunity to vote on the Issuer’s compensation approach at its Annual General Meeting in 2023. The Issuer has also established policies to promote responsible executive behaviour, including a “Clawback” Policy, an Equity Ownership Policy, a Whistleblower Policy and a Code of Business Ethics.

 

13


 

Cautionary Note Regarding Forward-Looking Statements

 

This AIF contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of Canadian securities laws concerning future events or future performance with respect to the Issuer’s projects, business approach and plans, including production, capital, operating and cash flow estimates; business transactions such as the potential sale or joint venture of the Issuer’s KSM Project and Courageous Lake Project (each as defined herein) and the acquisition of interests in mineral properties; requirements for additional capital; the estimation of mineral resources and reserves; and the timing of completion and success of exploration and advancement activities, community relations, required regulatory and third party consents, permitting, reporting and related programs in relation to the KSM Project, Courageous Lake Project, Iskut Project, Snowstorm Project or 3 Aces Project. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives or future events or performance (often, but not always, using words or phrases such as “expects”, “anticipates”, “believes”, “plans”, “projects”, “estimates”, “intends”, “strategy”, “goals”, “objectives” or variations thereof or stating that certain actions, events or results “may”, “could”, “would”, “might”, or “will” be taken, occur or be achieved, or statements of “potential” or something “possible”, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements and forward-looking information (collectively referred to in the following information simply as “forward-looking statements”). In addition, statements concerning mineral reserve and mineral resource estimates constitute forward-looking statements to the extent that they involve estimates of the mineralization expected to be encountered if a mineral property is developed and, in the case of reserves, the economics of developing a property and producing minerals.

 

Forward-looking statements are necessarily based on estimates and assumptions made by the Issuer in light of its experience and perception of historical trends, current conditions and expected future developments. In making the forward-looking statements in this AIF the Issuer has applied several material assumptions including, but not limited to, the assumption that: (1) market fundamentals will result in sustained demand and prices for gold and copper, and to a much lesser degree, silver and molybdenum; (2) the potential for production at its mineral projects will continue operationally, legally and economically; (3) any additional financing needed will be available on reasonable terms; and (4) estimated reserves and resources at the Issuer’s projects have merit and there is continuity of mineralization as reflected in such estimates.

 

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking statements, including, without limitation:

 

the Issuer’s history of net losses and negative cash flows from operations and expectation of future losses and negative cash flows from operations;

 

risks related to the Issuer’s ability to continue its exploration activities and future advancement activities, and to continue to maintain corporate office support of these activities, which are dependent on the Issuer’s ability to enter into joint ventures, to sell property interests or to obtain suitable financing;

 

the Issuer’s indebtedness requires payment of quarterly interest, a lump sum payment at the end of 2025 and, in certain circumstances, may require repayment of principal, and the Issuer’s principal sources for funds for repayment are capital markets and asset sales;

 

risks related to fluctuations in the market price of gold, copper and other metals;

 

the risk that the Issuer’s EAC might expire before the KSM Project is declared to be “substantially started”;

 

14


 

uncertainty whether the Issuer can secure a joint venture partner for its KSM Project or Courageous Lake Project and whether reserves estimated on the Issuer’s mineral properties will be brought into production;

 

risks related to unsettled First Nations rights and title and settled Treaty Nations’ rights and uncertainties relating to the process of making Canadian laws consistent with the United Nations Declaration on the Rights of Indigenous Peoples;

 

risks related to obtaining and maintaining all necessary permits and governmental approvals, or extensions/renewals thereof, for exploration, construction and operations activities, including rights of access over or through lands subject to third party rights, interests and mineral tenures;

 

risks regarding satisfying current and increasing regulatory requirements for exploration, construction and operation of mineral projects;

 

uncertainties regarding evolving environmental standards and risks of failing to meet such standards;

 

uncertainties relating to the assumptions underlying the Issuer’s reserve and resource estimates;

 

uncertainty of estimates of capital costs, operating costs, production and economic returns;

 

risks relating to the commencement of early access and site preparation construction activities at the KSM Project;

 

risks related to commercially producing precious metals and copper from the Issuer’s mineral properties;

 

risks related to fluctuations in foreign exchange rates;

 

mining, exploration and construction risks that could result in damage to mineral properties, plant and equipment, personal injury, environmental damage and delays in mining, which may be uninsurable or not insurable in adequate amounts;

 

uncertainty related to title to the Issuer’s mineral properties;

 

risks related to increases in demand for exploration, advancement and construction services and equipment, and related cost increases;

 

increased competition for prospective mineral properties;

 

regulatory and societal concerns regarding carbon emissions and the impacts of measures taken to induce or mandate lower carbon emissions on the ability to secure permits, finance projects and realize profitability at a project;

 

the Issuer’s current and proposed operations are subject to risks relating to climate and climate change that may adversely impact its ability to conduct operations, raise capital, increase operating costs, interfere with materials and equipment supply, delay execution or reduce the profitability of a future mining operation;

 

risks that regulatory measures directed at climate change issues adversely affect the Issuer’s business;

 

the Issuer’s need to retain key executives and attract qualified personnel;

 

risks associated with the use of information technology systems and cybersecurity;

 

risks related to some of the Issuer’s directors’ and officers’ involvement with other natural resource companies;

 

uncertainty surrounding an audit by the Canada Revenue Agency (“CRA”) of Canadian exploration expenses incurred by the Issuer during the 2014, 2015 and 2016 financial years which the Issuer has renounced to subscribers of flow-through share offerings and the CRA’s decision to reassess such subscribers;

 

the reassessment by the CRA of the Issuer’s refund claim for the 2010 and 2011 financial years in respect of the British Columbia Mining Exploration Tax Credit;

 

the Issuer’s classification as a “passive foreign investment company” under the United States tax code; and

 

risks related to the pro-environmental groups anti-mining efforts, and sometimes focused efforts on specific projects impacting the Company’s share price.

 

15


 

This list is not exhaustive of the factors that may affect any of the Issuer’s forward-looking statements. Forward-looking statements are statements about the future and are inherently uncertain, and actual achievements of the Issuer or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in this AIF under the heading “Risk Factors” and elsewhere in this AIF. In addition, although the Issuer has attempted to identify important factors that could cause actual achievements, events or conditions to differ materially from those identified in the forward-looking statements, there may be other factors that cause achievements, events or conditions not to be as anticipated, estimated or intended. Many of the foregoing factors are beyond the Issuer’s ability to control or predict. It is also noted that while Seabridge engages in exploration and advancement of its properties, including site work in preparation for feasibility study work or early construction work, it will not undertake production activities by itself.

 

These forward-looking statements are based on the beliefs, expectations and opinions of management on the date the statements are made and the Issuer does not assume any obligation to update forward-looking statements, except as required by applicable securities laws, if circumstances or management’s beliefs, expectations or opinions should change. For the reasons set forth above, investors should not place undue reliance on forward-looking statements.

 

KSM Project

 

Overview

 

Location

 

The KSM Project is located within the coastal mountains of northwest British Columbia, approximately 21 kilometers south-southeast of the former Eskay Creek Mine and approximately 65 kilometers by air north-northwest of Stewart, British Columbia. (See Figure 1.) The provincial government has recognized the significance of historical mining activity in this area, which includes the past producing Eskay Creek, Snip, Granduc, and Premier mines. Currently, the Red Chris Mine and the Brucejack Mine are producing mining operations.

 

Access to the property is by helicopter from Bell II Crossing on the Stewart Cassiar Highway or Stewart, British Columbia. Mobilization of equipment and personnel is staged from kilometer 54 on the private Eskay Creek Mine Road (about 25 km from the KSM Project) and from Bell II Crossing on the Stewart Cassiar Highway (about 40 km from the KSM Project).

 

The proposed pit areas lie within the headwaters of Sulphurets Creek, which is a tributary of the Unuk River, and flows into the Pacific through Alaska. The proposed process plant and tailings management facility (“TMF”) will be located within the tributaries of Teigen and Treaty Creeks. Teigen and Treaty Creeks are tributaries of the Bell-Irving River, which is itself a major tributary of the Nass River. The Nass river flows to the Pacific Ocean entirely within Canada.

 

16


 

The Deposits

 

At the time the Issuer acquired the KSM Project in 2001, the project consisted of two distinct zones (Kerr and Sulphurets) which had been modeled separately by Placer Dome (CLA) Limited (“Placer Dome”). Subsequent drilling and engineering work by the Issuer has defined two new very large zones, the Mitchell Zone and the Iron Cap Zone, as well as dramatically expanded the mineralized zone beneath the Kerr zone.

 

Figure 1 - KSM Project Location Map

 

 

 

From 2008 to 2012 Seabridge focused on further exploration and delineation of the four known deposits at the KSM Project. In 2012 Seabridge focused its exploration at KSM on a search for higher temperature core zones that typically concentrate high-grade metals within very large porphyry systems such as KSM. Exploration since 2011 has resulted in the discovery of two core zones, Deep Kerr (a down dip continuation of Kerr deposit mineralization) and Iron Cap Lower Zone (a down dip continuation of Iron Cap deposit mineralization), an extension of the Mitchell zone and other promising core targets.

 

17


 

In 2020 the Issuer acquired the East Mitchell Property (formerly known as the Snowfield Property), a single mineral claim covering 1,267 Ha adjacent to the Mitchell deposit, from Pretium Resources Inc. for US$100 million, a 1.5% net smelter returns (“NSR”) royalty on East Mitchell Property production and a future contingent payment of US$20 million of which US$15 million can be credited against future royalty payments. The East Mitchell Property hosts a large gold/copper mineral resource and was acquired with a view to incorporating it into the Issuer’s KSM Project.

 

Regulatory Approvals

 

In July, 2014, the Issuer’s provincial Environmental Assessment (“EA”) Application for the KSM Project under the British Columbia Environmental Assessment Act was approved. The Canadian Environmental Assessment Agency (CEAA) issued its Comprehensive Study Report in July 2014, as required by the Canadian Environmental Assessment Act, which concluded that the KSM Project would not have significant impacts to the environment. The EA Application and Environmental Impact Statement (“EIS”) review process involved Alaskan regulators throughout and the CEAA Study Report also concluded that the KSM Project would not have significant impacts to the environment situated downstream of the Alaska border. In December 2014 the Federal Minister of the Environment issued a positive project decision which endorsed the conclusions of the Comprehensive Study Report. Subsequently, the same Minister approved the Project in accordance with the requirements of the Nisga’a Final Agreement.

 

The provincial EA approval was for an initial term of five years; it was extended for a further five-year term in March, 2019 and for another two years in November, 2021, and now expires on July 29, 2026. The EAC will be extended indefinitely if the BC Environmental Assessment Office declares the Issuer has “substantially started” construction of the KSM Project. The federal approval is for an indefinite term (as long as the Provincial EAC remains in effect). The Issuer believes that the EA Application and EIS materials and subsequent extension approvals demonstrate that the KSM Project, as designed, is and continues to be an environmentally responsible and generally a socially accepted project. The EAC approves the mine development plan set forth in the 2022 KSM PFS and PEA Report within the 2016 PFS Plan (defined below). Specific provincial environmental assessment amendments will be required to proceed with the mine development plan set forth in the 2022 KSM PFS and PEA Report (defined below).

 

In September, 2014, the Issuer received early-stage construction permits for its KSM Project from the Province of British Columbia. The permits issued include: (1) authority to construct and use roadways along Coulter Creek and Treaty Creek; (2) rights-of-way for the proposed Mitchell-Treaty tunnels connecting project facilities; (3) permits for constructing and operating numerous camps required to support constructions activities; and (4) permits authorizing early-stage construction activities at the mine site and tailings management facility.

 

The KSM Project received a license under the International Rivers Improvement Act (Canada) on October 21, 2016, authorizing the construction, operation and maintenance of the Water Storage Facility (WSF) and ancillary water works for the KSM Project within the Unuk River watershed in northwestern British Columbia.

 

In June, 2017, the Issuer also announced it had been given a regulatory amendment to Schedule 2 of the Metal Mining Effluent Regulations under the Fisheries Act (Canada) which authorizes the use of North Treaty Creek for the discharge from the KSM tailings management facility, subject to strict bonding and fishery habitat offsets.

 

18


 

In addition, the Issuer received the authorization required under the Canada Navigable Waters Act for building the Bell-Irving River Bridge in November, 2021 and from the Department of Fisheries and Oceans Canada for constructing the Taft, Glacier and Treaty fish habitat compensation ponds.

 

Land Status

 

The KSM Property comprises four discrete tenure blocks (see Figure 2) and a group of placer claims. Tenure blocks of the KSM Property include mineral leases and both cell and legacy claims, all of which are owned by KSM Mining ULC (“KSMCo”), a wholly-owned subsidiary of the Issuer. The tenure blocks are referred to as:

 

(a) the KSM tenures containing 21 mineral claims totaling 7,364.85 Ha and 2 mining leases of 11,247.00 Ha (the westernmost block in Figure 2);

 

(b) the Seabee claims covering 18,674 Ha covered by 53 mineral claims (the large block in the east of the KSM Project lying mainly to the west of Highway 37 in Figure 2);

 

(c) the Tina claims composed of 11 mineral claims covering 3,052.44 Ha (the block between the KSM tenures and the Seabee claims in Figure 2); and

 

(d) the Treaty Creek Switching Station claims with 2 claims totalling 160.25 Ha (the small block lying to the east of Highway 37 in Figure 2).

 

Figure 2 - KSM Project Claim Map

The four claim blocks include 80 mineral claims (cell and legacy) and 2 mining leases with a combined area of 40,499 ha. The mineral resources are positioned within the KSM tenures and include the original claims purchased from Placer Dome and the BJ claims. The East Mitchell Property, which is included in the KSM tenures, lies immediately to the east of KSM mining leases. These tenures are shown in Figure 2 for clarity.

 

19


 

The Seabee and Tina claim blocks are located about 19 km northeast of the Kerr-Sulphurets-Mitchell-Iron Cap mineralized zones. These claim blocks are proposed for infrastructure siting. The Treaty Creek Switching Station claims, adjacent to the Northwest Transmission Line (“NTL”) and to the east of the Seabee claims, are being used for power infrastructure siting, specifically the Treaty Creek Terminal switching station.

 

Placer claims only cover areas on part of the westernmost KSM Claims covering an area of 1,553 hectares. The Issuer’s placer claims lie along Sulphurets Creek and Mitchell Creek in areas where certain of the KSM Project’s proposed infrastructure will be located.

 

These claims are 100% owned by the Issuer through its wholly-owned subsidiary, KSM Mining ULC, subject to the various royalties described below.

 

Newmont Corporation retains a 1% net smelter returns (“NSR”) royalty on the original claims acquired by the Issuer in 2001 that is capped at $4.5 million.

 

Under the Benefits Agreement (as defined herein) with the Nisga’a Nation and the Co-operation and Benefits Agreement (the “CBA”) with the Tahltan Nation, the Issuer has agreed to pay each Nation annual payments. The combined annual payments to these Nations are payable in two forms; payments that are a percentage of the tax payable (the “Mineral Tax”) under the Mineral Tax Act (British Columbia) (the “Mineral Tax Act”), which is a tax on net operating profit of the KSM Project, and payments that are based on net smelter returns of the KSM Project. The combined payments payable to both Nations are as follows:

 

(a) with respect to years 1-7 of mining operations, a 0.1% NSR royalty and either (i) 5% of the amount of Mineral Tax payable in respect of any Capital Recovery Year (defined below), or (ii) 11% of the amount of Mineral Tax payable in respect of any Post-Capital Recovery Year (defined below);

 

(b) with respect to years 8-20 of mining operations, a 0.4% NSR royalty and either (i) 7.75% of the amount of Mineral Tax payable in respect of any Capital Recovery Year, or (ii) 13.75% of the amount of Mineral Tax payable in respect of any Post-Capital Recovery Year; and

 

(c) with respect to period after 20 years of mining operations, a 0.5% NSR royalty and either (i) 7.75% of the amount of Mineral Tax payable in respect of any Capital Recovery Year, or (ii) 13.75% of the amount of Mineral Tax payable in respect of any Post-Capital Recovery Year.

 

For the purposes of the description above, a “Capital Recovery Year” is a year in which the Issuer is able to apply sufficient amounts in the KSM Capital Account (as determined under the Mineral Tax Act) to fully offset operating profit, and a “Post-Capital Recovery Year” is a year in which the Issuer is unable to apply sufficient amounts in the KSM Capital Account (as determined under the Mineral Tax Act) to fully offset operating profit.

 

The Issuer has granted two options to a subsidiary of Royal Gold, Inc. under which such subsidiary can acquire a 1.25% NSR Royalty and a 0.75% NSR Royalty on gold and silver produced from the KSM Property for $100 million and $60 million, respectively, subject to certain conditions.

 

20


 

In 2022, KSMCo sold to Sprott Private Resource Streaming and Royalty (B) Corp. the US$225 million 2022 Note under which Sprott has agreed it will use all of the principal amount repaid on maturity of the 2022 Note to purchase a 60% gross silver royalty on the KSM Project (or, in certain circumstances, a 75% gross silver royalty on the KSM Project), subject to certain rights of Sprott to redeem the 2022 Note and be repaid the principal, and in some circumstances a premium, instead of purchasing the royalty. (For the terms of the 2022 Note and the silver royalty see “General Description of Capital Structure – Secured Notes – The 2022 Note”.)

 

In 2023, KSMCo sold to Sprott Private Resource Streaming and Royalty (B) Corp. the US$150 million 2023 Note under which Sprott has agreed it will use all of the principal amount repaid on maturity of such 2023 Note to purchase a 1% NSR royalty on the KSM Project (or, in certain circumstances, a 1.2%, a 1.25% or a 1.5% NSR royalty on the KSM Project), subject to certain rights of Sprott to redeem the 2023 Note and be repaid the principal, and in some circumstances a premium, instead of purchasing the NSR royalty. (For the terms of the 2023 Note and the NSR royalty see “General Description of Capital Structure – Secured Notes – The 2023 Note”.)

 

Pretium Exploration Inc. (a subsidiary of Newmont Corporation) holds a 1.5% net smelter returns royalty on the East Mitchell Property.

 

Two of the pre-converted claims (Xray 2 and Xray 6), the areas of which have now been converted into part of mining lease 1031440, and one pre-converted claim (Xray 8), the area of which is within mineral claim 509216, are also subject to an effective 1% NSR royalty capped at US$650,000. The Treaty Creek Switching Station Claims and certain fractional claims within the Seabee claims are subject to royalties, however none of the mineral resources at the KSM Project are located on the claims subject to these royalties and they are intended for infrastructure siting.

 

In addition, a sale of the original claims that were purchased in 2001 is subject to a right of first refusal held by Glencore Canada Corporation.

 

The property is located on Crown land (land owned by the Province of British Columbia); therefore, all surface and access rights are granted under, and subject to, the Land Act (British Columbia) and the Mineral Tenure Act (British Columbia). Approximately 12.5 km of the proposed 23 km MTT pass under Crown Land subject to mineral claims held by a third party (the “3rd Party Claims”). The Issuer has been granted a licence of occupation, a form of land use right that grants it rights to occupy the area through which the proposed MTT will pass, subject to the rights of the holder of the 3rd Party Claims. The 3rd Party Claims are also subject to a conditional mineral reserve (the “Reserve”) that prohibits the holders of the 3rd Party Claims from obstructing, endangering or interfering with the construction, operation or maintenance of the MTT. The effect of the Reserve is to place limitations on the rights attached to ownership of the 3rd Party Claims. So, although the licence of occupation says the rights granted under it are subject to the rights of the holder of the 3rd Party Claims, such holder’s rights do not allow the holder to obstruct, endanger or interfere with the construction, operation or maintenance of the MTT. In the Issuer’s opinion, the rights of the holders of the 3rd Party Claims are addressed by the Issuer’s obligations, under the management plan associated with the licence of occupation, to segregate and deliver to such holder all earth and rock material removed from the 3rd Party Claims during construction of the MTT.

 

The five gold-copper deposits, and the proposed waste rock storage areas, lie within the Unuk River drainage in the area covered by the Cassiar-Iskut-Stikine Land and Resource Management Plan approved by the British Columbia Government in 2000. A part of the proposed ore transport tunnel lies within the boundaries of the Nass South Sustainable Resource Management Plan that was completed in 2012. The proposed sites for the tailings management and plant facilities lie outside of the boundaries of any provincial land-use planning process.

 

21


 

Relationships with Indigenous Groups in KSM Region

 

The KSM Project site is located in a region historically used by several Indigenous groups. Part of the KSM Project, including the proposed plant and TMF but excluding the mineral deposits and their immediately-related infrastructure, lies within the boundaries of the Nass Area, as defined in the Nisga’a Final Agreement. In this area, consultation, led by the federal and provincial governments, is required with the Nisga’a Lisims Government under the terms of the Nisga’a Final Agreement. Similarly, the Tahltan Nation has asserted rights and title over the area of the proposed plant and TMF but excluding the mineral deposits. Tsetsaut Skii km Lax Ha (“TSKLH”), an indigenous group asserting independent nation status as descendants of Tsetsaut people that lived in the area in the 1800s but which the Issuer understands is viewed by the Crown as being a wilp of the Gitxsan Nation (as opposed to an independent nation on its own), assert aboriginal rights and title over the entire KSM Project footprint. Additionally, the Gitxsan Nation and the Gitanyow Huwilp (the collective houses of the Gitanyow Nation) may have some interests within the broader region potentially affected by the KSM Project, in particular downstream of the plant site and TMF. Accordingly, the Issuer has been directed to engage with the Tahltan Nation, as well as with the Tsetsaut Skii km Lax Ha, as a wilp of the Gitxsan Nation, the Gitxsan Nation and the Gitanyow Nation on the basis of potential effects of the plant site and TMF and related downstream effects.

 

On June 16, 2014, the Issuer entered into a comprehensive Benefits Agreement with the Nisga’a Nation in respect of the KSM Project (the “Benefits Agreement”). The Benefits Agreement establishes a long-term co-operative relationship between Seabridge and the Nisga’a Nation under which the Nisga’a Nation will support development of the KSM Project, participate in economic benefits from the KSM Project and provide ongoing advice. Highlights of the Benefits Agreement include:

 

Nisga’a Nation agreement to provide letters in support of the KSM Project to British Columbian and Canadian regulators, as well as potential investors in Seabridge or the KSM Project.

 

Financial payments upon the achievement of certain KSM Project milestones and annual production payments based on a percentage of net profits, with the percentage of net profits payable increasing when the KSM Project is not recovering capital costs, as determined under the terms of the Agreement.

 

Strong commitments to education and training of Nisga’a citizens so that they will be better able to take advantage of the economic benefits the KSM Project offers.

 

Mutual co-operation on completing the operational permitting processes for the KSM Project.

 

A framework for the Nisga’a Nation and Seabridge to work together to achieve employment targets and to ensure Nisga’a businesses will have preferred access to certain contracting opportunities.

 

Mutual co-operation on responding to social impacts which Nisga’a Villages may experience as a result of the KSM Project.

 

The Benefits Agreement with the Nisga’a Nation will remain in effect throughout the life of the KSM Project and will apply to future partners in the KSM Project. This Benefits Agreement was signed on behalf of the Nisga’a Nation by the Nisga’a Lisims Government Executive.

 

In June, 2014, the Issuer entered into an agreement with the Gitanyow Huwilp in respect of the KSM Project. Under the agreement, Seabridge agreed to provide funding for certain programs relating to wildlife, fish and water quality monitoring to address some of the concerns raised by the Gitanyow Huwilp, as well as for a committee to establish a means of maintaining communications about KSM Project related issues. This Agreement was signed by seven of the eight wilps of the Gitanyow Nation and by the Gitanyow Hereditary Chiefs Office.

 

22


 

In September, 2013, the Gitxsan Hereditary Chiefs Office provided a letter to British Columbia and federal regulators expressing support for the KSM Project.

 

The Issuer has engaged directly with the TSKLH with respect to the KSM Project and is making efforts to establish a good relationship with the TSKLH. However, the ongoing disagreement between the government and the TSKLH regarding their status as a Nation, the extent to which the rights of their Tsetsaut ancestors has passed to the people who identify themselves as the TSKLH and their territorial boundary has created a difficult environment in which to build a good relationship and progress on establishing a co-operative relationship with TSKLH has been challenging.

 

In July, 2019, the Issuer entered into the CBA with the Tahltan Central Government, the Iskut band and the Tahltan Band in respect of the KSM Project. The CBA establishes a comprehensive framework for the parties to work together on the KSM Project, including detailed provisions on environmental management of the land, robust participation by the Tahltan Nation in the economic opportunities offered by the KSM Project and financial payments related to the performance of the KSM Project. It includes commitments to fund education of Tahltan members, commitments to work to achieve employment targets, processes for awarding contracts on a preferred basis to Tahltan businesses and a procedure for resolving disputes, including disputes on permitting issues. The CBA with the Tahltan Nation will apply to future partners in the KSM Project.

 

The Issuer holds an annual environmental workshop with Indigenous groups and regulators to review results of the previous year’s environmental studies and to communicate planned studies for the upcoming year. The Issuer also observes a process of review of each permit application with Indigenous groups, with an initial phase of review taking place before submission of the application and a second phase with the relevant regulator and Indigenous groups after permit submission.

 

Recent developments, both politically and legally, at the federal level in Canada and in British Columbia, have advanced the recognition and substance of the rights of Indigenous groups in British Columbia. The Supreme Court of Canada decision of June 26, 2014 in Tsilhqot’in Nation v. British Columbia declared aboriginal title for the first time in a certain area in Canada and outlined the rights associated with aboriginal title. In 2019 the British Columbia government passed the Declaration of the Rights of Indigenous Peoples Act and in 2021 the government of Canada passed the United Nations Declaration of the Rights of Indigenous Peoples Act and in those Acts the respective governments committed to ensure that their laws are consistent with the United Nations Declaration on the Rights of Indigenous Peoples. The British Columbia government has been advancing with expanded participation by Indigenous groups in decisions on lands historically used by them. The BC government has been advancing with its initiatives in a forward-looking manner and has left intact decisions it has already made. Nonetheless, the Issuer requires more permits and renewals of certain authorizations and expects that the Indigenous groups with rights impacted by the KSM Project will have even more influence on decision-making in respect of these permits and renewals in the future. One recent exception to its forward-looking approach occurred on March 7, 2024 when the BC government announced four Cabinet orders under the Environment and Land Use Act prohibiting placer and mineral claim staking on Banks Island and part of Vancouver Island, as well as restricting related mineral exploration activities. The BC Government indicated in a corresponding news release that it may amend the orders if affected parties could reach agreement with local Indigenous groups. This is the first time any government has used this power to suspend previously issued permits, impose blanket restrictions on a resource development activity and stated it is open to relaxing the rules if affected parties can reach agreement with Indigenous groups. While these orders apply only to the areas specified, in future the BC government may use its powers under the Environment and Land Use Act to suspend previously issued permits or any permit in the natural resource sector using this legislation to stop activities pending such agreements.

 

23


 

The eastern side of the KSM Project is an area over which the federal and provincial governments consult with three Indigenous groups, although the area in the vicinity has been used historically by the ancestors of the five groups named above at various times and to various extents. Accordingly, a clear understanding of how historic aboriginal rights and title should be recognized in the area is difficult to achieve. This also reduces the likelihood of a court recognizing aboriginal title in one specific group on the basis of the tests in the Tsilhqot’in Nation v. BC decision. The Issuer has been advancing the KSM Project with the objective of respecting the historic relationships of each of these groups with the land and finding ways to have them participate in economic opportunities arising from the Project, as appropriate.

 

Historic KSM Technical Studies

 

In June 2012, a Preliminary Feasibility Study for the KSM Project (the “2012 KSM PFS Report”) was completed. The mine development plan in the 2012 KSM PFS Report was the one approved in the EA Application and EIS review processes, with certain enhancements to the KSM Project infrastructure to improve environmental protection and various mitigation measures. Since the date of the 2012 KSM PFS Report, Seabridge has continued exploration activities at KSM which led to the discovery of the large higher-grade zones below the Kerr and Iron Cap deposits. In early 2016, the Issuer decided to update the 2012 KSM PFS Report to present the same development plan as in the 2012 KSM PFS Report at a pre-feasibility level using more current market values in the financial analysis but, in addition, incorporating into that development plan the infrastructure enhancements committed to in the EA Application and EIS processes and to incorporate other design improvements identified by the Issuer. Accordingly, the prefeasibility study level development plan (the “2016 PFS Plan”) did not include material from higher-grade discoveries at Kerr and Iron Cap after the 2012 KSM PFS. Given the positive impact the new higher grade material was expected to have on the KSM Project economics, the Issuer also decided to complete a study that would present an analysis of the integration of this additional material into the proposed KSM Project design as an alternative development plan (the “2016 PEA Plan”) at a preliminary economic assessment level and include the results in the new prefeasibility report. The report, which presents both the 2016 PFS Plan and the 2016 PEA Plan, (the “2016 KSM PFS/PEA Report”) was completed in November, 2016, and has an effective date of October 6, 2016.

 

Subsequent to completing the 2016 KSM PFS/PEA Report, the Issuer completed additional drilling at its Kerr and Sulphurets deposits with great success. In November, 2020, the Issuer announced the completion of a new technical Report that presented a new resource estimate for the KSM Project which incorporated all drilling on the KSM Project to December 31, 2019.

 

24


 

The Current KSM PFS and PEA

 

The East Mitchell Property hosts a large gold/copper mineral resource and was acquired in December, 2020, with a view to incorporating it into the Issuer’s KSM Project. After the acquisition of the East Mitchell Property, the Issuer decided to complete a new PFS that evaluates the KSM Project using only open pit mining of just the Mitchell, East Mitchell and Sulphurets deposits (the “2022 PFS”). The new report, entitled “KSM (Kerr-Sulphurets-Mitchell) Prefeasibility Study and Preliminary Economic Assessment, NI 43-101 Technical Report” has an effective date of August 8, 2022 (the “2022 KSM PFS and PEA Report”) and is available among Seabridge’s documents at www.sedarplus.ca and www.sec.gov/edgar. The 2022 KSM PFS and PEA Report also includes a Preliminary Economic Assessment (the “2022 PEA”) with a stand-alone mine plan that evaluates a potential future expansion of the KSM mine development set forth in the 2022 PFS to the Iron Cap and Kerr deposits after the 2022 PFS mine plan has been completed. None of the Mineral Resources incorporated into the 2022 PEA mine plan have been used in the 2022 PFS mine plan.

 

The 2022 KSM PFS and PEA Report incorporates the work of a number of industry-leading consulting firms. The principal consultants who contributed to the 2022 KSM PFS and PEA Report, and their Qualified Persons (as defined in NI 43-101) who prepared the 2022 KSM PFS and PEA Report are listed below along with their areas of responsibility:

 

Tetra Tech, under the direction of Hassan Ghaffari P.Eng. (surface infrastructure, capital estimate and financial analysis), John Huang P.Eng. (metallurgical testing review, permanent water treatment, mineral process design and operating cost estimation for process, general and administrative (“G&A”) and site services, and overall report preparation)
     
Wood Canada Limited, under the direction of Henry Kim P.Geo. (Mineral Resources)
     
Moose Mountain Technical Services under the direction of Jim Gray P.Eng. (open pit Mineral Reserves, open pit mining operations, mine capital and mine operating costs, MTT and rail ore conveyance design, tunnel capital costs)
     
W.N. Brazier Associates Inc. under the direction of W.N. Brazier P.Eng. (Electrical power supply, energy recovery plants)
     
ERM (Environmental Resources Management) under the direction of Rolf Schmitt P.Geo. (environment and permitting)
     
Klohn Crippen Berger Ltd. under the direction of David Willms P.Eng. (design of surface water diversions, diversion tunnels, tailings management facility, water storage dam and RSF and tunnel geotechnical)
     
BGC Engineering Inc. under the direction of Derek Kinakin P.Geo., P.L.Eng., P.G. (rock mechanics, geohazards and mining pit slopes)
     
WSP Golder, under the direction of Ross Hammett P.Eng. (block cave mining)

 

The 2022 KSM PFS and PEA Report supersedes the previous reports and the following (to, but not including, “Updated Kerr and Iron Cap Resource Estimates” and also excluding “Recommendations – Deferral of Feasibility Study Data Collection”) summarizes the information set forth in the 2022 KSM PFS and PEA Report.

 

Accessibility, Climate, Local Resources, Physiography and Infrastructure

 

The Property lies within the rugged coastal mountains of northwestern BC, with elevations ranging from 520 m in Sulphurets Creek Valley, to over 2,300 m at the highest peaks. The climate is generally that of a temperate or northern coastal rainforest, with sub-arctic conditions at high elevations. The length of the snow-free season varies from about May through November at lower elevations, and from July through September at higher elevations.

 

25


 

Construction has commenced on KSM’s 30 km long TCAR that will connect the KSM Process Tailings Management Area (“PTMA”) to Highway 37, and the initial segment of the 33 km long Coulter Creek access road (“CCAR”) that will connect the mine area to Highway 37 via the 59 km long Eskay Creek mine resource road.

 

KSM will connect to BC Hydro’s existing Northwest Transmission Line at BC Hydro’s Treaty Creek Terminal Substation (“TCT”). This TCT, located adjacent to the NTL and Highway 37, 18 km south of Bell 2 Lodge, is scheduled to be completed by mid-2025. KSM Mining has completed its design for a 30 km long 287 kV transmission line to interconnect the TCT and the KSM plant site.

 

There are multiple deep-water loading facilities for shipping bulk mineral concentrates located in the ice-free Port of Stewart, BC. Those port facilities are currently used by the Red Chris Mine. The nearest railway is the Canadian National Railroad (CNR) Yellowhead route, which is located approximately 220 km southeast of the Property. This line runs east-west, and can deliver concentrate to deep water ports near Prince Rupert and Vancouver, BC.

 

Exploration History

 

There is evidence that prospectors were active in the area prior to 1935. The modern exploration history of the area began in the 1960’s, with brief programs conducted by Newmont Exploration of Canada Ltd., Granduc Mines Ltd., Phelps Dodge Corp., and the Meridian Syndicate. All of these programs were focused towards gold exploration. The Sulphurets Zone was first drilled by Granduc Mines in 1968; Kerr was first drilled by Brinco Ltd. in 1985; Mitchell Creek by Newhawk Gold Mines Ltd. in 1991; and Iron Cap by Esso Minerals in 1980. These companies and others undertook exploration during the 1980s and 1990s, with Placer Dome producing an initial resource estimate at Kerr in the mid-1990s.

 

There is no recorded mineral production, nor evidence of it, from the KSM Project. Immediately west of the KSM Project, small-scale placer gold mining has occurred in Sulphurets and Mitchell Creeks.

 

During 2003-2005, under its option to earn up to a 65% interest in the KSM Project from Seabridge, Falconbridge Ltd. (“Falconbridge”) conducted geophysics, surface mapping, surface sampling and completed approximately 4,100 m of drilling at the KSM Project.

 

Drilling

 

Since 2006, Seabridge has been conducting exploration and advancement activities at the KSM Project, including annual drilling campaigns. A total of 968 core holes for a total of 377,348 m were used in determining the mineral resource estimate for the KSM Project, including holes from previous operators. The majority of KSM drilling information to the end of 2021 was collected by Seabridge (67%). The remaining 33% of the drilling data were collected by Pretium and Silver Standard (24%), Placer Dome (5%) and Falconbridge/Noranda (about 1%), with the balance collected by five other companies (3%).

 

26


 

Figure 3 is a drill hole location map for the entire KSM district, showing all of the drilling data that were available to estimate Mineral Resources that are the subject of the 2022 KSM PFS (drilling through 2021). The drill holes are colour coded (blue represents non- Seabridge and red represents Seabridge drilling).

 

Figure 3 - KSM Drill Hole Locations

 

 

 

Drilling at the Kerr deposit has identified a mineralized area measuring roughly 2,400 m north-south by 800 m east-west, and about 2,200 m vertically. The drill hole spacing in the upper open pit resource area is approximately 50 m to 75 m. Drill hole spacing through the block cave resource, which has been classified as nearly all Inferred material, ranges between 100 m to 200 m.

 

Drilling at the Sulphurets deposit has identified a mineralized area measuring roughly 2,200 m northeast-southwest by 550 m northwest-southeast, and about 330 m vertically. The drill hole spacing in the open pit resource area ranges between 50 m to 75 m.

 

Drilling at the Mitchell deposit has identified a mineralized area measuring roughly 1,600 m east-west by 1,500 m down-dip, and 850 m thick. The drill hole spacing in the upper open pit resource area is approximately 75 m to 100 m. Drill hole spacing through the block cave resource, which has been classified predominantly as Inferred material, ranges between 100 m to 200 m.

 

27


 

Drilling at the Iron Cap deposit has identified a mineralized area measuring roughly 1,500 m northeast-southwest, by 1,500 m northwest-southeast, and about 850 m thick. The drill hole spacing in the upper block cave resource shapes ranges from 70 m to 75 m. Drill hole spacing through the lower block cave resource, which has been classified predominantly as Inferred material, ranges from 100 m to 200 m.

 

Geological Setting and Mineralization

 

The KSM Property lies within “Stikinia”, a long-lived volcanic island-arc terrane that extends over much of the Canadian Cordillera. It was accreted onto the Paleozoic basement of the North American continental margin in the Middle Jurassic. Early Jurassic sub-volcanic intrusive complexes in the Stikinia terrane host several large Cu-Au porphyry deposits including the KSM deposits.

 

The Kerr deposit is centered on a north-south trending, steep westerly dipping tabular intrusive complex with a strike extent of 2,400 m, a width of 800 m, and vertical extent of 2,200 m. Mineralization extends several tens of meters into the host sedimentary rocks. The Sulphurets deposit is composed of stacked thrust fault panels of Triassic and Jurassic volcano-sedimentary strata intruded by a number of dykes and stocks. It forms a lens dipping 30 degrees northwest extending 2,200 m horizontally, 550 m down dip, with a thickness of up to 330 m. The Mitchell Zone is underlain by intrusive, volcanic, and clastic rocks that are exposed in an erosional window below the shallow dipping Mitchell Thrust Fault (“MTF”). Mineralization is genetically and spatially related to the Early Jurassic Mitchell intrusive complex of diorite, monzodiorite, and granodiorite stocks and dykes. Mineralization also permeates into surrounding sedimentary and volcanic rocks, and in total extends 1,000 m east-west and 850 m north-south, with a vertical extent of 1,100 m. The Mitchell complex comprises three successive intrusive phases accompanied by the development of different hydrothermal assemblages, veining and mineralization. The East Mitchell deposit is the upper portion of the Mitchell deposit, displaced some 1.5 km to the southeast by the MTF during Cretaceous age compressive deformation that produced the regional Skeena Fold and Thrust belt. The Iron Cap deposit is also structurally above the MTF. It is a tabular body striking north-south and dipping 60 degrees to the west, extends 1,500 m along strike, 1,500 m down dip, and is 800 m in thickness.

 

The KSM deposits feature many characteristics typical of gold-enriched, diorite hosted calc-alkaline porphyry copper deposits, with gold, molybdenum, and silver at low concentrations, occurring as fine disseminations in quartz veinlet stockworks with accompanying pyrite, pervasively dispersed over hundreds of metres. All of the deposits are at least partially exposed at the surface, are largely unoxidized, and have had significant portions eroded away by glacial processes.

 

Sampling, Analysis and Data Verification

 

Seabridge has employed relatively consistent sampling methods over the years with minor modifications over the past five years regarding some assaying protocols. Initially, Seabridge used Eco Tech as their primary assay laboratory from 2006 to 2011 when Eco Tech was bought out by ALS Chemex, who has acted as Seabridge’s primary assay laboratory since that time to the present. Over the years, Seabridge’s quality control protocols have included the submission of certified standard reference materials (“SRMs” or “standards”) blanks, and duplicate field samples. Typically, 5% to 10% of the assay pulps from the primary laboratory were submitted to a secondary accredited assay laboratory for check assay comparison purposes. More detail regarding these procedures is outlined in the 2022 KSM PFS and PEA Report.

 

28


 

Sample security, sample preparation, analytical procedures, and QA/QC protocols/results associated with Seabridge’s 2006 to 2021 KSM drilling campaigns were considered adequate and consistent with standard industry practices and the assays are considered suitable to be used to estimate Mineral Resources.

 

Mineral Processing and Metallurgical Testing

 

Several wide-ranging metallurgical test programs have been carried out since 2007 to assess the metallurgical responses of the mineral samples from the KSM deposits, especially the samples from the Mitchell deposit.

 

The primary economic metals at KSM are gold and copper. Primary copper bearing mineral is chalcopyrite. Gold and silver are associated primarily with chalcopyrite and pyrite. There is variability in the pyrite to chalcopyrite ratio between the deposits.

 

The test results indicate that the mineral samples from the KSM deposits are amenable to the proposed KSM flowsheet including:

 

copper-gold-silver-molybdenum bulk rougher flotation followed by gold—silver bearing pyrite flotation;
     
regrinding the bulk rougher concentrate followed by three stages of cleaner flotation to produce a copper-gold-silver-molybdenum bulk cleaner flotation concentrate;
     
molybdenum separation of the bulk cleaner flotation concentrate to produce a molybdenum concentrate and a copper-gold concentrate containing associated silver;
     
cyanide leaching of the gold- silver bearing pyrite flotation concentrate and the scavenger cleaner tailing to further recover gold and silver values as doré, the cyanide recovery circuit includes sulphidization, acidification, recycling, and thickening of precipitate (SART) and acidification, volatilization of hydrogen cyanide gas, and re-neutralization (AVR) processes to recover weak acid dissociable cyanide for reuse and dissolved copper for sale with copper concentrate; and
     
the flotation tailing will be sent to the flotation tailing storage cells with the TMF; the leach residue will be destructed for residual cyanide prior to being sent to the lined CIL Residue Cell, supernatants from both the cells will be reclaimed separately to the process plant for reuse as process makeup water.

 

Primary crushing is by gyratory crushers at the Mitchell ore processing complex (the “Mitchell OPC”). Coarse ore from the primary crushers is transported by train through the MTT to the processing facility in the PTMA. The MTT will also be used for electrical power transmission and the transport of personnel and supplies for mine area operations.

 

Coarse ore from the train is conveyed to two coarse ore stockpiles, followed by secondary cone crushing and tertiary crushing by high-pressure grinding roll (“HPGR”). Fine ore from the HPGR is fed to ball mills followed by copper-gold-silver-molybdenum bulk rougher flotation and pyrite flotation of copper rougher tailings. Bulk flotation concentrates are reground prior to cleaning flotation that produces bulk copper-gold-silver flotation concentrate and molybdenum concentrate products and a gold-silver bearing pyritic product for cyanide leaching. Final products include a copper-gold-silver concentrate, gold-silver doré, and a molybdenum concentrate.

 

29


 

Mineral Resources

 

The 2022 KSM PFS and PEA Report includes updated mineral resource estimates for the KSM Project. The four mineralized zones, Kerr, Sulphurets, Mitchell and East Mitchell, and Iron Cap, were modeled separately. As more understanding was gained after each annual drilling campaign, individual block models were created for each area. Grade interpolation parameters have also evolved over time, reflecting changes required for modeling deeper mineralization intersected below the Kerr and Iron Cap deposits. A variety of basic descriptive statistics and spatial analyses were completed for each area upon the completion of annual drilling campaigns. These investigations include the generation of grade distribution tables, grade histograms, cumulative probability plots, grade box plots, grade contact plots, down-hole variograms, and directional variograms. In addition, new drill hole results were typically compared against the previous grade model to assess model performance.

 

The Mineral Resources for the various KSM mineralized zones are constrained within conceptual open pit and block cave mining shapes to support reasonable prospects for eventual economic extraction as outlined in the CIM Definition Standards for Mineral Resources and Mineral Reserves (CIM, 2014). The conceptual open pit and underground mining shapes were generated for each resource area based on calculated block model NSR values. The NSR values were generated for each deposit. Moose Mountain Technical Services generated conceptual pits for the Kerr, Sulphurets, Mitchell and East Mitchell deposits using MineSight® software and Lerchs-Grossmann algorithms. WSP Golder developed conceptual block cave footprints for Kerr and Iron Cap using the block NSR values and Geovia’s PCBC™ Footprint Finder software. The footprint polygons were extruded vertically based on guidance from WSP Golder.

 

The following gold, copper, silver, and molybdenum metal prices were used for determining block NSR values, US$1,300/oz, US $3.00/lb, US $20.00/oz, and US $9.70/lb, respectively. Open pit and underground mining costs of Cdn$1.80 to 2.20/tonne and Cdn$6.00 to Cdn$7.00/tonne were used to establish conceptual open pit and underground resource shapes, respectively, along with a processing and G&A cost of Cdn$9.00/tonne for Kerr, Sulphurets and Iron Cap, and Cdn$10.75 to Cdn$11.20/tonne for Mitchell and East Mitchell.

 

The conceptual block cave footprints for Kerr and Iron Cap were extruded vertically up from the draw point extraction elevations to create 3D solids that were used for resource tabulation. Conceptual caves were clipped against surface topography (Iron Cap) or conceptual resource pit (Kerr). Mineral Resources are determined, at Cdn$10.75 to Cdn$11.25 and Cdn$16 NSR cutoffs for open-pit constrained and underground mining constrained Mineral Resources, respectively.

 

30


 

The table below summarizes the estimated Measured, Indicated, and Inferred Mineral Resources for each zone.

 

KSM Project Mineral Resources (Inclusive of Mineral Reserves)

 

Measured Resources

 

Project Cut Off
Grade
(g/t)
Tonnes
(000)
Gold Copper Silver Molybdenum
Grade
(g/t)
Ounces
(000)
Grade
(%)
Pounds
(millions)
Grade
(g/t)
Ounces
(000)
Grade
(ppm)
Pounds
(millions)
KSM: NSR:                  
Mitchell $10.75 691,700 0.68 15,124 0.19 2,876 3.3 72,831 52 79
East
Mitchell
$11.25
1,012,800

0.65

21,098

0.11

2,514

1.8

59,233

89

198
KSM Total   1,704,500 0.66 36,222 0.14 5,390 2.4 132,064 74 277

 

Indicated Resources

 

Project Cut Off
Grade
(g/t)
Tonnes
(000)
Gold Copper Silver Molybdenum
Grade
(g/t)
Ounces
(000)
Grade
(%)
Pounds
(millions)
Grade
(g/t)
Ounces
(000)
Grade
(ppm)
Pounds
(millions)
KSM:

$10.75-$11.25 NSR Pits

 

$16 NSR

UG

                 
Mitchell 1,667,000 0.48 25,935 0.14 5,120 2.8 149,160 66 241
East
Mitchell

746,200

0.42

10,080

0.08

1,390

1.7

41,814

79

130
Sulphurets 446,000 0.55 7,887 0.21 2,064 1.0 14,339 53 52
Kerr 374,000 0.22 2,660 0.41 3,405 1.1 13,744 5 4
Iron Cap 423,000 0.41 5,576 0.22 2,051 4.6 62,559 41 38
KSM Total 3,656,200 0.44 52,138 0.17 14,030 2.4 281,616 58 465

 

Measured plus Indicated Resources

 

Project Cut Off
Grade
(g/t)
Tonnes
(000)
Gold Copper Silver Molybdenum
Grade
(g/t)
Ounces
(000)
Grade
(%)
Pounds
(millions)
Grade
(g/t)
Ounces
(000)
Grade
(ppm)
Pounds
(millions)
KSM:

$10.75-$11.25 NSR Pits

 

$16 NSR

UG

                 
Mitchell 2,358,700 0.54 41,059 0.15 7,996 2.9 221,991 62 320
East
Mitchell
1,759,000 0.55 31,178 0.10 3,904 1.8 101,047 85 328
Sulphurets 446,000 0.55 7,887 0.21 2,064 1.0 14,339 53 52
Kerr 370,000 0.22 2,660 0.41 3,405 1.1 13,744 5 4
Iron Cap 423,000 0.41 5,576 0.22 2,051 4.6 62,559 41 38
KSM Total 5,356,700 0.51 88,360 0.16 19,420 2.4 413,680 63 742

 

31


 

Inferred Resources

 

Project Cut Off
Grade
(g/t)
Tonnes
(000)
Gold Copper Silver Molybdenum
Grade
(g/t)
Ounces
(000)
Grade
(%)
Pounds
(millions)
Grade
(g/t)
Ounces
(000)
Grade
(ppm)
Pounds
(millions)
KSM:

$10.75 NSR Pits

 

$16 NSR

UG

                 
Mitchell 1,282,600 0.29 11,819 0.14 3,832 2.5 102,228 47 133
East Mitchell 281,100 0.37 3,372 0.07 403 2.3 21,112 61 38
Sulphurets 223,000 0.44 3,155 0.13 639 1.3 9,320 30 15
Kerr 1,999,000 0.31 19,823 0.40 17,720 1.8 114,431 23 103
Iron Cap 1,899,000 0.45 27,474 0.30 12,556 2.6 158,741 30 126
KSM Total 5,684,700 0.36 65,643 0.28 35,150 2.2 405,832 33 415

 

Note:

 

1. The effective date for the Mineral Resource Estimate for Mitchell and East Mitchell is March 31, 2022.
  2. The effective date for the Kerr, Sulphurets and Iron Cap Mineral Resource Estimate is December 31, 2019. Subsequent to the publication of the 2022 KSM PFS and PEA Report an updated Mineral Resource Estimate was prepared for the Kerr and Iron Cap Deposits with an effective date of January 10, 2024. See “Updated Kerr and Iron Cap Resource Estimates” below. The mineral resources within the 2022 PEA mine plans for Kerr and Iron Cap are subsets of, and consistent with, the updated mineral resources, and the mineral resources within the 2022 PEA mine plan are not impacted by the updated underground block cave constraining shapes.
3. The Mineral Resource estimates have been reviewed and approved by Henry Kim P.Geo., an independent Qualified Person. Mr. Kim verified the databases supporting the mineral resource estimates and conducted a personal inspection of the property and reviewed drill core from a range of representative drill holes at site and at the core storage facilities in Stewart, B.C. with Seabridge geology staff.
4. Mineral Resources were prepared in accordance with CIM Definition Standards for Mineral Resources and Mineral Reserves (May 10, 2014) and CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines (Nov 29, 2019).
5. Mineral Resources were constrained within minable shapes depending on their mining methods.
6. Mineral Resources are reported inclusive of those Mineral Resources that were converted to Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
7. Following metal prices were used to determine Mineral Resources: US$1300/oz Au, US$3/lb Cu, US$20/oz Ag, and US$ 9.7/lb Mo.
8. For other key assumption parameters, methods used for: Mitchell and East Mitchell, see 2022 KSM PFS and PEA Report.
9. Numbers may not add due to rounding.

 

Note: United States investors are cautioned that the requirements and terminology of NI 43-101 may differ from the requirements of the SEC, including Regulation SK-1300. Accordingly, the Issuer’s disclosures regarding mineralization may not be comparable to similar information disclosed by companies subject to the SEC’s mining disclosure standards. Mineral Resources are reported inclusive of Mineral Reserves. Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.

 

Mineral Reserves

 

Mineral Reserves for the 2022 PFS are based on open pit mining of the Mitchell, East Mitchell and Sulphurets deposits. Waste to ore cut-offs were determined using an NSR for each block in the model. NSR is calculated using prices and process recoveries for each metal accounting for all off-site losses, transportation, smelting and refining charges. Metal prices of US$1,300/oz gold, US$3.00/lb copper, US$20.00/oz silver and US$9.70/lb molybdenum and a foreign exchange rate of US$0.79 to Cdn$1.00 have been used in the NSR calculations.

 

Lerchs-Grossman (“LG”) pit shell optimizations were used to define open pit mine pit limits in the 2022 PFS. Production is limited by the permitted tailings volume of 2.29 Bt. Open pit designed phases use updated geotechnical studies based on most recent site investigation programs.

 

32


 

Mineral reserves have been estimated using the updated pit designs. The open pit minimum NSR cut-off grade is based on an estimated process operating cost of Cdn$11.00/t. Process operating costs include plant processing (including crushing/ore transport costs where applicable), G&A, surface service, tailing construction, and water treatment costs. A premium cut-off grade of Cdn$25.00/t is used until the end of Year 5 to maximize the net present value (NPV) and minimize the time to payback of initial capital.

 

The table below summarizes the estimated Proven and Probable Mineral Reserves for the KSM mineral deposits.

 

KSM Proven and Probable Mineral Reserves as of May 26, 2022

 

  Ore
(Mt)
Diluted Grades Contained Metal
Au
(g/t)
Cu
(%)
Ag
(g/t)
Mo
(ppm)
Au
(Moz)
Cu
(Mlb)
Ag
(Moz)
Mo
(Mlb)
Proven Mitchell 483 0.74 0.20 3.3 49 11.5 2,161 51 53
East Mitchell 814 0.69 0.11 1.8 91 18.1 2,043 47 163
Sulphurets 0 0.00 0.00 0.0 0 0.0 0 0 0
Total Proven 1,297 0.71 0.15 2.4 75 29.6 4,203 98 215
Probable Mitchell 452 0.59 0.15 2.5 74 8.6 1,458 36 74
East Mitchell 392 0.46 0.09 1.7 84 5.8 784 21 73
Sulphurets 151 0.68 0.26 1.0 70 3.3 874 5 23
Total Probable 995 0.55 0.14 1.9 77 17.7 3,116 62 170
Proven +
Probable
Mitchell 935 0.67 0.18 2.9 61 20.1 3,619 87 126
East Mitchell 1,206 0.62 0.11 1.8 89 23.9 2,826 68 236
Sulphurets 151 0.68 0.26 1.0 70 3.3 874 5 23
Total Proven + Probable 2,292 0.64 0.14 2.2 76 47.3 7,320 160 385

 

Notes:

 

1. The Mineral Reserve estimates were reviewed by Jim Gray, P.Eng. (who is also the independent Qualified Person for these Mineral Reserve estimates), reported using the 2014 CIM Definition Standards and 2019 CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines, and have an effective date of May 26, 2022.
2. Mineral Reserves are based on the 2022 PFS all open pit Life of Mine plan.
3. Mineral Reserves are mined tonnes and grade, the reference point is the mill feed at the primary crusher and includes consideration for operational modifying factors.
4. Mineral Reserves are reported at NSR cut-off grades that vary between of $11/t and $25/t using the following assumptions: metal prices of US$1300/oz Au, US$3.00/lb Cu, US$20/oz Ag, and US$ 9.70/lb Mo at a currency exchange rate of 0.79 US$ per CAD$; Copper concentrate terms are 96% payable Cu; 97.8% payable Au; 90% payable Ag, molybdenum concentrate terms are 99% payable. Offsite costs (smelting, refining, transport, and insurance) are C$281 per tonne of copper concentrate and C$5,527 per tonne of molybdenum concentrate; doré terms are $2/oz offsite costs (refining, transport and insurance), 99.8% Au payable, and 90% Ag payable; metallurgical recovery projections vary depending on metallurgical domain and metal grades and are based on metallurgical test work.
5. The NSR cut-off grade is varied from Cdn11/t to Cdn25/t and covers the estimated process operating cost of $10/t for ore processing, G&A, surface service, tailings, and water treatment costs.
6. Mineral Reserves account for mining loss and dilution.
7. Mineral Reserves are a subset of the mineral resource.
8. Numbers have been rounded as required by reporting guidelines.

 

33


 

Mine Production Plan (PFS)

 

The open pit only mine production plan starts in the higher grade Mitchell pit. Production from the high grade upper East Mitchell zone is introduced in Year 3. Waste mined from the Sulphurets, East Mitchell and Mitchell pit is placed in the Mitchell rock storage facility (“RSF”) until Mitchell pit is mined out by Year 25. Final waste from East Mitchell is backfilled into the mined out Mitchell pit from Year 25 onward along with some waste rehandled from the Mitchell RSF.

 

The updated mine plan reduces overall footprint by not using the McTagg RSF as required in the 2016 KSM PFS/PEA Report and by utilizing mined out pits for backfilling waste rock.

 

Autonomous mine operations where applicable and an integrated remote operations centre reduce on-site personnel.

 

Electrification of the haul truck fleet with trolley assist reduces carbon emissions and overall mine energy costs by replacing diesel with low cost energy from electricity.

 

Mill feed ramps up to 130,000 tonnes per day by Year 2 followed by a 50% increase to 195,000 tonnes per day from Year 3 onwards. Average annual mill feed throughput for the 33 years of mine life is estimated at 69.5 million tonnes.

 

At Mitchell, a near-surface higher grade gold zone crops out allowing for gold production in the first seven years that is substantially above the mine life average. The mine plan is specifically designed for mining highest gold grade first to facilitate a quick capital investment payback. The project’s post-tax payback period is approximately 3.7 years for the Base Case or 11% of mine life. Metal production for the first seven years, compared to life of mine average production, is estimated as follows:

 

Average Annual Metal Production

 

  Years 1-7
Average
Life of Mine
Average
Average Grades:    
Gold (grams per tonne) 0.89 0.64
Copper (%) 0.21 0.14
Silver (grams per tonne) 3.0 2.2
Molybdenum (parts per million) 52 76
Annual Production:    
Gold (ounces) 1,413,000 1,027,000
Copper (pounds) 251 million 178 million
Silver (ounces) 3.8 million 3.0 million
Molybdenum (pounds) 2.1 million 4.2 million

 

Note: Annual production shows total metal contained in copper concentrate, doré, and molybdenum concentrate.

 

34


 

Infrastructure

 

Mitchell-Treaty Tunnels (MTT)

 

The MTT, two parallel 22 km tunnels, connects the mine site in the Mitchell Valley to the Processing Plant and Tailings Management Area in the North Treaty Valley. All mined ore from the Mitchell OPC will be transported to the Treaty OPC through the MTT, and personnel and freight will be transported between the PTMA and the Mine Site via the train system. The MTT also includes electric power cables to service the Mitchell mining area. The twinned tunnel configuration provides higher capacity with the haulage loop and rail cross-overs allow sections of the tunnel to be isolated for periodic tunnel maintenance.

 

Figure 4 – KSM Project Layout

 

 

 

Mine to Mill Ore Transport System

 

Ore will be crushed at the Mitchell OPC, loaded onto trains and transported to the Treaty coarse ore stockpile (COS) via the 22 km twin MTT. The trains are autonomous and controlled from a control centre at Treaty. The electric drives rely on regenerative braking which is input back into the grid.

 

The ore transport is configured to start operations at a nominal production rate of 130,000 tpd and ramps up to 195,000 tpd for the start of Year 3.

 

The train system will also handle personnel, freight, and fuel requirements between Treaty and Mitchell. The power cable for the mine will also be in the MTT.

 

35


 

Power Supply

 

Electric service for the KSM Project will be from BC Hydro’s Northern Transmission Line (“NTL”) that was completed in 2014.

 

The 344 km long, 287 kV, NTL runs from the Skeena Substation on the BC Hydro 500 kV grid near Terrace, BC, to Cranberry Junction, from which point it roughly parallels BC Highway 37 to its terminus at Bob Quinn Lake. A 30 km long, 287 kV transmission extension from the NTL will be constructed, originating at the Treaty Creek Switching Station (BC Hydro designation TCT) and terminating at the Treaty processing plant. This spur line will parallel the Treaty Creek access road in a common corridor. Land tenure for the right-of-way has been obtained and construction of the TCT is currently underway. The Treaty Creek Switching Station on the NTL will be approximately 18 km south of Bell II.

 

The Sept. 2018 System Impact Study (SIS) by BC Hydro provides for a site maximum demand of 245 MW based on 3 power supply queue positions, which were a result of two increases in the mine power supply based on two updates to the SIS, as the planned KSM size and load grew from the initial submission. As it stands, KSM has 245 MW reserved for its use.

 

Tailings Management

 

The TMF would be constructed in three cells: the North and South cells for flotation tailing, and a lined cell for CIL tailing. The cells are confined between four dams (North, Splitter, Saddle, and Southeast dams) located within the Teigen-Treaty Creek cross-valley. In total, the TMF is designed to have a capacity of 2.3 Bt.

 

De-pyritized flotation tailing is to be stored in the North and South cells. The pyrite bearing CIL tailing is to be stored in a lined central cell.

 

The cyclone sand dams will be constructed over earth fill starter dams using the centerline construction method with compacted cyclone sand shells and low-permeability glacial till cores. The Saddle and Splitter dam cores incorporate geomembranes to limit seepage from the CIL residue tailings. The dams will be progressively raised over their operating life to an ultimate elevation of 1,068 m.

 

Seepage from the impoundment will be controlled with low-permeability zones in the tailings dams and dam foundation treatment. Seepage and runoff from the tailings dams will be collected downstream at seepage collection dams and pumped back to the TMF. The ponds behind the collection dams will also be used to settle solids eroded by runoff from the dam and fines from cyclone sand construction drain-down water.

 

Mine Site Water Management

 

The overall site water management strategy, including the discharge from the Water Storage Facility (“WSF”) via the High-density Sludge (“HDS”) water treatment plant (“WTP”) was the strategy that was reviewed and approved during the EA Application and EIS review process.

 

Two main diversion tunnel routes will be required to route non-contact water from the Mitchell and McTagg valleys around the mine site.

 

Lined surface diversion channels will be constructed progressively during operations, along the contact of the RSF and the hillside, to divert surface flows.

 

36


 

All contact water from the mine site areas (open pits, RSFs, roads, infrastructure) will be directed to the WSF, located in the lower Mitchell Creek area. The WSF will be formed with a 165 m high rock fill asphalt core dam built to full height by Year -1 and is sized to store annual freshet flows and volumes resulting from a 200-year wet year. The core zones of the WSF dam will be founded on competent sedimentary rock foundations. Seepage will be controlled by the asphalt core in the dam and the dam foundation will be grouted. A seepage collection pond will collect seepage water beyond the toe of the main dam and return it to the WSF.

 

Mine area contact water will be treated with a High Density Sludge (HDS) lime water treatment plant (“WTP”). A Selenium WTP will be constructed and operational by Year 5 to treat up to 500 L/s of seepage principally from the RSF and select point sources within Mitchell Valley with selenium loaded waters, compared to lower concentrations within the WSF. The HDS WTP and the WSF will be operational before mill start-up to allow pre-production activity in the Mitchell Valley and Mitchell pit area.

 

Three major tunnels will be excavated during the construction period:

 

Mitchell Treaty Twinned Tunnels (MTT)
     
Mitchell Diversion Tunnel (MDT)
     
McTagg Diversion Tunnel (MTDT)

 

These tunnels are classified as either infrastructure tunnels (MTT) or water tunnels (MDT and MTDT). Additional tunnels will be constructed at various times during mine operations for diversion of contact water around mine facilities in Mitchell Valley or noncontact water around the east side of the TMF.

 

Access Roads

 

Current proposed permanent access roads include the existing 59 km long resource access route from Highway 37 to the former Eskay Creek Mine. The proposed 33 km long CCAR will commence near the southern limit of this existing road, and extend south then west to the proposed Mine Site.

 

The TCAR will leave Highway 37 approximately 19 km south of Bell 2, and head west. The TCAR network provides access to the Treaty OPC, the TMF, and the MTT Saddle Area. It will include a 30 km two-lane access route from Highway 37 to an intersection at approximately km 17 and continue up the Treaty River valley to the Saddle Area. The North Treaty Access Road branches off the TCAR at the km 17 intersection and leads to the Treaty OPC, TMF, and Treaty MTT portal.

 

Geohazards

 

Geohazard and risk assessments were completed for the proposed facilities within the KSM footprint. As expected for a mountainous, high-relief property site, snow avalanche and landslide hazards exist, with the potential to affect mine construction, operations, and closure. Mitigation strategies have been identified to reduce the high and very high risk scenarios to a target residual risk not exceeding moderate. Further risk reduction will be achieved where practical and cost-efficient and as part of the detailed design of specific facilities.

 

Capital Cost Estimate (2022 PFS)

 

An initial capital of US$6.432 billion is estimated for the 2022 PFS. Initial capital includes all costs to build the facilities that mine, transport, and process ore to produce first concentrate and doré. All currencies in are expressed in US dollars, unless otherwise stated. Costs have been converted using a fixed currency exchange rate of US$0.77 to Cdn$1.00. The expected accuracy range of the capital cost estimate is +25%/-10%.

 

37


 

A summary of the 2022 PFS initial and sustaining capital costs is shown in the Table below.

 

Capital Costs (US$ million)

 

  Initial Sustaining Total
US$ M US$ M US$ M
Direct Costs      
Mine 1,420 1,766 3,187
Process 2,003 309 2,312
Tailings Management Facility 513 630 1,143
Environmental 15 8 23
On-site Infrastructure 39 - 39
Off-site Infrastructure 76 11 87
Power Supply/Energy Recovery 121 46 167
Total Direct Capital 4,188 2,770 6,958
Indirect cost 1,090 97 1,188
Owner’s cost 204 - 204
Contingency 949 343 1,293
Total Capital 6,432 3,210 9,642

 

This estimate was prepared with a base date of Q1/Q2 2022. The estimate does not include any escalation past this date. Budget quotations were obtained for major equipment; vendors provided equipment prices, delivery lead times, spare allowances, and freight costs to a designated marshalling yard in northern BC, with some exceptions for delivery points to different BC locales. The quotations used in this estimate were obtained in Q1/Q2 2022, and are budgetary and non-binding. For non-major equipment, costing is based on in-house data, quotes from previous studies. No cost escalation is included.

 

All equipment and material costs include Incoterms FCA. Other costs such as spares, taxes, duties, freight, and packaging are covered separately in the estimate as indirect costs.

 

Capital costs exclude reclamation and closure costs that are accounted for in the economic analysis.

 

Sustaining capital costs were also estimated leveraging the same basis of information applied to the initial capital estimate with respect to vendor quotations, labour, and material costs. The sustaining capital costs total US$3.210 billion and consist of:

 

open pit mine development, principally mobile fleet replacement
     
process plant expansion

 

TMF expansions, mainly comprising dam raises and CIL basin expansions
     
indirect costs, including construction indirects, spares, freight, and logistics, EPCM, vendor assistance, and contingency

 

38


 

Operating Cost Estimate (2022 PFS)

 

Average mine, process and G&A operating costs over the project’s life (including waste mining and on-site power credits, excluding off-site shipping and smelting costs) are estimated at US$11.36 per tonne milled (before base metal credits). The cost estimates are based upon budget prices in Q1/Q2 2022 or data from the database of the consulting firms involved in the cost estimates. When required, certain costs in this report have been converted using a fixed currency exchange rate of Cdn$1.00 to US$0.77. The expected accuracy range of the operating cost estimate is +25%/-10%.

 

A breakdown of estimated unit operating costs is as follows:

 

LOM Average Unit Operating Costs (US$ Per Tonne Milled)

 

Mining     3.31  
Process     6.31  
G&A + Site Services     1.06  
Tailings Storage/Handling     0.11  
Water Management/Treatment     0.50  
Energy Recovery     -0.07  
Provincial Sales Tax     0.13  
Total Operating Costs     11.36  

 

The mining operating costs are LOM average unit costs calculated by dividing the total LOM operating costs by LOM milled tonnages. The costs exclude mine pre-production costs.

 

The electric service to the KSM Site (including all terms and conditions such as rates and metering requirements, connection charges, and many aspects of the KSM connecting transmission line) will be in accordance with the latest edition of BC Hydro Electric Tariffs, in particular:

 

Rate Schedule 1823 – Transmission Service – Stepped Rate

 

Rate Schedule 1901 – Deferral Account Rate Rider

 

BC Hydro Electric Tariff Supplement No. 5 (TS5) Agreement for Customers Taking Electricity under 1821 (1821 is now 1823) (TS5 is a template for the Electricity Supply Agreement with the format set as per the tariffs and is not subject to change)

 

BC Hydro Electric TS6 Agreement for Transmission Service Customers (TS6 is a fill in the blanks template for the Facilities Agreement with the format set as per the tariffs and is not subject to change)
     
BC Hydro Electric Tariff Supplement No. 74 (TS74) Customer Baseline Load Determination Guidelines

 

The cost of power for KSM, delivered to the 25 kV bus bars of the Treaty ore processing complex, has been estimated as Cdn $0.0596 per kWh, based on rates effective in Q1 of 2022) including applicable taxes and energy cost savings due to BC Hydro’s Power Smart program. The KSM power cost includes the transmission line losses from the metering point at the Treaty Creek Switching Station, plus Substations No. 1 and No. 2 transformer losses and peaking power cost. The calculated power cost as estimated for the 2022 PFS is somewhat below regular rates due to a large reduction or elimination of costly Tier 2 energy in accordance with an efficient plant design as accepted by BC Hydro’s “Power Smart” program based on a study approved by BC Hydro.

 

39


 

Economic Evaluation (2022 PFS)

 

The economic evaluation was prepared on both a pre-tax financial and a post-tax financial model.

 

A Base Case economic evaluation for the 2022 PFS was prepared incorporating historical three-year trailing averages for gold, copper and silver metal prices of as of June 20, 2022. Molybdenum price is based on a recent study for a primary molybdenum project. Two alternate cases are also presented: (i) The Recent Spot Case incorporating spot prices at about the effective date of the 2022 KSM PFS and PEA Report for gold, copper, silver and the US$/Cdn$ exchange rate; and, (ii) The Alternate Case that incorporates lower metal prices than used in the Base Case to demonstrate the 2022 PFS’s sensitivity to lower metal prices. The pre-tax and post-tax estimated economic results in U.S. dollars for all three cases are shown in the Table below.

 

Projected Economic Results (US$)

 

    2022 PFS
Base
Case
  2022 PFS
Recent
Spot Case
  2022 PFS
Alternate
Case
 
Metal Prices:              
Gold ($/ounce)     1,742     1,850     1,500  
Copper ($/pound)     3.53     4.25     3.00  
Silver ($/ounce)     21.90     22.00     20.00  
Molybdenum ($/lb)     18.00     18.00     18.00  
US$/Cdn$ Exchange Rate:     0.77     0.77     0.77  
Cost Summary:                    
Operating Costs Per Ounce of Gold Produced (years 1 to 7)   $ 35   $ -83 $ 118  
Operating Costs Per Ounce of Gold Produced (life of mine)   $ 275   $ 164   $ 351  
Total Cost Per Ounce of Gold Produced (inclusive of all capital and closure)   $ 601   $ 490   $ 677  
Initial Capital (billions)   $ 6.4   $ 6.4   $ 6.4  
Sustaining Capital (billions)   $ 3.2   $ 3.2   $ 3.2  
Unit Operating Cost (US$/tonne)   $ 11.36   $ 11.36   $ 11.36  
Pre-Tax Results:                    
Net Cash Flow (billions)   $ 38.6   $ 46.1   $ 27.9  
NPV @ 5% Discount Rate (billions)   $ 13.5   $ 16.4   $ 9.2  
Internal Rate of Return     20.1 %   22.4 %   16.5 %
Payback Period (years)     3.4     3.1     4.1  
Post-Tax Results:                    
Net Cash Flow (billions)   $ 23.9   $ 28.6   $ 17.1  
NPV @ 5% Discount Rate (billions)   $ 7.9   $ 9.8   $ 5.2  
Internal Rate of Return     16.1 %   18.0 %   13.1 %
Payback Period (years)     3.7     3.4     4.3  

 

Note:

 

1. Operating and total cost per ounce of gold are after copper, silver and molybdenum credits.
2. Total cost per ounce includes all start-up capital, sustaining capital and reclamation/closure costs.
3. Results include consideration of Royalties and Impact Benefit Agreements.
4. The post-tax results include the B.C. Mineral Tax and provincial and federal corporate taxes.

 

Sensitivity analyses were carried out on gold, copper, silver, and molybdenum metal prices, exchange rate, capital expenditure and operating costs. The analyses are presented in the 2022 KSM PFS and PEA Report graphically as financial outcomes in terms of pre-tax NPV, IRR and payback period. The KSM Project NPV is most sensitive to gold price and exchange rate followed by operating costs, copper price and capital costs. The IRR is most sensitive to exchange rate, capital costs and gold price followed by copper price and operating costs. In general, sensitivity to metal price is roughly equivalent to sensitivity to metal grade. Financial outcomes are relatively insensitive to silver and molybdenum prices.

 

40


 

Recommendations

 

2022 PFS Recommendations

 

It is recommended that Seabridge focus on advancing development of the KSM Property as described in the 2022 PFS by completing the data collection required to conduct a Feasibility Study. The majority of the US$21.7 million to US$27.3 million of estimated Feasibility Study data collection is related to geotechnical site investigations for TMF, site infrastructure, mine water management tunnels, and water storage dam.

 

Deferral of Feasibility Study Data Collection

 

The Issuer plans to continue to pursue a joint venture or sale of the KSM Project. Since it does not intend to build or operate the KSM Project and the KSM Project includes multiple deposits and provides a joint venture partner (or purchaser) significant flexibility in the design of the KSM Project in accordance with its priorities and risk tolerance, the Issuer believes that it does not make sense for it to start into work on a feasibility study on the KSM Project on its own. The work is expected to be work the joint venture partner will undertake. The 2022 KSM PFS and PEA Report includes recommendations on additional work that could be completed to advance the KSM Project, including budget estimates. The work that a joint venture partner might choose to complete might include none, some or all of this recommended work and might include significantly more work or take a different approach to developing the KSM Project, and so the timing and cost for a joint venture partner to conclude the recommended work or a feasibility study is impossible to predict. Certain data collection work and studies that are likely required regardless of the ultimate KSM Project design and steps towards satisfying conditions in its environmental assessment certificate have been undertaken and work on them is likely to continue as the Issuer determines it to be worthwhile, subject to available funding.

 

In addition, the Issuer has commenced certain early construction works to advance the KSM Project as the Issuer is seeking a joint venture partner. These works are focused on establishing site access, camps and construction power as well as initial work towards infrastructure on the critical path of the construction schedule. See “Early KSM Construction Works”.

 

2022 Preliminary Economic Assessment

 

The 2022 KSM PFS and PEA Report also includes a Preliminary Economic Assessment of a stand-alone mine plan and has been undertaken to evaluate a potential future expansion of the KSM mine to the Iron Cap and Kerr deposits after the 2022 PFS mine plan has been completed. The 2022 PEA is primarily an underground block cave mining operation supplemented with a small open pit and is planned to operate for 39 years with a peak mill feed production of 170,000 t/d, demonstrating that KSM has multigenerational long-life mining project potential with flexibility to vary metal output. None of the Mineral Resources incorporated into the 2022 PEA mine plan have been used in the 2022 PFS mine plan.

 

The 2022 PEA starts with the development of an Iron Cap block cave mine supplemented with a small open pit at Kerr. Development of a Kerr block cave mine begins when Iron Cap development tapers off. Kerr block cave mill feed starts 6 years after the start of Iron Cap mill feed. Mill feed delivery to the process plant is ramped up to 170,000 tpd by Year 12 but after year 23 tapers down to around 80,000 tpd for the final 13 years. Over the entire 39-year mine life, mill feed will be delivered to a flotation concentration mill circuit. The flotation plant will produce a gold/copper/silver concentrate and separate molybdenum concentrate for transport by truck to a nearby seaport at Stewart, B.C.

 

41


 

Mineral Resources (2022 PEA)

 

The 2022 PEA uses the mineral resource estimates for the Kerr and Iron Cap deposits disclosed above. In addition, the mineral resources are constrained by conceptual mining shapes.

 

The 2022 PEA is preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is no certainty that the results of the 2022 PEA will be realized. Mineral Resources in the 2022 PEA mine plan are not Mineral Reserves and do not have demonstrated economic viability.

 

2022 PEA Mine Design (2022 PEA)

 

Kerr open pit has been designed to supplement block cave mill feed during the ramp up of the PEA block cave production.

 

Waste to mill feed cut-offs are determined using a NSR for each block in the model. The pit delineated resources for the 2022 PEA use an NSR cut-off of Cdn$10.75/t. NSR is calculated using prices and process recoveries for each metal accounting for all off-site losses, transportation, smelting and refining charges. Metal prices of US$1,200 per ounce gold, US$2.70 per pound copper, and US$17.50 per ounce silver and a foreign exchange rate of US$0.83 per Cdn$1.00 are used in the NSR calculations.

 

The underground block caving mine designs for Iron Cap and Kerr are based on modeling using GEOVIA’s Footprint Finder (FF) software. The ramp-up and maximum yearly mine production rates are established based on the rate at which the drawpoints are constructed and the assumptions are conservatively less than the demonstrated maximum industry rate and the initial and maximum production rates at which individual drawpoints can be mucked. The values chosen for these inputs are based on industry averages adjusted to suit the anticipated conditions.

 

The Iron Cap block cave mine includes an estimated development duration of 4 years, a production ramp-up period of 6 years, steady state production at 32.9 million tonnes per year for 17 years, and then a production ramp-down period of 6 years. The Iron Cap block cave is located adjacent to the MTT, the transportation conduit between mine and mill.

 

The Iron Cap mine is designed as a partially electrified mine with partial automation where battery electric vehicles replace diesel production loaders on the extraction level and trains replace trucks on the haulage level. The height of draw averages around 500m, ranging from 200m on the west limit that is developed early in the mine life to 750m on the east edge of the design that is developed late in the mine life.

 

42


 

The Kerr block cave has an estimated development duration of five years, a production ramp-up period of 5 years, and steady state production at 29.2 million tonnes per year for 20 total years with a seven year production dip to as low as 15.0 million tonnes during the transition from the first to second lift.

 

The Kerr block cave has been designed as a conventionally developed and operated block cave mine leaving additional upside for improvement by electrification.

 

The mining NSR shut-off is Cdn$20 per tonne for the Iron Cap block cave and Cdn$18 per tonne for the Kerr block cave. The mill feed contained in the mine plan for the 2022 PEA including dilution and mining losses are stated as follows.

 

Mill Feed from the PEA Mine Plan

 

Zone Mining Method Classification Tonnes (millions) Average Grades Contained Metal

Gold

(g/t)

Copper

(%)

Silver

(g/t)

Gold

M oz’s

Copper

M lbs

Silver

M oz’s

Iron Cap Block Cave M+I 58 0.62 0.28 3.2 1.1 354 5.9
Inferred 685 0.58 0.36 3.0 12.7 5,424 65.4
Kerr Open Pit M+I 117 0.26 0.51 1.4 1.0 1,315 5
Inferred 7 0.74 0.09 1.5 0.2 14 0
Block Cave M+I 48 0.25 0.53 1.3 0.4 557 2.0
Inferred 777 0.31 0.49 1.7 7.8 8,339 43.6
Total Mill Feed Mined M+I 223 0.35 0.45 1.8 2.5 2,226 13
Inferred 1,469 0.44 0.43 2.3 20.7 13,777 109

 

Note: The 2022 PEA is preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is no certainty that the results of the 2022 PEA will be realized. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

 

43


 

Production (2022 PEA)

 

The 2022 PEA assumes that the 2022 PFS plan has been completed. Open pit mining equipment will be relocated to the Kerr deposit to begin prestripping while the Iron Cap block cave is being developed. Year 1 of the 2022 PEA mine life coincides with the first year of mill feed from the Iron Cap deposit. Mill feed from Kerr block cave begins in Year 7. The 2022 PEA production plan produces 14.3 billion pounds of copper, 14.3 million ounces of gold, 68.2 million ounces of silver, and 13.8 million pounds of molybdenum from 1.7 billion tonnes of mill feed over a 39 year mine life. The production schedule is shown in the graph below.

 

2022 PEA Mill Feed Production Schedule

 

 

 

Average annual production is summarized estimated as follows:

 

Average Annual Metal Production

 

    Life of Mine Average  
Average Grades:      
Gold (grams per tonne)     0.43  
Copper (%)     0.43  
Silver (grams per tonne)     2.2  
Molybdenum (parts per million)     24  
Average Annual Production:        
Gold (ounces)     368,000  
Copper (pounds)     366 million  
Silver (ounces)     1.8 million  
Molybdenum (pounds)     0.4 million  

 

Note: Annual production shows total metal contained in copper concentrate, doré, and molybdenum concentrate.

 

Cost allowances for tailings storage and management have been included in the 2022 PEA. Tailing management is envisioned as a combination of technically viable storage approaches that will be refined in future studies to comprise appropriate and responsible solutions depending on best selected locations and available technology.

 

44


 

Capital Costs (2022 PEA)

 

Initial capital cost for the 2022 PEA is estimated at US$1.5 billion with sustaining capital over the 39 year mine life estimated at US$12.8 billion dominated by block cave development capital. Initial capital includes all capital until the first year of mill feed (Year 1). Capital estimates are summarized as follows:

 

2022 PEA Capital Costs (US$ million)

 

    Initial     Sustaining     Total  
    US$ M     US$ M     US$ M  
Direct Costs                  
Mine     828       6,678       7,506  
Process     0       651       651  
Tailings Management Facility     74       664       738  
On-site Infrastructure     26       573       599  
Power Supply/Energy Recovery     0       112       112  
Total Direct Capital     927       8,678       9,606  
Indirect cost     253       1,249       1,502  
Contingency     320       2,824       3,145  
Total Capital     1,500       12,752       14,252  

 

Note: Numbers may not add due to rounding

 

Operating Costs (2022 PEA)

 

Average mine, process and G&A operating costs over the 2022 PEA’s life (including waste mining and on-site power credits, excluding off-site shipping and smelting costs) are estimated at US$11.98 per tonne milled (before base metal credits). A breakdown of estimated unit operating costs is as follows:

 

2022 PEA LOM Average Unit Operating Costs
(US$ Per Tonne Milled)

 

Mining     4.99  
Process     4.31  
G&A + Site Services     1.89  
Tailings Storage/Handling     0.15  
Water Management/Treatment     0.68  
Energy Recovery     -0.09  
Provincial Sales Tax     0.05  
Total Operating Costs     11.98  

 

45


 

Economic Analysis (2022 PEA)

 

A Base Case economic evaluation using a discounted cash flow analysis was undertaken incorporating historical three-year trailing averages for gold, copper and silver metal prices of as of June 20, 2022. This approach is used because it is consistent with the 2022 PFS Base Case. Molybdenum price is based on a recent study for a primary molybdenum project. Two alternate cases are also presented: (i) an Alternate Case that incorporates lower metal prices than used in the Base Case to demonstrate the project’s sensitivity to lower prices; and, (ii) a Recent Spot Case incorporating recent spot prices for gold, copper, silver and the US$/Cdn$ exchange rate. The pre-tax and post-tax estimated economic results in U.S. dollars for all three are as follows:

 

2022 PEA Projected Economic Results (US$)

 

    2022 PEA
Base Case
2022 PEA
Alternate
Case
2022 PEA
Recent
Spot Case
Metal Prices:              
Gold ($/ounce)     1,742     1,500     1,850  
Copper ($/pound)     3.53     3.00     4.25  
Silver ($/ounce)     21.90     20.00     22.00  
Molybdenum ($/lb)     18.00     18.00     18.00  
US$/Cdn$ Exchange Rate:     0.77     0.77     0.77  
Cost Summary:                    
Operating Costs Per Pound of Copper Produced (life of mine)   $ 0.38   $ 0.59   $ 0.32  
Total Cost Per Pound of Copper Produced (inclusive of all capital)   $ 1.44   $ 1.64   $ 1.38  
Pre-Tax Results:                    
Net Cash Flow (billions)   $ 29.8   $ 19.4   $ 40.9  
NPV @ 5% Discount Rate (billions)   $ 9.7   $ 5.8   $ 13.9  
Internal Rate of Return     24.0 %   17.4 %   30.4 %
Payback Period (years)     4.7     7.5     3.9  
Post-Tax Results:                    
Net Cash Flow (billions)   $ 18.5   $ 11.9   $ 25.6  
NPV @ 5% Discount Rate (billions)   $ 5.8   $ 3.3   $ 8.4  
Internal Rate of Return     18.9 %   13.5 %   24.0 %
Payback Period (years)     6.2     8.7     4.4  

 

Note:

 

1. The 2022 PEA is preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is no certainty that the results of the 2022 PEA will be realized. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.
2. Results include consideration of Royalties and Impact Benefit Agreements.
3. Operating and total cost per pound of copper produced are after gold, silver and molybdenum credits.
4. The post-tax results include the B.C. Mineral Tax and provincial and federal corporate taxes.
5. Cash flows are discounted to the start of the 2022 PEA development.
6. Payback years are measured from the first year of mill feed.

 

The 2022 PEA financials are more sensitive to changes in copper price and exchange rate than changes in capital costs and operating costs.

 

Updated Kerr and Iron Cap Resource Estimates

 

The mineral resource estimates for the Kerr and Iron Cap deposits in the 2022 KSM PFS and PEA applied a grade cut-off. The Issuer has given further consideration to its approach to resource estimation for these deposits and decided it is appropriate to apply a mining grade shut-off in resource estimation. This is consistent with the unselective block cave mining method used in the 2022 PEA. When undertaking this new approach, the underground block cave constraining shapes for Kerr and Iron Cap were updated using the same metal prices used in determining the Mitchell and East Mitchell open pit constraining shapes in the 2022 KSM PFS and PEA (US$1,820/oz Au, US$4.20/lb Cu, US$28/oz Ag, and US$ 13.5/lb Mo at a currency exchange rate of 0.83 US$ per 1.00 CDN). Resource models supporting the updated Mineral Resource Estimates have not changed and they are the same models used in the previous resource statement in the 2022 KSM PFS and PEA.

 

46


 

The updated Mineral Resource Estimates for Kerr and Iron Cap, which have been verified and endorsed by Henry Kim P.Geo., an independent Qualified Person and Principal Resource Geologist with Wood Canada Limited, are as follows:

 

  Resource
Category
Tonnes
(millions)
Average Grades Contained Metal

Gold
(gpt)

Copper
(%)
Silver
(gpt)
Moly
(ppm)
Gold
ounces
(millions)
Copper
Pounds
(millions)
Silver
ounces
(millions)
Moly
pounds
(millions)
Kerr Indicated Open Pit 356.9 0.22 0.41 1.1 5 2.5 3,210 13.0 4
Indicated Block Cave 27.4 0.21 0.41 1.5 11 0.2 246 1.3 1
Indicated Total 384.2 0.22 0.41 1.2 5 2.7 3,456 14.3 4
Inferred Open Pit 75.7 0.27 0.22 1.2 5 0.7 360 3.0 1
Inferred Block Cave 2,513.7 0.27 0.35 1.7 21 22.1 19,492 139.3 119
Inferred Total 2,589.3 0.27 0.35 1.7 21 22.8 19,852 142.3 120
Iron
Cap
Indicated Block Cave 471.0 0.38 0.21 4.3 39 5.8 2,206 65.6 40
Inferred Block Cave 2,309.4 0.41 0.27 2.5 31 30.3 13,755 186.3 160

 

Notes:

 

1. The effective date for the Mineral Resource Estimate for Kerr and Iron Cap is January 10, 2024.
2. Mineral Resources are reported inclusive of Mineral Reserves.
3. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
4. Mineral Resources were prepared in accordance with CIM Definition Standards for Mineral Resources and Mineral Reserves (May 10, 2014) and CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines (Nov 29, 2019).
5. Mineral Resources were constrained within mineable shapes depending on the assumed mining methods.
6. The Mineral Resource for Iron Cap deposit has been constrained by conceptual block cave shapes using the following assumptions: metal prices of US$1,820/oz Au, US$4.20/lb Cu, US$28/oz Ag, and US$13.5/lb Mo at a currency exchange rate of 0.83 US$ per 1.00 CDN$; Mining cost of $5.64/t; $11/t process + G&A costs; Total operating cost used for the block cave shut-off was rounded to $16.5/t; Copper concentrate terms are 96% payable Cu; 97.8% payable Au; 90% payable Ag. Offsite costs (smelting, refining, transport, and insurance) are $281 per tonne of concentrate; doré terms are $2/oz Au offsite costs (refining, transport, and insurance), 99.8% Au payable, and 90% Ag payable; metallurgical recovery projections vary depending on metallurgical domain and metal grades and are based on metallurgical test work, average metallurgical recoveries are: 64% for gold, 87% for copper, 50% for silver and 27% for molybdenum. The block cave constraining shapes assume a maximum height of draw of 750m and minimum height of draw of 195m, and a minimum span dimension for each of the footprints of 200m.
7. The Mineral Resource for Kerr deposit has been constrained by a conceptual open pit and conceptual block cave shapes below the pit.
8. The Kerr pit constraining shape uses the following assumptions: metal prices US$1,300/oz Au, US$3.00/lb Cu, US$20/oz Ag, and US$9.7/lb Mo at a currency exchange rate of 0.79 US$ per 1.00 CDN$; Mining cost of $1.8/t; $9/t process + G&A costs; Copper concentrate terms are 96% payable Cu; 97.8% payable Au; 90% payable Ag. Offsite costs (smelting, refining, transport, and insurance) are $281 per tonne of concentrate; doré terms are $2/oz Au offsite costs (refining, transport, and insurance), 99.8% Au payable, and 90% Ag payable; metallurgical recovery projections vary depending on metallurgical domain and metal grades and are based on metallurgical test work, average metallurgical recoveries are: 63% for gold, 83% for copper, 53% for silver and 7% for molybdenum. The Kerr constraining pit uses an assumed pit slope of 45 degrees. A mining restriction surface was used to limit the depth of the conceptual Kerr constraining pit in order to leave a reasonable quantity of potential underground material for the Kerr block cave resource constraining shape. The pit shell does not overlap with the block cave mining shape below the pit.

 

47


 

9. The Kerr block cave constraining shapes use the following assumptions: metal prices of US$1,820/oz Au, US$4.20/lb Cu, US$28/oz Ag, and US$ 13.5/lb Mo at a currency exchange rate of 0.83 US$ per 1.00 CDN$; Mining cost of $6.82/t; $11/t process + G&A costs; Total operating cost used for the block cave shut-off was rounded to $18/t; Copper concentrate terms are 96% payable Cu; 97.8% payable Au; 90% payable Ag. Offsite costs (smelting, refining, transport, and insurance) are $281 per tonne of concentrate; doré terms are $2/oz Au offsite costs (refining, transport, and insurance), 99.8% Au payable, and 90% Ag payable; metallurgical recovery projections vary depending on metallurgical domain and metal grades and are based on metallurgical test work, average metallurgical recoveries are: 55% for gold, 88% for copper, 49% for silver and 17% for molybdenum. The block cave constraining shapes assume a maximum height of draw of 750m and minimum height of draw of 195m, and a minimum span dimension for each of the footprints of 200m.
10. All material within the block cave constraining shapes have been reported in the Mineral Resource statements using a shut-off approach as block caving is a non-selective mining method.
11. Net Smelter Return (NSR) cut-off is $9/t for the Kerr open pit using the following assumptions: metal prices of US$1,300/oz Au, US$3.00/lb Cu, US$20/oz Ag, and US$ 9.7/lb Mo at a currency exchange rate of 0.79 US$ per 1.00 CDN$; Copper concentrate terms are 96% payable Cu; 97.8% payable Au; 90% payable Ag. Offsite costs (smelting, refining, transport, and insurance) are $281 per tonne of concentrate; doré terms are $2/oz Au offsite costs (refining, transport, and insurance), 99.8% Au payable, and 90% Ag payable; metallurgical recovery projections vary depending on metallurgical domain and metal grades and are based on metallurgical test work with average metallurgical recoveries of: 63% for gold, 83% for copper, 53% for silver and 7% for molybdenum.
12. “Moly” = “Molybdenum”
13. Numbers may not add due to rounding.
14. Unless noted otherwise, dollars reported herein are Canadian dollars.

 

The resource restatements reflect gains from a consistent application of metal price parameters. Inferred mineral resources increased by 5.9 million ounces of gold, 3.3 billion pounds of copper, 55.4 million ounces of silver and 51 million pounds of molybdenum. Indicated mineral resources increased by 0.3 million ounces of gold, 0.2 billion pounds of copper, 3.5 million ounces of silver and 2 million pounds of molybdenum.

 

The mineral resources within the 2022 PEA mine plans for Kerr and Iron Cap are subsets of, and consistent with, the updated mineral resources, and the mineral resources within the 2022 PEA mine plan are not impacted by the updated underground block cave constraining shapes.

 

The changes to the Mineral Resources are not a result of any changes to the resource models, but rather using a shut-off grade strategy for the Kerr and Iron Cap underground resources and aligning the metal price assumptions for the constraining shapes with other deposits on the KSM Project. The increased mineral resources compared to the previous estimate would only be mined after the 33 years of mine life based on the open pit Mineral Reserves.

 

Early KSM Construction Works

 

Under the B.C. Environmental Assessment Act, a project’s EAC is subject to expiry if the project has not been “substantially started” by the deadline specified in the EAC. Once the ‘substantially started’ designation is achieved, the EAC is no longer subject to expiry. The deadline specified in the EAC for the KSM Project to be “substantially started” is July 29, 2026.

 

In 2021, the Issuer began early construction activities at the KSM Project to achieve the “substantially started” designation by the July 29, 2026 deadline. Construction of infrastructure continued in 2022 and 2023 while the Issuer is searching concurrently for a partner for the KSM Project. The early construction work is focused on site access, camps, power supply and preparation for construction of infrastructure on the critical path for building the mine.

 

48


 

The work completed to date includes completing construction of the Glacier Creek fish habitat offsetting ponds, completing the initial 3.2 km of the CCAR, completing the initial 17.7 km of the TCAR, including the Bell-Irving River Bridge, construction of a 210-person camp near the beginning of the TCAR, preparation of the site where the Mitchell Valley camp will be constructed, access tracks for the first 13 transmission line structure sites, clearing for the first 17.5 km of the route and geotechnical drilling for the first 17.6 km of the 30 km long transmission line, and tree clearing for the North Treaty Creek Access Road, the substation at the PTMA, the Mitchell Portal for the MTT, the Camp near the PTMA and certain areas where the Water Storage Dam is to be located. In addition, in February, 2022, KSMCo entered into an agreement with BC Hydro covering the design and construction of the “TCT” by BC Hydro to supply construction phase hydro-sourced electricity to the KSM Project. The TCT is located near where KSM’s Treaty Creek Access Road meets Highway 37, 18 km south of Bell 2. BC Hydro has completed construction of the pad for the TCT and begun constructing the buildings.

 

With the extent of the work completed to the end of 2023, the Issuer decided it would submit an application to have the Environmental Assessment Office determine the KSM Project has been “substantially started”. This application was submitted on January 16, 2024 and is expected to take 9 - 12 months, but with the coming provincial election in British Columbia later this year a decision could take longer.

 

The Issuer has reduced the pace of additional construction as it works on attracting a major mining company to build and operate the KSM Project. In 2024 construction will continue on the TCT and clearing work is planned to begin at the location of Taft Creek fish habitat offsetting ponds.

 

BC Hydro and TCT Construction

 

The Issuer entered into a Facilities Agreement with BC Hydro on February 28, 2022 under which BC Hydro will design and construct the TCT, which will permit the Issuer to draw hydro power for its KSM Project from the Northwest Transmission Line. Under the terms of the Facilities Agreement, the Issuer agreed to pay BC Hydro for the work to be performed at an estimated cost of $77.1 - $98.1 million and the issuer was required to pay $28.9 million by April 1, 2022, a further $43.7 million by January 10, 2023 and the remaining $10.6 million by December 31, 2023. In late 2023, BC Hydro advised the Issuer that it had incurred cost overruns and the expected cost for completion of the work would be significantly more than the original estimate. The parties have since discussed the costs and timing for completion of the balance of the work and the payment schedule. On March 21, 2024, the Issuer and BC Hydro agreed to the terms of a Facilities Agreement Amendment Agreement under which the Facilities Agreement was amended. Under the Facilities Agreement, as amended, (the “Amended Facilities Agreement”) BC Hydro will seek an updated estimate of costs to complete the TCT, expected in Q2 2024, BC Hydro acknowledges receipt of $83.1 million from the Issuer and the Issuer has agreed to pay BC Hydro to complete the TCT construction $14 million by July 1, 2024, a further $40 million by December 1, 2024, and then additional amounts by July 1, 2025 and by a date after November 30, 2025 based on the updated estimate of costs to be prepared by BC Hydro. The Amended Facilities Agreement targets the last quarter of 2026 as the completion date for the construction of the TCT.

 

Independent Geotechnical Review Board

 

In January, 2015, the Issuer established an Independent Geotechnical Review Board (“IGRB”) for the KSM Project to review and consider the KSM Project’s TMF and WSF with a focus on their structural stability and integrity. The IGRB is in place to provide independent, expert oversight, opinion and advice to Seabridge on the design, construction, operational management and ultimate closure of the TMF and WSF. The IGRB has unimpeded access to all technical data necessary to enable them to assess KSM’s TMF and WSF on an ongoing basis to ensure that these structures meet internationally accepted standards and practices which effectively minimize risks to employees, lands and communities.

 

49


 

There are four core members of the IGRB and three support members whose expertise will be called upon as needed. The IGRB comprises the following leading experts in their fields:

 

Name   Education and Experience
Dr. Ian Hutchison (Chairman, Core Member)   Ph.D. in Civil Engineering and has over 45 years of experience in the planning design and construction of mining and heavy civil engineering facilities in North and South America and Southern Africa.
Dr. Gabriel Fernandez (Core Member)   Civil Engineer, M.S. in Soil, Ph.D. in Geotechnical Engineering and has over 45 years of experience.
Mr. Terry Eldridge (Core Member)   P.Eng., FEC and has over 35 years of experience in the investigation, design, construction and closure of mine waste management facilities.
Mr. Anthony Rattue (Core Member)   P.Eng. and has over 45 years of experience in geotechnical engineering.
Dr. Leslie Smith (Support Member)   Professor in the Department of Earth, Ocean and Atmospheric Sciences at the University of British Columbia, where he holds the Cominco Chair in Minerals and the Environment, and has 45 years of experience in hydrogeology in the topic areas of groundwater flow and contaminant transport, numerical modeling, groundwater – surface water interactions, and applications of hydrogeology in mining.
Mr. Jim Obermeyer (Support Member)   M.S. in Civil Engineering with a specialty in Geotechnical Engineering, a licensed professional engineer in Colorado, Arizona, New Mexico, Montana and Wyoming, and has 45 years of experience in Civil and Geotechnical Engineering and managing and coordinating multidisciplinary projects.
Dr. Jean Pierre Tournier (Support Member)   Ph.D. in Civil Engineering - Soil Mechanics and has 40 years of experience in the design and construction of hydroelectric developments.

 

The initial IGRB review of Seabridge Gold’s TMF and WSF design was conducted between March 9 and 12, 2015 and was developed to answer five questions: (1) Are dams and structures located appropriately; (2) Are dam sections, materials, construction methods and sequencing appropriate for the site; (3) What are the greatest design, construction and operating risks; (4) Are the facilities designed to operate effectively, and: (5) Are the facilities designed to be safe? The Board concluded that it was satisfied with the project’s designs and responded favourably to all five questions, as highlighted in the Board’s first report which was released in April 2015. Additionally, the Board presented a series of recommendations for Seabridge to consider during the ongoing engineering design of TMF and WSF as advancement continues.

 

Since 2015 the IGRB has held ten meetings, the most recent of which occurred on March 7-8, 2024.

 

All completed IGRB reports issued are posted to the Issuer’s KSM Project website.

 

Courageous Lake Project

 

The Courageous Lake Project is a gold project located approximately 240 kilometers northeast of Yellowknife in the Northwest Territories, Canada. Seabridge has a 100% interest in the project, subject to a 2% NSR on certain portions of the property. The Project is in the Slave Structural Province within the Courageous Lake greenstone belt (“CLGB”), which is a steeply east dipping homocline sequence of metavolcanic and metasedimentary rocks of the Yellowknife Supergroup. Felsic volcanic rocks and their intrusive equivalents in the CLGB were derived from peraluminous, sub-alkaline magmas of calc-alkaline affinity. These felsic volcanic lithologies are the predominant host of the FAT deposit.

 

50


 

The property lies in a historic mining district and includes two past producing gold mines. Year round access is available by air only, either by fixed wing aircraft to the airstrip at the former Salmita mine six kilometers to the south, or via float-equipped aircraft to several adjacent lakes. During mid-winter, access is available via a winter road which branches from the main Tibbitt to Contwoyto winter road.

 

The Issuer purchased the Courageous Lake project on July 31, 2002 from Newmont Canada Limited and Total Resources Canada Limited. It acquired 17 mining leases covering 18,178 acres. Seabridge has paid US$5.5 million for the Project and the mineral tenures are subject to a 2.0% NSR. Upon acquiring the Courageous Lake project, Seabridge assigned its right thereto to its wholly owned subsidiary, Seabridge Gold (NWT) Inc. (formerly, 5073 N.W.T. Ltd.). The obligations of Seabridge Gold (NWT) Inc. (“Seabridge NWT”) under the agreement, including the payment of the royalty, is secured by a debenture under which the vendors have been granted a security interest in the Courageous Lake property.

 

In 2004, Seabridge entered into an option to acquire an additional property (“Red 25”) in the area. Seabridge completed the payments required to acquire the property in 2017 and now holds title to Red 25. Subsequent to this acquisition, Seabridge staked contiguous open ground totaling an additional 49,133 acres in 42 mining claims of which a portion is subject to the terms of the purchase agreement with Newmont/Total, including the 2% royalty.

 

As of December 31, 2023, the Courageous Lake property is comprised of 85 Territorial mining leases and 4 Federal (AANDC) mining leases, having a combined area of 50,240 hectares. Seventeen of the mining leases were acquired from Newmont/Total as described above. The mining leases acquired from Newmont/Total are encumbered by two Royalty Agreements and two Debentures registered in favour of Newmont Canada Limited and Total, respectively. The royalties apply to a 2 km area of interest from and parallel to all exterior boundaries of the mining leases originally acquired from Newmont/Total.

 

Considerable exploration work was completed at the property before it was acquired by Seabridge in 2002. Seabridge completed additional extensive exploration and advancement on the property, which led to the preparation of a preliminary feasibility study in 2012. After the preparation of the pre-feasibility study, exploration activities on the property targeted new deposits along the CLGB. In March, 2014, the Issuer announced a resource estimate for a newly discovered higher grade deposit at Walsh Lake. After the announcement of the resource estimate in 2014 the Issuer only completed very limited exploration work on the Property from 2015 to 2017. However, in February, 2018 a new drill program started on additional targets for new deposits along the CLGB and identified two new targets for further drilling, Marsh Pond and Olsen. No further exploration work has been completed at the property.

 

In 2023 the Issuer decided to study a new approach to developing the Courageous Lake Project; an approach that looked for a smaller but more profitable mining operation. On January 16, 2024 the Issuer released the results of a new PFS for the Courageous Lake Project. The 2024 PFS all open pit mine plan shows a considerably more sustainable and profitable mining operation than its 2012 predecessor, with reduced initial capital, lower strip ratio, higher grade and smaller mine footprint. The 2024 PFS presents a development plan for the production of 2.5 million ounces of gold (from 33.9 Mt at 2.6 g/t in proven and probable reserves) over the 12.6 year life of mine with an annual average production of 201,000 ounces per year. The 2024 PFS plan estimates a 2.8 year payback of US$ 747 million initial capital with after tax IRR of 20.6% and NPV5% of US$523 million using an average gold price of US$1850/ounce. A stand-alone analysis of the potential expansion below the 2024 PFS mine plan was also announced as a PEA. None of the Mineral Resources used in the 2024 PEA mine plan have been used in the 2024 PFS.

 

51


 

The 2024 PFS mine plan uses an open pit truck and shovel operation. Mill feed would be processed onsite by crushing, grinding and flotation. Flotation concentrate would be pressure oxidized and cyanide leached to produce a gold doré. Waste rock would be directly hauled to a co-placement storage facility (CPSF) along with flotation tailings. Flotation tailings will be co-placed with waste rock while neutralized leach tailings will be placed in a separate facility. The 2024 PFS pit was restricted from mining below the base of the permafrost to minimize the ingress of saline groundwater.

 

The 2024 PEA presents a mine plan with production of 3.26 million ounces of payable gold over the 15.9 year mining operation.

 

Iskut Project

 

On June 21, 2016, the Issuer completed its acquisition of all of the outstanding shares of SnipGold Corp. (“SnipGold”) under a Plan of Arrangement.

 

SnipGold Corp. (formerly Skyline Gold Corporation) and its subsidiaries own the Iskut Project, a contiguous block of mineral claims in excess of 226 sq km in size in the Golden Triangle Area of northwestern B.C. which was assembled by SnipGold in a series of transactions that began in 2005. It is located about 30 kilometers from the KSM Project. The land package has undergone intermittent exploration with the majority of the historic work carried out in the late 1980s and early 1990s. This early work was undertaken by over 30 independent operators and their efforts have highlighted numerous targets which have seen little to no follow up work in the 20 years before the Project was acquired by the Issuer. SnipGold completed a resource estimate for the Bronson Slope Porphyry Deposit on its Iskut property in 2010. The Iskut Project includes the Johnny Mountain Mine site, which is now closed, and is adjacent to the Snip Mine.

 

Exploration by the Issuer

 

The Issuer conducted a series of exploration programs in each of 2016 through 2020 and led the Issuer to focus its work on the Quartz Rise lithocap. A lithocap is a clay-silica-rich alteration feature which is a product of hydrothermal fluids escaping at the top of a porphyry mineralizing system. The earlier programs resulted in the identification of a diatreme, which are commonly found above and adjacent to porphyry mineral systems and are their source of heat and fluids. Detailed work on the surface expression of the diatreme found that it plunges to the south toward the highest intensity chargeability anomaly and geochemical signature. The geophysical footprint was therefore expanded to the south and southwest into an area where glacial erosion had exposed the system vertically to a depth of over 800 meters. Surface mapping and sampling of this vertical exposure found extensive gold and copper anomalies within favorable thermally altered wall rock. Several intrusions have been identified in association with this diatreme and these features have been age dated to about 186 million years, the same age as the Issuer’s KSM deposits. As a result of this work, the Issuer believes it has identified a large intrusive system at relatively shallow depth that is likely responsible for the Quartz Rise Lithocap and elevated gold and copper concentrations within a geological environment remarkably similar to Seabridge’s nearby KSM Project.

 

52


 

Follow-up drilling in 2020 tested geophysical anomalies below the Quartz Rise Lithocap and results were consistent with the alteration halo from a large porphyry system and included indications of higher grade copper mineralization (0.62% copper over 31.8 m). Mineralized intervals of up to 158 meters grading 0.16 g/T gold and 0.16% copper were intersected, indicating that drilling was in the upper part of a gold-copper porphyry. The Issuer planned to test for a gold-copper porphyry mineral system below the depth of the encouraging intercepts in the 2020 program in a target area refined from the drill data and drawing on experience at KSM, however the Issuer experienced difficult drilling conditions and, based on results it was getting from drilling at Bronson Slope in 2022, it decided to direct more of its efforts to that target.

 

In 2022 it was decided to commence drilling at Bronson Slope, which contains a measured and indicated resource of 187Mt of 0.36 g/t Au, 0.12% Cu. 2022 core drilling discovered an unusually large, well-mineralized breccia pipe beneath the historic Bronson Slope skarn deposit at its 100%-owned Iskut project in northwestern British Columbia’s Golden Triangle. The extensive quartz-magnetite breccia pipe, which has been identified as the source of the Bronson Slope deposit, holds broadly disseminated gold and copper mineralization from multiple hydrothermal eruptive events believed to originate from a major porphyry intrusive source.

 

Drilling in 2023 at Bronson Slope confirmed an extensive area of magmatic-hydrothermal alteration sourced from the high fluid flux of a porphyry mineral system that generated the unusually large explosive breccia pipe discovered in 2022 and the intermediate epithermal occurrence that expands the known Bronson Slope copper-gold deposit. Results identified broad zones of sericite-pyrite-carbonate alteration associated with continuous low gold grades. Drilling also included some deeper holes to evaluate the source of the quartz-magnetite breccia pipe, which found narrow intervals of intrusive rocks within the breccia but the source of the pipe has not been identified. The Issuer is planning an intensive deeper drill program for 2024.

 

Regional geophysical surveys in 2020 and 2021 show a distinct regional trend that seems to be a primary control on the distribution of mineralized intrusive centers. All the prospective intrusions, including Quartz Rise, Bronson Slope and Snip North, fall along this regional trend and each surveyed intrusion on this trend has a coherent resistivity anomaly at depth like those recognized at KSM. In 2023, the Issuer initiated its first drilling at the Snip North target, located where historical drill data coincides with this regional trend. Shallow historical drill holes provided evidence of gold-copper mineralization which coincided with a strong positive magnetic anomaly surrounded by a low resistivity response seen in geophysical surveys. The drill program found well-preserved upper parts of a copper-gold porphyry and aligns with the regional trend. The last 3 holes drilled each returned widths of 200 plus meters of gold ranging from 0.48 to 0.80 g/t. The Issuer will use the drill results to vector towards improving mineralization for drilling in 2024.

 

An ongoing and rigorous quality control/quality assurance protocol is employed in all Seabridge drilling campaigns, including the program at the Iskut Project. This program includes blank and reference standards. Cross-check analyses include metallic screen fire assay techniques and external laboratory analysis on at least 10% of the drill samples.

 

53


 

Remediation at Bronson Slope and Johnny Mountain Mine Site

 

When the Issuer acquired the Iskut Project in 2016, it included areas of historical mining activity, including the Johnny Mountain Mine, a former gold producer. In order to address legacy issues at the property, the Issuer implemented a robust environmental program. This program included a comprehensive site investigation and evaluation of best practices for future remediation on the property, drawing from the Seabridge environmental team’s experiences at KSM and other North America sites and input from the local Indigenous group, the Tahltan Nation, and BC regulatory officials. The Issuer’s multi-year remediation plan has been ongoing since 2017 and most of the work at the Project has been performed by local contractors, Tahltan employees and the Tahltan Nation Development Corporation.

 

The remediation work performed at the Johnny Mountain mine site to date includes:

 

dismantling the abandoned fuel tank farm
     
initiating hydrocarbon remediation at and in the vicinity of the former fuel tank farm
     
removing hazardous materials from the mill building and sending it offsite to a licensed hazardous waste disposal facility
     
demolishing the mill building
     
closing underground adits and portals and cleaning up the site, generally
     
conducting a dam safety review and implementing an aquatic affects monitoring program
     
excavation and relocation of buried waste material discovered at unauthorized sites
     
moving waste rock from portal pads to the tailings management facility to be stored underwater

 

3 Aces Project

 

On May 25, 2020, the Issuer acquired the 3 Aces Project in southeast Yukon for 300,000 Common shares of the Issuer and potential additional payments of $1 million upon confirmation of a 3 Aces NI-43-101 compliant mineral resource of 2.5 million ounces of gold and a further $1.25 million upon confirmation of an aggregate mineral resource of 5 million ounces of gold. The Issuer also granted the vendor a 0.5% NSR royalty.

 

3 Aces is a district scale, orogenic-gold project consisting of 1,536 claims covering approximately 31,400 ha located in a readily accessible part of southeastern Yukon. The target concept for this project is consistent with some of the biggest and richest gold deposits in the world, including the California Mother Lode Belt, Juneau Gold Belt, Murentau in Uzbekistan and Obuasi in Ghana. Historical work has identified a broad area of gold-in-soil extending more than 20 kilometers (12.4 miles) along strike and drilling in the Central Core Area has progressed to a point where, with additional exploration drilling, the property could potentially advance to an initial resource with exceptional grade.

 

The Property is on the eastern margin of the Selwyn Basin, a thick package of sedimentary rocks extending across the Yukon and host to several enormous base metal deposits (Howard’s Pass District). Hyland Group host rocks, the basal unit of the Selwyn Basin, are interbedded clastic and carbonate sedimentary rocks exposed near a regional tectonic boundary. Polyphase fold and fault systems overprint the stratigraphy, creating ideal traps for gold-bearing fluids expressed as quartz veins. At 3 Aces, discrete quartz veins containing arsenopyrite-pyrrhotite-pyrite and free gold are found within a broad zone of gold-bearing iron carbonate-clay alteration envelopes which constrain this exploration target.

 

Past drilling has encountered a significant number of gold rich zones on the deformed stratigraphic/structural contacts at 3 Aces. By early 2019 the project had about 300 drill holes in it; 37% of these encountered +5.0 g/t gold intersections and 27% have returned +8.0g/t gold intervals. Many of these holes were close-space off-sets on high-grade veins that crop out, but all veins identified in the Central Core Area have yielded high grade intersections. Significant effort was expended by the previous owner to ensure that sampling of these high grade, nuggety intervals produced reliable and repeatable assay results. A sampling protocol is now in place to achieve reliable results.

 

54


 

The following table summarizes selected intervals from previous drilling.

 

Hole ID DH Type From
(meters)

To
(meters)

Intercept
(meters)
Gold
Grade
(g/T)
Spades High Grade Zone
3A16-032 RC 16.76 27.43 10.67 32.86
3A16-042 RC 17.53 24.38 6.85 25.61
3A16-044 RC 17.53 35.05 17.52 3.65
3A17-100 RC 19.05 25.91 6.86 20.15
3A17-124 RC 6.10 10.67 4.57 58.75
3A17-132 DD 20.00 33.30 13.30 6.69
3A17-127 RC 12.95 19.05 6.10 22.30
3A17-133 DD 23.80 40.00 16.80 20.50
and 57.50 65.00 7.50 13.92
3A17-138 DD 7.50 15.50 8.00 50.40
3A17-157 DD 19.00 23.20 4.20 20.04
3A17-208 RC 0.76 5.33 4.57 81.35
3A17-209 RC 2.29 23.62 21.33 18.33
3A17-211 RC 1.52 9.91 8.39 14.05
3A17-218 RC 5.33 18.29 12.96 14.19
3A17-220 RC 1.52 15.24 13.72 43.02
3A17-224 RC 1.52 11.43 9.91 21.81
3A17-238 RC 0.76 9.91 9.15 41.03
Hearts Zone
3A16-048 RC 96.01 104.39 8.38 6.39
3A16-054 RC 38.86 58.67 19.81 4.76
3A16-055 RC 51.05 60.20 9.15 9.37
3A16-082 DD 42.67 60.96 18.29 16.75
3A16-084 DD 103.98 115.82 11.84 1.72
3A16-085 RC 86.87 96.01 9.14 8.65
3A17-203 RC 10.67 30.48 19.81 3.32
Other Occurrences
3A17-143 DD 12.70 32.00 19.30 16.15
3A17-144 RC 5.33 52.58 47.25 1.11
3A17-147 DD 13.00 15.50 2.50 15.51
and 18.50 22.00 3.50 21.44
3A17-275 RC 40.39 48.77 8.38 5.24
3A18-335 DD 16.20 33.06 16.86 1.35
3A17-175 RC 32.00 33.53 1.53 36.33

 

The 2021 exploration program at 3 Aces commenced with line cutting to support a geophysical survey. A CSAMT geophysical survey program designed to aid in building a 3-D earth image was initiated. The geophysical results were integrated with historical drilling, which provided context to the high-grade gold zones identified on the property. A 3-D model was completed for the gold mineralization in the Central Core Area of the 3 Aces Project and plans were developed to test the model late in the 2021 season. Permitting delays resulted in the drilling program being deferred to 2022.

 

55


 

An exploration permit was finally granted on September 12, 2022 and the Issuer decided to initiate a reduced program involving testing the Issuer’s 3-dimensional model around the Hearts zone with the time remaining in the season. One drill hole pierced the Hearts Main Zone structure on the limb of a secondary anticline intersecting a broad zone of gold mineralization with a high-grade core and confirmed the predictions of the model. The assays from this hole were consistent with previous intersections. Another drill hole in the Hearts Main Zone was drilled down dip and confirmed continuity of the structure but as sheared intervals or splays. Additional drilling is warranted for further characterization of the structure. Two holes were drilled into the Hearts West Zone, which hosts a broad gold and arsenic in soil anomaly and extensive surface exposures as well as being deformed by secondary anticlines and synclines with thrust faults on the limbs of the folds. Both of the two holes drilled into this target zone intersected low-grade mineralization in host rocks similar to those at the Hearts Main Zone.

 

The Issuer developed a comprehensive exploration model from its drill results and set out to test it in 2023. This model predicts high grade gold localized in the limbs of second-order folds (F2), preferentially at the contacts between thick phyllite sequences and coarse interbedded sandstones and conglomerates. Multiple F2 synforms and antiforms had been identified in the Central Core Area but have not been systematically evaluated. The results from drilling in 2023 successfully confirmed these key parameters controlling gold deposition on the property and provided a clear set of directions for follow-up evaluation and resource delineation. These results equip the exploration team with the tools to identify additional promising targets and expand known gold zones at 3 Aces. The Issuer now sees a path for bringing the property’s extensive gold mineralization into resource configurations.

 

Snowstorm and Goldstorm Projects

 

The Snowstorm Project is strategically located at the projected intersection of three of the most important gold trends in Northern Nevada: the Carlin Trend, the Getchell Trend and the Northern Nevada Rift Zone (see Figure 5). The Snowstorm property consists of 977 mining claims covering more than 38 sq miles and 5,800 acres of fee lands. The Issuer also holds an extensive package of data generated by previous operators. Although potential targets are hidden under Tertiary cover, the historic data supports the project’s outstanding exploration potential. Snowstorm is contiguous and on strike with several large, successful gold producers including the Getchell/Turquoise Ridge, Twin Creeks Mines operated by Nevada Gold Mine Corp. (a joint venture between Barrick Gold and Newmont Mining) and Hecla Mining Company’s Midas and Holister operations.

 

The Issuer’s work before 2020 determined that the project, located 6 kilometers north of Twin Creeks and 15 kilometers northwest of Turquoise Ridge, has the permissive stratigraphic host rocks and structures found at these two successful gold mines. These carbonate rocks are intercalated with basaltic tuff and sills characteristic of Getchell-style deposits. Additional magnetotelluric (MT) surveys by Seabridge extended the most promising setting east into a previously unexplored area. Results from the MT survey improved the Issuer’s understanding of the fault patterns and regional deformation style at Snowstorm.

 

56


 

The 2020 program was designed to test magnetotelluric (MT) structures in an unexplored area east of previous exploration drilling. The drilling was planned to deliver definitive data on whether the MT structures provided pathways for gold-bearing fluids. Two holes tested a shallow dipping geophysical target near multiple converging northeast and northwest trending fault zones. A third angled hole was designed to cross a northeast structure and test the same shallow dipping geophysical target. The fourth hole tested a large low resistivity anomaly, hanging wall to the shallow dipping geophysical response and into the core of an interpreted fold. Results from the four drill holes completed in 2020 provided positive outcomes in our search for gold-bearing fluid pathways. Two of the holes encountered intensely altered intermediate intrusive rocks sited at stratigraphic breaks. These intrusive rocks and wall rocks around the intrusions are sheared and contain abundant introduced silica with concentrations of gold, arsenic and silver. This drilling confirmed that discrete gold-bearing intervals are hosted within a similar structural setting and rocks as the Turquoise Ridge Mine.

 

Figure 5 – Location of Snowstorm Project

 

 

 

The 2021 program was designed to off-set these previous intersections toward a structure with a topographic expression which is projected into the Paleozoic section using magnetotelluric (MT) geophysical readings. The surface expression of this structure has produced a significant arsenic in soil anomaly. The initial test terminated above the target due to down hole conditions. The second hole reached the target and cut intervals of intermediate intrusive rocks between 1,301 and 1,358 meters. This interval returned gold and arsenic concentrations similar to results from the earlier drilling.

 

Work at Snowstorm in 2023 targeted drill testing north northeast trending structures identified in MT surveys. These features are analogous to mineralized structures in the operating mines of the area. Drilling was targeted at intersections of the structures and carbonate host rocks. Results showed significant off-set on the structures and the target stratigraphy was beyond the capabilities of the drilling equipment. Ongoing work is now focused on refining the Paleozoic stratigraphy and evaluating other geophysical surveys that can image the potential targets.

 

The Goldstorm property consists of 134 mining claims and 1,160 leased acres (totaling approximately 3,900 acres or 15.9 km2) located about 3 km to the east of Seabridge’s Snowstorm Property. Goldstorm has had limited exploration to date. Previous operators identified a series of northwest trending veins that showed strong pathfinder geochemistry and highly anomalous gold results. A surface trench on one of these veins yielded 3.0 meters of 9.0 g/T gold and 44.0 g/T silver. Mountain View’s limited drill testing of this vein returned promising grades including an intersection of 2.0 meters assaying 5.50 g/T gold of which 1.0 meter graded 9.29 g/T gold and 73g/T silver. Historical information continued to be compiled in 2022 and field reviews conducted.

 

57


 

In 2022, an initial surface exploration program was completed at Goldstorm. The program employed geological mapping, surface sampling and a short wave infrared survey. This work provided context to previous drilling programs and identified untested structural controls with chemical and mineral characteristics indicative of Northen Nevada Rift epithermal mineral systems. In 2024, work is planned to establish access costs and complete permitting for drill testing the project.

 

Glossary of Technical Terms

 

 

In this AIF, the following technical terms have the following meanings:

 

Alteration – Any change in the mineral composition of a rock brought about by physical or chemical means.

 

Anticline – Landform of folded strata that is convex upward and whose core contains the stratigraphically oldest rocks.

 

Antiform – Referring to an anticline, part of a folded sequence of rocks that have the form of an anticline

 

Breccia – A rock in which angular fragments are surrounded by a mass of fine-grained minerals.

 

Breccia Pipe – A breccia body, generally with an aspect ratio of a longer vertical dimension than the surface expression of the breccia.

 

Carbonate – Sediment formed by the organic or inorganic precipitation from aqueous solution of carbonates of calcium, magnesium, or iron; e.g., limestone and dolomite.

 

Chalcopyrite – A sulphite mineral of copper and iron.

 

Clastic – Fragments of minerals and rocks that have been moved individually from their places of origin.

 

Cut-off grade – The lowest grade of mineralized material that qualifies as reserve in a deposit, i.e.: contributing material of the lowest assay that is included in a reserve estimate.

 

Diatreme – A breccia filled body that formed by a gaseous explosive eruption.

 

Diorite – An intrusive igneous rock.

 

Dip – The angle that a structural surface, a bedding or fault plan, makes with the horizontal, measured perpendicular to the strike of the structure.

 

Disseminated – Where minerals occur as scattered particles in the rock.

 

Fault – A fracture or break in rock along which there has been movement.

 

58


 

Feasibility Study – A comprehensive technical and economic study of the selected development option for a mineral project that includes appropriately detailed assessments of applicable considerations used to convert Mineral Resources to Mineral Reserves together with any other relevant operational factors and detailed financial analysis that are necessary to demonstrate, at the time of reporting, that extraction is reasonably justified (economically mineable). The results of the study may reasonably serve as the basis for a final decision by a proponent or financial institution to proceed with, or finance, the development of the project.

 

Felsic – An adjective describing an igneous rock having mostly light colored minerals and rich in silica, potassium and sodium.

 

Fracture – A break or crack in rock.

 

Geochemistry – The study of the chemical properties of rocks.

 

Grade – The metal content of rock with precious metals. Grade can be expressed as troy ounces or grams per tonne of rock.

 

Greywacke – A dark grey, firmly indurated, course-grained sandstone that consists of poorly sorted, angular to subangular grains of quartz and feldspar, with a variety of dark rock and mineral fragments embedded.

 

Hydrothermal – The products or the actions of heated waters in a rock mass such as a mineral deposit precipitating from a hot solution.

 

Hydrothermal alteration – The process by which heated or superheated water/solutions alter the chemistry of the rocks they circulate through.

 

Igneous – A primary type of rock formed by the cooling of molten material.

 

Indicated Mineral Resource – That part of a Mineral Resource for which quantity, grade and quality, densities, shape and physical characteristics can be estimated with sufficient confidence to allow the application of Modifying Factors (the considerations used to convert Mineral Resources to Mineral Reserves) in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing information and is sufficient to assume geological and grade or quality continuity between points of observation. An Indicated Mineral Resource has a lower level of confidence than that applying to a Measured Mineral Resource and may only be converted to a Probable Mineral Reserve.

 

Inferred Mineral Resource – That part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.

 

Intrusion; intrusive – Molten rock that is intruded (injected) into spaces that are created by a combination of melting and displacement.

 

Lithocap – A surficial clay-silica-rich alteration feature formed as a product of hydrothermal fluids escaping at the top of an intrusion-related mineralizing system.

 

59


 

Measured Mineral Resource – That part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are estimated with confidence sufficient to allow the application of Modifying Factors (the considerations used to convert Mineral Resources to Mineral Reserves) to support detailed mine planning and final evaluation of the economic viability of the deposit. Geological evidence is derived from detailed and reliable exploration, sampling and testing and is sufficient to confirm geological and grade or quality continuity between points of observation. A Measured Mineral Resource has a higher level of confidence than that applying to either an Indicated Mineral Resource or an Inferred Mineral Resource. It may be converted to a Proven Mineral Reserve or to a Probable Mineral Reserve.

 

Mineral – A naturally formed chemical element or compound having a definitive chemical composition and usually a characteristic crystal form.

 

Mineralization – A natural concentration in rocks or soil of one or more metalliferous minerals.

 

Net smelter return/NSR value – When used herein in reference to cutoff grades, NSR is calculated to determine the recoverable value of a mass of mineralized rock using prices and process recoveries for each metal accounting for all off-site losses, transportation, smelting and refining charges.

 

Net smelter return royalty/NSR royalty – A phrase used to describe a royalty payment made by a producer of metals based on gross metal production from the property, less deduction of certain limited costs including smelting, refining, transportation and insurance costs.

 

Orogenic-gold – Gold mineral system associated with a linear belt or region of folded and uplifted rocks.

 

Phenocryst – A term for large crystals or mineral grains floating in the matrix or groundmass of a porphyry.

 

Phyllite – Argillaceous rock metamorphosed to a state between slate and mica shist, metamorphosed mudstone.

 

Placer – A deposit of sand or gravel that contains particles of gold, ilmenite, gemstones, or other heavy minerals of value. The common types are stream gravels and beach sands.

 

Porphyritic – The texture of an igneous rock in which larger crystals (phenocrysts) are set in a finer-grained groundmass, which may be crystalline or glassy or both.

 

Porphyry – Any igneous rock in which relatively large crystals are set in a fine-grained matrix of rock.

 

Pre-Feasibility study or preliminary feasibility study – A comprehensive study of a range of options for the technical and economic viability of a mineral project that has advanced to a stage where a preferred mining method, in the case of underground mining, or the pit configuration, in the case of an open pit, is established and an effective method of mineral processing is determined. This study includes a financial analysis based on reasonable assumptions on the considerations used to convert Mineral Resources to Mineral Reserves and the evaluation of any other relevant factors which are sufficient for a qualified person acting reasonably, to determine if all or part of the Mineral Resource may be classified as a Mineral Reserve.

 

60


 

Preliminary economic assessment – A study, other than a pre-feasibility or feasibility study, that includes an economic analysis of the potential viability of mineral resources.

 

Pyrite – An iron sulphide mineral (FeS2), the most common naturally occurring sulphide mineral.

 

Quartz – Crystalline silica; often forming veins in fractures and faults within older rocks.

 

Reclamation – Restoration of mined land to original contour, use or condition.

 

Reserve or Mineral Reserve – The economically mineable part of a Measured Resource and/or Indicated Resource. It includes diluting materials and allowances for losses, which may occur when the material is mined or extracted and is defined by studies at Pre-Feasibility or Feasibility level, as appropriate that include application of the considerations used to convert Mineral Resources to Mineral Reserves. Such studies demonstrate that, at the time of reporting, extraction could reasonably be justified. The reference point at which Mineral Reserves are defined, usually the point where the ore is delivered to the processing plant, must be stated. It is important that, in all situations where the reference point is different, such as for a saleable product, a clarifying statement is included to ensure that the reader is fully informed as to what is being reported. The public disclosure of a Mineral Reserve must be demonstrated by a Pre-Feasibility Study or Feasibility Study.

 

Resource or Mineral Resource – A concentration or occurrence of solid material of economic interest in or on the Earth’s crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a Resource are known, estimated or interpreted from specific geological evidence and knowledge, including sampling.

 

Sedimentary – Formed by the deposition of sediment or pertaining to the process of sedimentation.

 

Sediments – Solid fragmental material that originates from weathering of rocks and is transported or deposited by air, water or ice, or that accumulates by other natural agents, such as chemical precipitation from solution or secretions by organisms, and that forms in layers of the Earth’s surface at ordinary temperatures in a loose, unconsolidated form; e.g., sand, gravel, silt, mud, alluvium.

 

Sericite – A fine-grained potassium mica found in various metamorphic rocks.

 

Shut-off – The NSR value at which the draw point is closed and is determined by the NSR value required to pay for mining, processing, and G&A costs.

 

Skarn – Ore deposit type associated with thermal metamorphism and characterized of Mg and Ca silicates with sulfide minerals.

 

Vein – A thin sheet-line, crosscutting body of hydrothermal mineralization, principally quartz.

 

Waste – Barren rock in a mine, or mineralized material that is too low in grade to be mined and milled at a profit.

 

61


 

ITEM 4: RISK FACTORS

 

Investing in the Common shares is speculative and involves a high degree of risk due to the nature of the Issuer’s business and the present stage of exploration and advancement of its mineral properties. The following risk factors, as well as risks currently unknown to the Issuer, could materially adversely affect the Issuer’s future business, operations and financial condition and could cause them to differ materially from the estimates described in forward-looking statements relating to the Issuer, or its business, property or financial results, each of which could cause investors to lose part or all of their investment. Before deciding to invest in any Common shares, investors should carefully consider the risks included herein.

 

Risks Related to the Issuer and its Industry

 

 

The Issuer has a history of net losses and negative cash flows from operations and expects losses and negative cash flows from operations to continue for the foreseeable future.

 

The Issuer has a history of net losses and negative cash flows from operations and the Issuer expects to incur net losses and negative cash flows from operations for the foreseeable future. As of December 31, 2023, the Issuer’s deficit totaled approximately $187 million. None of the Issuer’s properties has advanced to the commercial production stage and the Issuer has no history of earnings or positive cash flow from operations.

 

The Issuer expects to continue to incur net losses unless and until such time as one or more of its projects enters into commercial production and generates sufficient revenues to fund continuing operations or until such time as the Issuer is able to offset its expenses against the proceeds of sale of, or of retained royalties on, one or more of its projects or interests in its projects, if applicable. The development of one or more of the Issuer’s projects to achieve production will require the commitment of substantial financial resources. The amount and timing of expenditures will depend on a number of factors, including the progress of ongoing exploration and advancement, the results of consultant analysis and recommendations, the rate at which operating losses are incurred and the execution of any sale or joint venture agreements with strategic partners, some of which are beyond the Issuer’s control. There is no assurance that the Issuer will be profitable in the future.

 

The Issuer’s ability to continue its exploration activities and any future advancement activities, and to maintain the corporate office support of these activities, will depend on its ability to obtain suitable financing, enter into joint ventures or sell property interests. 

 

 

The Issuer estimates that it has financial resources to sustain corporate office operations, non-discretionary general and administrative cost; and non-discretionary project costs, including contractual obligations, to the end of 2024. However, the Issuer requires capital to maintain title to and undertake exploration and advancement of the Issuer’s principal exploration properties and to cover ongoing corporate expenses and presently has no ongoing source of revenue. Accordingly, the maintenance of and further exploration and advancement of the Issuer’s mineral properties is, therefore, dependent upon the Issuer’s ability to obtain financing through the sale of projects, sale of royalty or streaming interests, joint venturing of projects or equity or debt financing, including the sale of its shares over the NYSE under its “at-the-market” share offering. Such sources of financing may not be available on terms acceptable to the Issuer, or at all. Conditions in the credit and financial markets have improved for gold focused companies since the early months of the COVID-19 pandemic. However, limitations remain on access to capital and credit for many companies, which may make it more difficult for the Issuer to obtain, or may increase its cost of obtaining, capital and financing for its operations. Failure to obtain such financing may result in the delay or indefinite postponement of exploration and advancement work on the Issuer’s mineral properties, or the possible loss of such properties or expiry of permits relating to the development of them. Satisfying financing requirements through the sale of projects or interests in minerals produced from the projects, or the establishment of one or more joint ventures would reduce the Issuer’s gold ownership per share and have a corresponding negative impact on its leverage to the gold price.

 

62


 

The Issuer’s indebtedness requires quarterly interest payments, a lump sum payment at the end of 2025 and may require repayment in full, which may adversely affect its cash flow and ability to advance its business and necessitate dilutive financing or asset sales.

 

The Issuer has indebtedness arising from its sale of the US$225,000,000 2022 Note in March, 2022 and of the US$150,000,000 2023 Note in June, 2023. As a result of this indebtedness, the Issuer is required to make:

 

  quarterly interest payments of approximately US$3.66 million to the holder of the 2022 Note:

 

  starting on September 30, 2025, quarterly interest payments of approximately US$2.438 million to the holder of the 2023 Note; and

 

  a deferred interest payment of US$21,500,000 on December 29, 2025, representing compound interest accrued on the 2023 Note for the period from June 29, 2023 to June 29, 2025 (unless it elects to increase the size of the NSR payable to Sprott as described below).

 

The Issuer may issue common shares or raise money in the capital markets to fund its debt service costs, both of which would be dilutive to shareholders. Although the terms of the 2022 Note and the 2023 Note (together, the “Secured Notes”) are intended to result in all of the principal amount of the Secured Notes being used on maturity to purchase, by way of offset, royalties on metals produced from the KSM Project, in certain circumstances the holder of the Secured Notes may require the Issuer to repay the principal amount of each of the Secured Notes and the Issuer will have to raise the funds needed to repay these principal amounts in capital markets, settle these principal amounts by issuing Common shares to the holder or by selling assets.

 

The Issuer’s indebtedness could have adverse consequences for the Issuer, including: limiting its ability to obtain additional financing for working capital, capital expenditures, exploration and development, debt service requirements, acquisitions and general corporate or other purposes; restricting the Issuer’s flexibility and discretion to operate its business; and having to raise capital to pay interest or principal at unattractive prices or in poor financial markets; limiting its ability to adjust to changing market conditions; placing the Issuer at a competitive disadvantage compared to competitors that have less debt or greater financial resources; making the Issuer vulnerable in a downturn in general economic conditions; and preventing the Issuer’s ability to make expenditures that are important to its growth and strategies.

 

The ability of the Issuer to meet its debt service requirements may depend on its ability to raise capital in financial markets. There can be no assurance that the Issuer will be able to raise funds sufficient to pay amounts when due or to fund any other liquidity needs. If the Issuer is unable to meet the obligations to pay interest or principal due under the Secured Notes, the holder may exercise its rights under the security arrangements associated with the Secured Notes, which could result in a loss or substantial reduction in the value of the KSM Project or the Issuer’s interest in the KSM Project, the principal asset of the Issuer.

 

63


 

If the Issuer is unable to service its indebtedness or fulfil its other obligations under the Secured Notes, the Issuer may have to raise capital in ways that it might not otherwise choose, such as reducing or delaying expenditures, selling assets, restructuring or refinancing indebtedness or seeking equity capital in poor market conditions.

 

Changes in the market price of gold, copper and other metals, which in the past have fluctuated widely, affect the Issuer’s ability to finance its operations and the potential profitability of the Issuer’s projects.

 

The potential profitability of the Issuer’s projects depends, in large part, upon the market price of gold, copper and other metals and minerals to be produced. The market price of gold, copper and other metals is volatile and is impacted by numerous factors beyond the Issuer’s control, including:

 

expectations with respect to the rate of inflation;
     
the relative strength of the U.S. dollar and certain other currencies;
     
interest rates;
     
global or regional political or economic conditions;
     
supply and demand for jewelry and industrial products containing metals;
     
faith in paper currencies, digital money and governments;
     
costs of substitutes;
     
changes in global or regional investment or consumption patterns;
     
global production levels;
     
speculative activities; and
     
sales and purchases by central banks and other holders, speculators and producers of gold, copper and other metals in response to any of the above factors.

 

There can be no assurance that the market price of gold, copper and other metals will remain at current levels or that such prices will improve. A decrease in the market price of gold and copper could adversely affect the Issuer’s ability to finance the exploration and advancement of the Issuer’s properties and to enter into joint ventures with strategic partners relating to the Issuer’s properties, which would have a material adverse effect on the Issuer’s financial condition and results of operations. There is no assurance that if commercial quantities of gold, copper and other metals are discovered on the Issuer’s properties, that a profitable market will exist or continue to exist for a production decision to be made or for the ultimate sale of the metals. As the Issuer has a high ratio of gold resources per Common share, fluctuations in gold prices have tended to have a great impact on the price of the Common shares.

 

The Issuer’s Provincial Environmental Assessment Certificate expires on July 29, 2026 unless the Issuer has “Substantially Started” the KSM Project.

 

The Issuer has obtained federal and provincial environmental assessment approvals for its KSM Project. The federal approval has no time limit but the provincial approval (the EAC) requires evidence that meaningful work has been incurred at the KSM Project by July 29, 2026. The Issuer may convert its EAC into an indefinite approval if the KSM Project achieves a designation of “substantially started” from the BC government by July 29, 2026.

 

64


 

In 2021 the Issuer commenced early construction activities at its KSM Project to set it on course to achieve the “substantially started” designation before expiry of the EAC. The extent of the work required to achieve this designation is not clearly defined and leaves a reasonable degree of discretion to the statutory decision-maker. The Issuer has completed a significant amount of early construction including the first 17.7 km of the TCAR, the first 3.2 km of the CCAR, the construction of its camp near the beginning of the CCAR, the pad for construction of the Camp in the Mitchell Valley, the fish habitat compensation pond at Glacier Creek, tree clearing at the sites of planned infrastructure and has contracted BC Hydro to build the TCT (which is underway and should be completed in 2026). With these elements constructed by the end of 2023, the Issuer applied on January 16, 2024 for a “substantially started” designation. It is not certain this application will be successful. It may take over 12 months for a determination on its application. It is continuing its early construction activities and, if its first application is unsuccessful, this ongoing work and any further work the Issuer might complete could be considered in a second application for a “substantially started” designation to be submitted for decision before July 29, 2026. Obtaining the substantially started designation within the time available is uncertain.

 

If the Issuer is unable to convert its EAC into an indefinite approval, it would need to re-apply for a new environmental assessment certificate before it could proceed with building the KSM Project. Expiry of the KSM Project’s EAC will also result in the federal environmental assessment approval lapsing as well as the permits issued in reliance on those approvals. The environmental assessment legislation under which the KSM Project was approved has been replaced by new legislation with a more involved review process. Although the Issuer believes that the KSM Project has been responsibly designed and should satisfy the standards of current environmental laws, successfully obtaining a second environmental assessment certificate is not certain and would take several years. In addition, expiry of the EAC triggers a put right of Sprott under the 2022 Note and the 2023 Note and Sprott would be entitled to put the 2022 Note back to KSMCo for US$247.5 million at any time over the following nine months and to put the 2023 Note back to KSMCo for either US$165 million or US$186.5 million at any time over the following nine months.

 

The Issuer has reserves at its KSM Project and its Courageous Lake Project, but needs a joint venture partner to build and operate the Projects for them to be brought into production.

 

The Issuer does not intend to bring the KSM Project or the Courageous Lake Project into production on its own and intends to either enter into a joint venture with an experienced operator to build and operate the Project or to sell the KSM Project and the Courageous Lake Project. Given the size of the KSM Project and its estimated capital costs, there is a limited number of mining companies with the ability to raise the necessary capital to put the KSM Project into production, which limits the options available to the Issuer for such a joint venture or sale. The success of any joint venture with a major mining company will be dependent on many factors, including the ability of the Issuer or its partner to attract new, capable personnel in significant numbers to advance the project, to smoothly transition the operation of the KSM Project to the new majority joint venture partner and to prepare a favourable feasibility study that projects sufficient returns for the KSM Project to warrant the risks of construction and operations. Successfully achieving these is not assured.

 

The commercial viability of the KSM Project is also dependent on a number of factors, including metal prices, government policy and regulation and environmental protection initiatives, which are beyond the control of the Issuer. There is no certainty that the reserves estimated at the KSM Project or the Courageous Lake Project will actually be mined or, if mined, processed and sold profitably. The Issuer has relied and will continue to rely upon consultants for advancement and operating expertise.

 

65


 

There is uncertainty related to unsettled rights and title of Indigenous groups, as well as settled Treaty Nation’s rights, in British Columbia, the Yukon Territory and the Northwest Territories and uncertainties relating to the process of making Canadian laws consistent with the United Nations Declaration on the Rights of Indigenous Peoples and this may create delays in project approval, interruptions in project progress and create uncertainty in respect of the Issuer’s rights.

 

The nature and extent of First Nations’ and Treaty Nations’ rights and title remains the subject of active debate, claims and litigation in Canada, including in British Columbia, the Yukon Territory and the Northwest Territories. In 2014, the Supreme Court of Canada recognized for the first time Aboriginal title of an Indigenous group to a specific area in British Columbia. The Provincial and federal governments are also making efforts to settle claims of Aboriginal title and rights being advanced by Indigenous groups. The likely outcome of these court decisions and government negotiations is greater involvement of, and authority for, Indigenous groups in the permitting process for exploration and mine operations. In some areas, it is likely to result in the loss of corporate permits and rights, and the outright ownership of resources and a significant measure of regulatory control being transferred to Indigenous groups.

 

Parts of the KSM Project lie within an area asserted to be the traditional territory of one Indigenous group and all of the KSM Project lies within an area asserted to be the traditional territory of one or more Indigenous groups. No comprehensive treaty or land claims settlement has been concluded regarding these traditional territories, except for the part of the KSM Project that lies within territory subject to settled treaty rights of the Nisga’a Nation. The Courageous Lake Project lies within the traditional territory of the Yellowknives Dene First Nation and no comprehensive treaty or land claims settlement has been concluded regarding this traditional territory. A part of the Courageous Lake Project lies within territory designated as a shared use area under the settled treaty rights of the Tlicho Nation. The 3 Aces Project lies within the traditional territory of the Kaska Nation, specifically the Liard and the Ross River Dene First Nations. There can be no guarantee that the unsettled nature of land claims, or uncertainties associated with settled claims, in British Columbia, the Yukon Territory and the Northwest Territories will not create delays in obtaining permits, in ultimate project approval or other unexpected interruptions in project progress, or result in additional costs to advance the Issuer’s projects.

 

Mine construction and commencement of mining activities may only be possible with the support of the local Indigenous groups. Many companies have secured such support by committing to take measures to limit the adverse impact to, and ensure some of the economic benefits of the construction and mining activity will be enjoyed by, the local Indigenous groups. The Issuer has agreements of this sort with the Nisga’a Nation and the Tahltan Nation, as well as a much less comprehensive agreement with the Gitanyow Nation, each of which should reduce this risk. However, there can be no assurance that initial support, future on-going support or other assurances can or will be secured from these or other groups at an acceptable cost or that the KSM Project or the Courageous Lake Project will proceed without such support.

 

In December, 2019, the government of British Columbia passed Bill 41, the Declaration on Rights of Indigenous Peoples Act (“Bill 41”). Bill 41 commits the British Columbia government to a process of making the laws of British Columbia consistent with the United Nations Declaration on the Rights of Indigenous Peoples (“UNDRIP”). In June, 2021, the government of Canada passed Bill C – 15, the United Nations Declaration on Rights of Indigenous Peoples Act (“Bill C – 15”). Bill C – 15 commits the Canadian government to a process of making the laws of Canada consistent with UNDRIP. Article 32 of UNDRIP states that “Indigenous peoples have the right to determine and develop priorities and strategies for the development or use of their lands or territories and other resources” and requires government to consult and cooperate with Indigenous peoples to obtain “their free and informed consent prior to the approval of any project affecting their lands or territories and other resources”. There is uncertainty regarding the details of how the laws of British Columbia and Canada will change or regarding any other consequences of the adoption of Bill 41 and Bill C – 15. However, it will likely lead to a greater influence of relevant Indigenous peoples in permitting processes and decisions. It will also result in longer, more onerous and less certain permitting processes and outcomes of permitting processes, which could delay project advancement or lead to a greater number of projects not receiving required permits. It may become necessary to obtain the consent of an Indigenous group to a mining project before construction can begin.

 

66


 

In the September 2023 court case of Gitxaala v. British Columbia (Chief Gold Commissioner), 2023 BCSC 1680, the BC Supreme Court concluded that the mineral tenure system in British Columbia (which permitted online, automatic registration of mineral claims) breached the Crown’s duty to consult Indigenous peoples and adversely affected their asserted Aboriginal rights. The court provided the provincial government with 18 months to revamp the existing system to incorporate consultation of Indigenous groups into the mineral tenure staking process. It is uncertain what changes the Provincial government will make to the existing mineral tenure system, but it is likely to make the mineral staking process longer and more onerous and may result in the registration of certain claims being denied or the removal of large areas of land from the mineral staking process. The British Columbia government also recently made four Cabinet orders under the Environment and Land Use Act, which restricted previously authorized mineral exploration activities on Banks Island and parts of Vancouver Island, although these orders indicated that the restrictions could be lifted once an agreement is made with the local Indigenous groups. The relevant Indigenous groups are the groups involved in the Gitxaala court case. Although the Provincial government is indicating that it acted under special circumstances, there is a risk the same powers could be used in respect of other areas of BC where Indigenous groups oppose mineral exploration on their lands.

 

The Aboriginal land claims process in Canada has also recently resulted in some Indigenous groups taking greater roles in the administration of lands subject to the land claims. Indigenous groups may look to impose additional requirements over land they are involved in administering.

 

The Issuer requires further rights and permits in order to conduct current and anticipated future operations, and delays in obtaining or failure to obtain such rights and permits, or a failure to comply with the terms of any such permits that the Issuer has obtained, could adversely affect its business.

 

The Issuer’s current and anticipated future operations, including further exploration, development and commencement of production on its mineral properties, require approvals and permits from various governmental authorities. Obtaining or renewing governmental approvals and permits is a complex and time-consuming process. The duration and success of efforts to obtain and renew approvals and permits are contingent upon many variables not within the Issuer’s control. Shortages of personnel in various levels of government could result in delays or inefficiencies. Backlog within permitting agencies, affected by the number of other large-scale projects currently in a more advanced stage of development, could slow down the review process and adversely affect the permitting timeline of the Issuer’s projects. Negative public and stakeholder opinions is another factor that could affect the permitting timeline and success rate. As well, the specific permitting requirements that will ultimately apply to any project are difficult to correctly assess at the exploration and development stage.

 

As discussed in a “Risk Factor” above, the Issuer’s provincial EAC for its KSM Project is subject to expiry which, if it expires, would result in the federal environmental assessment approval expiring as well.

 

67


 

Regulatory decisions authorizing actions that adversely impact or potentially adversely impact the right of Canada’s Indigenous peoples can only be made after a consultation process with the relevant Indigenous group. Under such consultation processes, Indigenous groups are contacted and their comments sought on such proposed authorizations. When Indigenous groups raise issues with proposed authorizations and permits, regulatory authorities seek to resolve them and may require the proponent to mitigate impacts or otherwise resolve the issues through modification of project design or compensation to Indigenous peoples for anticipated impacts. This consultation process can significantly slow the granting of regulatory approvals. Where firm Indigenous opposition is encountered and resolution in a manner acceptable to the Issuer is not possible, the regulatory process may stall or result in no authorization being granted. Accordingly, establishing positive relationships with Indigenous groups and ensuring they benefit from a company’s operations in their territory is very important.

 

In addition, the Issuer’s future development plans may require it to obtain the necessary access rights from the private owners of such rights in order to complete the development of its projects. The design of the KSM Project includes building and operating the approximately 23 km MTT, of which approximately 12.5 km passes through mineral claims held by Tudor Gold Corp., Teuton Resources Corp. and American Creek Resources Ltd. (the “Third Party Claims Holders”). The Issuer presently holds a Licence of Occupation covering the entire length of the MTT, which grants it rights to occupy the area through which the proposed MTT will pass, subject to the rights of the Third Party Claims Holders. In the Issuer’s opinion, the Third Party Claims Holders’ rights are addressed by the Issuer’s obligations under the management plan associated with the Licence of Occupation, to segregate and deliver to the Third Party Claims Holders all earth and rock material removed from the third party claims during construction of the MTT.

 

The area of the MTT, including the area within the mineral claims of the Third Party Claims Holders, is also subject to a conditional mineral reserve (the “CMR”) that requires the Third Party Claims Holders “not to obstruct, endanger, or interfere with, or allow any other person to obstruct, endanger or interfere with, the construction, operation or maintenance” of the MTT. The Issuer also holds a permit that authorizes it to construct the MTT portals and the first 100m of the MTT beyond the portals, including construction of the portal in the Saddle Area and the initial 100m from such portal on the mineral claims held by the Third Party Claims Holders. However, the Licence of Occupation is subject to expiry on September 27, 2024. The Issuer has applied to have its Licence of Occupation reissued. Failure to have its Licence of Occupation reissued would leave the Issuer without rights to occupy the area of the MTT to construct and operate the MTT. The Issuer also still requires a permit to construct the MTT beyond the initial 100m of the MTT beyond the portals. The regulatory authority from which the Issuer must obtain authorization for construction of the remainder of the MTT has confirmed to the Issuer that it can authorize the construction and operation of the additional portions of the MTT not already authorized. However, it is not obligated to authorize such construction or operation. It also confirmed that when considering whether to authorize such activities it will consider impacts on the Third Party Claims Holders and the limitations imposed on the Third Party Claims Holders by the CMR.

 

There can be no assurance that the Issuer will successfully have its Licence of Occupation reissued or that it will obtain the authorization for the construction of the additional portions of the MTT on terms acceptable to the Issuer. Further, Tudor Gold Corp. has indicated that it will oppose such reissuance and any authorization and actions to commence construction of the MTT despite being prohibited from doing so by the CMR. The Issuer believes that if the Third Party Claim Holders can demonstrate they have a commercially viable and environmentally acceptable project on their claims, the MTT route can be modified to accommodate the development and operation of a mining operation on their claims without significantly adversely affecting the operation of the KSM Project.

 

68


 

Permit terms and conditions can also impose restrictions on how the Issuer operates, and may limit flexibility in the development of its mineral properties. Many of the Issuer’s permits are subject to renewal from time to time, and renewed permits may contain more restrictive conditions than existing permits. Renewal of the Issuer’s existing permits or obtaining new permits may also be more difficult if it is not able to comply with its existing permits. Grants of permits, permit amendments and renewals may be subject to administrative and judicial challenges by interested parties, including Indigenous groups, which can delay or prevent receipt of needed authorizations. The permitting process can also vary by jurisdiction in terms of its complexity and likely outcomes. Accordingly, permits required for the Issuer’s operations may not be issued, maintained or renewed in a timely fashion or at all, may be issued or renewed upon conditions that restrict its ability to operate economically, or may be subsequently revoked.

 

There can be no assurance that all approvals, permits and rights that are required for its operations, including any for construction of mining infrastructure or the conduct of mining, will be obtainable or renewable on reasonable terms, or at all. Delays or a failure to obtain such required permits, or the expiry, revocation or failure to comply with the terms of any such permits that the Issuer has obtained, would adversely affect the Issuer’s business and result in the relevant project ceasing further advancement or operations.

 

The Issuer is subject to substantial government regulatory requirements, which could cause delays in advancing its projects, or a restriction or suspension of the Issuer’s operations.

 

 

The exploration and advancement activities of the Issuer and the potential for profitable operations of the Issuer’s mineral properties are affected to varying degrees by government regulations governing, among other things: the acquisition of land, royalties, taxes, financial disclosure, labour standards, land use, water use, pollution control, toxic substances, environmental protection, measures to protect endangered species and critical habitats, consultation with indigenous groups, the labour makeup of supply chains, health and safety and expropriation of property. Changes in these regulations or in their application are beyond the control of the Issuer and may adversely affect its operations, business and the potential of its projects. Failure to comply with applicable statutes and regulations may result in fines or penalties for non-compliance, an order to cease or curtail further exploration or advancement, or a reduction or elimination of the potential profitability of a project. The Issuer may be required to compensate those suffering loss or damage by reason of its exploration activities or operations. In addition, no assurance can be given that new rules and regulations will not be enacted that could limit or curtail operations. This risk may increase following changes to government leadership or governing parties, or through increasing societal pressures.

 

69


 

The Issuer is subject to substantial environmental requirements which could cause a restriction or suspension of the Issuer’s operations. These requirements must be met for the Issuer to receive regulatory approvals for its operations.

 

In connection with its operations and properties, the Issuer is subject to extensive and changing environmental legislation, regulations and actions. The Issuer cannot predict what environmental legislation, regulations or policy will be enacted or adopted in the future or how current or future laws and regulations will be administered or interpreted. At the federal and provincial level, and increasingly with significant decision-making influence by Indigenous governments, recent trends include, without limitation, an increasing number and complexity of laws and regulations relating to air, soil and water quality, mine reclamation, waste handling and disposal, tailings management, the protection of certain species and critical habitats, the preservation of certain lands, respect for Indigenous cultures, artifacts and knowledge, reduction of carbon emissions and preparing for greater climatic variability. The general trend in environmental legislation and regulation generally is toward stricter standards and more robust enforcement, and this trend is likely to continue in the future. Ongoing monitoring of operations is also common. If the Issuer’s operations result in negative effects upon the environment, government agencies will usually require the Issuer to provide remedial actions to correct the negative effects. These laws and regulations may also limit or prohibit activities on certain lands lying within wetland areas, areas providing habitat for certain species or other protected areas. Compliance with more stringent laws and regulations, as well as the likelihood of more vigorous enforcement policies or stricter interpretation of existing laws, may necessitate significant capital outlays, which may adversely affect the Issuer’s results of operations and business, or may cause material changes or delays in the Issuer’s intended activities.

 

Depending upon the type and extent of its exploration, and the KSM Project’s early construction activities towards achieving “substantially started”, the Issuer will be required to post reclamation bonds and/or assurances that the affected areas will be reclaimed. Currently, the Issuer has estimated CDN$7.4 million in reclamation liabilities for all of its properties, the majority of which represents the costs associated with reclamation of the Johnny Mountain Mine. As at December 31, 2023, CDN$21.4 million has been deposited for the benefit of the various government agencies until released or applied to reclamation costs. If the reclamation requires funds in addition to those already estimated or allocated, the Issuer could be forced to pay for the extra work, which could have a material adverse effect on the Issuer’s financial position and operations. In addition, unidentified environmental deficiencies may exist on other properties of the Issuer. The discovery, and any required reclamation, of any significant additional environmental issues on one of the Issuer’s properties would likely have an adverse effect on the Issuer’s operations and financial position.

 

70


 

The figures for the Issuer’s resources and reserves are estimates based on interpretation and assumptions and the properties may yield less mineral production or less profit under actual conditions than is currently estimated.

 

Unless otherwise indicated, resource figures presented in this AIF and in the Issuer’s other filings with securities regulatory authorities, press releases and other public statements that may be made from time to time are based upon estimates made by Issuer personnel and independent geologists. These estimates are imprecise and depend upon geologic interpretation and statistical inferences drawn from drilling and sampling analysis, which may prove to be inaccurate. There can be no assurance that resource or other mineralization figures will be accurate or that this mineralization could be mined or processed profitably.

 

Because the Issuer has not completed a feasibility study or commenced commercial production at any of its properties, resource estimates for the Issuer’s properties may require adjustments or downward revisions based upon further exploration or advancement work or actual production experience. In addition, the grade of ore ultimately mined, if any, may differ from that indicated by drilling results. There can be no assurance that recovery of minerals in small-scale tests will be duplicated in large-scale tests under on-site conditions or in production scale.

 

The resource and reserve estimates contained in this AIF have been determined based on assumed future prices, cut-off grades and capital and operating costs that may prove to be inaccurate. Substantial declines in market prices for gold and other metals or increases in costs may eliminate the potential profitability of the Issuer’s deposits, require increases in cut-off grades and result in reduced reported resources or reserves. The equipment, supplies and materials needed to construct the KSM Project infrastructure and conduct operations at the KSM Project have been subject to meaningful inflation since the 2022 PFS and will impact capital and operating costs and it is not clear if the increases in metals prices will wholly offset such cost increases. Any material reductions in estimates of resources or reserves, or of the Issuer’s ability to extract these resources or reserves, could have a material adverse effect on the Issuer’s prospects and could restrict the Issuer’s ability to successfully implement its strategies for long-term growth.

 

Actual capital costs, operating costs, production and economic returns may differ significantly from those Seabridge has anticipated. There are no assurances future advancement activities by Seabridge, if any, will lead to a favourable feasibility study or profitable mining operations.

 

The Issuer has completed prefeasibility studies at each of its KSM Project and its Courageous Lake Project, but typically a company will not make a production decision until it has completed a feasibility study. Feasibility studies derive estimates of cash operating costs based upon, among other things:

 

anticipated tonnage, grades and metallurgical characteristics of the reserves to be mined and processed;
     
anticipated recovery rates of gold and other metals from the reserves;
     
cash operating costs of comparable facilities and equipment; and
     
anticipated climatic conditions and environmental protection measures.

 

71


 

Completing a feasibility study at each of these projects requires significant additional work and study in order to reduce the range of uncertainty associated with the study’s estimates and conclusions. Significant additional engineering design work has to be completed. Cash operating costs, production and economic returns, and other estimates contained in studies or estimates prepared by or for the Issuer in the future may differ significantly from those anticipated by the Issuer’s current studies and estimates and may even result in delays or cancellation of project advancement. There is no certainty that a feasibility study in respect of the KSM Project or the Courageous Lake Project will be completed or, if completed, that it will result in sufficiently favourable estimates of the economic viability of such projects to justify a construction decision. The Issuer has relied and will continue to rely upon consultants for advancement and operating expertise.

 

There can be no assurance that, if it starts production at one or more of its projects, the Issuer’s actual operating costs will not be higher than currently anticipated. None of the Issuer’s mineral properties have an operating history upon which the Issuer can base estimates of future operating costs.

 

The Issuer has commenced construction of the initial infrastructure at the KSM Project and, therefore, will be subject to all of the risks associated with construction operations.

 

Development of the KSM Project requires the Issuer to achieve “substantially started” by way of the construction of infrastructure, including for site access, such as access roads, bridges, site clearing, camp facilities, fish habitat and powerlines. As a result, the Issuer is and will continue to be subject to all of the risks associated with such construction, including:

 

the timing and cost of the construction of these facilities;
     
the availability and cost of skilled labour, equipment and principal supplies needed for such activities at the times required;
     
greater risks of workplace injuries and associated liabilities;
     
the need to obtain necessary environmental and other governmental approvals and permits and the timing of the receipt of those approvals and permits;
     
the need to meet the conditions of its permits and approvals, in particular the need to establish sufficient environmental controls in order to satisfy the environmental conditions required by its permits;
     
the availability of funds to finance construction activities;
     
potential opposition from non-governmental organizations, Indigenous groups, environmental groups, local groups or other stakeholders which may delay or prevent construction activities; and
     
potential increases in construction and operating costs due to changes in the cost of labour, fuel, power, materials and supplies.

 

The costs, timing and complexities of the construction activities at the KSM Project may be greater than anticipated because the majority of such property interests are not located in developed areas, and, as a result, lack road access and power supply and other support infrastructure. Cost estimates may increase as more detailed engineering work is completed on proposed construction work. It is common in construction in remote areas to experience unexpected costs, problems and delays during construction.

 

72


 

The Issuer has no history of commercially producing precious or base metals from its mineral exploration properties and there can be no assurance that it will successfully establish mining operations or profitably produce precious metals.

 

The Issuer has no history of commercially producing precious metals from its current portfolio of mineral exploration properties and the Issuer has no ongoing mining operations or revenue from mining operations. Mineral exploration and advancement involves a high degree of risk and few properties that are explored are ultimately developed into producing mines. The Issuer has not decided to construct a mine at any of its projects to date. The future advancement of properties estimated to be economically feasible will require obtaining permits and financing and the construction and operation of mines, processing plants and related infrastructure. Although the Issuer has disclosed that it will not undertake production activities by itself, it may be involved in construction and production at one or more of its properties if it enters into a joint venture or other arrangement with a third party regarding production. In addition, as part of continuing to advance its KSM Project pending completion of a sale or joint venture of the KSM Project, the Issuer undertook activities in 2021, 2022 and 2023 associated with data collection for a feasibility study and initiated early construction activities to establish site access, camps and construction power supply.

 

Seabridge may be subject to all of the risks associated with establishing new mining operations and business enterprises, including:

 

timing and cost, which can be considerable, of the construction of mining and processing facilities;
     
availability and costs of skilled labour and mining equipment;
     
availability and cost of appropriate smelting and/or refining arrangements;
     
need to obtain necessary environmental and other governmental approvals and permits, and the timing of those approvals and permits;
     
the need to meet the conditions of its permits and approvals, in particular the need to establish sufficient environmental controls in order to satisfy the environmental conditions required by its permits;
     
availability of funds to finance construction and advancement activities;
     
management of an increased workforce and co-ordination of contractors;
     
potential opposition from non-governmental organizations, environmental groups, Indigenous groups or local groups which may delay or prevent advancement activities;
     
potential increases in construction and operating costs due to changes in the cost of labour, fuel, power, materials and supplies and foreign exchange rates; and
     
greater exposure to climate-related risks associated with natural disasters such as wildfires, avalanches, mudslides and flooding.

 

The costs, timing and complexities of mine construction and advancement are increased by the remote location of the Issuer’s mining properties. It is common in new mining operations to experience unexpected problems and delays during advancement, construction and mine start-up. In addition, delays in the commencement of mineral production often occur. Accordingly, there are no assurances that, if the Issuer decides to be involved in construction or mining activities, the Issuer will successfully establish mining operations or profitably produce precious or base metals at any of its properties.

 

The Issuer may be adversely affected by future fluctuations of foreign exchange rates.

 

The potential profitability of the Issuer is exposed to the financial risk related to the fluctuation of foreign exchange rates. The minerals that could be produced from the Issuer’s projects are priced in U.S. dollars but, since the Issuer’s principal projects are located in Canada, a significant percentage of its estimated expenditures will be in Canadian dollars. A significant change in the currency exchange rates between the Canadian dollar relative to the U.S. dollar will have an effect on the potential profitability of the Issuer’s projects and therefore its ability to continue to finance its operations. To the extent the actual Canadian dollar to U.S. dollar exchange rate is less than or more than the exchange rate used in the preliminary feasibility studies summarized in this AIF, the profitability of the projects will be less than or more than that estimated (assuming the other assumptions are realized). Accordingly, the Issuer’s prospects may suffer due to adverse currency fluctuations.

 

73


 

The Issuer’s activities and proposed business are inherently dangerous and contain significant uninsured risks that could negatively impact the Issuer.

 

The Issuer’s exploration and advancement of its mineral properties involves a number of risks and hazards. In addition, the business of mining is subject to various risks and hazards including:

 

environmental hazards;
     
industrial accidents;
     
metallurgical and other processing problems;
     
unusual or unexpected rock formations;
     
rock bursts;
     
structural failures, cave-ins or slides;
     
flooding;
     
fires;
     
earthquakes, avalanches or landslides;
     
metals losses; and
     
periodic interruptions due to inclement or hazardous weather conditions.

 

These risks could result in damage to, or destruction of, mineral properties, plant and equipment, personal injury or death, environmental damage, delays in mining, monetary losses and possible legal liability.

 

The Issuer currently maintains insurance against risks relating to its exploration and construction activities in an amount which it believes to be reasonable. If the Issuer commences mining activities with a partner, it will be subject to mining risks, including those listed above. The Issuer anticipates that it will obtain the insurance it believes is reasonable for any mining activities it undertakes, however, such insurance contains exclusions and limitations on coverage and insurance for all risks is not likely available. There can be no assurance that the insurance the Issuer desires will continue to be available, will be available at economically acceptable premiums or will be adequate to cover any resulting liability. The issuer might also be subject to liability for environmental damage or other hazards which may be uninsurable or for which it may elect not to insure because of premium costs or commercial impracticality. The payment of such liabilities would reduce funds available for the acquisition of mineral properties or exploration and advancement and would have a negative effect on the Issuer’s ability to generate revenues, profits and cash flows.

 

74


 

Title to the Issuer’s mineral properties cannot be guaranteed and may be subject to prior unregistered agreements, transfers or claims and other defects.

 

 

The Issuer cannot guarantee that title to its properties will not be challenged. Title insurance is not available for mineral properties in Canada and the Issuer’s ability to ensure that it has obtained a secure claim to individual mineral properties or mining leases may be severely constrained. The Issuer’s mineral properties may be subject to prior unregistered agreements, transfers or claims, and title may be affected by, among other things, undetected defects. To date, the Issuer has only done a preliminary legal survey of the boundaries of its properties and has not obtained formal title reports on any of its properties and, therefore, in accordance with the laws of the jurisdictions in which these properties are situated, their existence and area could be in doubt. If title is challenged, the Issuer will have to defend its ownership through the courts. A successful challenge to the precise area and location of these claims could result in the Issuer being unable to operate on its properties or being unable to enforce its right with respect to its properties.

 

Periods of high metal prices encourage increased mining exploration, advancement and construction activity, which results in increased demand for, and cost of, exploration, advancement, construction and operating services and equipment.

 

During periods of relative strength of metal prices, as we saw over several years before 2013, increases in mining exploration, advancement and construction activities occur around the world, which results in increased demand for, and cost of, exploration, advancement, construction and operating personnel, services and equipment. While market conditions between 2013 and 2018 had a moderating effect on the costs of such services and equipment, increases in such costs have occurred with the recent resumption of an upward trend in metal prices. In addition to forces in the metals markets, inflation has emerged in goods and labour costs from supply chain disruptions caused by the COVID-19 pandemic and more recently the measures being taken in response to the Russian invasion of Ukraine and the duration of these impacts is uncertain. Increased demand for services and equipment could result in delays if services or equipment cannot be obtained by the Issuer in a timely manner due to inadequate availability and may cause scheduling difficulties due to the need to coordinate the availability of services or equipment, any of which could materially increase project exploration, advancement and/or construction costs. Persistent inflation will also increase operating costs and impact the cost of construction and the profitability of mining operations.

 

Increased competition could adversely affect the Issuer’s ability to acquire suitable properties for mineral exploration in the future.

 

The mining industry is intensely competitive. Significant competition exists for the acquisition of properties producing or capable of producing gold or other metals. The Issuer may be at a competitive disadvantage in acquiring additional mining properties because it must compete with other companies, many of which have greater financial resources, operational experience and technical capabilities than the Issuer. Competition for exploration properties is currently only moderate but, if metals prices increase, competition could again become very intense. Increased competition could adversely affect the Issuer’s ability to acquire suitable properties for mineral exploration in the future.

 

75


 

Regulatory efforts and societal pressure to control and reduce carbon dioxide emissions and achieving net neutral status could increase costs such that proposed projects may no longer be sufficiently profitable to construct or unprofitable.

 

Currently, there is increasing emphasis on carbon regulation and taxation. In British Columbia, the government has enacted a carbon tax with steadily increasing tax rates going forward. In Canada, the federal government has imposed a carbon tax in provinces where no provincial carbon tax is in place. These taxes not only adversely impact the Issuer’s costs of operations but add costs all along its supply chain, with adverse impacts on costs of operations or increased need to raise funds. There is also pressure on industry from investors to reduce carbon emissions and set goals to achieve net neutral carbon emissions over time in order to be seen as a preferred investment. Accordingly, the Issuer’s ability to secure regulatory approval and financing may depend upon its carbon footprint and its costs of operations would be adversely impacted through taxation.

 

The Issuer has been revising its development plans, with co-operation from BC Hydro, in order to build and operate its KSM Project with as great a percentage of hydro-electric generated power as possible, in order to substantially reduce its carbon footprint. However, it’s Courageous Lake Project is located in an area where renewable energy sources are not presently competitive with diesel power generation and, as such, development costs may increase, regulatory approvals may be more difficult and investment capital may be harder to attract.

 

Reporting requirements on companies have recently increased in respect of carbon emissions and impacts on nature. As reporting standards are consolidated and disclosure becomes more reliable and comparable, it is possible that new regulatory requirements will be adopted to limit companies’ emissions or environmental impacts, which might have an adverse impact on the Issuer’s ability to carry on its business, or require significant new capital investment and increase its costs of operations. The introduction and enforcement of any such requirements are beyond the Issuer’s control. The Issuer’s properties are located in remote areas, typically without proximate connection to electric power transmission lines, and technical solutions to meeting new and onerous regulatory requirements may not be feasible. Strict requirements on remote operations could severely impair the Issuer’s ability to carry on its business.

 

Other new regulatory measures or public/investor pressure aimed at the reduction of carbon emissions or more generally at reducing other impacts of exploration or mining activity on nature, including mandating the use of new or costly technologies, at its projects could result in increased operating costs or ultimately in eliminating the viability of its operations. The Issuer has little or no ability to control the adoption of such measures or public expectations.

 

The Issuer’s current and proposed operations are subject to risks relating to climate change and nature loss which may adversely impact its ability to conduct operations and increase its operating costs, and may delay execution or reduce the profitability of a future mining operation.

 

The potential impacts of climate change and nature loss on the Issuer’s operations are highly uncertain and are particular to the geographic areas in which its projects are located.

 

76


 

The Issuer’s projects are located in remote areas exposing it to the physical risks of climate change, including unexpected or extreme weather events or prolonged climatic conditions. Climate changes that could impact the Issuer’s business include changes in temperatures, rainfall or snowfall, glacier size, permafrost conditions, storm patterns and intensities, water management, wildfires, avalanches, landslides, and the presence of endangered species or invasive species. Most of its exploration projects are located in remote areas of northern Canada, with exploration work at the Iskut and KSM Projects being conducted at high altitude and by helicopter access only. The Issuer is very conscious of these heightened risks faced by its personnel in the field and all of these factors make the safety of the Issuer’s personnel paramount in its operations. Longer winters and deeper snowpacks can reduce the operating season for exploration and extreme weather can restrict access and the ability to operate during the exploration season. Hotter, drier weather can increase the risk of droughts and wildfires. This can impact the Issuer’s ability to conduct exploration work, access its projects, progress its objectives, and attract and retain personnel (that may be needed instead to address emergencies). All of these factors have elevated the ranking of climate related risks in the Issuer’s risk management efforts.

 

Global climatic conditions can also impact the insurance available in the market which could have a negative effect on the Issuer’s financial condition and risk exposure.

 

The Issuer has taken into account the potential for weather events outside of recent historic ranges in the design of its proposed KSM Project. Design details of the KSM Project include dams with excess freeboard, onsite water management through tunnels and considerable redundancy in systems in order to be prepared for the detrimental effects of climate change. However, events or conditions could disrupt mining and transport operations, impact exploration and development plans, mineral processing and rehabilitation efforts, and could damage public infrastructure, project property or equipment, and increase health and safety risks on site. Emergency plans for managing extreme weather conditions may not be sufficient. Environmental damage caused by the insufficiency of the Issuer’s plans to manage these risks have the potential to damage the Issuer’s reputation within local communities, with regulators and among investors. Significant capital investment may also be required to address these occurrences and to adapt to changes in average operating conditions caused by these changes to the climate and nature and impact the viability of the Issuer’s business.

 

Extreme weather events locally and globally also have the potential to disrupt supply chains, resulting in uncertain lead times and difficulties in sourcing supplies, materials, equipment and personnel required to operate at projects. Although measures can be taken to prepare for such extreme events, the impacts of them on supply chains are difficult to predict and the measures taken could be inadequate and extended disruptions could have adverse effects on the Issuer’s operations and financial condition.

 

Changes in climate change or nature-related regulatory regimes could adversely affect the Issuer’s business

 

Increased governmental regulation, including monitoring and financial disclosure requirements, relating to climate change and nature may increase the cost and complexity of compliance and may result in fines or penalties for non-compliance. New legislation and increased regulation may also cause reduced availability or higher prices for goods and services, which could result in higher costs or supply chain disruptions. The Issuer monitors the evolving regulatory landscape and engages its local legal counsel to provide updates on regulatory developments. The Issuer is also working with external consultants towards implementing recommendations of the Task Force on Climate-related Financial Disclosures (“TCFD”) and Taskforce on Nature-related Financial Disclosures (“TNFD”) to assess and disclose climate resilience and toward implementing the International Sustainability Standards Board reporting aligned with IFRS. Even after completing this undertaking, the Issuer cannot be certain that it will have adequately assessed the risks of climate change or nature-related regulatory regimes on its business or that its efforts to mitigate these risks will be adequate or effective.

 

77


 

The Issuer has a dependence upon key management employees, the absence of which would have a negative effect on the Issuer’s operations.

 

The Issuer strongly depends on the business and technical expertise of its management and key personnel, in particular Rudi Fronk, Chairman and Chief Executive Officer. There is little possibility that this dependence will decrease in the near term. The Issuer routinely engages in succession planning with respect to its senior officers with the aim of achieving orderly transition when key personnel depart. However, as a small company with no revenue, the Issuer tries to balance succession needs with maintaining a lean executive team. If the Issuer’s operations expand, additional general management resources will be required. The Issuer may not be able to attract and retain additional qualified personnel and this would have a negative effect on the Issuer’s operations. The Issuer does not consistently enter into any formal services agreements between itself and its officers or directors. The Issuer does not carry any “key man” life insurance.

 

The Issuer uses digital record keeping and utilizes the internet in its business activities which exposes it to cybersecurity risks.

 

The Issuer uses information technology systems and networks in its business, including maintaining digital records of its affairs, operating a web site and using other web-based services. The Issuer’s information systems, and those of its third-party service providers and vendors, are vulnerable to an increasing threat of continually evolving cyber security risks. Unauthorized parties may attempt to gain access to these systems or the Issuer’s information through fraud or other means of deceiving the Issuer or its third-party service providers or vendors.

 

The Issuer’s operations depend, in part, on how well the Issuer and its suppliers, protect networks, equipment, information technology (“IT”) systems and software against damage from a number of threats. The Issuer has entered into agreements with third parties for hardware, software, telecommunications, and other services in connection with its operations. The Issuer depends on SOC 2 Security Certification reports provided by a supplier and uses datacenters engineered to provide 99.999% availability to meet customer SLAs and service needs. The failure of information systems or a component of information systems could, depending on the nature of any such failure, adversely impact the Issuer’s reputation and its ability to conduct operations.

 

Although the Issuer has not experienced any known material losses relating to cyber attacks or other data/information security breaches in the last three years, there can be no assurance that the Issuer will not incur such losses in the future. The Issuer’s risk and exposure to these matters cannot be fully mitigated because of, among other things, the evolving nature of these threats. As a result, cyber security and the continued development and enhancement of controls, processes, and practices designed to protect systems, computers, software, data, and networks from attack, damage, or unauthorized access remain a priority.

 

78


 

Any future significant compromise or breach of the Issuer’s data/information security, whether external or internal, or misuse of data or information, could result in additional significant costs, fines, and lawsuits, and damage to the Issuer’s reputation. In addition, as the regulatory environment related to data/information security, data collection and use, and privacy becomes increasingly rigorous, with new and constantly changing requirements applicable to the Issuer’s business, compliance with those requirements could also result in additional costs. As cyber threats continue to evolve, the Issuer may be required to expend additional resources to continue to modify or enhance protective measures or to investigate and remediate any security vulnerabilities.

 

Certain of the Issuer’s directors and officers serve in similar positions with other natural resource companies, which put them in conflict of interest positions from time to time.

 

Certain of the directors and officers of the Issuer are also directors, officers or shareholders of other natural resource or mining-related companies. Such associations may give rise to conflicts of interest from time to time. The directors of the Issuer are required by law to act honestly and in good faith with a view to the best interests of the Issuer and to disclose any interest that they may have in any project or opportunity of the Issuer. If a conflict of interest arises in a matter to be discussed at a meeting of the board of directors, any director in a conflict must disclose his interest and abstain from voting on such matter. In determining whether or not the Issuer will participate in any project or opportunity, the directors will primarily consider the degree of risk to which the Issuer may be exposed and its financial position at the time.

 

The Issuer has spent the proceeds of the issuance of flow-through shares on expenditures it believes to be Canadian exploration expenses (“CEE”) and renounced such expenditures to investors in flow-through shares, but the CRA has advised it is going to reduce the amounts of CEE renounced. The Issuer is challenging the CRA’s conclusions but there is a risk the Issuer could be subject to additional tax and liable to indemnify the investors.

 

The Issuer has funded certain of its exploration activities, from time-to-time, with the proceeds of issuance of flow-through shares. The Issuer records and reports as CEE those expenditures which are required to determine “the existence, location, extent, or quality of a mineral resource” (applicable wording of the definition of CEE in the Income Tax Act), and renounces those amounts to investors to fulfill the Issuer’s commitments made at the time of the issuance of the flow-through shares. Whether certain expenditures qualify as CEE and are therefore eligible for renunciation by the Issuer was audited by the CRA for the three years ended December 31, 2016. The CRA reduced the amount of expenditures renounced as CEE by the Issuer in those years by approximately $19.1 million. The Issuer believes the CRA’s interpretation of the applicable legislation is inconsistent with previous audits and unjustifiably narrows the scope of eligible CEE as defined in the applicable legislation. The Issuer is challenging the CRA’s interpretation vigorously, and, if necessary, will proceed to litigation on the issue. Although the Issuer believes it will ultimately prevail on the merits, if the Issuer is not successful in its challenge, there is a risk the Issuer could be subject to additional tax and be liable to indemnify investors whose tax liabilities increase under reassessments of amounts renounced as ineligible. The Issuer has been made aware that the CRA has reassessed certain investors who subscribed for flow-through shares in 2013, 2014 and 2015 and may reassess other investors with reduced CEE deductions. Notice of objections to the Issuer’s and investors’ reassessments have and will be filed as received and will be appealed to the courts should the notices of objection be denied. The Issuer has indemnified the investors that subscribed for the flow-through shares and that have been reassessed by depositing the amount of their reassessments, including interest charges, into the accounts of the reassessed investors with the Receiver General in return for such investors agreement to object to their respective reassessments and to repay the Issuer any refund of the amount deposited on their behalf upon resolution of the Issuer’s appeal. To date, the Issuer has deposited $9.3 million with the Receiver General on behalf of such investors. It is possible that additional investors may be reassessed, but the Issuer estimates the additional amount it may agree to deposit with the Receiver General on behalf of reassessed investors will not exceed $4.8 million. If CRA’s position substantially prevails, it would have an adverse impact on future earnings and financial resources of the Issuer.

 

79


 

The Issuer has been reassessed by the CRA for expenditures it claims qualified for refunds under the British Columbia Mining Exploration Tax Credit (“BCMETC”) legislation and it will need to return some refunded money or challenge the reassessments in court and may not be successful in full.

 

For the tax years 2010 and 2011 the Issuer received refunds of qualifying exploration expenditures under the BCMETC legislation of $8.6 million. The CRA has audited and reassessed the Issuer in respect of such expenditures and has demanded that the Issuer return $3.2 million of the amounts refunded. The Issuer disagrees with the CRA’s decision and has commenced a legal action challenging the CRA’s reassessment. The outcome of its challenge is uncertain. There is a risk that if the reassessment is upheld the Issuer may be required to return money refunded to it by the CRA. However, the Issuer’s cash resources would not be impacted since the CRA already holds the full amount of the funds at issue.

 

Risks Related to the Common Shares

 

The market for the Common shares has been subject to volume and price volatility which could negatively affect a shareholder’s ability to buy or sell the Common shares.

 

The market for the Common shares may be highly volatile for reasons both related to the performance of the Issuer or events pertaining to the industry (i.e., mineral price fluctuation, high production costs) as well as factors unrelated to the Issuer or its industry. In particular, the price for gold, which was over US$1,900 per ounce in 2011, was below US$1,100 per ounce at the beginning of 2016, rose to over US$2,060 in August 2020 and again in March 2022, traded below $1,630 in October, 2022 and in March, 2024 traded over US$2,200/oz. In addition, market demand for products incorporating minerals fluctuates from one business cycle to the next, resulting in a change of demand for the mineral and a corresponding change in the price for the mineral. The Common shares can be expected to be subject to volatility in both price and volume arising from market expectations, announcements and press releases regarding the Issuer’s business, and changes in estimates and evaluations by securities analysts or other events or factors. In some years the securities markets in the United States and Canada have experienced a high level of price and volume volatility, and the market price of securities of many companies, particularly small-capitalization companies such as the Issuer, have experienced wide fluctuations that have not necessarily been related to the operations, performances, underlying asset values or prospects of such companies. For these reasons, the Common shares can also be expected to be subject to volatility resulting from market forces over which the Issuer will have no control. Further, despite the existence of markets for trading the Common shares in Canada and the United States, shareholders of the Issuer may be unable to sell significant quantities of Common shares in the public trading markets without a significant reduction in the price of the shares.

 

The Common shares are publicly traded and are subject to various factors that have historically made the Common share price volatile.

 

The market price of the Common shares has been, and may continue to be, subject to large fluctuations, which may result in losses to investors. The market price of the Common shares may increase or decrease in response to a number of events and factors, including: the Issuer’s operating performance and the performance of competitors and other similar companies; volatility in metal prices; the public’s reaction to the Issuer’s press releases, material change reports, other public announcements and the Issuer’s filings with the various securities regulatory authorities; changes in recommendations or price targets by research analysts who track the Common shares or the shares of other companies in the resource sector; changes in general economic and/or political conditions; the number of Common shares to be publicly traded after an offering of Common shares; the arrival or departure of key personnel; acquisitions, strategic alliances or joint ventures involving the Issuer or its competitors; and the factors listed under the heading “Description of the Issuer’s Business – Cautionary Statement Regarding Forward-Looking Information and Statements”. The Issuer has a high number of gold resource ounces per outstanding share relative to its competitors, which may lead to greater price fluctuations in the price of the Issuer’s Common shares relative to its competitors when the price of gold fluctuates.

 

80


 

The market price of the Common shares is affected by many other variables that are not directly related to the Issuer’s success and are, therefore, not within its control, including other developments that affect the market for all resource sector securities, the breadth of the public market for the Common shares and the attractiveness of alternative investments. The effect of these and other factors on the market price of the Common shares on the exchanges on which they trade has historically made the trading price of the Common shares volatile and suggests that the trading price of the Common shares will continue to be volatile in the future.

 

The Issuer has never declared or paid any dividends on the Common shares.

 

The Issuer has never declared or paid any dividends on the Common shares. The Issuer intends to retain earnings, if any, to finance the growth and advancement of the business and does not intend to pay cash dividends on the Common shares in the foreseeable future. Any return on an investment in the Common shares will come from the appreciation, if any, in their value. The payment of future cash dividends, if any, will be reviewed periodically by the Issuer’s Board of Directors and will depend upon, among other things, conditions then existing including earnings, financial conditions and capital requirements, restrictions in financing agreements, business opportunities and conditions, and other factors. See “Dividend Policy.”

 

Shareholders’ interest may be diluted in the future.

 

The Issuer requires additional funds for exploration and advancement programs or potential acquisitions. If it raises additional funding by issuing additional equity securities or other securities that are convertible into equity securities, such financings may substantially dilute the interests of existing or future shareholders. Sales or issuances of a substantial number of securities, or the perception that such sales could occur, may adversely affect the prevailing market price for the Common shares. With any additional sale or issuance of equity securities, investors will suffer dilution of their voting power and may experience dilution in ownership of the Issuer’s assets.

 

The Issuer believes it was a passive foreign investment company in 2023 which could have negative consequences for U.S. investors.

 

U.S. holders of our Common shares should be aware that we believe that for U.S. federal income tax purposes we were classified as a passive foreign investment company (“PFIC”) during the tax year ended December 31, 2023 and, based upon current business plans and financial expectations, we expect to be classified as a PFIC for the tax year ending December 31, 2024. Assuming the Issuer is a PFIC, then owners of the Common shares who are U.S. taxpayers generally will be required to treat any “excess distribution” received on their Common shares, or any gain realized upon a disposition of Common shares, as ordinary income and to pay an interest charge on a portion of such distribution or gain, unless the taxpayer makes a qualified electing fund (“QEF”) election or a mark-to-market election with respect to the Common shares. A U.S. taxpayer who makes a QEF election generally must report on a current basis its share of the Issuer’s net capital gain and ordinary earnings for any year in which the Issuer is classified as a PFIC, whether or not the Issuer distributes any amounts to its shareholders. U.S. investors should consult with their tax advisors for advice as to the U.S. tax consequences of an investment in the Common shares. For each tax year that we are a PFIC, we will make available the PFIC annual information statement as provided pursuant to Treasury Regulation Section 1.1295-1(g) on our website.

 

The Issuer operates in the mining industry, which tends to be opposed by pro-environmental groups and, with the increasing public concern about the environment, these groups may be able to negatively impact the investing public’s interest in owning mining industry stocks or investment in particular companies.

 

The Issuer is focused on the exploration and advancement of mineral properties and various environmental groups that seek to preserve nature and reduce carbon emissions typically oppose mining everywhere and often campaign aggressively against specific mining projects. The Issuer’s projects are located in areas where pro-environmental opposition to mining occurs. If the efforts of these groups are successful it could negatively impact share prices in the industry generally and, particularly if projects of the Issuer become the focus of an anti-mining campaign, it could negatively impact the Issuer’s share price.

 

ITEM 5: DIVIDENDS

 

The Issuer has not paid any dividends since incorporation. Payment of dividends in the future is dependent upon the earnings and financial condition of the Issuer and other factors which the directors may deem appropriate at the time. However, the Issuer is not limited in any way in its ability to pay dividends on its Common shares other than to comply with solvency tests that apply to it under its governing corporate legislation.

 

81


 

ITEM 6: GENERAL DESCRIPTION OF CAPITAL STRUCTURE

 

Share Capital

 

The Issuer is authorized to issue an unlimited number of Common shares without par value and an unlimited number of Preferred shares, issuable in series, of which at March 27, 2024, 86,853,771 Common shares were issued and outstanding and no Preferred shares were issued and outstanding.

 

The holders of the Common shares are entitled to receive notice of and to attend the vote at all meetings of the shareholders of the Issuer and each Common share confers the right to one vote in person or by proxy at all meetings of the shareholders of the Issuer. The holders of the Common shares, subject to the prior rights, if any, of the holders of any other class of shares of the Issuer, are entitled to receive such dividends in any financial year as the Board of Directors of the Issuer may by resolution determine. In the event of the liquidation, dissolution or winding-up of the Issuer, whether voluntary or involuntary, the holder of the Common shares are entitled to receive, subject to the prior rights, if any, of the holders of any other class of shares of the Issuer, the remaining property and assets of the Issuer.

 

The directors of the Issuer are authorized to create series of Preferred shares in such number and having such rights and restrictions with respect to dividends, rights of redemption, conversion or repurchase and voting rights as may be determined by the directors and shall have priority over the Common shares to the property and assets of the Issuer in the event of liquidation, dissolution or winding-up of the Issuer.

 

Secured Notes

 

The 2022 Note

 

Pursuant to a Subscription Agreement dated February 25, 2022, among KSMCO, Sprott and Ontario Teachers Pension Plan (for which Sprott acted as agent), Sprott agreed to purchase, and KSMCo agreed to sell, the 2022 Note to Sprott and the Issuer agreed to sell a Contingent Right to Sprott, for US$225,000,000. The transaction was completed on March 24, 2022. Unless redeemed by Sprott at an earlier date under to the terms of the 2022 Note, upon repayment of the principal due under the 2022 Note at maturity Sprott is obligated to use the principal to purchase a 60% gross silver royalty (the “Silver Royalty”) on the KSM Project. The proceeds of sale of the 2022 Note must be used by KSMCo to continue ongoing physical works at the KSM Project to advance the KSM Project towards a designation of “substantially started”.

 

The principal terms of the 2022 Note and gross silver royalty include:

 

(a) The 2022 Note matures on the date (the “Maturity Date”) that is the first to occur of:

 

(i) commercial production being achieved at the KSM Project; and

 

(ii) either March 24, 2032, or, if the environmental assessment certificate (“EAC”) expires and Sprott does not exercise its right to put the 2022 Note to KSMCo (described below), March 24, 2035.

 

(b) Prior to the Maturity Date, the 2022 Note bears interest at 6.5% per annum, payable quarterly in arrears. KSMCo can elect to satisfy interest payments in cash or by having the Issuer issue common shares of equivalent value under the Contingent Right.

 

(c) KSMCo has the option to buy back 50% of the Silver Royalty, once purchased by Sprott, on or before 3 years after commercial production has been achieved, for an amount that provides Sprott a minimum guaranteed annualized return.

 

(d) If project financing to develop, construct and place the KSM Project into commercial production is not in place by March 24, 2027, Sprott can put the 2022 Note back to KSMCo for US$232.5 million, with KSMCo able to pay such amount in cash or by having the Issuer issue common shares under the Contingent Right, at KSMCo’s option. This put right expires once such project financing is in place. If Sprott exercises this put right, its right to purchase the Silver Royalty terminates.

 

(e) If the KSM Project’s EAC expires at any time while the 2022 Note is outstanding, Sprott can put the 2022 Note back to KSMCo for US$247.5 million at any time over the following nine months, with KSMCo able to satisfy the put in cash or by having the Issuer issue common shares under the Contingent Right, at KSMCo’s option. If Sprott exercises this put right, Sprott’s right to purchase the Silver Royalty terminates.

 

(f) If commercial production is not achieved at the KSM Project prior to March 24, 2032, the Silver Royalty payable to Sprott will increase to a 75% gross silver royalty (if the EAC expires during the term of the 2022 Note and the corresponding put right is not exercised, this increase in the royalty percentage will occur at March 24, 2035).

 

(g) No amount payable may be paid in common shares of the Issuer if, after the payment, Sprott would own more than 9.9% of the Issuer’s outstanding shares.

 

(h) KSMCo’s obligations under the 2022 Note is secured by a charge over all of the assets of KSMCo and a limited recourse guarantee from the Issuer secured by a pledge of the shares of KSMCo.

 

82


 

The 2023 Note

 

On June 28, 2023, the Company and KSMCo, signed a definitive agreement to sell a secured note (“2023 Note”) that is to be exchanged at maturity for a net smelter returns royalty on the KSM Project to Sprott for US$150,000,000. The transaction closed on June 29, 2023. The key terms of the 2023 Note include:

 

(a) When the 2023 Note matures, Sprott will use all of the principal amount repaid on maturity to purchase a 1% NSR, subject to adjustment of the amount as described below (the “Sprott NSR”). Maturity occurs upon the first to occur of:

 

(i) commercial production being achieved at KSM; and

 

(ii) either on March 24, 2032 or, if the EAC expires and the Investors do not exercise their right to put the 2023 Note to the Company, on March 24, 2035.

 

(b) Prior to its maturity, the 2023 Note bears interest at 6.5% per annum, payable quarterly in arrears. However, payment of quarterly interest due on or before June 29, 2025 (the “Deferred Interest”) will be deferred and the Deferred Interest plus interest accrued on it (the “Interest Deferral Amount”) is payable on or before December 29, 2025 in a lump sum in cash or in Seabridge common shares.

 

(c) KSMCo can pay the Interest Deferral Amount in the amount of US$21.5M by paying it to Sprott. Instead of paying the Interest Deferral Amount, KSMCo can elect to increase the size of the Sprott NSR to be sold to Sprott on the Maturity Date from a 1% NSR to a 1.2% NSR (the “Royalty Increase Election”).

 

(d) The Company can elect to satisfy quarterly interest payments due by paying them in cash or Seabridge common shares. The requirement to make quarterly interest payments expires on the maturity date.

 

(e) If commercial production is not achieved at the KSM Project prior to March 24, 2032, the size of the Sprott NSR to be sold to Sprott on the Maturity Date will increase to 1.25% if KSMCo paid the Interest Deferral Amount in cash or shares, or to 1.5% if KSMCo made the Royalty Increase Election (the applicable increase being the “Production Delay Increase”).

 

(f) The Company has the option to purchase the Sprott NSR amount down (after the Sprott NSR is sold to Sprott) to a 0.5% NSR (or to 0.625% if the Production Delay Increase occurred) on or before three years after commercial production has been achieved, for an amount that provides Sprott a minimum guaranteed annualized return.

 

(g) If project financing to develop, construct and place KSM into commercial production is not in place by March 24, 2027, Sprott can put the 2023 Note back to the Company for:

 

(i) if the Company is obligated to sell Sprott a 1% NSR on the Maturity Date at the time, US$155 million plus accrued and unpaid interest, or

 

83


 

(ii) if the Company is obligated to sell Sprott a 1.2% or 1.5% NSR on the Maturity Date at the time, US$180 million plus accrued and unpaid interest.

 

This Sprott put right expires once such project financing is in place. If Sprott exercises this put right, Sprott’s right to purchase the Sprott NSR terminates.

 

(h) If KSM’s EAC expires at anytime while the 2023 Note is outstanding, Sprott can put the 2023 Note back to the Company at any time over the following nine months for:

 

(i) if the Company is obligated to sell Sprott a 1% NSR on the Maturity Date at the time, US$165 million plus accrued and unpaid interest, or

 

(ii) if the Company is obligated to sell Sprott a 1.2% NSR on the Maturity Date at the time, US$186.5 million plus accrued and unpaid interest.

 

If Sprott exercises this put right, Sprott’s right to purchase the Sprott NSR terminates.

 

(i) The Company can elect to satisfy payments due on Sprott’s exercise of either of its put rights in cash or by delivering common shares.

 

(j) No amount payable shall be paid in common shares if, after the payment, Sprott would own more than 9.9% of the Company’s outstanding shares.

 

(k) The Company’s obligations under the 2023 Note are secured by a charge over all of the assets of KSMCo and a limited recourse guarantee from the Company secured by a pledge of the shares of KSMCo.

 

ITEM 7: MARKET FOR SECURITIES

 

Trading Price and Volume

 

The Issuer’s Common shares are listed for trading through the facilities of the TSX under the symbol “SEA”, and on the NYSE under the symbol “SA”. During the Issuer’s most recently completed financial year, the high and low trading prices and trading volume (rounded up or down to the nearest 100) of the Issuer’s Common shares on the TSX and on the NYSE was as follows:

 

2023 TSX NYSE/AMEX
Month Volume High
(CDN$)
Low
(CDN$)
Volume High
(US$)
Low
(US$)
January   1,059,526 19.00 17.19 6,670,299 14.18 12.58
February   1,133,107 18.20 14.22 4,793,746 13.62 10.43
March   1,413,412 18.22 14.36 8,544,562 13.47 10.41
April   1,032,223 19.40 16.87 7,811,729 14.28 12.44
May   1,467,302 21.78 17.94 9,633,552 16.18 13.18
June      891,268 19.26 14.94 7,684,126 14.37 11.25
July      763,584 18.01 15.69 5,756,131 13.65 11.82
August      901,342 16.72 15.11 5,002,664 12.52 11.15
September   1,119,340 16.25 14.15 5,579,896 12.00 10.43
October      822,381 16.39 13.34 8,172,210 12.00 9.72
November   1,044,497 16.90 14.76 8,425,196 12.46 10.62
December   1,117,108 17.32 14.57 10,509,163 13.12 10.71

 

84


 

ITEM 8: DIRECTORS AND OFFICERS

 

The By-Laws of the Issuer provide for the election and retirement of directors. At each annual general meeting, all the directors retire and the Issuer elects a Board of Directors consisting of the number of directors fixed from time to time by the shareholders, subject to the Issuer’s Articles. If the election of directors is not held at the proper time, the incumbent directors shall continue in office until their successors are elected. The Issuer has a three member Audit Committee, a four member Corporate Governance and Nominating Committee, a four member Sustainability Committee, a three member Compensation Committee and a five member Technical Committee.

 

The Issuer adopted a Diversity Policy in 2019 and formally recognized that diversity combined with experience and perspective can contribute insights and promote sensitivities useful to the Board’s deliberations and to the management of the Issuer’s operations. Since that date it has made consistent progress in building diversity in the Issuer, including amongst management. Of the 11 directors in office, 4 are women representing 36.4% of the directors and one is an Indigenous Canadian representing 9.1% of the directors. Of the 10 executive officers of the Company, 3 are women representing 30% of the executive officers and one is an Indigenous Canadian representing 9.1% of the executive officers. Of the 5 Board Committees, 2 are Chaired by women directors, 1 has 67% women members, another has 50% women members and two others have 40% women members.

 

The names and municipalities of residence of the directors and officers of the Issuer, the positions held by them with the Issuer, their principal occupations for the past five years and their shareholdings in the Issuer as of March 15, 2024 are as follows:

 

Directors

 

Name, Municipality of Residence and Position Principal Occupation or employment and,
if not a previously elected director,
occupation during the past 5 years
Previous
Service as a
Director
Number of
Common shares
beneficially
owned, or
controlled or
directed,
directly or
indirectly(6)
Trace Arlaud (3) (5)
Frisco, Colorado, USA
Director
CEO of IMB Inc. since 2019, Project Director - Mass Mining, JDS Energy and Mining, 2017-2019, Regional Director, Mining (USA &. Western Canada) & Associate. Hatch Associate Inc 2010-2017. Since June 2021 14,000
Matthew Coon Come(4)
Mistissini, Quebec, Canada
Director
Consultant/Negotiator, Former Grand Chief of the Crees of Northern Quebec and Board Member of the Grand Council of Crees and Cree Regional Authority, Former National Chief of the Assembly of First Nations (2000-03), formerly a director of Creeco, AirCreebec, Cree Regional Intercompany Enterprise Company and Cree Construction Company and Chairman of Cree Housing Corporation and James Bay Native Development Corporation Since June 2023 0
Rudi P. Fronk
Denver, Colorado, USA
Chairman and CEO, Director
Chairman and CEO, Seabridge Gold Inc.   Since October 1999 1,203,666 directly 30,000 indirectly
Eliseo Gonzalez-Urien(2) (5)
Ashland, Oregon, USA
Director
Senior Technical Advisor, Seabridge Gold Inc.  Retired as Senior Vice President, Placer Dome Inc. in 2001.   Since January 2006 124,765

 

85


 

Name, Municipality of Residence and Position Principal Occupation or employment and,
if not a previously elected director,
occupation during the past 5 years
Previous
Service as a
Director
Number of
Common shares
beneficially
owned, or
controlled or
directed,
directly or
indirectly(6)
Jay Layman(4) (5)
Jackson Hole, Wyoming, USA Director
President and Chief Operating Officer, Seabridge Gold from June 2012 to July 2022 Since June, 2012 33,400
Melanie Miller(4)(5)
Crested Butte, Colorado, USA
Director, Vice President, Chief Sustainability Officer
Vice President, Chief Sustainability Officer, Seabridge, August 2022 to present, Director of Highland Copper, December 2021 to present, General Manager, Hemlo Operations at Barrick Gold 2017 to 2018, Vice President, Supply Chain Management at Barrick Gold 2014 to 2017 Since June, 2019 13,900
Clem Pelletier(2)(4)(5)
North Vancouver, B.C., Canada
Director
Senior Technical Advisor at ERM: Environmental Resources Management, Process Chemist/Metallurgist, founder and former CEO of Rescan Group Ltd. 1981 to September 2012 Since June, 2018 38,000
Julie Robertson(1)
Mississauga, Ontario, Canada
Director
Chief Financial Officer of Marathon Gold Corp. 2022 to 2024, Vice President Finance and Capital Projects, Centerra Gold Corp. 2019 to 2022, Vice President & Controller, Barrick Gold Corp. 2006 to 2019 Since June, 2023 0
John Sabine(3)
Plympton-Wyoming, Ontario, Canada
Lead Director
Retired as Counsel to Bennett Jones LLP in August 2020; former Lead Director of Osisko Green Acquisitions Limited, non-executive chair of Anvil Mining Limited, Meridian Mining UK S, and North American Nickel Inc. Since June, 2014 25,000 directly 19,600 indirectly
Gary Sugar(1)(2)(3)
Toronto, Ontario, Canada
Director
Retired in 2011 as a Managing Director at RBC Capital Markets, former Director of Norzinc Ltd., former Director, Stillwater Mining Co., Osisko Mining Corp. and Romarco Minerals Inc. Since May 13, 2016 31,500
Carol Willson(1)(3)(4)
Oakville, Ontario, Canada
Director
President, Willson Advisory Inc. (consulting risk services), 2021 to present, Engagement Partner (Internal Audit co-sourcing, Operational Risk/Enterprise Risk and Internal Controls Projects), Ernst & Young, 1993 to 2021 Since June 29, 2022 5,000

 

(1) Member of the Audit Committee.
(2) Member of the Compensation Committee.
(3) Member of the Corporate Governance and Nominating Committee.
(4) Member of the Sustainability Committee
(5) Member of the Technical Committee.
(6) Shares beneficially owned, directly or indirectly, or over which control or direction is exercise, as at March 15, 2024, based upon information furnished to the Corporation by individual directors. Unless otherwise indicated, such shares are held directly.

 

86


 

Executive Officers

 

 Name, Municipality of Residence and Position

Principal Occupation or employment
and, if not a previously elected
director, occupation during the past
5 years
Previous
Service as
a Director

Number of
Common shares
beneficially
owned, or
controlled or
directed,
directly or
indirectly(1)

Ryan Hoel
Tucson, Arizona, USA
President and Chief Operating Officer
President and Chief Operating Officer, Seabridge, January 2024 to present, Senior Vice President, Chief Operating Officer, Seabridge, September 2021 to December 2023, Vice President, Project Development, South32, September 2018 to September 2021, Vice President, Construction, Arizona Mining, July 2017 to September 2018 N/A 68,250
Tracey Meintjes
Oliver, B.C., Canada
Senior Vice President, Technical Services
Senior Vice President, Technical Services, Seabridge, January 2024 to present, Vice President, Technical Studies, Seabridge, September 2021 to December 2023, Director and Principal Consultant, Moose Mountain Technical Services to September 2021 N/A 1,302
R. Brent Murphy
Lake George, NB, Canada
Senior Vice President, Environmental Affairs
Senior Vice President, Environmental Affairs, Seabridge Gold since January 2020, Vice President, Environmental Affairs, Seabridge Gold since December 2010 N/A 86,919 directly
6,810 indirectly
C. Bruce Scott
West Vancouver, B.C., Canada
Senior Vice President, General Counsel and Corporate Secretary
Senior Vice President, General Counsel and Corporate Secretary, Seabridge Gold since January 2023, Vice President, Corporate Affairs and Corporate Secretary, Seabridge Gold from January 2012 to December 2018, President of CBCS Law Corporation, counsel to the Issuer, January 2012 to December 2018 N/A 82,458 directly
34,700 indirectly
William E. Threlkeld
Morrison, Colorado, USA
Senior Vice President, Exploration
Senior V.P., Exploration, Seabridge Gold since 2001 N/A 423,897
Elizabeth Miller
Smithers, B.C., Canada
Vice President, Environment and Social Responsibility
Vice President, Environment and Social Responsibility, Seabridge Gold since January, 2020; Environmental Co-ordinator, Seabridge Gold, since 2011 N/A 30,002 directly
2,200 indirectly
Julie Rachynski
Kamloops, B.C., Canada
Vice President, Human Resources
Vice President, Human Resources, Seabridge Gold since September 2021; Operations HR and Community Manager, New Gold March 2019 – August 2021 Vice President, HR, New Gold, September 2017 – March 2019, HR Manager, New Gold May 2014 – August 2017 N/A 8,481
Christopher J. Reynolds
Oakville, Ontario, Canada
Vice President, Finance & CFO
Vice President, Finance and Chief Financial Officer, Seabridge Gold since May 2011; Director of Paramount Gold Nevada Corp., since April 2015; Director of Mayfair Gold Corp. since November, 2020. N/A 167,506

 

(1) Shares beneficially owned, directly or indirectly, or over which control or direction is exercise, as at March 15, 2024, based upon information furnished to the Corporation by individual directors. Unless otherwise indicated, such shares are held directly.

 

87


 

As of March 15, 2024, the directors and executive officers of the Issuer, as a group, hold 2,451,356 Common shares of the Issuer (excluding Common shares which may be acquired upon exercise of stock options and vesting of restricted share units held by them), representing 2.8% of the Issuer’s issued and outstanding shares.

 

The Issuer has adopted an Equity Ownership Policy under which its directors and executive officers are required to own, directly or indirectly, securities of the Issuer with a value that is a multiple of their annual retainer or salary. For the directors and the CEO, the multiple is 3, for the CFO and COO, the multiple is 2, for the Senior Vice Presidents the multiple is 1.5 and for Vice Presidents it is 1. In order to ensure that the Equity Ownership Policy has its desired effect, the Issuer has adopted an Anti-Hedging Policy that prohibits directors and the top executive officers from hedging the Company’s securities.

 

None of the Issuer’s directors or executive officers is, as at the date of this AIF, or has been, within ten years before the date of this AIF, a director, chief executive officer or chief financial officer of any company (including the Issuer) that:

 

(a) was subject to an Order (as defined below) that was issued while the director or executive officer was acting in the capacity as director, chief executive officer or chief financial officer; or

 

(b) was subject to an Order that was issued after the director or executive officer ceased to be a director, chief executive officer or chief financial officer and which resulted from an event that occurred while that person was acting in the capacity as director, chief executive officer or chief financial officer.

 

“Order” means a cease trade order, an order similar to a cease trade order, or an order that denied the relevant company access to any exemption under securities legislation and, in each case, that was in effect for a period of more than 30 consecutive days.

 

Other than as set forth below, none of the Issuer’s directors or executive officers or any shareholder holding a sufficient number of securities of the Issuer to affect materially the control of the Issuer:

 

(a) is, as at the date of this AIF or has been, within the ten years before the date of this AIF, a director or executive officer of any company, that while that person was acting in that capacity, or within a year of that person ceasing to act in that capacity, became bankrupt, made a proposal under any legislation relating to bankruptcy or insolvency or was subject to or instituted any proceedings, arrangements or compromise with creditors or had a receiver, receiver manager or trustee appointed to hold its assets; or

 

(b) has, within the ten years before the date of this AIF, become bankrupt, made a proposal under any legislation relating to bankruptcy or insolvency, or become subject to or instituted any proceedings, arrangements or compromise with creditors, or had a receiver, receiver manager or trustee appointed to hold the assets of the director, officer or shareholder.

 

Gedex Systems Inc. (“Gedex”), a Canadian private company of which Rudi P. Fronk and Eliseo Gonzalez-Urien were non-executive chairman and a director, respectively, was subject to an application made by FCMI Parent Co. to commence proceedings under the Companies’ Creditors Arrangement Act (Canada) (the “CCAA”) in respect of Gedex, among others, pursuant to an Initial Order of the Ontario Superior Court of Justice (Commercial List) (the “Court”) dated August 12, 2019. The Court subsequently granted a CCAA Termination Order on December 5, 2019 pursuant to which the Court approved the termination of the CCAA proceedings effective at the date and time on which Zeifman Partners Inc, as monitor (the “Monitor”) filed a Discharge Certificate with the Court. On December 23, 2019, the Monitor filed the Discharge Certificate with the Court.

 

Nautilus Minerals Inc. (“Nautilus”), a Canadian reporting issuer of which Jay Layman was a non-executive director, filed for and was granted creditor protection under the CCAA. Mr. Layman and the other independent directors of Nautilus resigned on March 29, 2019 prior to Nautilus being delisted from the TSX on April 3, 2019. By order made August 13, 2019, the Supreme Court of British Columbia sanctioned and approved a plan of compromise, arrangement and reorganization dated July 23, 2019 pursuant to which Deep Sea Mining Finance Ltd., as buyer, acquired certain assets from Nautilus.

 

88


 

ITEM 9: AUDIT COMMITTEE INFORMATION

 

Audit Committee Charter

 

 

The Issuer’s audit committee has a charter (The “Audit Committee Charter”) in the form attached to this AIF as Schedule “A”.

 

Composition of the Audit Committee

 

Each of the members of the Issuer’s Audit Committee is independent and financially literate, as those terms are defined in National Instrument 52-110 Audit Committees.

 

Relevant Education and Experience

 

A description of the education and experience of each audit committee member that is relevant to the performance of his or her responsibilities as an audit committee member is set out below.

 

Carol Willson (Audit Committee Chair)

 

Ms. Willson retired from EY in 2021 after a 28-year career where she was engagement partner for Internal Audit of clients which included multi-year internal audit outsourced projects and related internal audit transformations and reviews, fraud investigations, and in various assurance and advisory capacities including capital projects, ESG, finance function-related improvements, and cybersecurity. During Ms. Willson’s career as an experienced internal audit and risk professional, she was retained to lead risk, internal audit and SOX functions for a variety of public corporations including several major mining companies. She served for three years as the global head of internal audit and SOX for Kinross Gold Corporation where her key audit areas included: supply chain, capital projects, procure to pay, ERP/cybersecurity, sustainability, budgeting & forecasting, fixed assets, and treasury. Ms. Willson currently has her own consulting business where she serves as a senior risk advisor for clients. She holds a Bachelor of Arts degree from the University of Western Ontario and an MBA-Accounting degree from the University of Toronto.

 

Julie Robertson

 

Ms. Julie Robertson is a Certified Public Accountant and brings extensive experience in various finance roles within the mining sector, including expertise in the areas of International Financial Reporting Standards, US Generally Accepted Accounting Principles, external reporting, internal control optimization and compliance, including SOX, risk assessment processes, capital project management, ESG reporting and cybersecurity. She was most recently the Chief Financial Officer of Marathon Gold Corp., previously the Vice President of Finance and Capital Projects at Centerra Gold, and the Vice President and Controller at Barrick Gold. She also holds a graduate diploma in Finance and Accounting from Wilfred Laurier University.

 

Gary Sugar

 

Mr. Sugar retired in 2011 from RBC Capital Markets after a distinguished 32-year career. He initially worked in the mining industry in exploration and corporate development for companies including Inco, Cominco, Rio Algom, and Imperial Oil (Exxon). Mr. Sugar joined a predecessor company to RBC Capital Markets in 1979. He specialized in the mining sector, particularly in equity and debt financings, mergers and acquisitions, and other advisory services for a wide range of Canadian and international mining companies. He was appointed a managing director in 1987, and led the mining practice for many years. Mr. Sugar was a director of Stillwater Mining Company until its acquisition by Sibanye Gold Limited in May, 2017, was a member of the Board of Directors of Osisko Mining Corporation from March 2012 until its acquisition in June, 2014, and also served on the Board of Directors of Romarco Minerals Inc. until its acquisition by Oceana Gold on October 1, 2015. Mr. Sugar ceased to be a director of Norzinc Ltd. upon its acquisition by RCF VI CAD LLC in December, 2022. He holds a Bachelor of Science degree in Geology and an M.B.A. from the University of Toronto.

 

89


 

External Auditor Services Fees (by Category)

 

The aggregate fees billed by the Issuer’s external auditors in the following categories for the 12 months ended December 31, 2023 and 2022 are as follows:

 

    2023     2022  
Audit Fees   $ 750,500     $ 755,275  
Audit Related Fees             0  
Tax Fees   $ 185,760     $ 70,979  
All Other Fees             0  
Total   $ 936,260     $ 826,254  

 

Pre-Approval of Audit and Non-Audit Services Provided by Independent Auditors

 

Pursuant to its responsibilities under the Audit Committee Charter, the Audit Committee has developed a practice under which audit and review services, specified audit-related services, certain permitted non-audit services and tax-related non-audit services are presented to the Audit Committee for pre-approval on an annual basis.  Following the annual pre-approval, the Vice President, Finance and Chief Financial Officer of the Issuer oversees statutory audits and reviews and additional audit-related services and specified non-audit services, provided that the estimated fees for such services do not exceed specified dollar limits. Additional specified non-audit services that exceed the dollar limits and all additional non-audit services, including tax-related non-audit services, require the pre-approval of the Audit Committee.

 

ITEM 10: CONFLICTS OF INTEREST

 

Certain of the Issuer’s directors and officers serve or may agree to serve as directors or officers of other reporting companies or have significant shareholdings in other reporting companies and, to the extent that such other companies may pursue business objectives similar to those which the Issuer may pursue, the directors of the Issuer may have a conflict of interest respecting such pursuits. Under the corporate laws applicable to the Issuer, the directors of the Issuer are required to act honestly, in good faith and in the best interests of the Issuer and to disclose all conflicts to the directors so that appropriate procedures may be established for the circumstances, including abstaining from voting or the establishment of special committees.

 

ITEM 11: LEGAL PROCEEDINGS AND REGULATORY ACTIONS

 

Legal Proceedings

 

In 2010 and 2011, the Issuer spent $56 million on the KSM Project. The Issuer applied for a BC Mineral Exploration Tax Credit (“BCMETC”) refund with respect to $42 million of these costs that it considered Canadian Exploration Expenses (“CEE”) under the relevant legislation. The Issuer received $8.5 million in refunds based on its application. Of the $42 million of spending on CEE that generated the refunds, the CRA has, upon completion of an audit, concluded that $15.8 million was not CEE and the Issuer received a notice of re-assessment demanding the Issuer return $3.1 million of the refunds. The Issuer believes the CRA’s interpretation of the applicable legislation unjustifiably narrows the scope of eligible CEE, which is described in the applicable legislation as expenditures incurred for the purpose of determining “the existence, location, extent, or quality of a mineral resource”. The Issuer objected to the re-assessment and has filed a Notice of Appeal with the Supreme Court in BC challenging the position of the CRA. The Department of Justice has responded to the Notice of Appeal and reiterated its position. The case is currently in discovery, with documents and information being exchanged between the parties. The Issuer intends to continue to fully defend its position as the expenditures meet the purpose test for CEE as defined in the Income Tax Act (BC). The CRA holds the full dollar amount in dispute.

 

90


 

In early 2019, the Issuer received a notice from the CRA that, after completing its audit of the three years ended December 31, 2016, it intends to reduce the amount of expenditures the Issuer reported as CEE for such years. The Issuer has funded certain of its exploration activities, from time-to-time, with the proceeds of issuance of flow-through shares. The Issuer records and reports the expenditures it believes to be CEE and is obligated to renounce CEE to purchasers of flow-through shares in the amount of their flow-through share subscriptions and indemnify purchasers for additional tax payable by them due to the CRA reducing CEE renounced to them. The CRA reduced the amount of expenditures renounced to such purchasers as CEE by the Issuer in those years by approximately $19.1 million. The CRA’s decision resulted in a reassessment of the Issuer and the potential reassessment of each of the individual purchasers for the years in question. As with the matter described above relating to BCMETC, the Issuer believes the CRA’s interpretation of the applicable legislation is inconsistent with previous audits and unjustifiably narrows the scope of eligible CEE as defined in the applicable legislation. The Issuer has formally objected to its reassessment and is defending its position. The Issuer has been contacted by certain investors who subscribed for flow-through shares in 2013, 2014 and 2015 that the CRA has reassessed and CRA may reassess other investors with reduced CEE deductions. Notice of objections to the Issuer’s and investors’ reassessments have and will be filed as received and will be appealed to the courts should the notices of objection be denied. The Issuer has indemnified the investors that subscribed for the flow-through shares and that have been reassessed by depositing the amount of their reassessments, including interest charges, into the accounts of the reassessed investors with the Receiver General in return for such investors agreement to object to their respective reassessments and to repay the Issuer any refund of the amount deposited on their behalf upon resolution of the Issuer’s appeal. To date, the Issuer has deposited $9.3 million with the Receiver General on behalf of such investors. It is possible that additional investors may be reassessed, but the Issuer estimates the additional amount it may agree to deposit with the Receiver General on behalf of reassessed investors will not exceed $4.3 million.

 

Other than the foregoing two matters with the CRA, the Issuer is not a party to, and its properties were not the subject of, any material legal proceedings during the financial year ended December 31, 2023 and it does not know of any such proceedings that are contemplated.

 

Regulatory Actions

 

There are no: (a) penalties or sanctions imposed against the Issuer by a court relating to securities legislation or by a securities regulatory authority during the Issuer’s most recently completed financial year and up to the date of this AIF; (b) other penalties or sanctions imposed by a court or regulatory body against the Issuer that would likely be considered important to a reasonable investor in making an investment decision; or (c) settlement agreements the Issuer entered into with a court relating to securities legislation or with a securities regulatory authority during the Issuer’s most recently completed financial year and up to the date of this AIF.

 

ITEM 12: INFORMATION TECHNOLOGY AND CYBERSECURITY

 

The Issuer’s operations depend upon the availability, capacity, reliability, and security of its information technology (IT) infrastructure, and its ability to expand and update this infrastructure as required, to conduct daily operations.  In 2022, Seabridge hired a dedicated Director of Information Technology, who is located at the Issuer’s office in Toronto, Canada.  He reports to the Vice-President, Finance and Chief Financial Officer, who reports on IT matters to the Audit Committee of the Board of Directors quarterly.

 

91


 

Seabridge relies on various IT systems in all areas of its operations, including financial reporting, contract management, exploration and development data analysis and other operational activities, human resource management, regulatory compliance and communications with employees and third parties. These IT systems could be subject to network disruptions caused by a variety of sources. As such, Seabridge conducts regular maintenance, updates and replacement of networks, equipment, IT systems and software, as well as pre-emptive work and redundancies to mitigate the risks or magnitude of failures, if any. In addition, Seabridge’s IT systems and software are protected by various tools including, but not limited to, anti-virus and anti-malware with integrated threat intelligence and immediate response systems, perimeter firewalls, password requirements including multi-factor authentications, and e-mail security and protection solutions.  An independent cybersecurity review of access to information and other security protocols around the Company’s IT systems was undertaken in 2023.  This cybersecurity review, among other items, verifies all employees’ ability to recognize potentially malicious emails or other communications that could enable an intruder to download malware onto the Company’s systems leading to the potential circumventing of the Company’s cybersecurity protocols and to potentially steal or hold ransom Company data.  The Issuer has conducted a penetration review by a third-party consultant in the second quarter of 2023 and conducted IT training sessions for its personnel. 

 

During the last three years the Issuer has not experienced any material losses relating to cyber-attacks or other information security breaches.

 

ITEM 13: INTEREST OF MANAGEMENT AND OTHERS IN MATERIAL TRANSACTIONS

 

No director, executive officer or person or company that beneficially owns, or controls or directs, directly or indirectly, more than 10% of the Issuer’s outstanding Common shares, or any associate or affiliate of the foregoing, has had any material interest, direct or indirect, in any transaction within the three most recently completed financial years or during the current financial year prior to the date of this AIF that has materially affected or is reasonably expected to materially affect the Issuer.

 

ITEM 14: TRANSFER AGENTS AND REGISTRARS

 

The registrar and transfer agent for the Common shares is Computershare Investor Services Inc. at its principal office at 100 University Avenue, 9th floor, Toronto, Ontario, Canada M5J 2Y1 and co-transfer points at 510 Burrard Street, Vancouver, British Columbia, Canada V6C 3B9 and Computershare Trust Company, N.A., at 350 Indiana Street, Suite 800, Golden, Colorado, USA 80401.

 

ITEM 15: MATERIAL CONTRACTS

 

On June 28, 2023, the Company and KSMCo, signed a definitive agreement to sell the 2023 Secured Note that is to be exchanged at maturity for the Sprott NSR on its KSM Project to Sprott for US$150 million. The transaction closed on June 29, 2023. The key terms of the 2023 Secured Note are described under the heading “General Description of Capital Structure – Secured Notes – The 2023 Note”. The proceeds of sale of the Note must be used by KSMCo to continue ongoing physical works at the KSM Project to advance the KSM Project towards a designation of “substantially started”.

 

Other than the agreement described above, the Issuer is not a party to a material contract that was not entered into in the ordinary course of its business or that is otherwise required to be filed under section 12.2 of National Instrument 51-102 (“NI 51-102”) at the time this AIF is filed or would be required to be filed under section 12.2 of NI 51-102 at the time this AIF is filed but for the fact that it was previously filed.

 

92


 

ITEM 16: INTERESTS OF EXPERTS

 

None of Hassan Ghaffari, Dr. John Huang, Henry Kim, Jim Gray, W.N. Brazier, Rolf Schmitt, David Willms, Derek Kinakin, and Ross Hammett, each being persons who have been named as having prepared or participated in preparing reports relating to the Issuer’s KSM Project referred to in this AIF or otherwise filed under NI 51-102 by the Issuer during, or relating to, the Issuer’s most recently completed financial year or during the period thereafter to the date of this AIF, or any director, officer, employee or partner thereof, as applicable, holds, received or has received a direct or indirect interest in the property of the Issuer or of any associate or affiliate of the Issuer. To the Issuer’s knowledge, as at the dates of their respective reports, the aforementioned persons, and the directors, officers, employees and partners, as applicable, of each of the aforementioned companies and partnerships beneficially own, directly or indirectly, in total, less than one percent of the securities of the Issuer and none of them have received securities of the Issuer from the Issuer since such dates.

 

Neither the aforementioned persons, nor any director, officer, employee or partner, as applicable, of the aforementioned companies or partnerships, are currently expected to be elected, appointed or employed as a director, officer or employee of the Issuer or of any associate or affiliate of the Issuer.

 

The auditors of the Issuer are KPMG LLP of Toronto, Ontario, Canada. KPMG LLP have confirmed that they are independent with respect to the Issuer with the meaning of the relevant rules and related interpretations prescribed by the relevant professional bodies in Canada and any applicable legislation or regulations, and also that they are independent accountants with respect to the Issuer under all relevant US professional and regulatory standards.

 

ITEM 17: ADDITIONAL INFORMATION

 

Additional information relating to the Issuer may be found on SEDAR+ at www.sedarplus.ca. The information available at www.sedarplus.ca includes copies of the full text of all of the technical reports prepared for the Issuer in respect of the Issuer’s properties described herein.

 

Additional information, including directors’ and officers’ remuneration and indebtedness, principal holders of the Issuer’s securities, and securities authorized for issuance under equity compensation plans, where applicable, is contained in the Issuer’s Information Circular for its most recent annual general meeting of securityholders that involved the election of directors.

 

Additional financial information is provided in the Issuer’s consolidated financial statements and management’s discussion and analysis for the Issuer’s most recent completed financial year.

 

93


 

SCHEDULE A

 

AUDIT COMMITTEE CHARTER

 

The Audit Committee (“Committee”) is responsible to oversee the Corporation’s accounting and financial reporting processes on behalf of the Board of Directors (“Board”) to assist the directors of the Corporation in meeting their responsibilities with respect to financial reporting. The Committee has general responsibility for oversight of internal controls, risk management, complaints handling and information systems of the Corporation. The Committee will also monitor the independence and performance of the Corporation’s independent auditors.

 

Composition

 

The Committee shall comprise a minimum of three directors, each of whom shall be unrelated and independent as determined by the Board in accordance with the requirements of laws governing the Corporation including National Instrument 58-101 Disclosure of Corporate Governance Practices, as amended from time to time, the rules of the stock exchanges on which the shares of the Corporation are traded, the Canada Business Corporations Act, and applicable securities regulatory authorities.

 

The members of the Committee shall be appointed by the Board annually at the meeting following the annual general meeting of shareholders, or such other times as the Board may determine, to serve at the pleasure of the Board. The Board shall designate one member to serve as the chair of the Committee (“Chair”), failing which the members may designate a Chair by majority vote.

 

Meetings

 

The Committee shall meet at least quarterly, or more frequently as may be deemed appropriate, in the judgment of the Chair, in person or teleconference or videoconference, at such times and places as determined by the Chair. The Committee shall report regularly to the Board with respect to its activities.

 

Authority to Retain Advisors

 

In the course of its duties, the Committee shall have the sole authority, at the Corporation’s expense, to retain and terminate such advisors as it deems necessary, including the authority to approve the fees and terms of reference thereof.

 

Responsibilities

 

The following sets forth the duties and responsibilities of the Committee in carrying out its oversight function and as a guide to the Committee which may be revised by the Committee as appropriate in the circumstances and to the extent permitted by applicable law or stock exchange listing standards:

 

Financial Accounting and Reporting processes

 

a) to review with the independent auditors and with management, prior to making recommendations to the Board for its approval:

 

i) interim and annual financial statements, including the notes thereto;

 

94


 

ii) management’s discussion and analysis (“MD&A”) of operations accompanying or contained in the annual or quarterly interim reports and the consistency of the MD&A with the financial statements;

 

iii) any expert report or opinion obtained by the Corporation in connection with the financial statements; and,

 

iv) all prospectuses, offering circulars, and similar documents.

 

b) to review and ensure that management has adequate procedures in place for the review of the Corporation’s public disclosure of financial information extracted or derived from the Corporation’s financial statements, management’s discussion and analysis and annual and interim press releases.

 

c) to review significant estimates and judgements made by management in the preparation of the financial statements and the view of the independent auditors as to appropriateness of such judgements.

 

d) to review management’s regulatory filings and decisions as they relate to the Corporation’s financial statements.

 

Internal controls, risk management, complaints handling and information systems

 

e) to satisfy themselves from discussions with and/or reports from management and the independent auditors and internal auditors that the Corporation has designed, implemented, and maintains an effective system of internal controls. The responsibility of the Committee includes a review and discussion of the effectiveness of, or any deficiencies in, the design and operation of the Corporation’s internal controls.

 

f) to review the appropriateness, effectiveness and compliance of the Corporation’s policies and business practices which impact on the financial integrity of the Corporation, including those relating to insurance, accounting, and financial controls such as financial risk management.

 

g) to receive regular reports from management on the risks that the Corporation faces, and the status of action plans implemented by management to mitigate such risks.

 

h) to review with management the Corporation’s privacy and cyber security risk exposure and the policies, procedures, and mitigation plans in place to protect the security and integrity of the Corporation’s information systems and data at least annually.

 

i) to review and ensure that the Corporation has procedures in place for the receipt, retention, and treatment of complaints by the Corporation regarding accounting, internal accounting controls or auditing matters, as well as confidential, anonymous submission by employees of concerns regarding questionable accounting by the Corporation or audit matters.

 

Independent auditors

 

j) to evaluate the performance of the independent auditors and recommend the appointment and termination of the independent auditors,

 

k) to review the terms of the audit engagement and appropriateness of the proposed fee,

 

95


 

l) to review through discussion of a formal document the plan for the annual audit with the independent auditors and management,

 

m) to review all relationships between the independent auditors and the Corporation to assess the independent auditors’ independence,

 

n) to review and pre-approve all audit and audit-related services and the fees and other compensation related thereto, and any non-audit services provided by the Corporation’s independent auditors and the fees and other compensation related thereto,

 

o) to meet with the Corporation’s independent auditors to review audit, financial reporting, and other pertinent matters and to review their recommendations to management,

 

p) to implement structures and procedures to ensure that the Committee meets the independent auditors on a regular basis in the absence of management.

 

96

 

Exhibit 99.2

 

SEABRIDGE GOLD INC.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONSOLIDATED

FINANCIAL STATEMENTS

 

FOR THE YEARS ENDED

DECEMBER 31, 2023 and 2022

 

 


 

Management’s Responsibility for Financial Statements

 

The accompanying consolidated financial statements have been prepared by management in accordance with International Financial Reporting Standards (IFRS) as issued by the International Accounting Standards Board. Financial statements include certain amounts based on estimates and judgments. When an alternative method exists under IFRS, management has chosen a policy it deems most appropriate in the circumstances in order to ensure that the consolidated financial statements are presented fairly, in all material respects, in accordance with IFRS.

 

The Company maintains adequate systems of internal controls. Such systems are designed to provide reasonable assurance that transactions are properly authorized and recorded, the Company’s assets are appropriately accounted for and adequately safeguarded and that the financial information is relevant and reliable.

 

The Board of Directors of the Company is responsible for ensuring that management fulfills its responsibilities for financial reporting and is ultimately responsible for reviewing and approving the consolidated financial statements and the accompanying management’s discussion and analysis. The Board of Directors carries out this responsibility principally through its Audit Committee.

 

The Audit Committee is appointed by the Board of Directors and all of its members are non-management directors. The Audit Committee meets periodically with management and the external auditors to discuss internal controls, auditing matters and financial reporting issues, and to satisfy itself that each party is properly discharging its responsibilities. The Audit Committee also reviews the consolidated financial statements, management’s discussion and analysis, the external auditors’ reports, examines the fees and expenses for audit services, and considers the engagement or reappointment of the external auditors. The Audit Committee reports its findings to the Board of Directors for its consideration when approving the consolidated financial statements for issuance to the shareholders. KPMG LLP, the external auditors, have full and free access to the Audit Committee.

 

/s/ Rudi P. Fronk   /s/ Christopher J. Reynolds
Rudi P. Fronk   Christopher J. Reynolds
Chairman & CEO   Vice President, Finance and Chief Financial Officer
March 27, 2024   March 27, 2024

 

Page 2


 

KPMG LLP

Bay Adelaide Centre

333 Bay Street Suite 4600

Toronto ON M5H 2S5

Canada

Telephone

Fax

Internet

(416) 777-8500

(416) 777-8818

 www.kpmg.ca

 

 

Report of Independent Registered Public Accounting Firm

 

To the Shareholders and Board of Directors of Seabridge Gold Inc.

 

Opinion on the Consolidated Financial Statements

 

We have audited the accompanying consolidated statements of financial position of Seabridge Gold Inc. (the Company) as of December 31, 2023 and 2022, the related consolidated statements of operations and comprehensive income (loss), changes in shareholders’ equity, and cash flows for each of the years then ended, and the related notes (collectively, the consolidated financial statements). In our opinion, the consolidated financial statements present fairly, in all material respects, the financial position of the Company as of December 31, 2023 and 2022, and its financial performance and its cash flows for each of the years then ended, in conformity with International Financial Reporting Standards as issued by the International Accounting Standards Board.

 

We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the Company’s internal control over financial reporting as of December 31, 2023, based on criteria established in Internal Control – Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission, and our report dated March 27, 2024, expressed an unqualified opinion on the effectiveness of the Company’s internal control over financial reporting.

 

Basis for Opinion

 

These consolidated financial statements are the responsibility of the Company’s management. Our responsibility is to express an opinion on these consolidated financial statements based on our audits. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

 

We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the consolidated financial statements are free of material misstatement, whether due to error or fraud. Our audits included performing procedures to assess the risks of material misstatement of the consolidated financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the consolidated financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements. We believe that our audits provide a reasonable basis for our opinion.

 

Critical Audit Matter

 

The critical audit matter communicated below is a matter arising from the current period audit of the consolidated financial statements that was communicated or required to be communicated to the audit committee and that: (1) relates to accounts or disclosures that are material to the consolidated financial statements and (2) involved our especially challenging, subjective, or complex judgments. The communication of a critical audit matter does not alter in any way our opinion on the consolidated financial statements, taken as a whole, and we are not, by communicating the critical audit matter below, providing a separate opinion on the critical audit matter or on the accounts or disclosures to which it relates.

 

Page 3


 

Valuation of secured note liabilities

 

As discussed in Note 4(ii) to the consolidated financial statements, the Company measures the fair value of its secured note liabilities using a discounted cash flow model with a Monte Carlo simulation. Key assumptions into the models include future precious and base metals prices, discount rates, forecasted metals production, and probabilities of Environmental Assessment Certificate (“EAC”) expiry, achieving commercial production and securing project financing.

 

Changes to these inputs and assumptions could have a significant impact on the measurement of the secured note liabilities. There is significant estimation uncertainty with respect to the application of the key assumptions in determining the fair value of the secured note liabilities. As discussed in Note 12 to the consolidated financial statements, the fair value of the Company’s 2022 secured note liability at December 31, 2023 was $294,363 thousand, the fair value of the Company’s 2023 secured note liability at inception was $198,825 thousand and the fair value at December 31, 2023 was $279,525 thousand.

 

We identified the determination of the fair value of the secured note liabilities as a critical audit matter. Significant auditor judgment was required to assess the fair value of the secured note liabilities and to assess certain key assumptions of future precious and base metals prices, discount rates, and forecasted metals production used to determine the fair values.

 

The following are the primary procedures we performed to address this critical audit matter. We evaluated the design and tested the operating effectiveness of a certain internal control over the Company’s process to determine the fair values of the secured note liabilities. This included a control over the development and selection of the significant assumptions. We compared forecasted metals production to the Company’s previously filed technical report. We involved valuation professionals with specialized skills and knowledge who assisted in:

 

evaluating the estimated future metals prices by performing an independent recalculation using data obtained from third party estimates and sources;

 

evaluating the discount rate by comparing the Company’s assumption to information derived from publicly available third-party sources.

 

/s/ KPMG LLP

 

Chartered Professional Accountants, Licensed Public Accountants

 

We have served as the Company’s auditor since 2002.

 

Toronto, Canada

March 27, 2024

 

Page 4


 

KPMG LLP

Bay Adelaide Centre

333 Bay Street Suite 4600

Toronto ON M5H 2S5

Canada

Telephone

Fax

Internet

(416) 777-8500

(416) 777-8818

www.kpmg.ca

 

Report of Independent Registered Public Accounting Firm

 

To the Shareholders and Board of Directors of Seabridge Gold Inc.

 

Opinion on Internal Control Over Financial Reporting

 

We have audited Seabridge Gold Inc.’s (the Company) internal control over financial reporting as of December 31, 2023, based on criteria established in Internal Control – Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. In our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2023, based on criteria established in Internal Control – Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission.

 

We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the consolidated statements of financial position of the Company as of December 31, 2023 and 2022, the related consolidated statements of operations and comprehensive income (loss), changes in shareholders’ equity, and cash flows for each of the years then ended, and the related notes (collectively, the consolidated financial statements), and our report dated March 27, 2024 expressed an unqualified opinion on those consolidated financial statements.

 

Basis for Opinion

 

The Company’s management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting, appearing under the heading Internal Control over Financial Reporting in Management’s Discussion and Analysis for the year ended December 31, 2023. Our responsibility is to express an opinion on the Company’s internal control over financial reporting based on our audit. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

 

We conducted our audit in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit of internal control over financial reporting included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, and testing and evaluating the design and operating effectiveness of internal control based on the assessed risk. Our audit also included performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.

 

Definition and Limitations of Internal Control Over Financial Reporting

 

A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.

 

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

 

/s/ KPMG LLP

 

Chartered Professional Accountants, Licensed Public Accountants

 

Toronto, Canada
March 27, 2024

 

Page 5


 

SEABRIDGE GOLD INC.

Consolidated Statements of Financial Position

(Expressed in thousands of Canadian dollars)

 

 

        December 31,     December 31,  
    Note   2023     2022  
                 
Assets                
Current assets                
Cash and cash equivalents   5   $ 82,438     $ 46,150  
Short-term deposits   5    
-
      81,690  
Amounts receivable and prepaid expenses   6     7,763       8,220  
Investment in marketable securities   7     3,750       3,696  
Convertible notes receivable        
-
      631  
          93,951       140,387  
Non-current assets                    
Investment in associate   7     1,247       1,389  
Long-term receivables and other assets   8     105,947       51,703  
Mineral interests, property and equipment   9     1,128,464       881,497  
Reclamation deposits   11     21,350       20,643  
          1,257,008       955,232  
Total assets       $ 1,350,959     $ 1,095,619  
                     
Liabilities and shareholders’ equity                    
Current liabilities                    
Accounts payable and accrued liabilities   10   $ 32,734     $ 42,956  
Flow-through share premium   13     5,543       4,183  
Lease obligations         373       511  
Provision for reclamation liabilities   11     759       4,343  
          39,409       51,993  
Non-current liabilities                    
Secured note liabilities   12     573,888       263,541  
Deferred income tax liabilities   18    
-
      31,934  
Lease obligations         1,063       1,115  
Provision for reclamation liabilities   11     6,676       6,503  
          581,627       303,093  
Total liabilities         621,036       355,086  
                     
Shareholders’ equity   13     729,923       740,533  
Total liabilities and shareholders’ equity       $ 1,350,959     $ 1,095,619  

 

Subsequent events (Notes 8, 13, and 19), commitments and contingencies (Note 19)

The accompanying notes form an integral part of these consolidated financial statements.

These financial statements were approved by the Board of Directors and were signed on its behalf:

 

/s/ Rudi P. Fronk   /s/ Carol Willson
Rudi P. Fronk   Carol Willson
Director   Director

 

Page 6


 

SEABRIDGE GOLD INC.

Consolidated Statements of Operations and Comprehensive Income (Loss)

(Expressed in thousands of Canadian dollars except common share and per common share amounts)

 

 

        Year ended December 31,  
    Note   2023     2022  
                 
Remeasurement of secured notes   12   $ (29,690 )   $ 36,967  
Corporate and administrative expenses   16     (17,441 )     (16,090 )
Impairment of investment in associate   7    
-
      (873 )
Equity loss of associate   7     (208 )     (207 )
Other income - flow-through shares   13     4,183       1,366  
Environmental rehabilitation expense   11    
-
      (6,722 )
Unrealized loss on convertible notes receivable   7     (88 )     (16 )
Foreign exchange gain (loss)         9,282       (12,874 )
Finance costs and other         (2,204 )     (3,471 )
Interest income (expense)         (1,795 )     2,794  
Earnings (loss) before income taxes         (37,961 )     874  
Income tax recovery (expense)   18     8,695       (8,268 )
Net loss for the year       $ (29,266 )   $ (7,394 )
                     
Other comprehensive income (loss)                
Items that will not be reclassified to net income or loss                    
Remeasurement of secured notes       $ (84,393 )   $ 2,912  
Change in fair value of marketable securities         54       329  
Tax impact         22,780       (831 )
Total other comprehensive income (loss)         (61,559 )     2,410  
Comprehensive loss for the year       $ (90,825 )   $ (4,984 )
                     
Weighted average number of common shares outstanding                
Basic   13     83,001,989       80,058,861  
Diluted   13     83,001,989       80,058,861  
                     
Loss per common share                    
Basic   13   $ (0.35 )   $ (0.09 )
Diluted   13   $ (0.35 )   $ (0.09 )

 

The accompanying notes form an integral part of these consolidated financial statements.

 

Page 7


 

SEABRIDGE GOLD INC.

Consolidated Statements of Changes in Shareholders’ Equity

(Expressed in thousands of Canadian dollars except number of shares)

 

 

    Number
of Shares
    Share
Capital
    Warrants     Stock-based
Compensation
    Contributed
Surplus
    Deficit     Accumulated
Other
Comprehensive
Gain
(Loss)
    Total
Equity
 
                                                 
As at December 31, 2022     81,339,012     $ 856,462     $
-
    $ 4,655     $ 36,160     $ (157,377 )   $ 633     $ 740,533  
Share issuance - At-The-Market offering     2,516,839       43,681      
-
     
-
     
-
     
-
     
-
      43,681  
Share issuance - Interest expense paid in shares     1,285,178       19,737      
-
     
-
     
-
     
-
     
-
      19,737  
Share issuance - Private placement     875,150       14,011      
-
     
-
     
-
     
-
     
-
      14,011  
Share issuance - Options exercised     50,000       1,150      
-
      (2,815 )     2,438      
-
     
-
      773  
Share issuance - RSUs vested     41,840       823      
-
      (823 )    
-
     
-
     
-
     
-
 
Share issuance costs     -       (1,715 )    
-
     
-
     
-
     
-
     
-
      (1,715 )
Deferred tax on share issuance costs     -       459      
-
     
-
     
-
     
-
     
-
      459  
Stock-based compensation     -      
-
     
-
      3,269      
-
     
-
     
-
      3,269  
Expired options     -      
-
     
-
      (886 )     886      
-
     
-
     
-
 
Other comprehensive loss     -      
-
     
-
     
-
     
-
     
-
      (61,559 )     (61,559 )
Net loss for the year     -      
-
     
-
     
-
     
-
      (29,266 )    
-
      (29,266 )
As at December 31, 2023     86,108,019     $ 934,608     $
-
    $ 3,400     $ 39,484     $ (186,643 )   $ (60,926 )   $ 729,923  
As at December 31, 2021     78,975,349     $ 809,269     $
-
    $ 8,697     $ 36,126     $ (149,983 )   $ (1,776 )   $ 702,333  
Share issuance - At-The-Market offering     998,629       22,793      
-
     
-
     
-
     
-
     
-
      22,793  
Share issuance - Private placement     675,400       10,840      
-
     
-
     
-
     
-
     
-
      10,840  
Share issuance - Options exercised     540,834       11,295      
-
      (3,974 )    
-
     
-
     
-
      7,321  
Share issuance - RSUs vested     148,800       3,172      
-
      (3,172 )    
-
     
-
     
-
     
-
 
Share issuance costs     -       (1,237 )    
-
     
-
     
-
     
-
     
-
      (1,237 )
Deferred tax on share issuance costs     -       330      
-
     
-
     
-
     
-
     
-
      330  
Stock-based compensation     -      
-
     
-
      3,138      
-
     
-
     
-
      3,138  
Expired options     -      
-
     
-
      (34 )     34      
-
     
-
     
-
 
Other comprehensive income     -      
-
     
-
     
-
     
-
     
-
      2,409       2,409  
Net loss for the year     -      
-
     
-
     
-
     
-
      (7,394 )    
-
      (7,394 )
As at December 31, 2022     81,339,012     $ 856,462     $
-
    $ 4,655     $ 36,160     $ (157,377 )   $ 633     $ 740,533  

 

The accompanying notes form an integral part of these consolidated financial statements.

 

Page 8


 

SEABRIDGE GOLD INC.

Consolidated Statements of Cash Flows

(Expressed in thousands of Canadian dollars)

 

 

    Year ended December 31,  
    2023     2022  
             
Operating Activities            
Net loss   $ (29,266 )   $ (7,394 )
Adjustment for non-cash items:                
Remeasurement loss (gain) on secured notes     29,690       (36,967 )
Environmental rehabilitation expense    
-
      6,722  
Stock-based compensation     3,269       3,138  
Other income - flow-through shares     (4,183 )     (1,366 )
Income tax (recovery) expense     (8,695 )     8,268  
Unrealized foreign exchange (gain) loss     (9,150 )     21,158  
Other non-cash items     362       (2,044 )
Adjustment for cash items:                
Environmental rehabilitation disbursements     (3,664 )     (4,499 )
Changes in working capital items:                
Amounts receivable and prepaid expenses     457       (845 )
Accounts payable and accrued liabilities     (357 )     541  
Net cash used in operating activities     (21,537 )     (13,288 )
                 
Investing Activities                
Mineral interests, property and equipment     (230,162 )     (177,991 )
Redemption of short-term deposits     151,854       349,378  
Investment in short-term deposits     (70,164 )     (401,825 )
Long-term receivables and other assets     (54,244 )     (30,545 )
Interest paid    
-
      (14,735 )
Redemption of convertible notes receivable     528      
-
 
Investment in security deposits     (707 )     (5,412 )
Net cash used in investing activities     (202,895 )     (281,130 )
                 
Financing Activities                
Secured notes     198,825       282,263  
Share issuance net of costs     61,519       36,579  
Exercise of options     773       7,321  
Payment of lease liabilities     (666 )     (334 )
Net cash from financing activities     260,451       325,829  
Effects of exchange rate fluctuation on cash and cash equivalents     269       3,216  
Net increase in cash and cash equivalents during the year     36,288       34,627  
Cash and cash equivalents, beginning of the year     46,150       11,523  
Cash and cash equivalents, end of the year   $ 82,438     $ 46,150  

 

The accompanying notes form an integral part of these consolidated financial statements.

 

Page 9


 

SEABRIDGE GOLD INC.

Notes to the Consolidated Financial Statements

For the years ended December 31, 2023 and 2022

 

1. Reporting entity

 

Seabridge Gold Inc. is comprised of Seabridge Gold Inc. (“Seabridge” or the “Company”) and its subsidiaries, KSM Mining ULC, Seabridge Gold (NWT) Inc., Seabridge Gold (Yukon) Inc., Seabridge Gold Corp., SnipGold Corp. and Snowstorm Exploration (LLC), and is a Company engaged in the acquisition and exploration of gold properties located in North America. The Company was incorporated under the laws of British Columbia, Canada on September 14, 1979 and continued under the laws of Canada on October 31, 2002. Its common shares are listed on the Toronto Stock Exchange trading under the symbol “SEA” and on the New York Stock Exchange under the symbol “SA”. The Company is domiciled in Canada, the address of its registered office is 10th Floor, 595 Howe Street, Vancouver, British Columbia, Canada V6C 2T5 and the address of its corporate office is 106 Front Street East, 4th Floor, Toronto, Ontario, Canada M5A 1E1.

 

2. Basis of preparation

 

A. Statement of compliance

 

These consolidated financial statements have been prepared in accordance with International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board (“IASB”). These financial statements were authorized for issuance by the Board of Directors of the Company on March 27, 2024.

 

B. Basis of consolidation

 

(i) Subsidiaries

 

Subsidiaries are entities over which the Company has control. Control over an entity exists when the Company is exposed or has rights to returns from its involvement with the entity and has the ability to affect those returns through its power over the entity. Subsidiaries are fully consolidated from the date on which control is transferred to the Company. They are deconsolidated from the date on which control ceases.

 

Business acquisitions are accounted for using the acquisition method whereby acquired assets and liabilities are recorded at fair value as of the date of acquisition with the excess of the purchase consideration over such fair value being recorded as goodwill and allocated to cash generating units. Non-controlling interest in an acquisition may be measured at either fair value or at the non-controlling interest’s proportionate share of the fair value of the acquiree’s net identifiable assets.

 

If the fair value of the net assets acquired exceeds the purchase consideration, the difference is recognized immediately as a gain in the consolidated statement of operations and comprehensive income (loss).

 

Where a business combination is achieved in stages, previously held non-controlling equity interests in the acquiree are re-measured at acquisition-date fair value and any resulting gain or loss is recognized in the consolidated statement of operations and comprehensive income (loss) or other comprehensive income, as appropriate. Acquisition related costs are expensed during the period in which they are incurred, except for the cost of debt or equity instruments issued in relation to the acquisition which is included in the carrying amount of the related instrument. Certain fair values may be estimated at the acquisition date pending confirmation or completion of the valuation process. Where provisional values are used in accounting for a business combination, they may be adjusted retrospectively during the measurement period. However, the measurement period will not exceed one year from the acquisition date.

 

Page 10


 

(ii) Associates

 

An associate is an entity over which the Company has significant influence but not control nor joint control. Significant influence is presumed to exist where the Company has between 20% and 50% of the voting rights but can also arise where the Company has less than 20% if influence is exerted over policy decisions that affect the entity. The Company’s share of the net assets and net income or loss of associates is accounted for in the consolidated financial statements using the equity method of accounting.

 

3. Summary of material accounting policies

 

The material accounting policy information used in the preparation of these consolidated financial statements is described below.

 

A. Basis of measurement

 

The consolidated financial statements have been prepared on the historical cost basis, except certain financial instruments described in note “L”, which are measured at fair value.

 

B. Translation of foreign currencies

 

These consolidated financial statements are presented in Canadian dollars, which is the Company’s, and each of its subsidiaries’, functional currency.

 

Foreign currency transactions are translated into Canadian dollars using the exchange rates prevailing at the dates of the transactions or valuation where items are re-measured. Foreign exchange gains and losses resulting from the settlement of such transactions are recognized in the consolidated statement of operations and comprehensive income (loss).

 

Monetary assets and liabilities of the Company denominated in a foreign currency are translated into Canadian dollars at the rate of exchange at the statement of financial position date. Non-monetary assets and liabilities are translated at historical rates. Revenues and expenses are translated at average exchange rates prevailing during the period. Exchange gains and losses are included in the determination of profit or loss for the year.

 

C. Mineral interests, property and equipment

 

(i) Mineral interests

 

Mineral resource properties are carried at cost. The Company considers exploration and development costs and expenditures to have the characteristics of property and equipment and, as such, the Company capitalizes all exploration costs, which include acquisition costs, advance royalties, holding costs, field exploration and field supervisory costs and all costs associated with exploration and evaluation activities relating to specific properties as incurred, until those properties are determined to be economically viable for mineral production. General and administrative costs are only included in the measurement of exploration and evaluation costs where they are related directly to activities in a particular area of interest. The fair value of any recoveries from the disposition or optioning of a mineral property is credited to the carrying value of mineral properties.

 

Page 11


 

Once a project has been established as commercially viable and technically feasible, related development expenditures are capitalized. This includes costs incurred in preparing the site for mining operations. Capitalization ceases when the mine is capable of operating as intended by management.

 

The actual recoverable value of capitalized expenditures for mineral properties and deferred exploration costs will be contingent upon the discovery of economically viable reserves and the Company’s financial ability at that time to fully exploit these properties or determine a suitable plan of disposition.

 

When a decision is made to proceed with development in respect of a particular area of interest, the relevant exploration and evaluation asset is tested for impairment, reclassified to development properties, and then amortized over the life of the reserves associated with the area of interest once mining operations have commenced.

 

(ii) Construction in progress

 

Construction in progress includes power infrastructure, camps, bridges, and roads related to early infrastructure development at the Company’s KSM Project (“KSM”). Costs are not depreciated until the underlying assets are ready for use as intended by management.

 

(iii) Equipment

 

Equipment located at project site are earth moving equipment, vehicles and other equipment used in the early infrastructure development at KSM. To the extent that the Company utilizes its own equipment for the activities which are capitalized for the mineral properties or the construction in progress, the associated depreciation is capitalized to those assets.

 

(iv) Capitalized borrowing costs

 

Borrowing costs are capitalized and allocated specifically to qualifying assets when funds have been borrowed, either to specifically finance a project or for general borrowings during the period of construction. Qualifying assets are assets that require a significant amount of time to get ready for their intended use, including projects that are in the development or construction stages. Capitalization of borrowing costs ceases when such assets are ready for their intended use.

 

D. Depreciation

 

Effective from the point an asset is available for its intended use, the assets are depreciated using the straight-line method over the estimated economic life of the asset. Estimated useful lives normally vary from three to fifteen years for equipment to a maximum of forty years for buildings. During the development phase, depreciation expense related to the right of use assets and property and equipment is recapitalized to the construction in progress pool.

 

Residual values, useful lives and depreciation methods are reviewed at least annually and adjusted if appropriate. The impact of changes to the estimated useful lives, depreciation method or residual values is accounted for prospectively.

 

Page 12


 

E. Leasing arrangements

 

Leases are recognized as a right-of-use (“ROU”) asset and a corresponding liability at the date at which the leased asset is available for use by the Company. Each lease payment is allocated between the liability and finance cost. The finance cost is charged to profit or loss over the lease period. The ROU asset is depreciated over the shorter of the asset’s useful life and the lease term on a straight-line basis. Payments associated with short-term leases and leases of low-value assets are recognized on a straight-line basis as an expense in profit or loss. Short-term leases are leases with a lease term of 12 months or less.

 

F. Impairment of non-financial assets

 

The carrying value of the Company’s mineral interests is assessed for impairment when indicators of such impairment exist. Indicators may include the loss of the right to explore in the area; the Company deciding not to continue exploring or incur substantial additional expenditures on the project; or it is determined that the carrying amount of the project is unlikely to be recovered by its development or sale. If any indication of impairment exists, an estimate of the asset’s recoverable amount is calculated to determine the extent of the impairment loss, if any. The recoverable amount is determined as the higher of the fair value less costs of disposal for the asset and the asset’s value in use. In assessing value in use, the estimated future cash flows are discounted to their present value using a discount rate that reflects current market assessments of the time value of money and the risks specific to the asset for which the estimates of future cash flows have not been adjusted.

 

Impairment is determined on an asset by asset basis, whenever possible. If it is not possible to determine impairment on an individual asset basis, then impairment is considered on the basis of a cash generating unit (“CGU”). CGUs represent the lowest level for which there are separately identifiable cash inflows that are largely independent of the cash flows from other assets or other group of assets.

 

If the carrying amount of the asset exceeds its recoverable amount, the asset is impaired, and an impairment loss is charged immediately to comprehensive loss within the consolidated statements of operations and comprehensive income (loss) so as to reduce the carrying amount to its recoverable amount.

 

An assessment is made at each reporting date as to whether there is any indication that previously recognized impairment losses may no longer exist or may have decreased. If such indication exists, the Company makes an estimate of the recoverable amount.

 

A previously recognized impairment loss is reversed only if there has been a change in the estimates used to determine the asset’s recoverable amount since the last impairment loss was recognized. If this is the case, the carrying amount of the asset is increased to its recoverable amount. The increased amount cannot exceed the carrying amount that would have been determined had no impairment loss been recognized for the asset in prior years. Such reversal is recognized in the consolidated statements of operations and comprehensive income (loss).

 

G. Reclamation liabilities

 

Provisions for environmental restoration are recognized when: (i) the Company has a present legal or constructive obligation as a result of past exploration, development or production events; (ii) it is probable that an outflow of resources will be required to settle the obligation; and (iii) the amount can be reliably estimated. Provisions do not include obligations which are expected to arise from future disturbance.

 

Page 13


 

Provisions are measured at the present value of the expenditures expected to be required to settle the obligation incorporating risks specific to the obligation using a pre-tax rate that reflects current market assessments of the time value of money. When estimates of obligations are revised, the present value of the changes in obligations is recorded in the period by a change in the obligation amount and a corresponding adjustment to the carrying amount of the related property. For locations where mining activities have ceased, the changes to obligations are charged directly to the consolidated statements of operations and comprehensive income (loss).

 

The amortization or ‘unwinding’ of the discount applied in establishing the net present value of provisions due to the passage of time is charged to the consolidated statements of operations and comprehensive income (loss) in each accounting period.

 

The ultimate cost of environmental remediation is uncertain and cost estimates can vary in response to many factors including changes to the relevant legal requirements, the emergence of new restoration techniques or experience at other mine sites. The expected timing of expenditure can also change, for example in response to changes in ore reserves or production rates. As a result, there could be significant adjustments to the provisions for restoration and environmental cleanup, which would affect future financial results.

 

Funds on deposit with third parties provided as security for future reclamation costs are included in reclamation deposits on the statement of financial position.

 

H. Income taxes

 

Income tax expense comprises current and deferred tax. Current and deferred tax are recognized in profit or loss except to the extent that it relates to a business combination or items recognized directly in equity. Current tax is the expected tax payable on the taxable income for the year, using tax rates enacted or substantively enacted at the reporting date, and any adjustment to tax payable in respect of previous years.

 

Deferred tax is recognized using the asset and liability method, providing for temporary differences between the carrying amounts of assets and liabilities for financial reporting purposes and the amounts used for taxation purposes.

 

Deferred tax is measured at the rates that are expected to be applied to temporary differences when they reverse, based on the laws that have been enacted or substantively enacted by the reporting date. Deferred tax is not recognized for the following temporary differences; the initial recognition of assets or liabilities in a transaction that is not a business combination and that affects neither accounting nor taxable profit or loss, and differences relating to investments in subsidiaries and jointly controlled entities to the extent that it is probable that they will not reverse in the foreseeable future where the timing of the reversal of the temporary differences can be controlled by the parent. In addition, deferred tax is not recognized for taxable temporary differences arising on the initial recognition of goodwill which is not deductible for tax purposes.

 

A deferred tax asset is recognized only to the extent that it is probable that future taxable profits will be available against which the asset can be utilized. Deferred tax assets are reviewed at each reporting date and are reduced to the extent that it is no longer probable that the related tax benefit will be realized.

 

Page 14


 

The Company has certain non-monetary assets and liabilities for which the tax reporting currency is different from its functional currency. Any translation gains or losses on the remeasurement of these items at current exchange rates versus historic exchange rates that give rise to a temporary difference is recorded as a deferred tax asset or liability.

 

I. Stock-based compensation options and restricted share units (“RSUs”)

 

The Company applies the fair value method for stock-based compensation and other stock-based payments. The fair value of options is valued using the Black Scholes option-pricing model and other models for the two-tiered options and restricted share units as may be appropriate. The grant date fair value of stock-based payment awards granted to employees is recognized as an employee expense, with a corresponding increase in equity, over the period that the employees unconditionally become entitled to the awards. The amount recognized as an expense is adjusted to reflect the number of awards for which the related service and non-market vesting conditions are expected to be met, such that the amount ultimately recognized as an expense is based on the number of awards that meet the related service and non-market performance conditions at the vesting date (Note 13). The Company reviews estimated forfeitures of options on an ongoing basis.

 

The factors affecting stock-based compensation include estimates of when stock options might be exercised, share price volatility and the assessment of the probability and timing of those instruments that have non-market performance vesting criteria. The timing for exercise of options is out of the Company’s control and will depend upon a variety of factors, including the market value of the Company’s shares and financial objectives of the share-based instrument holders. The Company uses historical data to determine volatility in accordance with appropriate fair value methodology. However, the future volatility is uncertain, and models share their limitations.

 

J. Flow-through shares

 

The Company finances a portion of its exploration activities through the issuance of flow-through common shares. The tax deductibility of qualifying expenditures is transferred to the investor purchasing the shares. Consideration for the transferred deductibility of the qualifying expenditures is often paid through a premium price over the market price of the Company’s shares. The Company reports this premium as a liability on the statement of financial position and the balance is reported as share capital. At each reporting period, and as qualifying expenditures have been incurred, the liability is reduced on a proportionate basis and income is recognized in the consolidated statements of operations and comprehensive income (loss).

 

K. Net earnings (loss) per common share

 

Basic earnings (loss) per common share is computed based on the weighted average number of common shares outstanding during the year. The Company uses the treasury stock method for calculating diluted earnings per share which assumes that stock options with an exercise price lower than the average quoted market price were exercised at the later of the beginning of the year, or time of issue RSUs. Stock options with an exercise price greater than the average quoted market price of the common shares are not included in the calculation of diluted earnings (loss) per share as the effect is anti-dilutive.

 

L. Financial instruments

 

The Company recognizes financial assets and financial liabilities on the date the Company becomes a party to the contractual provisions of the instruments. A financial asset is derecognized either when the Company has transferred substantially all the risks and rewards of ownership of the financial asset or when cash flows expire. A financial liability is derecognized when the obligation specified in the contract is discharged, canceled or expired. Certain financial instruments are recorded at fair value in the consolidated statement of financial position.

 

Page 15


 

Non-derivative financial instruments

 

Non-derivative financial instruments are recognized initially at fair value plus attributable transaction costs, where applicable for financial instruments not classified as fair value through profit or loss (“FVTPL”). Subsequent to initial recognition, non-derivative financial instruments are classified and measured as described below.

 

Financial assets at FVTPL

 

Cash and cash equivalents and short-term deposits are classified as financial assets at FVTPL and are measured at fair value. Cash equivalents are short-term deposits with maturities of up to 90 days at the date of purchase. Short-term deposits consist of investments with maturities from 91 days to one year at the date of purchase. Convertible notes receivable are recorded at FVTPL.

 

Financial assets at amortized cost

 

Trade and other receivables are classified as and measured at amortized cost using the effective interest rate method, less impairment losses, if any.

 

Financial assets at fair value through other comprehensive income

 

The Company’s investments in equity marketable securities are designated as financial assets at fair value through other comprehensive income and are recorded at fair value on the trade date with directly attributable transaction costs included in the recorded amount. Subsequent changes in fair value are recognized in other comprehensive income.

 

Non-derivative financial liabilities

 

Accounts payable and accrued liabilities are accounted for at amortized cost, using the effective interest rate method.

 

Secured note liabilities

 

The Company has elected to account for its secured note liabilities and all embedded derivatives as a single financial liability. The change in fair value of the secured note liabilities is recognized in profit or loss. The change in the fair value related to the Company’s own credit risk is recorded through other comprehensive income (loss).

 

M. Accounting pronouncements

 

New accounting standards and interpretations issued and effective:

 

IAS 1 - Presentation of financial statements: disclosure of material accounting policy information

 

On January 1, 2023, the Company adopted amendments to IAS 1 that requires companies to disclose material accounting policies instead of significant accounting policies. The adoption of these amendments resulted in certain changes to the Company’s accounting policy disclosures. The Company’s material accounting policies are disclosed in Note 3 – Summary of material accounting policies herein.

 

Page 16


 

IAS 8 - Accounting Policies, Changes in Accounting Estimates and Errors

 

In February 2021, the IASB issued Definition of Accounting Estimates, which made amendments to IAS 8. The amendments replaced the definition of a change in accounting estimates with a definition of accounting estimates. Under the new definition, accounting estimates are “monetary amounts in financial statements that are subject to measurement uncertainty”. Accounting estimates are developed if accounting policies require items in financial statements to be measured in a way that involves measurement uncertainty. The amendments clarify that a change in an accounting estimate that results from new information or new developments is not the correction of an error. In addition, the effects of a change in an input or a measurement technique used to develop an accounting estimate are changes in accounting estimates if they do not result from the correction of prior period errors. A change in an accounting estimate may affect only the current period’s Consolidated Statements of Operations and Comprehensive Income, or the Consolidated Statements of Operations and Comprehensive Income of both the current period and future periods. The effect of the change relating to the current period is recognized as income or expense in the current period. The effect, if any, on future periods is recognized as income or expense in those future periods. The amendments apply for annual periods beginning on or after January 1, 2023 and early adoption was permitted. The Company adopted the amendments effective January 1, 2023. The application of these amendments did not have a material impact on the Company’s consolidated financial statements.

 

IAS 12 - Deferred Tax

 

In May 2021, the IASB issued Deferred Tax related to Assets and Liabilities Arising from a Single Transaction which amended IAS 12, Income Taxes (“IAS 12”). Prior to the amendments, IAS 12 contained a recognition exemption whereby deferred income tax assets and liabilities were not recognized for temporary differences arising on initial recognition of assets and liabilities, other than in business combinations, that affect neither accounting nor taxable income. The amendments narrowed the scope of the recognition exemption in IAS 12 so that it no longer applies to transactions that, on initial recognition, give rise to equal taxable and deductible temporary differences.

 

The Company applied the amendments to IAS 12 to its consolidated financial statements for the annual reporting period beginning on January 1, 2023. The application of these amendments did not have an impact on the Company’s consolidated financial statements.

 

IAS 12 - International Tax Reform - Pillar Two Model Rules

 

On May 23, 2023, the IASB issued amendments to IAS 12 which introduce a temporary exception from accounting for deferred taxes arising from the implementation of the Organization for Economic Co-operation and Development (“OECD”) Pillar Two model rules. The amendments provide relief from recognizing deferred taxes related to the OECD Pillar two income taxes as well as any related disclosure. The Company has applied the exception immediately upon issuance of the amendment and retrospectively in accordance with IAS 8 for the 2023 fiscal year.

 

Accounting pronouncements issued but not yet effective:

 

On January 23, 2020 and October 31, 2022, the IASB issued amendments to IAS 1 to clarify that the classification of liabilities as current or non-current should be based on rights that exist at the end of the reporting period and that classification is unaffected by expectations about whether an entity will exercise its right to defer settlement of a liability. For liabilities with covenants, the amendments clarify that only covenants with which an entity is required to comply on or before the reporting date affect the classification as current or non-current. The Company will adopt the amendments to IAS 1 effective January 1, 2024. These amendments are not expected to have a significant impact on the Company’s statement of financial position on the date of adoption.

 

Page 17


 

On September 22, 2022, the IASB issued amendments to IFRS 16 to add subsequent measurement requirements for sale and leaseback transactions, particularly those with variable lease payments. The amendments require the seller-lessee to subsequently measure lease liabilities in a way such that it does not recognize any gain or loss relating to the right of use it retains. The amendments are effective on January 1, 2024 and are not expected to have a significant impact on the Company’s financial statements.

 

On May 25, 2023, the IASB issued amendments to IAS 7 requiring entities to provide qualitative and quantitative information about their supplier finance arrangements. In connection with the amendments to IAS 7, the IASB also issued amendments to IFRS 7 requiring entities to disclose whether they have accessed, or have access to, supplier finance arrangements that would provide the entity with extended payment terms or the suppliers with early payment terms. These amendments are effective on January 1, 2024, and are not expected to have a significant impact on the Company’s financial statements.

 

On August 15, 2023, the IASB issued amendments to IAS 21 to specify how to assess whether a currency is exchangeable and how to determine the exchange rate when it is not exchangeable. The amendments specify that a currency is exchangeable when it can be exchanged through market or exchange mechanisms that create enforceable rights and obligations without undue delay at the measurement date and the specified purpose. For non-exchangeable currencies, an entity is required to estimate the spot exchange rate as the rate that would have applied to an orderly exchange transaction between market participants at the measurement date under prevailing economic conditions. The amendments are effective on January 1, 2025 and are not expected to have a significant impact on the Company’s financial statements.

 

4. Critical accounting judgments and estimation uncertainty

 

The preparation of consolidated financial statements in accordance with IFRS requires management to make judgments, estimates and assumptions that affect the amounts reported in the consolidated financial statements and the application of the Company’s accounting policies, which are described in Note 3. Management believes that the estimates used in the preparation of the consolidated financial statements are reasonable; however, actual results could differ from those estimates. The key areas of significant judgments, estimates and assumptions are discussed below.

 

(i) Critical accounting judgments

 

The following are the critical judgments that the Company has made in the process of applying the Company’s accounting policies and that have the most significant effect on the amounts recognized in the consolidated financial statements (refer to appropriate accounting policies for details).

 

Impairment of mineral interests, property and equipment

 

Mineral interests are tested for impairment when events or changes in circumstances indicate that the carrying amount may not be recoverable. When an indication of impairment exists, and the carrying amount of the mineral interest exceeds its estimated recoverable amount, the carrying value is written down to the recoverable amount and the loss is recognized in the statement of operations and comprehensive income (loss). Judgment is required to determine whether there are indications that the carrying amount of an exploration project is unlikely to be recovered in full from the successful development or the sale of the project.

 

Page 18


 

(ii) Key sources of estimation uncertainty

 

Mineral reserves and resources

 

Mineral reserves and resources have been estimated by qualified persons as defined in accordance with Canadian Securities Administrators’ National Instrument 43-101 Standards of Disclosure for Mineral Projects requirements. Mineral reserve and resource estimates include numerous uncertainties and depend heavily on geological interpretations and statistical inferences drawn from drilling and other data, and require estimates of the future price for the commodity and the future cost of operations. The mineral reserve and resource estimates are subject to uncertainty and actual results may vary from these estimates. Results from drilling, testing and production, as well as material changes in metal prices and operating costs subsequent to the date of an estimate, may justify revision of such estimate.

 

A number of accounting estimates, as described in the relevant accounting policy notes, are impacted by the mineral reserve and resource estimates:

 

Mineral properties and determination of technical feasibility and commercial viability. The application of the Company’s accounting policy for exploration and evaluation expenditures requires judgment in determining whether future economic benefits may be realized, which are based on assumptions about future events and circumstances
     
Impairment analysis of non-financial assets
     
Estimates of timing of cash outlays for asset retirement obligations, and
     
The valuation of the secured note liabilities

 

Mineral properties

 

The recoverability of the carrying value of mineral properties and associated deferred exploration expenses is based on market conditions for minerals, underlying mineral resources associated with the properties and future costs that may be required for ultimate realization through mining operations or by sale. The Company is in an industry that is dependent on a number of factors including environmental, legal and political risks, the existence of economically recoverable reserves, the ability of the Company and its subsidiaries to obtain necessary financing to complete the development, and future profitable production or the proceeds of disposition thereof.

 

Reclamation Liabilities

 

Provisions for reclamation require the use of estimates of the future costs the Company will incur to complete the reclamation and remediation work required to comply with existing laws and regulations at each project site, as well as the timing of the reclamation activities and estimated discount rate. The Company assesses and revises its reclamation provision on a periodic basis or when new material information becomes available. Adjustments to the estimated amount and timing of future reclamation cash flows are a normal occurrence in light of the significant judgments and estimates involved.

 

Actual costs incurred may differ from those amounts estimated. Changes in future costs could materially impact the estimate of reclamation provision. The provision represents management’s best estimate of the present value of the future reclamation and remediation costs based on environmental disturbances as at the reporting date. A change in any, or a combination of, the key assumptions used to determine the provisions, could have a material impact on the carrying value of the provisions.

 

Page 19


 

Secured note liabilities

 

The Company measures the fair value of its secured note liabilities using a discounted cash flow model with a Monte Carlo simulation. Key assumptions into the models include future precious and base metals prices, discount rates, forecasted metals production, and probabilities of Environmental Assessment Certificate (“EAC”) expiry, achieving commercial production and securing project financing. Changes to these inputs and assumptions could have a significant impact on the measurement of the secured note liabilities. There is significant estimation uncertainty with respect to the application of the key assumptions in determining the fair value of the secured note liabilities. Refer to Note 12 for further information.

 

5. Cash and cash equivalents and short-term deposits

 

($000s)   December 31,
2023
    December 31,
2022
 
Cash and cash equivalents   82,438     46,150  
Short-term deposits  
-
    81,690  
    82,438     127,840  

 

All of the cash and cash equivalents are held in a Canadian Schedule I bank. Short-term deposits consist of Canadian Schedule I bank guaranteed deposits and are cashable in whole or in part with interest at any time to maturity.

 

6. Amounts receivable and prepaid expenses

 

($000s)   December 31,
2023
    December 31,
2022
 
HST   4,493     4,247  
Prepaid expenses and other receivables   3,270     3,973  
    7,763     8,220  

 

Page 20


 

7. Investments

 

($000s)   January 1,
2023
    Fair value
through other
comprehensive
income (loss)
    Loss of
associate
      Impairment     Additions     December 31,
2023
 
                                     
Current assets:                                    
Investments in marketable securities   3,696     54    
-
   
-
   
-
    3,750  
                                     
Non-current assets:                                    
Investment in associate   1,389    
-
    (208 )  
-
    66 (a)    1,247  

 

($000s)   January 1,
2022
    Fair value
through other
comprehensive
income (loss)
    Loss of
associate
    Impairment     Additions     December 31,
2022
 
Current assets:                                    
Investments in marketable securities   3,367     329    
-
   
-
   
-
    3,696  
                                     
Non-current assets:                                    
Investment in associate   2,429    
-
    (206 )   (873 )(b)    39 (a)    1,389  

 

(a) In 2023, the Company received 151,855 common shares of Paramount for payment of interest on the secured convertible note receivable accrued between July 1, 2022 and December 27, 2023 when the note was repaid. In 2022, the Company received 55,322 common shares of Paramount for payment of interest on the secured convertible note receivable accrued between July 1, 2021 and June 30, 2022.
   
(b) During the second quarter of 2022, the Company concluded that the fair value of its investment in Paramount, determined based on the closing share price on June 30, 2022, had declined significantly and recorded an impairment of $0.9 million in the consolidated statements of operations and comprehensive income (loss).

 

The Company holds a 4.7% (December 31, 2022 – 5.6%) interest in Paramount which is classified as investment in associate and accounted for using the equity method on the basis that the Company has the ability to exert significant influence through its representation on Paramount’s board of directors. During 2023, the Company recorded its proportionate share of Paramount’s net loss of $0.2 million (2022 – $0.2 million) within equity loss of associate on the consolidated statements of operations and comprehensive income (loss). As at December 31 2023, the carrying value of the Company’s investment in Paramount was $1.2 million (December 31, 2022 - $1.4 million).

 

Page 21


 

8. Long-term receivables and prepaid expenses

 

($000s)   December 31,
2023
    December 31,
2022
 
BC Hydro 1   92,720     38,500  
Canadian Exploration Expenses 2   9,361     9,337  
British Columbia Mineral Exploration Tax Credit 3   3,866     3,866  
    105,947     51,703  

 

1) During the first quarter in 2023, the Company paid $43.6 million (as at December 31, 2022, $38.5 million) to British Columbia Hydro and Power Authority (“BC Hydro”) as advance payment made pursuant to the Company signing a Facilities Agreement with BC Hydro covering the design and construction of facilities to supply hydro-sourced electricity to the KSM project. Prepayments to complete the design and construction amounted to $92.7 million inclusive of $10.6 million which was accrued as at December 31, 2023, and paid subsequent to December 31, 2023.

 

2) As previously disclosed in the Company’s prior years financial statements, in 2019 the Company received a notice from the CRA that it proposed to reduce the amount of expenditures reported as Canadian Exploration Expenses (CEE) for the three-year period ended December 31, 2016. The Company has funded certain of its exploration expenditures, from time-to-time, with the proceeds from the issuance of flow-through shares and renounced, to subscribers, the expenditures which it determined to be CEE. The notice disputes the eligibility of certain types of expenditures previously audited and approved as CEE by the CRA. The Company strongly disagrees with the notice and responded to the CRA auditors with additional information for their consideration. In 2020, the CRA auditors responded to the Company’s submission and, although accepting additional expenditures as CEE, reiterated that their position remains largely unchanged and subsequently issued reassessments to the Company reflecting the additional CEE expenditures accepted and $2.3 million of Part Xll.6 tax owing. The CRA has reassessed certain investors who subscribed for the flow-through shares, reducing CEE deductions. Notice of objections to the Company’s and investors’ reassessments have been filed for all those that have been received and will be appealed to the courts, should the notice of objections be denied. The Company has indemnified the investors that subscribed for the flow-through shares and that have been reassessed by depositing the amount of their reassessments, including interest charges, into the accounts of the reassessed investors with the Receiver General in return for such investors agreement to object to their respective reassessments and to repay the Company any refund of the amount deposited on their behalf upon resolution of the Company’s appeal. During 2021 and 2022, the Company deposited $9.3 million into the accounts of certain investors with the Receiver General. The deposits made have been recorded as long-term receivables on the statement of financial position as at December 31, 2023. The potential tax indemnification to the investors is estimated to be $10.8 million, plus $3.3 million potential interest. No provision has been recorded related to the tax, potential interest, nor the potential indemnity as the Company and its advisors do not consider it probable that there will ultimately be an amount payable.

 

3) During 2016, upon the completion of an audit of the application by tax authorities of the British Columbia Mineral Exploration Tax Credit (“BCMETC”) program, the Company was reassessed $3.6 million, including accrued interest for expenditures that the tax authority has categorized as not qualifying for the BCMETC program. The Company recorded a $3.6 million provision within non-trade payables and accrued expenses on the consolidated statements of financial position as at December 31, 2016 with a corresponding increase in mineral interests. In 2017 the Company filed an objection to the reassessment with the appeals division of the tax authorities and paid one-half of the accrued balance to the Receiver General and reduced the provision by $1.8 million. In 2019, the Company received a decision from the appeals division that the Company’s objection was denied, and the Company filed a Notice of Appeal with the British Columbia Supreme Court. The Attorney General of Canada replied to the facts and arguments in the Company’s Notice of Appeal and stated its position that the Company’s expenditures did not qualify for the BCMETC program. During the first quarter of 2023, the Company completed discovery process with the Department of Justice and will continue to move the appeal process forward, including settling an agreed statement of facts. The Company will defend its case in courts in the third quarter of 2024. Based on the facts and circumstances of the Company’s objection, the Company concludes that it is more likely than not that it will be successful in its objection. As at December 31, 2023, the Company has paid $1.6 million to the Receiver General, and the Canada Revenue Agency (CRA) has withheld $2.3 million of HST credits due to the Company that would fully cover the residual balance, including interest, should the Company be unsuccessful in its challenge. The amount recorded in long-term receivables as of December 31, 2023 of $3.9 million includes the initial reassessment of $3.6 million, plus accrued interest.

 

Page 22


 

9. Mineral Interests, Property and Equipment

 

($000s)   Mineral interests     Construction in progress     Property & equipment     Right-of-use assets     Total  
Cost                              
As at January 1, 2022   632,005     27,061     3,080     407     662,553  
Additions   55,069     158,728     4,736     2,030     220,563  
Transfers adjusted 2  
-
    (64,588 )   64,588    
-
   
-
 
As at December 31, 2022 adjusted 2   687,074     121,201     72,404     2,437     883,116  
Additions   69,732     178,764     1,187     781     250,464  
Transfers  
-
    (101,899 )   101,899    
-
   
-
 
As at December 31, 2023   756,806     198,066     175,490     3,218     1,133,580  
Accumulated Depreciation                              
As at January 1, 2022  
-
   
-
    117     157     274  
Depreciation expense  
-
   
-
    953     392     1,345  
As at December 31, 2022  
-
   
-
    1,070     549     1,619  
Depreciation expense 1  
-
   
-
    2,517     980     3,497  
As at December 31, 2023  
-
   
-
    3,587     1,529     5,116  
Net Book Value                              
As at December 31, 2022   687,074     121,201     71,334     1,888     881,497  
As at December 31, 2023   756,806     198,066     171,903     1,689     1,128,464  

 

1) Depreciation expense related to camps, equipment, and right-of-use assets associated with the KSM construction is capitalized to construction in progress.

 

2) Additions in the prior year financial statements were net of $38.4 transfers from construction in progress to property and equipment additions. Additionally, during 2023, $26.1 million of costs were determined to have been ready for use in 2022 and were reclassified from construction in progress to property and equipment to correct for this.

 

Page 23


 

Mineral interests, property and equipment additions by project are as follows.

 

    Year ended December 31, 2023  
($000s)   January 1,
2023
    Mineral interests     Construction in progress     Property & equipment     Right-of-use assets     Total Additions     December 31,
2023
 
Additions                                          
KSM additions 1     707,190       40,490       178,764       1,187       781       221,222       928,412  
KSM transfers            
-
      (101,899 )     101,899      
-
     
-
     
-
 
Courageous Lake     77,999       3,520      
-
     
-
     
-
      3,520       81,519  
Iskut     49,904       14,174      
-
     
-
     
-
      14,174       64,078  
Snowstorm     34,562       4,897      
-
     
-
     
-
      4,897       39,459  
3 Aces     12,079       6,651      
-
     
-
     
-
      6,651       18,730  
Grassy Mountain     771      
-
     
-
     
-
     
-
     
-
      771  
Corporate     611      
-
     
-
     
-
     
-
     
-
      611  
Total     883,116       69,732       76,865       103,086       781       250,464       1,133,580  

 

    Year ended December 31, 2022  
($000s)   January 1,
2022
    Mineral interests     Construction in progress     Property & equipment     Right-of-use assets     Total Additions     December 31,
2022
 
Additions                                          
KSM additions 1     502,015       39,985       158,728       4,736       1,726       205,175       707,190  
KSM transfers adjusted 2    
-
     
-
      (64,588 )     64,588      
-
     
-
     
-
 
Courageous Lake     77,176       823      
-
     
-
     
-
      823       77,999  
Iskut     41,779       8,125      
-
     
-
     
-
      8,125       49,904  
Snowstorm     31,471       3,091      
-
     
-
     
-
      3,091       34,562  
3 Aces     9,034       3,045      
-
     
-
     
-
      3,045       12,079  
Grassy Mountain     771      
-
     
-
     
-
     
-
     
-
      771  
Corporate     307      
-
     
-
     
-
      304       304       611  
Total adjusted 2     662,553       55,069       94,140       69,324       2,030       220,563       883,116  

 

1) In 2023, Construction in progress additions at KSM included $19.4 million of capitalized borrowing costs (2022 - $14.7 million).

 

2) Additions in the prior year financial statements were net of $38.4 transfers from construction in progress to property and equipment additions. Additionally, during 2023, $26.1 million of costs were determined to have been ready for use in 2022 and were reclassified from construction in progress to property and equipment to correct for this.

 

Continued exploration of the Company’s mineral properties is subject to certain lease payments, project holding costs, rental fees and filing fees.

 

a) KSM

 

In 2001, the Company purchased a 100% interest in contiguous claim blocks in the Skeena Mining Division, British Columbia. The vendor maintains a 1% net smelter royalty interest on the project, subject to maximum aggregate royalty payments of $4.5 million. The Company is obligated to purchase the net smelter royalty interest for the price of $4.5 million in the event that a positive feasibility study demonstrates a 10% or higher internal rate of return after tax and financing costs.

 

Page 24


 

In 2011 and 2012, the Company completed agreements granting a third party an option to acquire a 2% net smelter royalty on all gold and silver production sales from KSM for a payment equal to the lesser of C$160 million or US$200 million. The option is exercisable for a period of 60 days following the announcement of receipt of all material approvals and permits, full project financing and certain other conditions for the KSM Project.

 

In December 2020, the Company purchased the Snowfield (renamed East Mitchell) property from Pretium Resources Inc. The East Mitchell property, located in the same valley that hosts KSM’s Mitchell deposit, was purchased for US$100 million ($127.5 million) in cash, a 1.5% net smelter royalty on East Mitchell property production, and a conditional payment of US$20 million, payable following the earlier of (i) commencement of commercial production from East Mitchell property, and (ii) announcement by the Company of a bankable feasibility study which includes production of reserves from the East Mitchell property. US$15 million of the conditional payment can be credited against future royalty payments.

 

Additions to construction in progress consisted of $156.9 million (2022 - $104.6 million) of KSM assets under construction costs, $19.4 million (2022 - $14.7) of capitalized borrowing costs related to the secured note liabilities interest expense, and $2.5 million (2022 - $0.9 million) of capitalized depreciation expense. In 2023, $128.0 million was transferred from construction in progress to property and equipment (2022 - $38.4 million).

 

b) Courageous Lake

 

In 2002, the Company purchased a 100% interest in the Courageous Lake gold project from Newmont Canada Limited and Total Resources (Canada) Limited. The Courageous Lake gold project consists of mining leases located in Northwest Territories of Canada.

 

c) Iskut

 

On June 21, 2016, the Company purchased 100% of the common shares of SnipGold Corp. which owns the Iskut Project, located in northwestern British Columbia.

 

d) Snowstorm

 

In 2017, the Company purchased 100% of the common shares of Snowstorm Exploration LLC which owns the Snowstorm Project, located in northern Nevada. In connection with the acquisition, the Company has agreed to make a conditional cash payment of US$2.5 million if exploration activities at the Snowstorm Project result in defining a minimum of five million ounces of gold resources compliant with National Instrument 43-101 and a further cash payment of US$5.0 million on the delineation of an additional five million ounces of gold resources.

 

e) 3 Aces

 

In 2020, the Company acquired a 100% interest in the 3 Aces gold project in the Yukon, Canada from Golden Predator Mining Corp. through the issuance of 300,000 common shares valued at $6.6 million. Should the project attain certain milestones, including the confirmation of a National Instrument 43-101 compliant mineral resource of 2.5 million ounces of gold, the Company will pay an additional $1 million, and upon confirmation of an aggregate mineral resource of 5 million ounces of gold, the Company will pay an additional $1.25 million.

 

Page 25


 

f) Grassy Mountain

 

In 2013, the Company sold 100% of its interest in the Grassy Mountain Project with a net book value of $0.8 million retained within mineral properties, related to the option to either receive, at the discretion of the Company, a 10% net profits interest royalty or a $10 million cash payment. Settlement is due four months after the later of: the day that the Company receives a feasibility study on the project; and the day that the Company is notified that permitting and bonding for the mine is in place. The current owner of the Grassy Mountain Project is Paramount who completed a feasibility study in 2020 but they have not notified the Company that permitting and bonding for the mine is in place.

 

10. Accounts payable and accrued liabilities

 

($000s)   December 31,
2023
    December 31,
2022
 
Trade payables   27,302     15,686  
Non-trade payables and accrued expenses   5,432     27,270  
    32,734     42,956  

 

11. Provision for reclamation liabilities

 

($000s)   December 31,
2023
    December 31,
2022
 
Beginning of the period   10,846     8,442  
Disbursements   (3,664 )   (4,519 )
Environmental rehabilitation expense  
-
    6,851  
Accretion   253     72  
End of the period   7,435     10,846  
             
Provision for reclamation liabilities – current   759     4,343  
Provision for reclamation liabilities – long-term   6,676     6,503  
    7,435     10,846  

 

The estimate of the provision for reclamation obligations, as at December 31, 2023, was calculated using the estimated discounted cash flows of future reclamation costs of $7.4 million (December 31, 2022 - $10.8 million) and the expected timing of cash flow payments required to settle the obligations between 2024 and 2026. As at December 31, 2023, the undiscounted future cash outflows are estimated at $8.1 million (December 31, 2022 - $11.5 million) primarily over the next three years. The nominal discount rate used to calculate the present value of the reclamation obligations was 3.9% at December 31, 2023 (December 31, 2022 - 4.07%). For the year ended December 31, 2023, reclamation disbursements amounted to $3.7 million (2022 - $4.5 million).

 

In 2022, the Company updated the closure plan for the Johnny Mountain mine site and charged an additional $6.6 million of rehabilitation expenses to the consolidated statements of operations and comprehensive income (loss). Expenditures include the estimated costs for the closure of all adits and vent raises, removal of the mill and buildings, treatment of landfills and surface water management as well as ongoing logistics, freight and fuel costs.

 

In 2023, the Company placed $0.7 million on deposit as security for the reclamation obligations at KSM and 3 Aces. In 2022, the Company placed $5.4 million on deposit as security for the reclamation obligations at KSM. As at December 31, 2023, the Company has placed a total of $21.4 million (December 31, 2022 - $20.6 million) on deposit with financial institutions or with government regulators that are pledged as security against reclamation liabilities. The deposits are recorded on the consolidated statements of financial position as reclamation deposits. As at December 31, 2023, the Company had $10.0 million (December 31, 2022, $7.9 million) of uncollateralized surety bond, issued pursuant to arrangements with an insurance company, in support of environmental closure costs obligations related to the KSM project.

 

Page 26


 

12. Secured Note liabilities

 

i. 2022 Secured Note

 

On February 25, 2022, the Company, through its wholly-owned subsidiary, KSM Mining ULC (“KSMCo”) signed a definitive agreement to sell a secured note (“2022 Secured Note”) that is to be exchanged at maturity for a silver royalty on its 100% owned KSM Project (“KSM”) to institutional investors (“Investors”) for US$225 million. The transaction closed on March 24, 2022. The key terms of the 2022 Secured Note include:

 

When the 2022 Secured Note matures, the Investors will use all of the principal amount repaid on maturity to purchase a 60% gross silver royalty (the “Silver Royalty”). Maturity occurs upon the first to occur of:

 

a) Commercial production being achieved at KSM; and

 

b) Either on March 24, 2032, the 10-year anniversary, or if the Environmental Assessment Certificate (“EAC”) expires and the Investors do not exercise their right to put the 2022 Secured Note to the Company, on March 24, 2035, the 13-year anniversary of the issue date of the 2022 Secured Note.

 

Prior to its maturity, the 2022 Secured Note bears interest at 6.5% per annum, payable quarterly in arrears. The Company can elect to satisfy interest payments in cash or by delivering common shares.

 

The Company has the option to buyback 50% of the Silver Royalty, once exchanged, on or before 3 years after commercial production has been achieved, for an amount that provides the Investors a minimum guaranteed annualized return.

 

If project financing to develop, construct and place KSM into commercial production is not in place by March 24, 2027, the Investors can put the 2022 Secured Note back to the Company for US$232.5 million, with the Company able to satisfy such amount in cash or by delivering common shares at its option. This right expires once such project financing is in place. If the Investors exercise this put right, the Investors’ right to purchase the Silver Royalty terminates.

 

If KSM’s EAC expires at anytime while the 2022 Secured Note is outstanding, the Investors can put the 2022 Secured Note back to the Company for US$247.5 million at any time over the following nine months, with the Company able to satisfy such amount in cash or by delivering common shares at its option. If the Investors exercise this put right, the Investors’ right to purchase the Silver Royalty terminates.

 

If commercial production is not achieved at KSM prior to March 24, 2032, the Silver Royalty payable to the Investors will increase to a 75% gross silver royalty (if the EAC expires during the term of the 2022 Secured Note and the corresponding put right is not exercised by the Investors, this uplift will occur at the thirteenth anniversary from closing).

 

No amount payable shall be paid in common shares if, after the payment, any of the Investors would own more than 9.9% of the Company’s outstanding shares.

 

The Company’s obligations under the 2022 Secured Note are secured by a charge over all of the assets of KSMCo and a limited recourse guarantee from the Company secured by a pledge of the shares of KSMCo.

 

Page 27


 

To satisfy the interest payment on the 2022 Secured Note, during 2023, the Company issued 1,285,178 common shares, in respect of the interest incurred during year ended December 31, 2023 (2022 - 977,745 common shares).

 

A number of the above noted options within the agreement represent embedded derivatives. Management has elected to not separate these embedded derivatives from the underlying host secured note, and instead account for the entire secured note as a financial liability at fair value through profit or loss.

 

The Company entered into the loan commitment within the scope of IFRS 9 ‘Financial Instruments’ on February 25, 2022 related to the 2022 Secured Note, as at that date, the Company and the Investors were committed under pre-specified terms and conditions to complete the transaction. The loan commitment was initially recognized at a fair value of US$225 million. Upon funding of the 2022 Secured Note on March 24, 2022, the loan commitment was settled with no gain or loss recognized.

 

The 2022 Secured Note was recognized at its estimated fair value at initial recognition of $282.3 million (US$225 million) using a discounted cash flow model with a Monte Carlo simulation. This incorporated several scenarios and probabilities of the EAC expiring, achieving commercial production and securing project financing, silver prices forecast from five year quoted forward price, and the discount rates. During the year ended December 31, 2023, the fair value of the 2022 Secured Note increased, and the Company recorded a $30.8 million loss (year ended December 31, 2022 - $18.7 million gain) on the remeasurement.

 

The following inputs and assumptions were used in the determination of fair value:

 

Inputs and assumptions   December 31,
2023
    December 31,
2022
 
Forecast silver production in thousands of ounces     166,144       166,144  
Five year quoted future silver price     US$28.62       US$29.38  
Risk-free rate     4.0%       3.4%  
Credit spread     4.0%       5.3%  
Share price volatility     60%       60%  
Silver royalty discount factor     9.2%       8.6%  

 

The carrying amount for the 2022 Secured Note is as follows:

 

($000s)     December 31,
2023
      December 31,
2022
 
Fair value beginning of the period (or on issuance)     263,541       282,263  
Change in fair value (gain) loss through profit and loss     3,096       (36,967 )
Change in fair value (gain) loss through other comprehensive income (loss)     34,830       (2,912 )
Foreign currency translation (gain) loss     (7,104 )     21,157  
Total change in fair value     30,822       (18,722 )
                 
Fair value end of the period     294,363       263,541  

 

Page 28


 

Sensitivity Analysis:

 

For the fair value of the 2022 Secured Note, reasonably possible changes at the reporting date to one of the significant inputs, holding other inputs constant, would have the following effects:

 

Key Inputs   Inter-relationship between significant inputs and fair value measurement   Increase
(decrease)
(millions)
 
Key observable inputs   The estimated fair value would increase (decrease) if:        
●    Silver price forward curve   ●     Future silver prices were 10% higher   $ 16.7  
    ●     Future silver prices were 10% lower   $ (16.9 )
●    Discount rates   ●     Discount rates were 1% higher   $ (25.6 )
    ●     Discount rates were 1% lower   $ 30.0  
Key unobservable inputs            
●    Forecasted silver production   ●     Silver production indicated silver ounces were 10% higher   $ 16.7  
    ●     Silver production indicated silver ounces were 10% lower   $ (16.9 )

 

ii. 2023 Secured Note

 

On May 11, 2023, the Company announced that it, through its wholly-owned subsidiary, KSM Mining ULC (“KSMCo”), had agreed to the principal terms of a royalty agreement under which Sprott Resource Streaming and Royalty Corp. (“Sprott”) would pay KSMCo US$150 million and KSMCo would grant Sprott up to 1.2% net smelter royalty (“NSR”) on the KSM project. Thereafter, the Company and Sprott agreed to restructure the proposed transaction as the sale of a secured note and, on June 28, 2023, the Company and KSMCo, signed a definitive agreement to sell a secured note (“2023 Secured Note”) that is to be exchanged at maturity for a net smelter returns royalty (the “NSR”) on its 100% owned KSM Project (“KSM”) to Sprott for US$150 million. The transaction closed on June 29, 2023. The key terms of the 2023 Secured Note include:

 

When the 2023 Secured Note matures, Sprott will use all of the principal amount repaid on maturity to purchase a 1% NSR, subject to adjustment of the amount as described below. Maturity occurs upon the first to occur of:

 

a) Commercial production being achieved at KSM; and

 

b) Either on March 24, 2032 or, if the Environmental Assessment Certificate (“EAC”) expires and the Investors do not exercise their right to put the 2023 Secured Note to the Company, on March 24, 2035.

 

Prior to its maturity, the 2023 Secured Note bears interest at 6.5% per annum, payable quarterly in arrears. However, payment of quarterly interest due on or before June 29, 2025 (the “Deferred Interest”) will be deferred and the Deferred Interest plus interest accrued on it (the “Interest Deferral Amount”) is payable in a lump sum on or before December 29, 2025.

 

KSMCo can pay the Interest Deferral Amount (US$21.5M) in cash or Seabridge common shares or KSMCo can elect to increase the size of the NSR to be sold to Sprott on the Maturity Date from a 1% NSR to a 1.2% NSR (the “Royalty Increase Election”).

 

The Company can elect to satisfy quarterly interest payments, including the Deferral Amount due, by paying in cash or Seabridge common shares. The requirement to make quarterly interest payments expires on the maturity date.

 

Page 29


 

No amount payable shall be paid in common shares if, after the payment, Sprott would own more than 9.9% of the Company’s outstanding shares.

 

If commercial production is not achieved at the KSM Project prior to March 24, 2032, the size of the NSR to be sold to Sprott on the Maturity Date will increase to 1.25% if KSMCo paid the Interest Deferral Amount in cash or shares, or to 1.5% if KSMCo made the Royalty Increase Election (the applicable increase being the “Production Delay Increase”).

 

The Company has the option to purchase the NSR amount down (after the NSR is sold to Sprott) to a 0.5% NSR (or to 0.625% if the Production Delay Increase occurred) on or before three years after commercial production has been achieved, for an amount that provides Sprott a minimum guaranteed annualized return.

 

If project financing to develop, construct and place KSM into commercial production is not in place by March 24, 2027, Sprott can put the 2023 Secured Note back to the Company for:

 

a) if the Company is obligated to sell Sprott a 1% NSR on the Maturity Date at the time, US$155 million plus accrued and unpaid interest, or

 

b) if the Company is obligated to sell Sprott a 1.2% or 1.5% NSR on the Maturity Date at the time, US$180 million plus accrued and unpaid interest.

 

This Sprott put right expires once such project financing is in place. If Sprott exercises this put right, Sprott’s right to purchase the NSR terminates.

 

If KSM’s EAC expires at anytime while the 2023 Secured Note is outstanding, Sprott can put the 2023 Secured Note back to the Company at any time over the following nine months for:

 

a) if the Company is obligated to sell Sprott a 1% NSR on the Maturity Date at the time, US$165 million plus accrued and unpaid interest, or

 

b) if the Company is obligated to sell Sprott a 1.2% NSR on the Maturity Date at the time, US$186.5 million plus accrued and unpaid interest.

 

If Sprott exercises this put right, Sprott’s right to purchase the NSR terminates.

 

The Company can elect to satisfy payments due on Sprott’s exercise of either of its put rights in cash or by delivering common shares.

 

No amount payable shall be paid in common shares if, after the payment, Sprott would own more than 9.9% of the Company’s outstanding shares.

 

The Company’s obligations under the 2023 Secured Note are secured by a charge over all of the assets of KSMCo and a limited recourse guarantee from the Company secured by a pledge of the shares of KSMCo.

 

A number of the above noted options within the agreement represent embedded derivatives. Management has elected to not separate these embedded derivatives from the underlying host secured note, and instead account for the entire secured note as a financial liability at fair value through profit or loss.

 

The 2023 Secured Note was recognized at its estimated fair value at initial recognition of $198.8 million (US$150 million) using a discounted cash flow model with a Monte Carlo simulation. This incorporated several scenarios and probabilities of the EAC expiring, achieving commercial production and securing project financing, metal prices forecast and discount rates. As at December 31, 2023 and since inception, the fair value of the 2023 Secured Note increased, and the Company recorded a $80.7 million loss on the remeasurement.

 

Page 30


 

The following inputs and assumptions were used in the determination of fair value:

 

Inputs and assumptions   December 31,
2023
    June 29,
2023
 
Forecast NSR:            
Gold in thousands of ounces     10,500       10,500  
Silver in thousands of ounces     29,876       29,876  
Copper in millions of pounds     19,322       19,322  
Molybdenum in millions of pounds     152       152  
Five year quoted future metal price                
Gold per ounce     US$2,553.60       US$2,346.82  
Silver per ounce     US$28.62       US$27.48  
Copper per pound     US$4.08       US$3.65  
Molybdenum per pound     US$24.89       US$29.26  
Risk-free rate     4.0%       3.9%  
Credit spread     4.0%       5.4%  
Share price volatility     60%       60%  
NSR royalty discount factor     9.2%       9.1%  

 

The carrying amount for the 2023 Secured Note is as follows:

 

($000s)     December 31,
2023
 
Fair value at inception     198,825  
Change in fair value (gain) loss through profit and loss     33,182  
Change in fair value (gain) loss through other comprehensive income (loss)     49,563  
Foreign currency translation (gain) loss     (2,045 )
Total change in fair value     80,700  
         
Fair value end of the period     279,525  

 

Sensitivity Analysis:

 

For the fair value of the 2023 Secured Note, reasonably possible changes at the reporting date to one of the significant inputs, holding other inputs constant, would have the following effects:

 

Key Inputs   Inter-relationship between significant inputs and fair value measurement  

Increase
(decrease)

(millions)

 
Key observable inputs   The estimated fair value would increase (decrease) if:        
●   Metals price forward curve   ●    Future metal prices were 10% higher   $ 20.7  
    ●    Future metal prices were 10% lower   $ (20.9 )
●   Discount rates   ●    Discount rates were 1% higher   $ (34.4 )
    ●    Discount rates were 1% lower   $ 42.1  
Key unobservable inputs            
●   Forecasted metal production   ●    Metal production indicated volumes were 10% higher   $ 19.7  
    ●    Metal production indicated volumes were 10% lower   $ (20.1 )

 

Page 31


 

13. Shareholders’ equity

 

The Company is authorized to issue an unlimited number of preferred shares and common shares with no par value. No preferred shares have been issued or were outstanding at December 31, 2023 or December 31, 2022.

 

The Company manages its capital structure and makes adjustments to it, based on the funds available to the Company, in order to support the acquisition, exploration and development of mineral properties. The Board of Directors does not establish quantitative return on capital criteria for management, but rather relies on the expertise of the Company’s management to sustain future development of the business.

 

The properties in which the Company currently has an interest are in the pre-operating stage, as such the Company is dependent on external financing to fund its activities. In order to carry out the planned exploration and pay for administrative costs, the Company will spend its existing working capital and raise additional amounts as needed.

 

Management reviews its capital management approach on an ongoing basis and believes that this approach, given the relative size of the Company, is reasonable. There were no changes in the Company’s approach to capital management during 2023. The Company considers its capital to be share capital, stock-based compensation, warrants, contributed surplus and deficit. The Company is not subject to externally imposed capital requirements.

 

a) Equity financings

 

During the first quarter of 2021, the Company entered into an agreement with two securities dealers, for an At-The-Market offering program, entitling the Company, at its discretion, and from time to time, to sell up to US$75 million in value of common shares of the Company. This program was in effect until the Company’s US$775 million Shelf Registration Statement, that expired in December 2022, was replaced with a new US$750 million the same month. During the first quarter of 2023, a US$100 million prospectus supplement was filed and the program was renewed. In the first quarter of 2023, the Company entered into a new agreement with two securities dealers, for an At-The-Market offering program, entitling the Company, at its discretion, and from time to time, to sell up to US$100 million in value of common shares of the Company. This program can be in effect until the Company’s US$750 million Shelf Registration Statement expires in 2025. In 2023, the Company issued 2,516,839 shares, at an average selling price of $17.36 per share, for net proceeds of $42.8 million under the Company’s At-The-Market offering. As at December 31, 2023, US$67.6 million is available under the ATM. Subsequent to the quarter end, the Company issued 682,686 shares, at an average selling price of $16.50 per share, for net proceeds of $11.0 million under the Company’s At-The-Market offering. In 2022, the Company issued 998,629 shares, at an average selling price of $22.82 per share, for net proceeds of $22.3 million under the Company’s At-The-Market offering.

 

In December 2023, the Company issued a total of 875,150 flow-through common shares at an average $22.34 per common share for aggregate gross proceeds of $19.6 million. The Company committed to renounce its ability to deduct qualifying exploration expenditures for the equivalent value of the gross proceeds of the flow-through financing and transfer the deductibility to the purchasers of the flow-through shares. The effective date of the renouncement was December 31, 2023. At the time of issuance of the flow-through shares, $5.5 million premium was recognized as a liability on the consolidated statements of financial position.

 

In December 2022, the Company issued a total of 675,400 flow-through common shares at an average $22.24 per common share for aggregate gross proceeds of $15.0 million. The Company committed to renounce its ability to deduct qualifying exploration expenditures for the equivalent value of the gross proceeds of the flow-through financing and transfer the deductibility to the purchasers of the flow-through shares. The effective date of the renouncement was December 31, 2022. At the time of issuance of the flow-through shares, $4.2 million premium was recognized as a liability on the consolidated statements of financial position. During the year ended December 31, 2023, the Company incurred $15.0 million of qualifying exploration expenditures and the $4.2 million premium was recognized through other income on the consolidated statements of operations and comprehensive income (loss).

 

Page 32


 

b) Stock options and restricted share units

 

The Company provides compensation to directors and employees in the form of stock options and RSUs. Pursuant to the Share Option Plan, the Board of Directors has the authority to grant options, and to establish the exercise price and life of the option at the time each option is granted, at a price not less than the closing price of the common shares on the Toronto Stock Exchange on the date of the grant of such option and for a period not exceeding five years. All exercised options are settled in equity. Pursuant to the Company’s RSU Plan, the Board of Directors has the authority to grant RSUs, and to establish terms of the RSUs including the vesting criteria and the life of the RSUs. Stock option and RSU transactions were as follows:

 

    Options     RSUs      Total  
    Number of Options     Weighted Average Exercise Price ($)     Amortized Value of options ($000s)     Number of RSUs     Amortized Value of RSUs ($000s)     Stock-based Compensation ($000s)  
Outstanding January 1, 2023   477,500     15.85     4,117     345,266     538     4,655  
Granted    
-
     
-
     
-
      399,300       144       144  
Exercised option or vested RSU     (50,000 )     15.46       (460 )     (41,840 )     (823 )     (1,283 )
Options surrendered for cash     (273,500 )     15.46       (2,355 )    
-
     
-
      (2,355 )
Expired     (104,000 )     16.17       (886 )     (5,000 )     (33 )     (919 )
Amortized value of stock-based compensation    
-
     
-
     
-
     
-
      3,158       3,158  
Outstanding at December 31, 2023     50,000       17.72       416       697,726       2,984       3,400  
Exercisable at December 31, 2023     50,000                                          

 

    Options     RSUs     Total  
    Number of Options     Weighted Average Exercise Price ($)     Amortized Value of options ($000s)     Number of RSUs     Amortized Value of RSUs ($000s)     Stock-based Compensation ($000s)  
Outstanding at January 1, 2022     1,023,334       14.61       8,125       173,800       572       8,697  
Granted    
-
     
-
     
-
      320,266       187       187  
Exercised option or vested RSU     (540,834 )     13.54       (3,974 )     (148,800 )     (3,172 )     (7,146 )
Expired     (5,000 )     13.14       (34 )    
-
     
-
      (34 )
Amortized value of stock-based compensation    
-
     
-
     
-
     
-
      2,951       2,951  
Outstanding at December 31, 2022     477,500       15.85       4,117       345,266       538       4,655  
Exercisable at December 31, 2022     477,500                                          

 

Page 33


 

In December 2023, 273,500 options, with exercise price of $15.46 per option, were surrendered for cash at the weighted average rate of $0.18 cash payment per option. As at December 31, 2023, there were 50,000 outstanding share options, with an exercise prices of $17.72, expiring in June 2024.

 

In December 2023, 379,300 RSUs were granted to the Board members, members of senior management, and to other employees of the Company. Of those, 277,500 was granted to senior management, with vesting dependent on certain corporate objectives including the completion of a bankable feasibility study at KSM, and the Company’s share price outperforming certain market benchmarks. The fair value of RSUs granted with vesting dependent on market conditions was valued using a Monte-Carlo simulation. The fair value of total RSU grants, of $4.6 million, was estimated as at the grant date to be amortized over the expected service period of the grants. The expected service period ranges from one year to three years from the date of the grant and is dependent on the corporate objectives being met.

 

In December 2022, 310,266 RSUs were granted to the Board members, members of senior management, and to other employees of the Company. Of those, 232,266 was granted to senior management, with vesting dependent on certain corporate objectives including the Company submitting its formal application to the regulator for the KSM Project to be designated as “substantially started”, notification from the regulator that the KSM Project has been designated as “substantially started”, and announcement of KSM joint venture agreement, or other transformative transaction affecting the ownership and control of KSM. The fair value of the total RSU grants, of $5.1 million, was estimated as at the grant date to be amortized over the expected service period of the grants. The expected service period ranges from nine months to three years from the date of the grant and is dependent on the corporate objectives being met. Subsequent to year end in January 2024, upon the Company submitting its formal application to the regulator for the KSM Project to be designated as “substantially started”, 58,067 RSUs vested and were exchanged for common shares of the Company.

 

In December 2021, 123,800 RSUs were granted to the Board members, members of senior management, and to other employees of the Company. The fair value of the grants, of $2.6 million, was estimated as at the grant date to be amortized over the expected service period of the grants. The expected service period of approximately four months from the date of the grant was dependent on certain corporate objectives being met.

 

c) Basic and diluted net income loss per common share

 

Basic and diluted net loss attributable to common shareholders of the Company for the year ended December 31, 2023 was $29.3 million (2022 - $7.4 million net loss).

 

Page 34


 

Loss per share has been calculated using the weighted average number of common shares and common share equivalents issued and outstanding during the period. Stock options are reflected in diluted earnings per share by application of the treasury method. The following table details the weighted average number of outstanding common shares for the purpose of computing basic and diluted loss per common share for the following periods:

 

($000s)   December 31,
2023
    December 31,
2022
 
Weighted average number of common shares outstanding   83,001,989     80,058,861  
Weighted average shares dilution adjustments: 1 Stock options  
-
   
-
 
RSUs  
-
   
-
 
Diluted weighted average shares outstanding   83,001,989     80,058,861  

 

1) Excluded in the diluted weighted average number of common shares outstanding as their exercise or settlement would be anti-dilutive in the earnings per share calculation.

 

14. Cash flow items

 

Adjustment for other non-cash items within operating activities:

 

        Year Ended  
($000s)   Notes   December 31,
2023
    December 31,
2022
 
Impairment of investment in associate   7    
-
      873  
Equity loss of associate   7     208       207  
Loss (gain) on convertible notes receivable   -     103       (25 )
Interest income earned on convertible notes receivable   -     (66 )     (39 )
Depreciation   9     132       84  
Finance costs, net   -     254       72  
Effects of exchange rate fluctuation on cash and cash equivalents   -     (269 )     (3,216 )
          362       (2,044 )

 

15. Fair value of financial assets and liabilities

 

Fair value is the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date. The fair value hierarchy establishes three levels to classify the inputs to valuation techniques used to measure fair value.

 

Level 1: Inputs are quoted prices (unadjusted) in active markets for identical assets or liabilities.

 

Level 2: Inputs are quoted prices in markets that are not active, quoted prices for similar assets or liabilities in active markets, inputs other than quoted prices that are observable for the asset or liability (for example, interest rate and yield curves observable at commonly quoted intervals, forward pricing curves used to value currency and commodity contracts, volatility measurements used to value option contracts and observable credit default swap spreads to adjust for credit risk where appropriate), or inputs that are derived principally from or corroborated by observable market data or other means.

 

Level 3: Inputs are unobservable (supported by little or no market activity).

 

Page 35


 

The fair value hierarchy gives the highest priority to Level 1 inputs and the lowest priority to Level 3 inputs.

 

The Company’s fair values of financial assets and liabilities were as follows:

 

    December 31, 2023  
($000s)   Carrying Amount     Level 1     Level 2     Level 3     Total Fair Value  
Assets                        
Cash and cash equivalents     82,438       82,438      
-
     
-
      82,438  
Amounts receivable     5,019       5,019      
-
     
-
      5,019  
Investment in marketable securities     3,749       3,749      
-
     
-
      3,749  
Long-term receivables     13,227       13,227      
-
     
-
      13,227  
      104,433       104,433      
-
     
-
      104,433  
Liabilities                                        
Accounts payable and accrued liabilities     32,733       32,733      
-
     
-
      32,733  
Secured note liabilities     573,888      
-
     
-
      573,888       573,888  
      606,621       32,733      
-
      573,888       606,621  

 

    December 31, 2022  
($000s)   Carrying Amount     Level 1     Level 2     Level 3     Total Fair Value  
Assets                              
Cash and cash equivalents     46,150       46,150      
-
     
-
      46,150  
Short-term deposits     81,690       81,690      
-
     
-
      81,690  
Amounts receivable     6,260       6,260      
-
     
-
      6,260  
Investment in marketable securities     3,696       3,696      
-
     
-
      3,696  
Convertible notes receivable     631      
-
     
-
      631       631  
Long-term receivables     13,203       13,203      
-
     
-
      13,203  
      151,630       150,999      
-
      631       151,630  
Liabilities                                        
Accounts payable and accrued liabilities     42,956       42,956      
-
     
-
      42,956  
Secured note liabilities     263,541      
-
     
-
      263,541       263,541  
      306,497       42,956      
-
      263,541       306,497  

 

The carrying value of cash and cash equivalents, short-term deposits, amounts receivable and accounts payable and accrued liabilities approximate their fair values due to the short-term maturity of these financial assets and liabilities.

 

The Company’s financial risk exposures and the impact on the Company’s financial instruments are summarized below:

 

Credit Risk

 

The Company’s credit risk is primarily attributable to short-term deposits, convertible notes receivable, and receivables included in amounts receivable and prepaid expenses. The Company has no significant concentration of credit risk arising from operations. The short-term deposits consist of Canadian Schedule I bank guaranteed notes, with terms up to one year but are cashable in whole or in part with interest at any time to maturity, for which management believes the risk of loss to be remote. Management believes that the risk of loss with respect to financial instruments included in amounts receivable and prepaid expenses to be remote.

 

Page 36


 

Liquidity Risk

 

The Company’s ability to fund its operations and capital expenditures and other obligations as they become due is dependent upon market conditions. The Company has in place an At-the-Market offering that allows for the issuance of up to US$100 million of its common shares and has been an effective source of funding. In 2023, the Company raised $42.8 million, and as at December 31, 2023, has room for an additional US$67.6 million under its At-the-Market offering. The Company intends to fully utilize the At-the-Market offering currently in place and believes that with this it will have sufficient liquidity to continue its operations and meet its obligations for the next twelve months. As the Company does not generate cash inflows from operations, the Company is dependent upon external sources of financing to fund its exploration projects and on-going activities, including proceeding with additional payments pursuant to the Facilities Agreement with BC Hydro (refer to Note 19). When required, the Company will seek additional sources of cash to cover its proposed exploration and development programs at its key projects, in the form of equity financing or from the sale of non-core assets.

 

The Company’s approach to managing liquidity risk is to ensure that it will have sufficient liquidity to meet liabilities when due. As at December 31, 2023, the Company had cash and cash equivalents of $82.4 million (December 31, 2022 - cash and cash equivalents of $46.2 million and short-term deposits of $81.7 million) for settlement of current financial liabilities of $33.5 million (December 31, 2022 - $47.3 million). Except for the secured note liabilities and the reclamation obligations, the Company’s financial liabilities primarily have contractual maturities of 30 days and are subject to normal trade terms. The Company’s ability to fund its operations and capital expenditures and other obligations as they become due is dependent upon market conditions.

 

The following table details the Company’s expected remaining contractual cash flow requirements for its financial liabilities on repayment or maturity periods. The amounts presented are based on the contractual undiscounted cash flows and may not agree with the carrying amounts in the Consolidated Statements of Financial Position.

 

($000s)     Less than 1 year       1-3 years       3-5 years       Greater than 5 years       Total  
2022 Secured Note including interest     19,368       38,736       38,736       197,523       294,363  
2023 Secured Note including interest    
-
      47,840       25,824       205,860       279,524  
Flow-through share expenditures     19,554      
-
     
-
     
-
      19,554  
Lease obligation     905       337       150       249       1,641  
      39,827       86,913       64,710       403,632       595,082  

 

As the Company does not generate cash inflows from operations, and is dependent upon external sources of financing to fund its exploration projects and on-going activities. If required, the Company will seek additional sources of cash to cover its proposed exploration and development programs at its key projects, in the form of equity financing and from the sale of non-core assets. Refer to Note 12 for details on equity financing.

 

Market Risk

 

(a) Interest Rate Risk

 

Interest rate risk is the risk that the future cash flows of a financial instrument or its fair value will fluctuate because of changes in market interest rates. The secured note liabilities (Note 12) bear interest at a fixed rate of 6.5% per annum. The Company’s current policy is to invest excess cash in Canadian bank guaranteed notes (short-term deposits). The short-term deposits can be cashed in at any time and can be reinvested if interest rates rise.

 

Page 37


 

(b) Foreign Currency Risk

 

The Company’s functional currency is the Canadian dollar and major purchases are transacted in Canadian and US dollars. The secure note liability and the related interest payments are denominated in US dollars. The Company has the option to pay the interest either in cash or in shares. The Company also funds certain operations, exploration and administrative expenses in the United States on a cash call basis using US dollar cash on hand or converted from its Canadian dollar cash. Management believes the foreign exchange risk derived from currency conversions is not significant to its operations and has not entered into any foreign exchange hedges. As at December 31, 2023, the Company had cash and cash equivalents, investment in associate, convertible notes receivable, loan receivable, reclamation deposits, accounts payable, accrued liabilities and secured notes that are in US dollars.

 

(c) Investment Risk

 

The Company has investments in other publicly listed exploration companies which are included in investments. These shares were received as option payments on certain exploration properties the Company owns or has sold. In addition, the Company holds $3.7 million in a gold exchange traded receipt that is recorded on the consolidated statements of financial position in investments. The risk on these investments is significant due to the nature of the investment but the amounts are not significant to the Company.

 

16. Corporate and administrative expenses

 

($000s)     2023       2022  
Employee compensation     7,165       7,479  
Stock-based compensation     3,318       3,138  
Professional fees     3,011       2,591  
Other general and administrative     3,947       2,882  
      17,441       16,090  

 

17. Related party disclosures

 

Compensation to key management personnel of the Company:

 

($000s)     2023       2022  
Compensation of directors:                
Directors’ fees     734       560  
Stock-based compensation     435       675  
      1,169       1,235  
                 
Compensation of key management personnel:                
Salaries and benefits and consulting fees     7,632       7,892  
Stock-based compensation     2,511       2,026  
      10,143       9,918  
      11,312       11,153  

 

Page 38


 

During year ended December 31, 2023 and 2022, there were no payments to related parties other than compensation paid to key management personnel. These transactions were in the normal course of operations and were measured at the exchange amount, which is the amount of consideration established and agreed to by the related parties.

 

18. Income taxes

 

($000s)     2023       2022  
                 
Deferred tax expense (recovery)     (8,695 )     8,268  
      (8,695 )     8,268  

 

Tax expense (recovery) recognized in other comprehensive income or directly in equity

 

($000s)     2023       2022  
                 
Financing costs - recognized in statement of equity     (459 )     (330 )
Revaluation of the secured note liabilities – recognized in OCI     (22,780 )     831  
      (23,239 )     501  

 

In 2023, the Company recognized income tax recovery of $8.7 million, primarily due to the deferred tax asset arising from the loss recognized on remeasurement of the fair value of the secured note liabilities, and the losses in the period. The income tax recovery was partially offset by income tax expense arising from the renouncement of expenditures related to the December 2022 flow-through shares issued which are capitalized for accounting purposes. The income tax impact of the revaluation of the secured note liabilities that was recorded through other comprehensive income (loss) during 2023, of $22.8 million, was also recorded through other comprehensive income (loss).

 

(a) Rate Reconciliation

 

The provision for income taxes differs from the amount that would have resulted by applying the combined Canadian Federal and Provincial statutory income tax rates of 26.75% (2022 - 26.68%).

 

($000s)     2023       2022  
Earnings (loss) before income taxes     (37,961 )     874  
      26.75 %     26.68 %
                 
Income tax calculated using statutory rates     (10,153 )     233  
Non-deductible/(non-taxable) items     (1,512 )     2,280  
Difference in foreign tax rates     (25 )     103  
Change in deferred tax rates     (134 )     (116 )
Movement in tax benefits not recognized     (985 )     2,996  
Impact of true-up of prior year balances     180       124  
Renouncement of flow-through expenditures     4,018       2,525  
Other     (84 )     123  
Income tax (recovery) expense     (8,695 )     8,268  

 

Page 39


 

(b) Deferred Income Tax

 

The following table summarizes the significant components of deferred income tax assets and liabilities:

 

($000s)     December 31,
2023
      December 31,
2022
 
Deferred income tax assets:                
Property and equipment     1,253       565  
Provision for reclamation liabilities     1,406       1,235  
Financing costs     2,383       2,487  
Non-capital loss carryforwards     46,571       38,255  
Secured note liabilities     21,814       (10,766 )
                 
Deferred income tax liabilities:                
Mineral interests     (73,428 )     (63,710 )
Net deferred income tax liabilities    
-
      (31,934 )

 

(c) Unrecognized Deferred Tax Assets

 

The company has not recognized deferred income tax assets in respect of the following tax effected deductible temporary differences:

 

($000s)     December 31,
2023
      December 31,
2022
 
Marketable securities     130       137  
Loss carryforwards     1,712       834  
Investment tax credits     1,481       1,481  
Foreign tax credits     268       268  
Mineral properties     351       437  
Provision for reclamation liabilities    
-
      1,091  
Other     1,576      
-
 

 

Deferred tax has not been recognized on the deductible temporary difference of $1.9 million (2022 - $2.1 million) relating to investments in subsidiaries as these amounts will not be distributed in the foreseeable future.

 

The tax losses not recognized expire as per the amount and years noted below. The deductible temporary differences do not expire under the current tax legislation. Deferred tax assets have not been recognized in respect of these items because it is not probable that future taxable profit would be available against which the Company can utilize the benefits there from.

 

Page 40


 

(d) Income Tax Attributes

 

As at December 31, 2023, the Company had the following income tax attributes to carry forward.

 

    ($000s)     Expiry date  
Canadian non-capital losses     178,403       2043  
Canadian capital losses     2,574       Indefinite  
Canadian tax basis of mineral interest     462,381       Indefinite  
                 
US non-capital losses     528       2043  
US tax basis of mineral interest     27,707       Indefinite  

 

19. Commitments and contingencies

 

    Payments due by years  
($000s)   Total     2024     2025-26     2027-28     2029-30  
2022 Secured Note – interest     135,576       19,368       38,736       38,736       38,736  
2023 Secured Note – interest     99,488      
-
      47,840       25,824       25,824  
Capital expenditure obligations     18,434       18,434      
-
     
-
     
-
 
Flow-through share expenditures     19,554       19,554      
-
     
-
     
-
 
Mineral interests     7,967       758       1,527       2,403       3,279  
Lease obligation     1,542       905       337       150       150  
      282,561       59,019       88,440       67,113       67,989  

 

In 2022, the Company entered into a Facilities Agreement with BC Hydro covering the design and construction of facilities by BC Hydro to supply construction phase hydro-sourced electricity to the KSM project.

 

The cost to complete the construction is estimated to be $32.9 million of which the Company has paid $24.9 million to BC Hydro and the remaining balance was paid subsequent to the year end. In addition, the Facilities Agreement requires $59.8 million in security or cash from the Company for BC Hydro system reinforcement which is required to make the power available of which the Company has paid $57.1 million to BC Hydro and the remaining balance was paid subsequent to the year end. The $59.8 million system reinforcement security will be forgiven annually, typically over a period of less than 8 years, based on project power consumption. Prepayments to complete the design and construction amounted to $92.7 million inclusive of $10.6 million, accrued as at December 31, 2023, paid subsequent to December 31, 2023. On March 21, 2024, the Company signed an amendment to the Facilities Agreement with BC Hydro for additional payments that are scheduled for $14.0 million in July 2024 and $40.0 million in December 2024 (refer to Note 15).

 

Prior to its maturity, the 2022 Secured Note bears interest at 6.5%, or US$14.6 million per annum, payable quarterly in arrears. The Company can elect to satisfy interest payments in cash or by delivering common shares.

 

Prior to its maturity, the 2023 Secured Note bears interest at 6.5% or US$9.8 million per annum, payable quarterly in arrears. Payment of quarterly interest due from the closing date to the second anniversary is deferred and US$21.5 million must be paid on or before 30 months after the closing date. Ongoing quarterly interest can be satisfied by way of cash, common shares or increasing the NSR percentage from 1 to 1.2%. Refer to Note 12 for details on the secured note liabilities.

 

Page 41

 

false FY 0001231346 0001231346 2023-01-01 2023-12-31 0001231346 dei:BusinessContactMember 2023-01-01 2023-12-31 0001231346 2023-12-31 0001231346 2022-12-31 0001231346 2022-01-01 2022-12-31 0001231346 ifrs-full:ClassesOfShareCapitalMember 2022-12-31 0001231346 ifrs-full:WarrantsMember 2022-12-31 0001231346 sa:StockbasedCompensationMember 2022-12-31 0001231346 sa:ContributedSurplusMember 2022-12-31 0001231346 ifrs-full:RetainedEarningsMember 2022-12-31 0001231346 sa:AccumulatedOtherComprehensiveGainLossMember 2022-12-31 0001231346 ifrs-full:ClassesOfShareCapitalMember 2023-01-01 2023-12-31 0001231346 ifrs-full:WarrantsMember 2023-01-01 2023-12-31 0001231346 sa:StockbasedCompensationMember 2023-01-01 2023-12-31 0001231346 sa:ContributedSurplusMember 2023-01-01 2023-12-31 0001231346 ifrs-full:RetainedEarningsMember 2023-01-01 2023-12-31 0001231346 sa:AccumulatedOtherComprehensiveGainLossMember 2023-01-01 2023-12-31 0001231346 ifrs-full:ClassesOfShareCapitalMember 2023-12-31 0001231346 ifrs-full:WarrantsMember 2023-12-31 0001231346 sa:StockbasedCompensationMember 2023-12-31 0001231346 sa:ContributedSurplusMember 2023-12-31 0001231346 ifrs-full:RetainedEarningsMember 2023-12-31 0001231346 sa:AccumulatedOtherComprehensiveGainLossMember 2023-12-31 0001231346 ifrs-full:ClassesOfShareCapitalMember 2021-12-31 0001231346 ifrs-full:WarrantsMember 2021-12-31 0001231346 sa:StockbasedCompensationMember 2021-12-31 0001231346 sa:ContributedSurplusMember 2021-12-31 0001231346 ifrs-full:RetainedEarningsMember 2021-12-31 0001231346 sa:AccumulatedOtherComprehensiveGainLossMember 2021-12-31 0001231346 2021-12-31 0001231346 ifrs-full:ClassesOfShareCapitalMember 2022-01-01 2022-12-31 0001231346 ifrs-full:WarrantsMember 2022-01-01 2022-12-31 0001231346 sa:StockbasedCompensationMember 2022-01-01 2022-12-31 0001231346 sa:ContributedSurplusMember 2022-01-01 2022-12-31 0001231346 ifrs-full:RetainedEarningsMember 2022-01-01 2022-12-31 0001231346 sa:AccumulatedOtherComprehensiveGainLossMember 2022-01-01 2022-12-31 0001231346 ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0001231346 ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0001231346 ifrs-full:OfficeEquipmentMember ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0001231346 ifrs-full:OfficeEquipmentMember ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0001231346 ifrs-full:BuildingsMember 2023-01-01 2023-12-31 0001231346 2022-01-01 2022-06-30 0001231346 sa:ParamountMember 2023-01-01 2023-12-31 0001231346 sa:ParamountMember 2022-01-01 2022-12-31 0001231346 sa:ParamountMember 2023-12-31 0001231346 sa:ParamountMember 2022-12-31 0001231346 sa:InvestmentInMarketableSecuritiesMember 2022-12-31 0001231346 sa:InvestmentInMarketableSecuritiesMember 2023-01-01 2023-12-31 0001231346 sa:InvestmentInMarketableSecuritiesMember 2023-12-31 0001231346 sa:InvestmentInAssociateMember 2022-12-31 0001231346 sa:InvestmentInAssociateMember 2023-01-01 2023-12-31 0001231346 sa:InvestmentInAssociateMember 2023-12-31 0001231346 sa:InvestmentInMarketableSecuritiesMember 2021-12-31 0001231346 sa:InvestmentInMarketableSecuritiesMember 2022-01-01 2022-12-31 0001231346 sa:InvestmentInAssociateMember 2021-12-31 0001231346 sa:InvestmentInAssociateMember 2022-01-01 2022-12-31 0001231346 sa:BCHydroMember 2023-12-31 0001231346 sa:BCHydroMember 2022-12-31 0001231346 sa:CEEMember 2023-01-01 2023-12-31 0001231346 sa:BritishColumbiaMineralExplorationTaxCreditMember 2016-12-31 0001231346 2016-12-31 0001231346 2017-12-31 0001231346 sa:KsmMember 2022-01-01 2022-12-31 0001231346 sa:KsmMember 2023-01-01 2023-12-31 0001231346 2011-12-31 0001231346 2012-12-31 0001231346 sa:KsmMember 2023-12-31 0001231346 sa:KsmMember 2022-12-31 0001231346 sa:CourageousLakeMember 2002-12-31 2002-12-31 0001231346 sa:SnipGoldCorpMember sa:IskutMember 2016-06-21 2016-06-21 0001231346 sa:SnowstormMember 2023-01-01 2023-12-31 0001231346 sa:ThreeAcesMember 2023-01-01 2023-12-31 0001231346 sa:GrassyMountainMember 2023-01-01 2023-12-31 0001231346 sa:MineralInterestsMember 2021-12-31 0001231346 ifrs-full:ConstructionInProgressMember 2021-12-31 0001231346 sa:PropertyEquipmentMember 2021-12-31 0001231346 sa:RightofuseAssetMember 2021-12-31 0001231346 sa:MineralInterestsMember 2022-01-01 2022-12-31 0001231346 ifrs-full:ConstructionInProgressMember 2022-01-01 2022-12-31 0001231346 sa:PropertyEquipmentMember 2022-01-01 2022-12-31 0001231346 sa:RightofuseAssetMember 2022-01-01 2022-12-31 0001231346 sa:MineralInterestsMember 2022-12-31 0001231346 ifrs-full:ConstructionInProgressMember 2022-12-31 0001231346 sa:PropertyEquipmentMember 2022-12-31 0001231346 sa:RightofuseAssetMember 2022-12-31 0001231346 sa:MineralInterestsMember 2023-01-01 2023-12-31 0001231346 ifrs-full:ConstructionInProgressMember 2023-01-01 2023-12-31 0001231346 sa:PropertyEquipmentMember 2023-01-01 2023-12-31 0001231346 sa:RightofuseAssetMember 2023-01-01 2023-12-31 0001231346 sa:MineralInterestsMember 2023-12-31 0001231346 ifrs-full:ConstructionInProgressMember 2023-12-31 0001231346 sa:PropertyEquipmentMember 2023-12-31 0001231346 sa:RightofuseAssetMember 2023-12-31 0001231346 sa:KsmMember 2022-12-31 0001231346 sa:KsmMember 2023-01-01 2023-12-31 0001231346 sa:KsmMember 2023-12-31 0001231346 sa:KSMTransfersMember 2023-01-01 2023-12-31 0001231346 sa:KSMTransfersMember 2023-12-31 0001231346 sa:CourageousLakeMember 2022-12-31 0001231346 sa:CourageousLakeMember 2023-01-01 2023-12-31 0001231346 sa:CourageousLakeMember 2023-12-31 0001231346 sa:IskutMember 2022-12-31 0001231346 sa:IskutMember 2023-01-01 2023-12-31 0001231346 sa:IskutMember 2023-12-31 0001231346 sa:SnowstormMember 2022-12-31 0001231346 sa:SnowstormMember 2023-01-01 2023-12-31 0001231346 sa:SnowstormMember 2023-12-31 0001231346 sa:ThreeAcesMember 2022-12-31 0001231346 sa:ThreeAcesMember 2023-01-01 2023-12-31 0001231346 sa:ThreeAcesMember 2023-12-31 0001231346 sa:GrassyMountainMember 2022-12-31 0001231346 sa:GrassyMountainMember 2023-01-01 2023-12-31 0001231346 sa:GrassyMountainMember 2023-12-31 0001231346 sa:CorporateOneMember 2022-12-31 0001231346 sa:CorporateOneMember 2023-01-01 2023-12-31 0001231346 sa:CorporateOneMember 2023-12-31 0001231346 sa:TotalMember 2022-12-31 0001231346 sa:TotalMember 2023-01-01 2023-12-31 0001231346 sa:TotalMember 2023-12-31 0001231346 sa:KsmMember 2021-12-31 0001231346 sa:KsmMember 2022-01-01 2022-12-31 0001231346 sa:KSMTransfersAdjustedMember 2021-12-31 0001231346 sa:KSMTransfersAdjustedMember 2022-01-01 2022-12-31 0001231346 sa:KSMTransfersAdjustedMember 2022-12-31 0001231346 sa:CourageousLakeMember 2021-12-31 0001231346 sa:CourageousLakeMember 2022-01-01 2022-12-31 0001231346 sa:IskutMember 2021-12-31 0001231346 sa:IskutMember 2022-01-01 2022-12-31 0001231346 sa:SnowstormMember 2021-12-31 0001231346 sa:SnowstormMember 2022-01-01 2022-12-31 0001231346 sa:ThreeAcesMember 2021-12-31 0001231346 sa:ThreeAcesMember 2022-01-01 2022-12-31 0001231346 sa:GrassyMountainMember 2021-12-31 0001231346 sa:GrassyMountainMember 2022-01-01 2022-12-31 0001231346 sa:CorporateOneMember 2021-12-31 0001231346 sa:CorporateOneMember 2022-01-01 2022-12-31 0001231346 sa:TotalMember 2021-12-31 0001231346 sa:TotalMember 2022-01-01 2022-12-31 0001231346 sa:ReclamationLiabilitiesMember 2023-12-31 0001231346 sa:ReclamationLiabilitiesMember 2022-12-31 0001231346 2022-02-25 0001231346 sa:SecuredNoteMember 2023-12-31 0001231346 sa:CommonSharesMember sa:SecuredNoteMember 2023-12-31 0001231346 sa:KSMsEACMember 2023-12-31 0001231346 sa:CommonSharesMember 2023-12-31 0001231346 sa:CommonSharesMember 2022-12-31 0001231346 sa:NSRMember 2023-01-01 2023-12-31 0001231346 sa:RoyaltyIncreaseElectionMember 2023-01-01 2023-12-31 0001231346 sa:CommonSharesMember 2023-01-01 2023-12-31 0001231346 sa:KSMCoMember 2023-01-01 2023-12-31 0001231346 sa:ProductionDelayIncreaseMember 2023-01-01 2023-12-31 0001231346 sa:SecuredNoteMember 2023-01-01 2023-12-31 0001231346 sa:KSMMember 2023-01-01 2023-12-31 0001231346 sa:SecuredNoteOutstandingMember 2023-01-01 2023-12-31 0001231346 sa:KSMsEACMember 2023-01-01 2023-12-31 0001231346 sa:GoldInThousandsOfOuncesMember 2023-01-01 2023-12-31 0001231346 sa:GoldInThousandsOfOuncesMember 2023-06-29 2023-06-29 0001231346 sa:SilverInThousandsOfOuncesMember 2023-01-01 2023-12-31 0001231346 sa:SilverInThousandsOfOuncesMember 2023-06-29 2023-06-29 0001231346 sa:CopperInMillionsOfPoundsMember 2023-01-01 2023-12-31 0001231346 sa:CopperInMillionsOfPoundsMember 2023-06-29 2023-06-29 0001231346 sa:MolybdenumInMillionsOfPoundsMember 2023-01-01 2023-12-31 0001231346 sa:MolybdenumInMillionsOfPoundsMember 2023-06-29 2023-06-29 0001231346 sa:GoldPerOunceMember 2023-01-01 2023-12-31 0001231346 sa:GoldPerOunceMember 2023-06-29 2023-06-29 0001231346 sa:SilverPerOunceMember 2023-01-01 2023-12-31 0001231346 sa:SilverPerOunceMember 2023-06-29 2023-06-29 0001231346 sa:CopperPerPoundMember 2023-01-01 2023-12-31 0001231346 sa:CopperPerPoundMember 2023-06-29 2023-06-29 0001231346 sa:MolybdenumPerPoundMember 2023-01-01 2023-12-31 0001231346 sa:MolybdenumPerPoundMember 2023-06-29 2023-06-29 0001231346 sa:InputsAndAssumptionsMember 2023-01-01 2023-12-31 0001231346 sa:InputsAndAssumptionsMember 2023-06-29 2023-06-29 0001231346 sa:TwoThousandTwentyTwoSecuredNoteMember 2022-12-31 0001231346 sa:TwoThousandTwentyTwoSecuredNoteMember 2021-12-31 0001231346 sa:TwoThousandTwentyTwoSecuredNoteMember 2023-01-01 2023-12-31 0001231346 sa:TwoThousandTwentyTwoSecuredNoteMember 2022-01-01 2022-12-31 0001231346 sa:TwoThousandTwentyTwoSecuredNoteMember 2023-12-31 0001231346 sa:TwoThousandTwentyThreeSecuredNoteMember 2023-12-31 0001231346 sa:TwoThousandTwentyThreeSecuredNoteMember 2023-01-01 2023-12-31 0001231346 sa:SilverPriceForwardCurveMember 2022-01-01 2022-12-31 0001231346 sa:SilverPriceForwardCurveOneMember 2022-01-01 2022-12-31 0001231346 sa:DiscountRates7696Member 2022-01-01 2022-12-31 0001231346 sa:DiscountRates7696oneMember 2022-01-01 2022-12-31 0001231346 sa:ForecastedSilverProductionMember 2022-01-01 2022-12-31 0001231346 sa:ForecastedSilverProductionOneMember 2022-01-01 2022-12-31 0001231346 sa:SilverPriceForwardCurveMember 2023-01-01 2023-12-31 0001231346 sa:SilverPriceForwardCurveOneMember 2023-01-01 2023-12-31 0001231346 sa:DiscountRates7696Member 2023-01-01 2023-12-31 0001231346 sa:DiscountRates7696oneMember 2023-01-01 2023-12-31 0001231346 sa:ForecastedSilverProductionMember 2023-01-01 2023-12-31 0001231346 sa:ForecastedSilverProductionOneMember 2023-01-01 2023-12-31 0001231346 sa:EquityFinancingsMember 2023-12-31 0001231346 sa:EquityFinancingsMember 2022-12-31 0001231346 sa:EquityFinancingsMember 2023-01-01 2023-12-31 0001231346 sa:StockOptionsAndRestrictedShareUnitsMember 2023-01-01 2023-12-31 0001231346 sa:RSUMember 2023-01-01 2023-12-31 0001231346 sa:RSUMember 2022-01-01 2022-12-31 0001231346 sa:RSUMember 2022-12-31 0001231346 sa:RSUMember 2021-01-01 2021-12-31 0001231346 sa:RSUMember 2021-12-31 0001231346 ifrs-full:CreditRiskMember 2023-01-01 2023-12-31 0001231346 ifrs-full:LiquidityRiskMember 2023-01-01 2023-12-31 0001231346 sa:LiquidityRiskOneMember 2023-12-31 0001231346 sa:LiquidityRiskOneMember 2022-12-31 0001231346 sa:LiquidityRiskOneMember 2023-01-01 2023-12-31 0001231346 sa:InvestmentRiskMember 2023-12-31 0001231346 ifrs-full:CarryingAmountMember 2023-12-31 0001231346 ifrs-full:Level1OfFairValueHierarchyMember 2023-12-31 0001231346 ifrs-full:Level2OfFairValueHierarchyMember 2023-12-31 0001231346 ifrs-full:Level3OfFairValueHierarchyMember 2023-12-31 0001231346 ifrs-full:CarryingAmountMember 2022-12-31 0001231346 ifrs-full:Level1OfFairValueHierarchyMember 2022-12-31 0001231346 ifrs-full:Level2OfFairValueHierarchyMember 2022-12-31 0001231346 ifrs-full:Level3OfFairValueHierarchyMember 2022-12-31 0001231346 sa:LessThan1YearMember 2023-12-31 0001231346 sa:OnethreeYearsMember 2023-12-31 0001231346 sa:ThreefiveYearsMember 2023-12-31 0001231346 sa:GreaterThanFiveYearsMember 2023-12-31 0001231346 sa:EmployeeCompensationMember 2023-01-01 2023-12-31 0001231346 sa:EmployeeCompensationMember 2022-01-01 2022-12-31 0001231346 sa:StockbasedCompensationMember 2023-01-01 2023-12-31 0001231346 sa:StockbasedCompensationMember 2022-01-01 2022-12-31 0001231346 sa:ProfessionalFeesMember 2023-01-01 2023-12-31 0001231346 sa:ProfessionalFeesMember 2022-01-01 2022-12-31 0001231346 sa:OtherGeneralAndAdministrativeMember 2023-01-01 2023-12-31 0001231346 sa:OtherGeneralAndAdministrativeMember 2022-01-01 2022-12-31 0001231346 sa:DirectorsFeesMember sa:CompensationOfDirectorsMember 2023-01-01 2023-12-31 0001231346 sa:DirectorsFeesMember sa:CompensationOfDirectorsMember 2022-01-01 2022-12-31 0001231346 sa:StockbasedCompensationMember sa:CompensationOfDirectorsMember 2023-01-01 2023-12-31 0001231346 sa:StockbasedCompensationMember sa:CompensationOfDirectorsMember 2022-01-01 2022-12-31 0001231346 sa:CompensationOfDirectorsMember 2023-01-01 2023-12-31 0001231346 sa:CompensationOfDirectorsMember 2022-01-01 2022-12-31 0001231346 sa:SalariesAndConsultingFeesMember sa:CompensationOfKeyManagementPersonnelMember 2023-01-01 2023-12-31 0001231346 sa:SalariesAndConsultingFeesMember sa:CompensationOfKeyManagementPersonnelMember 2022-01-01 2022-12-31 0001231346 sa:StockbasedCompensationMember sa:CompensationOfKeyManagementPersonnelMember 2023-01-01 2023-12-31 0001231346 sa:StockbasedCompensationMember sa:CompensationOfKeyManagementPersonnelMember 2022-01-01 2022-12-31 0001231346 sa:CompensationOfKeyManagementPersonnelMember 2023-01-01 2023-12-31 0001231346 sa:CompensationOfKeyManagementPersonnelMember 2022-01-01 2022-12-31 0001231346 sa:PropertyAndEquipmentMember 2023-12-31 0001231346 sa:PropertyAndEquipmentMember 2022-12-31 0001231346 sa:ProvisionForReclamationLiabilitiesMember 2023-12-31 0001231346 sa:ProvisionForReclamationLiabilitiesMember 2022-12-31 0001231346 sa:FinancingCostsMember 2023-12-31 0001231346 sa:FinancingCostsMember 2022-12-31 0001231346 sa:NoncapitalLossCarryforwardsMember 2023-12-31 0001231346 sa:NoncapitalLossCarryforwardsMember 2022-12-31 0001231346 sa:SecuredNoteLiabilitiesMember 2023-12-31 0001231346 sa:SecuredNoteLiabilitiesMember 2022-12-31 0001231346 sa:MineralInterestsMember 2023-12-31 0001231346 sa:MineralInterestsMember 2022-12-31 0001231346 sa:MarketableSecuritiesMember 2023-12-31 0001231346 sa:MarketableSecuritiesMember 2022-12-31 0001231346 sa:LossCarryforwardsMember 2023-12-31 0001231346 sa:LossCarryforwardsMember 2022-12-31 0001231346 sa:InvestmentTaxCreditsMember 2023-12-31 0001231346 sa:InvestmentTaxCreditsMember 2022-12-31 0001231346 sa:ForeignTaxCreditsMember 2023-12-31 0001231346 sa:ForeignTaxCreditsMember 2022-12-31 0001231346 sa:MineralPropertiesMember 2023-12-31 0001231346 sa:MineralPropertiesMember 2022-12-31 0001231346 sa:OtherMember 2023-12-31 0001231346 sa:OtherMember 2022-12-31 0001231346 sa:CanadianNoncapitalLossesMember 2023-01-01 2023-12-31 0001231346 sa:CanadianCapitalLossesMember 2023-01-01 2023-12-31 0001231346 sa:CanadianTaxBasisOfMineralInterestMember 2023-01-01 2023-12-31 0001231346 sa:USNoncapitalLossesMember 2023-01-01 2023-12-31 0001231346 sa:USTaxBasisOfMineralInterestMember 2023-01-01 2023-12-31 0001231346 sa:BCHydroMember 2023-01-01 2023-12-31 0001231346 srt:ScenarioForecastMember 2024-07-01 2024-07-31 0001231346 srt:ScenarioForecastMember 2024-12-01 2024-12-31 0001231346 sa:TwoThousandTwentyTwoSecuredNoteInterestMember 2023-12-31 0001231346 sa:TwoThousandTwentyThreeSecuredNoteInterestMember 2023-12-31 0001231346 srt:MinimumMember 2023-12-31 0001231346 srt:MaximumMember 2023-12-31 0001231346 sa:TwoThousandAndTwentyTwoSecuredNoteInterestMember 2023-12-31 0001231346 sa:TwoThousandTwentyFourMember sa:TwoThousandAndTwentyTwoSecuredNoteInterestMember 2023-12-31 0001231346 sa:TwoThousandTwentyFiveToTwentySixMember sa:TwoThousandAndTwentyTwoSecuredNoteInterestMember 2023-12-31 0001231346 sa:TwoThousandTwentySevenToTwentyEightMember sa:TwoThousandAndTwentyTwoSecuredNoteInterestMember 2023-12-31 0001231346 sa:TwoThousandTwentyNineToThirtyMember sa:TwoThousandAndTwentyTwoSecuredNoteInterestMember 2023-12-31 0001231346 sa:TwoThousandAndTwentyThreeSecuredNoteInterestMember 2023-12-31 0001231346 sa:TwoThousandTwentyFourMember sa:TwoThousandAndTwentyThreeSecuredNoteInterestMember 2023-12-31 0001231346 sa:TwoThousandTwentyFiveToTwentySixMember sa:TwoThousandAndTwentyThreeSecuredNoteInterestMember 2023-12-31 0001231346 sa:TwoThousandTwentySevenToTwentyEightMember sa:TwoThousandAndTwentyThreeSecuredNoteInterestMember 2023-12-31 0001231346 sa:TwoThousandTwentyNineToThirtyMember sa:TwoThousandAndTwentyThreeSecuredNoteInterestMember 2023-12-31 0001231346 sa:CapitalExpenditureObligationsMember 2023-12-31 0001231346 sa:TwoThousandTwentyFourMember sa:CapitalExpenditureObligationsMember 2023-12-31 0001231346 sa:TwoThousandTwentyFiveToTwentySixMember sa:CapitalExpenditureObligationsMember 2023-12-31 0001231346 sa:TwoThousandTwentySevenToTwentyEightMember sa:CapitalExpenditureObligationsMember 2023-12-31 0001231346 sa:TwoThousandTwentyNineToThirtyMember sa:CapitalExpenditureObligationsMember 2023-12-31 0001231346 sa:FlowthroughShareExpendituresMember 2023-12-31 0001231346 sa:TwoThousandTwentyFourMember sa:FlowthroughShareExpendituresMember 2023-12-31 0001231346 sa:TwoThousandTwentyFiveToTwentySixMember sa:FlowthroughShareExpendituresMember 2023-12-31 0001231346 sa:TwoThousandTwentySevenToTwentyEightMember sa:FlowthroughShareExpendituresMember 2023-12-31 0001231346 sa:TwoThousandTwentyNineToThirtyMember sa:FlowthroughShareExpendituresMember 2023-12-31 0001231346 sa:MineralInterestsMember 2023-12-31 0001231346 sa:TwoThousandTwentyFourMember sa:MineralInterestsMember 2023-12-31 0001231346 sa:TwoThousandTwentyFiveToTwentySixMember sa:MineralInterestsMember 2023-12-31 0001231346 sa:TwoThousandTwentySevenToTwentyEightMember sa:MineralInterestsMember 2023-12-31 0001231346 sa:TwoThousandTwentyNineToThirtyMember sa:MineralInterestsMember 2023-12-31 0001231346 sa:LeaseObligationMember 2023-12-31 0001231346 sa:TwoThousandTwentyFourMember sa:LeaseObligationMember 2023-12-31 0001231346 sa:TwoThousandTwentyFiveToTwentySixMember sa:LeaseObligationMember 2023-12-31 0001231346 sa:TwoThousandTwentySevenToTwentyEightMember sa:LeaseObligationMember 2023-12-31 0001231346 sa:TwoThousandTwentyNineToThirtyMember sa:LeaseObligationMember 2023-12-31 0001231346 sa:TwoThousandTwentyFourMember 2023-12-31 0001231346 sa:TwoThousandTwentyFiveToTwentySixMember 2023-12-31 0001231346 sa:TwoThousandTwentySevenToTwentyEightMember 2023-12-31 0001231346 sa:TwoThousandTwentyNineToThirtyMember 2023-12-31 xbrli:shares iso4217:CAD iso4217:CAD xbrli:shares xbrli:pure iso4217:USD
EX-99.3 19 ea020236101ex99-3_seabri.htm MANAGEMENT'S DISCUSSION AND ANALYSIS FOR THE YEAR ENDED DECEMBER 31, 2023

Exhibit 99.3

 

 

 

SEABRIDGE GOLD INC.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MANAGEMENT’S DISCUSSION AND ANALYSIS

 

FOR THE YEAR ENDED

DECEMBER 31, 2023

 

 

 

 

 


 

SEABRIDGE GOLD INC.

 

MANAGEMENT’S DISCUSSION AND ANALYSIS

 

The following is a discussion of the results of operations and financial condition of Seabridge Gold Inc. and its subsidiary companies for the years ended December 31, 2023 and 2022. This report is dated March 27, 2024 and should be read in conjunction with the audited consolidated financial statements for the years ended December 31, 2023 and 2022, the Company’s Annual Information Form filed on SEDAR+ at www.sedarplus.ca, and the Annual Report on Form 40-F filed on EDGAR at www.sec.gov/edgar.shtml. Other corporate documents are also available on SEDAR+ and EDGAR as well as the Company’s website www.seabridgegold.com. As the Company has no operating project at this time, its ability to carry out its business plan rests with its ability to sell projects or to secure equity or other financings. All amounts contained in this document are stated in Canadian dollars unless otherwise disclosed.

 

The consolidated financial statements for the year ended December 31, 2023 and the comparative year ended December 31, 2022 have been prepared by the Company in accordance with International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board.

 

COMPANY OVERVIEW

 

Seabridge Gold Inc. is a company engaged in the acquiring, exploring and advancing of mineral properties, with an emphasis on gold resources, located in the United States of America and Canada. The Company’s objective is to provide its shareholders with exceptional leverage to a rising gold price and the returns from significant copper resources it has acquired and discovered. The Company’s business plan is to increase its mineral resources in the ground, through exploration, but not to go into production on its own. The Company intends to sell projects or participate in joint ventures towards production with major mining companies. Since inception in 1999, Seabridge has acquired interests in numerous advanced-stage gold projects situated in North America and its principal projects include the KSM property located in British Columbia and the Courageous Lake property located in the Northwest Territories. The Company also holds a 100% interest in the Iskut Project in British Columbia, the 3 Aces Project in Yukon and the Snowstorm Project in Nevada. Although focused on gold exploration, the Company has made significant copper discoveries, in particular, at KSM. Seabridge’s common shares trade in Canada on the Toronto Stock Exchange under the symbol “SEA” and in the United States on the New York Stock Exchange under the symbol “SA”.

 

Page 1


 

SELECTED ANNUAL INFORMATION

 

 

Summary Operating Results ($000s - except per share amounts)

  2023     2022     2021  
Remeasurement of secured notes     (29,690 )     36,967       -  
Gain on disposition of mineral interests     -       -       21,943  
Corporate and administrative expenses     (17,441 )     (16,090 )     (13,379 )
Foreign exchange gain (loss)     9,282       (12,874 )     22  
Environmental rehabilitation expense     -       (6,722 )     (5,377 )
Finance expense and other     (2,204 )     (3,471 )     (116 )
Impairment of investment in associate     -       (873 )     -  
Equity loss of associate     (208 )     (207 )     (221 )
Other income - flow-through shares     4,183       1,366       2,373  
Unrealized gain (loss) on convertible notes receivable     (88 )     (16 )     104  
Interest (expense) income     (1,795 )     2,794       176  
Income tax recovery (expense)     8,695       (8,268 )     (4,630 )
Net income (loss)     (29,266 )     (7,394 )     895  
Basic earnings (loss) per share   $ (0.35 )   $ (0.09 )   $ 0.01  

 

Summary Statement of Financial Position ($000s)   2023     2022     2021  
Current assets     93,950       140,387       54,159  
Non-current assets     1,257,008       955,232       693,583  
Total assets     1,350,958       1,095,619       747,742  
Current liabilities     39,408       51,993       17,301  
Non-current liabilities     581,627       303,093       28,108  
Equity     729,923       740,533       702,333  
Total liabilities and equity     1,350,958       1,095,619       747,742  

 

RESULTS OF OPERATIONS, 2023 COMPARED TO 2022

 

The Company recorded a net loss of $29.3 million or $0.35 per share for the year ended December 31, 2023, compared to a net loss of $7.4 million or $0.09 per share for the year ended December 31, 2022.

 

During the year ended December 31, 2023, the most significant items contributing to the net loss included unrealized loss due to changes in the fair value of the Company’s secured note liabilities, corporate and administrative expenses, and finance costs, partially offset by deferred income tax recoveries, foreign exchange gains and other income on flow-through shares. These items are discussed further below.

 

During the year ended December 31, 2022, the most significant items contributing to the net loss included corporate and administrative expenses, environmental rehabilitation expenses, foreign exchange loss, finance costs, and income taxes, partially offset by unrealized gain due to change in the fair value of the Company’s secured note liabilities and interest income.

 

Page 2


 

The change in the fair value of the secured note liabilities during the twelve months ended December 31, 2023, and the comparative period in 2022 is summarized in the following table.

 

    Twelve months ended
December 31,
 
 ($000s)     2023       2022  
                 
2022 Secured Note:                
Remeasurement gain (loss)     (3,096 )     36,967  
Foreign Exchange gain (loss)     7,104       (21,157 )
Total gain through profit or loss     4,008       15,810  
Loss through other comprehensive income (loss)     (34,830 )     (2,912 )
Decrease (increase) in fair value during the period     (30,822 )     18,772  
                 
2023 Secured Note:            
Remeasurement loss     (33,182 )     -  
Foreign Exchange gain     2,045       -  
Total loss through profit or loss     (31,137 )     -  
Loss through other comprehensive income (loss)     (49,563 )     -  
Increase in fair value during the period     (80,700 )     -  
                 
2022 and 2023 Secured Notes:            
Remeasurement gain (loss)     (36,278 )     36,967  
Foreign Exchange gain (loss)     9,149       (21,157 )
Total gain (loss) through profit or loss     (27,129 )     15,810  
Loss through other comprehensive income (loss)     (84,393 )     (2,912 )
Decrease (increase) in fair value during the period     (111,522 )     18,772  

 

The Deferred Interest related to the 2023 Secured Note, of $6.6 million, incurred in 2023 was classified as capitalized borrowing costs.

 

The company measures the fair value of its secured note liabilities using a discounted cash flow model with a Monte Carlo simulation. Key assumptions in this model are summarized in the following table.

 

2022 Secured Note:

 

Inputs and assumptions   December 31,
2023
  December 31,
2022
 
Forecast silver production in thousands of ounces     166,144     166,144  
Five year quoted future silver price     US$28.62     US$29.38  
Risk-free rate     4.0%     3.4%
Credit spread     4.0%     5.3%
Share price volatility     60%     60%
Silver royalty discount factor     9.2%     8.6%

 

Page 3


 

2023 Secured Note:

 

Inputs and assumptions   December 31,
2023
  June 29,
2023
 
Forecast NSR:          
Gold in thousands of ounces     10,500     10,500  
Silver in thousands of ounces     29,876     29,876  
Copper in millions of pounds     19,322     19,322  
Molybdenum in millions of pounds     152     152  
Five year quoted future metal price              
Gold per ounce     US$2,553.60     US$2,346.82  
Silver per ounce     US$28.62     US$27.48  
Copper per pound     US$4.08     US$3.65  
Molybdenum per pound     US$24.89     US$29.26  
Risk-free rate     4.0%     3.9%
Credit spread     4.0%     5.4%
Share price volatility     60%     60%
NSR royalty discount factor     9.2%     9.1%

 

The fair value of the 2022 Secured Note and 2023 Secured Note was estimated using Level 3 inputs and is most sensitive to changes in discount rates, metal prices, and forecasted production.

 

It should be noted that the remeasurement of the secured note liabilities under IFRS leads to significant gains or losses over time due to changes in the input variables. However, these swings in fair value will have no impact on the actual outcome of the notes at maturity. Either the notes will be put back to the Company at the prescribed fixed price under the rights of the noteholders, or the note will be exchanged for the prescribed royalty and NSR, at maturity.

 

Corporate and administrative expenses in 2023 were $17.4 million, up $1.4 million or 8% from prior year. The increase was mainly due to higher professional and external consulting fees, and higher travel, legal, and insurance costs.

 

Cash compensation decreased by $0.3 million, from $7.5 million in 2022 to $7.2 million in 2023. The reduced cash compensation was mainly related to a decrease in non-project headcount. Professional fees and other general and administrative expenses increased by $1.5 million, from $5.5 million in 2022 to $7.0 million in 2023. The increase was mainly related to the costs associated with audit, accounting and tax advisory, legal expenses and patent costs, the Company-wide risk assessment review, and sustainability reporting.

 

Stock-based compensation expense related to RSUs increased by $0.2 million, from $3.1 million in 2022 to $3.3 million in 2023. The increase was mainly due to the fact that the RSUs granted in December 2022 had a range of estimated vesting periods of up to 36 months compared to RSUs granted in December 2021 that had a vesting period of 4 months and had vested in the second quarter of 2022.

 

Page 4


 

The Company’s stock-based compensation expense related to stock options and restricted share units are illustrated on the following tables:

 

        ($000s)  
RSUs granted   Number of RSUs     Grant date fair value     Expensed prior to 2022     Expensed in 2022     Expensed in 2023     Balance to be expensed  
June 24, 2021     10,000       222       -       185       37       -  
September 1, 2021     20,000       454       75       304       75       -  
September 07, 2021     10,000       229       36       155       38       -  
October 1, 2021     10,000       195       24       122       49       -  
December 13, 2021     123,800       2,622       437       2,185       -       -  
July 04, 2022     10,000       159       -       52       81       26  
December 13, 2022     305,266       4,991       -       135       2,820       2,036  
June 28, 2023     20,000       312       -       -       52       260  
December 11, 2023     379,300       4,640                        117       4,523  
                      572       3,138       3,269       6,845  

 

In the last quarter of 2023, a total of 379,300 RSUs were issued, with 48,300 RSUs allocated to Board members, 277,500 RSUs granted to executive members, and 53,500 RSUs issued to employees. On December 11, 2023, 11,840 RSUs vested which represents 1/3 of RSUs granted to employees in 2022. Subsequent to year-end and upon the Company submitting its formal application to the regulator for the KSM Project to be designated as “substantially started” in January 2024, 58,067, granted in 2022, RSUs vested and were exchanged for common shares of the Company.

 

During the second quarter of 2022, 123,800 RSUs granted in December 2021 vested upon the Company completing the 2021 exploration program at Snowstorm and were exchanged for common shares of the Company. Of the total fair value of $2.6 million, $0.4 million was charged to the statement of operations and comprehensive loss in fourth quarter of 2021, and the remaining $2.2 million was charged to the statement of operations and comprehensive loss during the first and second quarter of 2022.

 

The $9.3 million foreign exchange gain recognized in 2023 comprised of $9.1 million of foreign exchange gain associated with the secured note liabilities, and a $0.2 million gain recognized mainly on the US dollar-denominated cash and short-term investments translated to Canadian dollars during the period.

 

The $12.9 million foreign exchange loss recognized in 2022 was the net result of $21.2 million of foreign exchange loss associated with the secured note liabilities, partially offset by $8.3 million of foreign exchange gain recognized mainly on the US dollar-denominated cash and short-term investments translated to Canadian dollars during the period.

 

In 2023, the Company incurred $2.2 million of finance costs compared to $3.5 million in 2022. The finance costs incurred during the current and comparative year primarily related to the secured notes financings.

 

In 2023, the Company recognized $4.2 million of other income related to the flow-through shares premium recorded primarily on the financing completed in December 2022, compared to $1.4 million of other income related to the flow-through shares premium recorded primarily on the financings completed in June 2021 (discussed below).

 

The Company holds common shares of several mining companies that were received as consideration for optioned mineral properties and other short-term investments, including one gold exchange traded receipt. In 2023, the Company recognized an increase in fair value of investments of $0.1 million, net of income taxes. During the comparative year, the Company recognized an increase in fair value of investments, net of income taxes, of $0.3 million. The change in the fair value of these investments was recorded within comprehensive income (loss) on the consolidated statement of operations and comprehensive income (loss).

 

Page 5


 

The Company holds one investment in an associate that is accounted for on an equity basis. In 2023, the Company recognized $0.2 million loss in investment in associates. During the comparative year, the Company recognized $0.2 million loss in investment in associates. Also, during the second quarter of 2022, the Company reviewed the recoverability of the investment in the associate and recorded an impairment of $0.9 million in the consolidated statement of operations and comprehensive income (loss).

 

In 2022, the Company reassessed the closure plan for the Johnny Mountain Mine and charged $6.6 million of rehabilitation expenses to the consolidated statements of operations and comprehensive income (loss). The provision for reclamation liabilities, now estimated at $7.4 million is expected to be incurred until 2026.

 

In 2023, the Company incurred $3.7 million of environmental rehabilitation expenditures at Johnny Mountain Mine (2022 - $4.5 million) that were recorded as a reduction to the provision for reclamation liabilities on the consolidated statements of financial position.

 

In 2023, reclamation activities at Johnny Mountain Mine focused on relocating waste, in-situ hydrocarbon remediation, tailings storage facility improvements, placement of the deconstructed mill building materials into the main landfill, and conducting permit compliance monitoring activities.

 

In 2023, the Company recognized income tax recovery of $8.7 million, primarily due to the deferred tax asset arising from the loss recognized on remeasurement of the fair value of the secured note liabilities, and the losses in the period. The income tax recovery was partially offset by income tax expense arising from the renouncement of expenditures related to the December 2022 flow-through shares issued which are capitalized for accounting purposes. The income tax impact, of $22.8 million, recorded through other comprehensive income (loss) was related to the portion of the revaluation of the secured note liabilities that was recorded through other comprehensive income (loss) during 2023.

 

In 2022, the Company recognized income tax expense of $8.3 million, primarily due to the deferred tax liability arising from the gain recognized on remeasurement of the fair value of the secured note liabilities, and from the renouncement of expenditures related to the June 2021 flow-through shares issued which are capitalized for accounting purposes. The income tax expense was partially offset by income tax recovery arising from the losses in the period. The income tax impact of the revaluation of the secured note liabilities that was recorded through other comprehensive income (loss) during 2022, of $0.1 million, was also recorded through other comprehensive income (loss).

 

RESULTS OF OPERATIONS, 2022 COMPARED TO 2021

 

The Company recorded net loss of $7.4 million or $0.09 per share for the year ended December 31, 2022 compared to net income of $0.9 million or $0.01 per share for the year ended December 31, 2021.

 

During the year ended December 31, 2022, the most significant items contributing to the net loss included corporate and administrative expenses, environmental rehabilitation expense, foreign exchange loss, finance costs, and income taxes, partially offset by unrealized gain due to change in the fair value of the Company’s secured note liabilities and interest income. These items are discussed further below.

 

Page 6


 

Since the issuance on March 24, 2022, the fair value of the secured note liabilities decreased by $39.9 million of which the Company recorded $37.0 million gain through profit or loss, and $2.9 million through other comprehensive income (loss).

 

The Company measures the fair value of its secured note liabilities using a discounted cash flow model with a Monte Carlo simulation. Key assumptions into this model are summarized in the following table.

 

Inputs and Assumption   March 24,
2022
  December 31,
2022
Weighted Average Life1   23.5 years   44.9 years
Forecast silver production, in thousands of ounces   105,778   166,144
Future silver price   US$28.96 to US$35.42   US$29.38 to US$110.51
Risk-free rate   2.5%   3.4%
Credit spread   5.2%   5.3%
Volatility   60%   60%
Silver royalty discount factor   7.1%   8.6%

 

1) Weighted average life reflects the revised silver forecast production schedule contained in the recently filed KSM updated Preliminary Feasibility Study (PFS) and Preliminary Economic Assessment (PEA) for the KSM Project, discussed below.

 

The fair value of the secured note liabilities was estimated using Level 3 inputs and is most sensitive to changes in silver prices and forecasted silver production.

 

During the second quarter of 2021, the Company disposed of its residual interests in its previously owned Red Mountain project located in northwestern British Columbia, for cash proceeds of US$18 million and recorded a gain of $21.9 million through the statement of operations and comprehensive earnings (loss) in that period. The capitalized costs incurred and accumulated while the Company held the project had previously been recovered through option and acquisition payments and the residual interest in the project had no carrying value.

 

Corporate and administrative expenses for 2022 were $16.1 million, up $2.7 million or 20% from prior year. The increase was mainly due to higher cash compensation, and higher professional fees and other general and administrative expenses, partially offset by lower stock-based compensation (discussed below).

 

Cash compensation increased by $1.7 million, from $5.8 million in 2021 to $7.5 million in 2022. The increased cash compensation mainly related to an increase in non-project headcount. Professional fees and other general and administrative expenses increased by $0.8 million, from $1.8 million in 2021 to $2.6 million in 2022. The increase mainly related to the costs associated with the implementation of a new ERP system, the Company wide risk assessment review, and sustainability reporting. Other general and administrative expenses increased by $0.6 million, from $2.3 million in 2021 to $2.9 million in 2022. The increase was mainly related to increased external consulting costs and travel. The Company anticipates that personnel numbers and related remuneration will continue to increase slightly but not as significantly as has been the case in 2022.

 

The Company has, since 2019, refocused the compensation practices away from issuing a combination of stock options and RSUs to only issuing restricted share units (RSUs). During the year ended December 31, 2022, stock-based compensation expense, related to RSUs, decreased by $0.4 million, from $3.5 million in 2021, to $3.1 million in 2022. The decrease was mainly due to the fact that the RSUs granted in December 2020 and expensed in 2021, had a higher grant date fair value when compared to the RSUs granted during 2021 and expensed in 2022.

 

Page 7


 

QUARTERLY INFORMATION

 

Selected financial information for the last eight quarters ending December 31, 2023 is as follows:

 

(in thousands of Canadian dollars,   2023   2022  
except per share amounts)   Q4     Q3     Q2     Q1     Q4     Q3     Q2     Q1  
Revenue     -                   -       -       -       -       -  
Earnings (loss) for the period     (36,352 )     (5,292 )     8,985       (10,784 )     (25,246 )     5,045       19,088       (6,281 )
Basic earnings (loss) per share     (0.43 )     (0.06 )     0.11       (0.13 )     (0.31 )     0.06       0.24       (0.08 )
Diluted earnings (loss) per share     (0.43 )     (0.06 )     0.11       (0.13 )     (0.31 )     0.06       0.24       (0.08 )

 

Change in the fair values of secured note liabilities is summarized in the following table:

 

  2023   2022  
(in thousands of Canadian dollars)   Q4     Q3     Q2     Q1     Q4     Q3     Q2     Q1  
Change in fair value through profit of loss:                                                
Fair value Remeasurement gain (loss)     (46,653 )     11,742       10,379       (11,746 )     (19,496 )     24,897       31,566       -  
Unrealized foreign exchange gain (loss)     14,881     (12,013 )     5,723       559       (423 )     (13,571 )     (8,266 )     1,102  
Total change in fair value gain (loss) through profit or loss     (31,772 )     (271 )     16,102       (11,187 )     (19,919 )     11,326       23,300       1,102  
Change in fair value gain (loss) through other comprehensive income (loss)     (53,457 )     (32,063 )     8,728       (7,601 )     (22,961 )     2,329       23,544       -  
Total change in fair value     (85,229 )     (32,334 )     24,830       (18,788 )     (42,880 )     13,655       46,844       1,102  

 

In the first quarter of 2022, the loss for the period included $2.3 million of stock-based compensation expense related to the amortization of RSUs granted in December 2021 that were vested during the second quarter of 2022. In the fourth quarter of 2022, the loss included $6.6 million of rehabilitation expenses related to the Johnny Mountain Mine.

 

SITE CAPTURE ACTIVITIES

 

In 2023, the Company’s main efforts and most significant spending were focused on its site capture and early infrastructure development activities that were designed to ensure that KSM’s Environmental Assessment Certificate (“EAC”) remains in good standing.

 

Under the B.C. Environmental Assessment Act, a project’s EAC is subject to expiry if the project has not been substantially started (“Substantial Start”) by the deadline specified in the EAC. The expiry date for KSM’s EAC is July 29, 2026. However, if the B.C. Minister of Environment and Climate Change Strategy determines that a project has been Substantially Started on or before the deadline, the EAC remains in effect for the life of the project. Subsequent to year-end, the Company submitted its formal application to the regulator for the KSM Project to be designated as substantially started.

 

Page 8


 

Expenditures related to the site capture activities, started in 2021 and continued through 2023, are illustrated below:

 

($000s)     Capital expenditures       Prepayments to BC Hydro1             Capitalized borrowing costs 1       Total  
Cost                                
As at January 1, 2022     25,502       9,620       -       35,122  
Additions     152,797       28,880       14,735       196,412  
As at December 31, 2022     178,299       38,500       14,735       231,534  
Additions     158,072       54,220       19,403       231,695  
As at December 31, 2023     336,371       92,720       34,138       463,229  

 

1) During the first quarter in 2023, the Company paid $43.6 million (as at December 31, 2022, $38.5 million) to British Columbia Hydro and Power Authority ("BC Hydro") as advance payment made pursuant to the Company signing a Facilities Agreement with BC Hydro covering the design and construction of facilities to supply hydro-sourced electricity to the KSM Project. Prepayments to complete the design and construction amounted to $92.7 million inclusive of $10.6 million, which was accrued as at December 31, 2023, and paid subsequent to December 31, 2023. Refer to Note 19 for further information.

 

2) During 2023, the Company incurred $19.4 million (2022 - $14.7 million) of interest expense related to the secured note liabilities that is capitalized at KSM as borrowing costs.

 

In 2023, the Company incurred $157.9 million (2022 - $147.5 million) on capital expenditures including road, bridge, and camp construction, hydro installations, fish habitat offsetting programs, and the acquisition and transport of construction equipment and vehicles (discussed below).

 

Camp

 

In 2023, the Company finalized the construction of additional camp installations, expanding the capacity of the Camp 11 facility by ninety beds, bringing the total to 210 beds. Laydown areas were also expanded, and water management infrastructure was implemented. The associated costs for these developments amounted to $44.0 million in 2023.

 

Road and Bridges

 

In 2023, the construction of the Treaty Creek Access Road's initial 17.8 kilometers, encompassing road development, bridge installations, and slope cutbacks, reached its final design. The associated costs for this phase amounted to $35.6 million in 2023. Furthermore, the completion of the Bell Irving River Bridge and the associated area and road extending to Highway 37 incurred costs of $3.3 million in 2023.

 

Coulter Creak Access Road

 

In 2023, the construction of the Coulter Creek Access Road was completed at a cost of $9.5 million. The project involved building the road and putting in measures to control water flow and prevent sediment buildup.

 

Page 9


 

Fish Habitat

 

The Glacier Creek Fish Habitat Offsetting Program, including all bulk and final earthworks, fish habitat structures, specialty gravels, woody debris, mulching, and revegetation, has been successfully completed. Costs incurred in 2023 amounted to $38.2 million.

 

Land Clearing for Project Infrastructure

 

In order to further site investigation activities and in preparation for future works, initial land clearing activities took place for many of the permanent infrastructure locations. These locations included Camp 5, Ore Processing Center, Water Diversion Channel, Mitchell Portal Pad, Mitchell Temporary Water Treatment Plant & Muck Pads, Water Storage Dam, and Mitchell Valley Onsite Roads.

 

Hydro Installation

 

The Company continued its collaboration with BC Hydro for the extended construction of the Treaty Creek Terminal station. Substantial progress has been made, with primary tasks accomplished and the ongoing placement of concrete equipment foundations. The Company submitted a deposit of $43.6 million in 2023, and $10.6 million subsequent to December 31, 2023 year-end to BC Hydro. Currently, discussions are underway regarding anticipated cost overruns in both construction and system reinforcement. It is expected that the power infrastructure work completed by December 31, 2023, will be sufficient for the Substantially Started Application.

 

MINERAL INTERESTS

 

During the year ended December 31, 2023, the Company added an aggregate of $69.7 million (2022 - $55.1 million) of expenditures that were attributed to mineral interests. The breakdown of the mineral interests expenditures by project is illustrated on the following table:

 

  2023     2022  
($000s)   Amount     Percentage     Amount     Percentage  
KSM   40,490     58 %   39,985     72 %
Iskut   14,174     20 %   8,125     15 %
Snowstorm   4,897     7 %   3,091     6 %
3 Aces   6,651     10 %   3,045     6 %
Courageous Lake   3,520     5 %   823     1 %
Total expenditures   69,732     100 %   55,069     100 %

 

The mineral interests activities by project are further discussed below.

 

KSM Project

 

At KSM, the results of the 2022 PFS show a considerably more sustainable and profitable mining operation than its 2016 predecessor. It envisages an open pit mine plan that includes the Mitchell, East Mitchell and Sulphurets deposits only with a 33-year operating life. Mill production is increased from an initial 130,000 metric tonnes per day (tpd) to 195,000 tpd in the third year of production. The primary reasons for the improvements in the plan arise from the acquisition of the East Mitchell resource in December 2020 and an expansion to planned mill throughput. The many design improvements over earlier studies include a smaller environmental footprint, reduced waste rock production, a 50% increase in mill throughput, and the elimination of capital-intensive block cave mining. The Company is also studying the use of trolley-assist technology on how supply of power from BC Hydro and the possible electrification of the entire mine fleet can enhance carbon optimization.

 

Page 10


 

Projected economic results of the study compared to the 2016 study and against alternate scenarios are illustrated below.

 

Amounts expressed in US dollars   2016 PFS
Base Case
    2022 PFS Base Case     2022 PFS Recent Spot Case     2022 PFS Alternate Case  
Metal Prices:                        
Gold ($/ounce)     1,230       1,742       1,850       1,500  
Copper ($/pound)     2.75       3.53       4.25       3.00  

Silver ($/ounce)

   

17.75

     

21.90

     

22.00

     

20.00

 
Molybdenum ($/lb)     8.49       18.00       18.00       18.00  
US$/Cdn$ Exchange Rate:     0.80       0.77       0.77       0.77  
Cost Summary:                                
Operating Costs Per Ounce of Gold Produced (years 1 to 7)   $ 119     $ 35     $ -83     $ 118  
Operating Costs Per Ounce of Gold Produced (life of mine)   $ 277     $ 275     $ 164     $ 351  
Total Cost Per Ounce of Gold Produced (inclusive of all capital and closure)   $ 673     $ 601     $ 490     $ 677  
Initial Capital (billions)   $ 5.0     $ 6.4     $ 6.4     $ 6.4  

Sustaining Capital (billions)

  $

5.5

    $

3.2

    $

3.2

    $

3.2

 
Unit Operating Cost (US$/tonne)   $ 12.36     $ 11.36     $ 11.36     $ 11.36  
Pre-Tax Results:                                
Net Cash Flow (billions)   $ 15.9     $ 38.6     $ 46.1     $ 27.9  
NPV @ 5% Discount Rate (billions)   $ 3.3     $ 13.5     $ 16.4     $ 9.2  
Internal Rate of Return     10.4 %     20.1 %     22.4 %     16.5 %
Payback Period (years)     6.0       3.4       3.1       4.1  
Post-Tax Results:                                
Net Cash Flow (billions)   $ 10.0     $ 23.9     $ 28.6     $ 17.1  
NPV @ 5% Discount Rate (billions)   $ 1.5     $ 7.9     $ 9.8     $ 5.2  
Internal Rate of Return     8.0 %     16.1 %     18.0 %     13.1 %
Payback Period (years)     6.8       3.7       3.4       4.3  

 

The results of the PEA announced in 2022 is a stand-alone mine plan that was undertaken to evaluate a potential future expansion of the KSM mine to the copper-rich Iron Cap and Kerr deposits after the PFS mine plan has been completed. The PEA is primarily an underground block cave mining operation supplemented with a small open pit and is planned to operate for 39 years with a peak mill feed production of 170,000 t/d. The PEA demonstrates that KSM is a potential multigenerational mining project with the flexibility to vary the metal output.

 

In July 2023, the Company was informed that Tudor Gold Corp (“Tudor”) is requesting that a certain license of occupation (the “Licence”) and Mines Act permit M-245 (the “Permit”) held by the Company’s wholly-owned subsidiary, KSM Mining ULC (KSMCo), be cancelled. The rights conveyed by the Licence and the relevant activities authorized by the Permit were initially conveyed and authorized in September 2014, and include rights and authorizations to engage in certain activities on land to which Tudor only acquired mineral rights in 2016. Tudor is claiming that, as a matter of law, the B.C. government did not have the power to issue this License and Permit. Tudor also argues that the License and Permit destroy the value of their own claims.

 

Page 11


 

The Permit authorizes various activities, including activities on claims held by Tudor, along the route of, what is projected to be, the tunnels that will connect the east and west sides of the KSM Project. The License provides KSMCo the right to occupy the area in which it intends to construct the tunnels. Once constructed, the Licence will be converted into a statutory right of way including the 12.5 km that pass through mineral claims owned by Tudor. This type of authorization is commonly used by the B.C. government to manage activities that take place on the government-owned land base. The Licence and Permit have been in place for almost a decade and were granted after a thorough regulatory process that included participation by First Nations as well as Tudor’s joint venture partners, American Creek Resources Ltd. and Teuton Resources Corp., who were the owners of the claims at the time. In September, 2023, the Company made a submission to both the BC Ministry of Energy, Mines and Low Carbon Innovation (“EMLI”) and Ministry of Forests arguing for the dismissal of Tudor’s application. In October 2023, EMLI sent letters to each of the Company and Tudor stating that it affirms the province of BC’s authority to grant the License and Permits that authorize mining activities on third-party tenures and giving no indication that either will be cancelled or revoked. On November 17, 2023, Tudor's submissions prompted a response from the BC Ministry of Water, Land, and Resource Stewardship (WLRS) regarding Seabridge's License of Occupation ("LOO"). The WLRS Letter verified that their records show the LOO is in good standing, and there is no justification for canceling it under the empowering statute or relevant LOO provisions.

 

Subsequent to the year end, EMLI further clarified their position in a revised letter that states that a Conditional Registration Reserve (CRR) was established by the Chief Gold Commissioner, for the MTT area, in 2012, and the CRR prohibits the obstruction, endangerment, or interference, with the construction, operation, and maintenance of the tunnel works by any free miner, including Tudor.

 

In order to achieve its objectives and milestones, the Company estimates annual costs for each of its mineral interests and tracks costs against those estimates for payroll, environmental and social, technical engineering, exploration and other holding or property costs. The below information describes those planned and actual incurred costs for the year ended December 31, 2023:

 

($000s)     Actual       Plan  
Payroll     3,419       3,229  
Technical and engineering     17,076       14,336  
Environmental and social     19,761       20,954  
Exploration     136       400  
Other holding or property     306       299  
Total     40,698       39,218  

 

Technical and engineering costs include costs related to the updating the Mineral Resource Estimate for KSM’s Kerr and Iron Cap deposits. Significant variance in the technical and engineering expenses compared to the initial plan arose from exceeding direct drilling costs, stemming from a shift in the scope of work, and increased expenditures attributable to inflation. This inflation affected various aspects such as labour, commodities, logistics, and camp support. Expenditures in the environmental and social aspects pertain to conducting baseline studies for environmental monitoring at KSM.

 

Page 12


 

Iskut Project

 

At Iskut, the Company’s 2023 actual and planned expenditures are summarized in the following table:

 

($000s)     Actual       Plan  
Payroll     1,602       766  
Exploration     11,611       8,001  
Environmental and social     4,630       5,300  
Total     17,843       14,067  

 

In 2023 the Company conducted an extensive drilling program at Iskut based on the analysis of the 2022 drilling and geophysical surveying programs. The work program was designed to test for deeper copper-gold porphyry systems and to expand the Bronson Slope mineral resource. Three helicopter-portable core drills were used for this program which entailed the completion of 17 drill holes exceeding 19,500 meters of core. Results of 2023 program identified broad zones of sericite-pyrite-carbonate alteration associated with continuous low gold grades. In addition, the first drill program on the Snip North target has found a new porphyry mineral system. The discovery consists of the intact, well-preserved upper parts of a copper-gold porphyry which is identified as an intermediate sulfidation epithermal occurrence. 

 

The 2022 program entailed ten drill holes, totaling 10,162 meters, and was designed to test the porphyry gold-copper potential at depth on the Bronson Slope deposit as well as below the Quartz Rise Lithocap. Work was also planned to consider forming a drill testing program at an additional site on the SnipGold claim block.

 

Drilling in 2022 the Company discovered a large, well-mineralized breccia pipe beneath the historic Bronson Slope skarn deposit. The extensive quartz-magnetite pipe, which has been identified as the source of the Bronson Slope deposit, holds broadly disseminated gold and copper mineralization from multiple hydrothermal eruptive events believed to originate from a major porphyry intrusive source. A 2023 drill program was conducted to target an increase in the Bronson gold-copper resource and find the intrusive source of the breccia pipe. The current resource at Bronson Slope contains a measured and indicated resource of 187Mt of 0.36 g/t gold and 0.12% copper.

 

Regional geophysical surveys and continuous surface geology work on the property point to a distinct structural feature that connects the Quartz Rise, Bronson Slope and Snip North targets. All the prospective gold-copper intrusions recognized on the property fall along this regional trend and this observation has led us to envision a cluster of gold-copper deposits. Prior drilling at the lithocap on Quartz Rise and historical drilling at the Snip North target has encountered gold-copper grades that were followed up in the 2023 exploration program.

 

In addition to exploration work at Iskut, the Company continued its planned 2023 reclamation and closure activities at the Johnny Mountain mine site. Work included, among other items, general cleanup activities, monitoring of the tailing management facility, permanent storage of waste rock, and hydrocarbon remediation. Reported within provision for reclamation liabilities and in support of the reclamation and closure of the Johnny Mountain Mine, in 2023 the Company incurred $3.7 million of costs compared to $4.3 million planned.

 

Page 13


 

Snowstorm Project

 

At Snowstorm, where the Company’s objective was to continue exploration activities, the Company’s 2023 actual and planned expenditures are summarized in the following table:

 

($000s)     Actual       Plan  
Payroll     1,242       487  
Exploration     3,261       3,056  
Other holding or property     394       465  
Total     4,897       4,008  

 

At Snowstorm, during 2023, the Company evaluated the results of the drilling program that commenced in late 2022 and was completed in early 2023. The 2023 exploration program was to further test for potential mineralized faults along the uplifted host stratigraphy zone.

 

3 Aces Project

 

At the Company’s 3 Aces project, the Company’s 2023 actual and planned expenditures are summarized in the following table:

 

($000s)     Actual       Plan  
Payroll     1,517       816  
Exploration     5,451       7,002  
Environmental     881       1,692  
Other holding or property     74       45  
Total     7,923       9,555  

 

At 3 Aces, the 2023 program completed 7,759 meters of core and reverse circulation drilling within the Central Core Area (CCA) of the project. An updated 3-dimensional model has been built that brings together results from the drilling and historical drill programs to indicate the likelihood of continuous mineralization between previously isolated historical deposits in the CCA. The 2023 drill program confirmed these extensions of historical discoveries, including localized high-grade zones, within the favorable parts of the regional fold architecture.

 

Courageous Lake Project

 

At the Courageous Lake project, the Company’s 2023 actual and planned expenditures are summarized in the following table:

 

($000s)     Actual       Plan  
Payroll     570       288  
Environmental and social     189       864  
Technical and engineering     2,360       2,675  
Exploration     235       457  
Other property or holding costs     166       148  
Total     3,520       4,432  

 

As reported in prior periods, the Company continues to evaluate the best path forward at its Courageous Lake project in NWT. Options include securing a joint venture partner, the sale of all or a portion of the project or conducting additional exploration outside the area of known reserves and resources.

 

Subsequent to the year end, the Company filed an updated Preliminary Feasibility Study (the "2024 PFS") for Courageous Lake. The 2024 PFS all open pit mine plan shows a considerably more sustainable and profitable mining operation than its 2012 predecessor, with reduced initial capital, lower strip ratio, higher grade and smaller mine footprint. The 2024 PFS outlines the production of 2.5 million ounces of gold over the initial 12.6 year life of the mine. A stand-alone analysis of the potential expansion below the 2024 PFS mine plan was included as a Preliminary Economic Assessment ("2024 PEA") forming a separate part of the PFS.

 

Page 14


 

Significant changes from the 2012 PFS include:

 

A 73% increase in after-tax NPV of 5% to US$523 million from US$303 million in 2012
     
A 50% reduction in initial capital from US$1,522 million to US$747 million
     
Increased after-tax IRR from 7.3% to 20.6%
     
Reduced capital payback period from 11.2 years to 2.8 years
     
Average gold reserve grade increased 19% from 2.2 g/t to 2.6 g/t
     
Life of mine strip ratio reduced by 39% from 12.5 to 7.58
     
38% increase in estimated measured and indicated gold resources from 8.0 million to 11.0 million ounces.

 

LIQUIDITY AND CAPITAL RESOURCES

 

The Company’s working capital position at December 31, 2023, was $54.5 million compared to $88.4 million on December 31, 2022. Decreased cash resources resulted from the cash used in early infrastructure development and corresponding equipment, the advance payment to the BC Hydro related to the power infrastructure work at KSM, environmental, reclamation and exploration projects, and corporate and administrative costs, offset by cash raised through financings (discussed below). Included in current liabilities at December 31, 2023, is $5.5 million of flow-through premium liability which is a non-cash item (December 31, 2022 - $4.2 million) and will be reduced as flow-through expenditures are incurred.

 

The Company’s ability to fund its operations and capital expenditures and other obligations as they become due is dependent upon market conditions. The Company has in place an At-the-Market offering that allows for the issuance of up to US$100 million of its common shares and has been an effective source of funding. In 2023, the Company raised $42.8 million, and as at December 31, 2023, has room for an additional US$67.6 million under the its offering. Subsequent to the year end, the Company raised a further $11.0 million through the program. The Company intends to fully utilize the At-the-Market offering currently in place and believes that with this it will have sufficient liquidity to continue its operations and meet its obligations for the next twelve months. As the Company does not generate cash inflows from operations, the Company is dependent upon external sources of financing to fund its exploration projects and on-going activities, including proceeding with additional payments pursuant to the Facilities Agreement with BC Hydro. When required, the Company will seek additional sources of cash to cover its proposed exploration and development programs at its key projects, in the form of equity financing or from the sale of non-core assets.

 

Page 15


 

    December 31,       December 31,  
($000s)     2023       2022  
Assets                
Current assets                
Cash and cash equivalents   $ 82,438     $ 46,150  
Short-term deposits     -       81,690  
Amounts receivable and prepaid expenses     7,763       8,220  
Investment in marketable securities     3,749       3,696  
Convertible notes receivable     -       631  
Total current assets     93,950     $ 140,387  
                 
Liabilities and shareholders’ equity                
Current liabilities                
Accounts payable and accrued liabilities   $ 32,733     $ 42,956  
Flow-through share premium     5,543       4,183  
Lease obligations     373       511   
Provision for reclamation liabilities     759       4,343  
Total current liabilities     39,408       51,993  
Working Capital (1)     54,542       88,394  

 

(1) This is a non-GAAP financial performance measure with no standard definition under IFRS.

 

On June 29, 2023, the Company, through its wholly-owned subsidiary, KSM Mining ULC (“KSMCo”) issued a secured note and royalty arrangement (collectively referred to as the “2023 Secured Note”) on the KSM Project with Sprott Private Resource Streaming and Royalty (B) Corp. (“Sprott”). The 2023 Secured Note has a principal amount of US$150 million, bears interest at 6.5% per annum and matures upon the earlier of commercial production and March 24, 2032 or March 24, 2035 if certain events occur, as described below. The arrangement includes conditions and multiple features that could alter the Company’s obligation to Sprott. The 2023 Secured Note includes options for Sprott to put the royalty back to the Company if KSM’s Environmental Assessment Certificate (the “EAC”) expires or if project financing for construction is not secured. Unless Sprott exercises its put rights at an earlier date, the 2023 Secured Note is to be exchanged at maturity for a net smelter returns royalty (the “NSR”) on all metals produced from the KSM Project and sold, in the range of 1% to 1.5%, to be paid in perpetuity. The Company has the option to reduce the royalty percentage after commercial production.

 

The key terms of the 2023 Secured Note include:

 

The 2023 Secured Note matures (“Maturity Date”) at the earlier of:

 

a) Commercial production being achieved at KSM; and
     
b) Either March 24, 2032, or, if the EAC expires and Sprott does not exercise its right to put the 2023 Secured Note to the Company, March 24, 2035.
     
On the Maturity Date, the NSR is issued and Sprott may satisfy the obligation to pay the NSR purchase price of US$150 million with cash or setting-off the amount against the note principal amount due.
     
Prior to its maturity, the 2023 Secured Note bears interest at 6.5% per annum, payable quarterly in arrears. Payment of quarterly interest due from the closing date to the second anniversary is deferred (“Deferred Interest Payment”) and US$21.5 million must be paid on or before 30 months after the closing date. Deferred interest can be satisfied by way of cash, common shares or increasing the NSR percentage from 1% to 1.2%. The Company can elect to satisfy quarterly interest payments in cash or by having Seabridge issue common shares, with a value equal to a 5% discount on the 5-day volume weighted average trading price (“VWAP”).

 

Page 16


 

Project Financing Repayment Amount: If project financing to develop, construct and place the KSM Project into commercial production is not in place by March 24, 2027, Sprott can put the 2023 Secured Note back to the Company for:
     
a) If the Company is obligated to sell Sprott a 1% NSR on the Maturity Date at the time US$155 million plus accrued and unpaid interest, or
     
b) If the Company is obligated to sell Sprott a 1.2% or 1.5% NSR on the Maturity Date at the time, US$180 million plus accrued and unpaid interest.
     
EAC Repayment Amount: If the KSM Project’s EAC expires at any time while the 2023 Secured Note is outstanding, Sprott can put the note back to the Company at any time over the following nine months for:
     
a) If the Company is obligated to sell Sprott a 1% NSR on the Maturity Date at the time, US$165 million plus accrued and unpaid interest, or
     
b) If the Company is obligated to sell Sprott a 1.2% NSR on the Maturity Date at the time, US$186.5 million plus accrued and unpaid interest.

 

If Sprott exercises these put rights, its right to purchase the NSR terminates. The Company can elect to make payment in the form of Seabridge common shares instead of cash for the EAC Repayment Amount, the Project Financing Repayment Amount, and any interest payments, including the Deferred Interest Payment.

 

A number of the above-noted options within the agreement represent embedded derivatives. Management has elected to not separate these embedded derivatives from the underlying host secured note, and instead account for the entire secured note as a financial liability at fair value through profit or loss.

 

The 2023 Secured Note was recognized at its estimated fair value at initial recognition of $198.8 million (US$150 million) using a discounted cash flow model with a Monte Carlo simulation. This incorporated several scenarios and probabilities of the EAC expiring, achieving commercial production and securing project financing, metal prices forecasts and discount rates. From inception the fair value of the 2023 Secured Note increased by $80.7 million to $279.5 million as at December 31, 2023.

 

On March 24, 2022, the Company entered into an agreement selling a secured note (“2022 Secured Note”) that is to be exchanged at maturity for a 60% gross silver royalty (the “Silver Royalty”) on the KSM Project to Sprott Resource Streaming and Royalty Corp. and Ontario Teachers’ Pension Plan (jointly, the “Investors”) for US$225 million. The proceeds of the financing were to be used to continue ongoing physical works at KSM and advance the project towards a designation of Substantially Started. The Substantially Started designation ensures the continuity of the KSM project’s approved EAC for the life of the project. The key terms of the 2022 Secured Note include:

 

When the 2022 Secured Note matures, the Investors will use all of the principal amount repaid on maturity to purchase a 60% gross silver royalty (the “Silver Royalty”). Maturity occurs upon the first to occur of:

 

a) Commercial production being achieved at KSM; and

 

b) Either on March 24, 2032, the 10-year anniversary, or if the Environmental Assessment Certificate (“EAC”) expires and the Investors do not exercise their right to put the 2022 Secured Note to the Company, on March 24, 2035, the 13-year anniversary of the issue date of the 2022 Secured Note.

 

Prior to its maturity, the 2022 Secured Note bears interest at 6.5% per annum, payable quarterly in arrears. The Company can elect to satisfy interest payments in cash or by delivering common shares.

 

Page 17


 

The Company has the option to buyback 50% of the Silver Royalty, once exchanged, on or before 3 years after commercial production has been achieved, for an amount that provides the Investors a minimum guaranteed annualized return.

 

If project financing to develop, construct and place KSM into commercial production is not in place by March 24, 2027, the Investors can put the 2022 Secured Note back to the Company for US$232.5 million, with the Company able to satisfy such amount in cash or by delivering common shares at its option. This right expires once such project financing is in place. If the Investors exercise this put right, the Investors’ right to purchase the Silver Royalty terminates.

 

If KSM’s EAC expires at anytime while the 2022 Secured Note is outstanding, the Investors can put the 2022 Secured Note back to the Company for US$247.5 million at any time over the following nine months, with the Company able to satisfy such amount in cash or by delivering common shares at its option. If the Investors exercise this put right, the Investors’ right to purchase the Silver Royalty terminates.

 

If commercial production is not achieved at KSM prior to March 24, 2032, the Silver Royalty payable to the Investors will increase to a 75% gross silver royalty (if the EAC expires during the term of the 2022 Secured Note and the corresponding put right is not exercised by the Investors, this uplift will occur at the thirteenth anniversary from closing).

 

No amount payable shall be paid in common shares if, after the payment, any of the Investors would own more than 9.9% of the Company’s outstanding shares.

 

The Company’s obligations under the 2022 Secured Note are secured by a charge over all of the assets of KSMCo and a limited recourse guarantee from the Company secured by a pledge of the shares of KSMCo.

 

The 2022 Secured Note was recognized at its estimated fair value at initial recognition of $282.3 million (US$225 million) using a discounted cash flow model with a Monte Carlo simulation. This incorporated several scenarios and probabilities of the EAC expiring, achieving commercial production and securing project financing, silver prices forecast from five-year quoted forward price, and the discount rates. During the year ended December 31, 2023, the fair value of the 2022 Secured Note increased to $294.4 million, and the Company recorded a $30.8 million loss (year ended December 31, 2022 - $18.7 million gain) on the remeasurement.

 

To satisfy the interest payment on the 2022 Secured Note, the Company issued 1,285,178 common shares, in respect of all the interest incurred during the year ended December 31, 2023.

 

During the first quarter of 2021, the Company entered into an agreement with two securities dealers, for an At-The-Market offering program, entitling the Company, at its discretion, and from time to time, to sell up to US$75 million in value of common shares of the Company. This program was in effect until the Company’s US$775 million Shelf Registration Statement, that expired in December 2022, was replaced with a new US$750 million the same month. During the first quarter of 2023, a US$100 million prospectus supplement was filed and the program was renewed. In the first quarter of 2023, the Company entered into a new agreement with two securities dealers, for an At-The-Market offering program, entitling the Company, at its discretion, and from time to time, to sell up to US$100 million in value of common shares of the Company. This program can be in effect until the Company’s US$750 million Shelf Registration Statement expires in 2025. In 2023, the Company issued 2,516,839 shares, at an average selling price of $17.36 per share, for net proceeds of $42.8 million under the Company’s At-The-Market offering. As at December 31, 2023, US$67.6 million is available under the ATM. Subsequent to the quarter end, the Company issued 682,686 shares, at an average selling price of $16.50 per share, for net proceeds of $11.0 million under the Company’s At-The-Market offering. In 2022, the Company issued 998,629 shares, at an average selling price of $22.82 per share, for net proceeds of $22.3 million under the Company’s At-The-Market offering.

 

Page 18


 

During the year ended December 31, 2023, the Company received $0.8 million upon the exercise of 50,000 stock options. During the year ended December 31, 2022, the Company received $7.3 million upon the exercise of 540,834 stock options.

 

In December 2023, the Company issued a total of 875,150 flow-through common shares at an average $22.34 per common share for aggregate gross proceeds of $19.6 million. The Company committed to renounce its ability to deduct qualifying exploration expenditures for the equivalent value of the gross proceeds of the flow-through financing and transfer the deductibility to the purchasers of the flow-through shares. The effective date of the renouncement was December 31, 2023. At the time of issuance of the flow-through shares, $5.5 million premium was recognized as a liability on the consolidated statements of financial position with exploration expenditures expected to be incurred in 2024.

 

In December 2022, the Company issued a total of 675,400 flow-through common shares at an average $22.24 per common share for aggregate gross proceeds of $15.0 million. The Company committed to renounce its ability to deduct qualifying exploration expenditures for the equivalent value of the gross proceeds of the flow-through financing and transfer the deductibility to the purchasers of the flow-through shares. The effective date of the renouncement was December 31, 2022. At the time of issuance of the flow-through shares, $4.2 million premium was recognized as a liability on the consolidated statements of financial position. During the year ended December 31, 2023, the Company incurred $15.0 million of qualifying exploration expenditures and the $4.2 million premium was recognized through other income on the consolidated statements of operations and comprehensive income (loss).

 

During 2023, operating activities, including working capital adjustments, used $21.5 million cash compared to $13.3 million cash used by operating activities in 2022. The increase in cash used in operating activities was mainly due to lower interest income, higher general and administrative expenses, and working capital movement that was partially offset by lower financing costs and lower environmental rehabilitation disbursements. Cash used in operating activities in 2023 included $0.1 million foreign exchange gain. Cash used in operating activities in comparative period in 2022 was partially offset by $5.1 million foreign exchange gain. Operating activities in the near term are expected to remain stable or increase marginally given the growth in project and corporate activity in the Company.

 

The Company will continue its objective of advancing its major gold projects, KSM and Courageous Lake, and to further explore the Iskut, Snowstorm and 3 Aces projects to either sell or enter into joint venture arrangements with major mining companies. The market for metals streams and royalty interests seems to be growing and the Company will determine the merits of disposing of options it holds on non-core net profits interests and net smelter returns. Financing future exploration and development may include the selling or entering into new streaming and royalty arrangements.

 

Page 19


 

CONTRACTUAL OBLIGATIONS

 

The Company has the following commitments as at December 31, 2023:

 

    Payments due by years  
($000s)   Total     2024     2025-26     2027-28     2029-30  
2022 Secured Note – interest     135,576       19,368       38,736       38,736       38,736  
2023 Secured Note – interest     99,488       -       47,840       25,824       25,824  
Capital expenditure obligations     18,434       18,434       -       -       -  
Flow-through share expenditures     19,554       19,554       -       -       -  
Mineral interests     7,967       758       1,527       2,403       3,279  
Lease obligation     1,542       905       337       150       150  
      282,561       59,019       88,440       67,113       67,989  

 

In 2022, the Company entered into a Facilities Agreement with BC Hydro covering the design and construction of facilities by BC Hydro to supply construction phase hydro-sourced electricity to the KSM Project.

 

The cost to complete the construction is estimated to be $32.9 million of which the Company has paid $24.9 million to BC Hydro and the remaining balance was paid subsequent to the year-end but accrued at December 31, 2023. In addition, the Facilities Agreement requires $59.8 million in security or cash from the Company for BC Hydro system reinforcement which is required to make the power available of which the Company has paid $57.1 million to BC Hydro and the remaining balance was paid subsequent to the year end. The $59.8 million system reinforcement security will be forgiven annually, typically over a period of less than 8 years, based on project power consumption. Including the payment made subsequent to the year end, the Company has deposited $92.7 million with BC Hydro. Subsequent to the year end on March 21, 2024, the Company signed an amendment to the Facilities Agreement with BC Hydro for additional payments that are scheduled for $14.0 million in July 2024 and $40.0 million in December 2024.

 

Prior to its maturity, the 2022 Secured Note bears interest at 6.5%, or US$14.6 million per annum, payable quarterly in arrears. The Company can elect to satisfy interest payments in cash or by delivering common shares.

 

Prior to its maturity, the 2023 Secured Note bears interest at 6.5% or US$9.8 million per annum, payable quarterly in arrears. Payment of quarterly interest due from the closing date to the second anniversary is deferred and US$21.5 million must be paid, in cash or by delivering common shares, on or before 30 months after the closing date. Ongoing quarterly interest can be satisfied by way of cash, common shares or increasing the NSR percentage from 1 to 1.2%.

 

Page 20


 

OTHER CONTINGENCIES

 

As previously disclosed in the Company’s prior years financial statements, in 2019 the Company received a notice from the CRA that it proposed to reduce the amount of expenditures reported as Canadian Exploration Expenses (CEE) for the three-year period ended December 31, 2016. The Company has funded certain of its exploration expenditures, from time-to-time, with the proceeds from the issuance of flow-through shares and renounced, to subscribers, the expenditures which it determined to be CEE. The notice disputes the eligibility of certain types of expenditures previously audited and approved as CEE by the CRA. The Company strongly disagrees with the notice and responded to the CRA auditors with additional information for their consideration. In 2020, the CRA auditors responded to the Company’s submission and, although accepting additional expenditures as CEE, reiterated that their position remains largely unchanged and subsequently issued reassessments to the Company reflecting the additional CEE expenditures accepted and $2.3 million of Part Xll.6 tax owing. The Company has been made aware that the CRA has reassessed certain investors who subscribed for the flow-through shares, reducing CEE deductions. Notice of objections to the Company’s and investors’ reassessments have been filed for all those that have been received and will be appealed to the courts, should the notice of objections be denied. The Company has indemnified the investors that subscribed for the flow-through shares and that have been reassessed by depositing the amount of their reassessments, including interest charges, into the accounts of the reassessed investors with the Receiver General in return for such investors agreement to object to their respective reassessments and to repay the Company any refund of the amount deposited on their behalf upon resolution of the Company’s appeal. During 2021, 2022 and 2023, the Company deposited $9.4 million into the accounts of certain investors with the Receiver General. The deposits made have been recorded as long-term receivables on the statement of financial position as at December 31, 2023. The potential tax indemnification to the investors is estimated to be $10.8 million, plus $3.3 million potential interest. No provision has been recorded related to the tax, potential interest, nor the potential indemnity as the Company and its advisors do not consider it probable that there will ultimately be an amount payable.

 

During 2016, upon the completion of an audit of the application by tax authorities of the British Columbia Mineral Exploration Tax Credit (“BCMETC”) program, the Company was reassessed $3.6 million, including accrued interest for expenditures that the tax authority has categorized as not qualifying for the BCMETC program. The Company recorded a $3.6 million provision within non-trade payables and accrued expenses on the consolidated statements of financial position as at December 31, 2016 with a corresponding increase in mineral interests. In 2017 the Company filed an objection to the reassessment with the appeals division of the tax authorities and paid one-half of the accrued balance to the Receiver General and reduced the provision by $1.8 million. In 2019, the Company received a decision from the appeals division that the Company’s objection was denied, and the Company filed a Notice of Appeal with the British Columbia Supreme Court. The Attorney General of Canada replied to the facts and arguments in the Company’s Notice of Appeal and stated its position that the Company’s expenditures did not qualify for the BCMETC program. During the first quarter of 2023, the Company completed discovery process with the Department of Justice and will continue to move the appeal process forward, including settling an agreed statement of facts and settling court dates for the hearing. The Company intends to continue to fully defend its position. Based on the facts and circumstances of the Company’s objection, the Company concludes that it is more likely than not that it will be successful in its objection. As at December 31, 2023, the Company has paid $1.6 million to the Receiver General, and the Canada Revenue Agency (CRA) has withheld $2.3 million of HST credits due to the Company that would fully cover the residual balance, including interest, should the Company be unsuccessful in its challenge. The amount recorded in long-term receivables as of December 31, 2023 of $3.9 million includes the initial reassessment of $3.6 million, plus accrued interest.

 

Page 21


 

OUTLOOK

 

The Company continues its pursuit of a joint venture agreement on the KSM Project with a suitable partner on terms advantageous to the Company, since it does not intend to build or operate the project alone. The KSM Project includes multiple deposits and provides a joint venture partner, or purchaser, flexibility in the design of the project. In accordance with its priorities and risk tolerance, the Company believes that it does not make sense for it to start preparing a feasibility study on the KSM Project on its own. The 2022 KSM PFS includes recommendations on additional work that could be completed to advance the project, including budget estimates. The work that a joint venture partner might choose to complete might include some or all of this recommended work and might include significantly more work, and so the timing and cost for a joint venture partner to conclude the recommended work or a feasibility study is difficult to predict. The Company plans its work to advance the KSM Project on an annual basis, when the results of one year’s work have been received and analyzed, planning for the next year begins. Subsequent to the year end, the Company filed its application for the Substantially Started designation for KSM and it is anticipated that a determination should be made by the end of 2024. While planning its programs, the Company will consider the recommended work in the PFS, but the Company will decide work based on its priorities and available financing, the results of its advancement work and the items it believes are best left for a joint venture partner to decide. Plans for each year are typically announced in the second quarter of the year and budgets are established at the beginning of that year.

 

In order to apply for the Substantially Started designation for KSM, in 2023, the Company completed construction work including the construction of fish habitat offsetting ponds, powerline installations, road and bridge and camp construction. In 2024, subject to financing, the Company will continue early works activities, including continuing with the construction of the power substation and the clearing of additional sites for location of proposed infrastructure along with other technical and environmental activities.

 

The Company has only prepared preliminary estimates for the cost of additional work at KSM and certain of the work requires further engineering before reasonable cost estimates can be established. The Company’s budget for 2024 activities is estimated at $115 million. The budgeted scope will be funded with the remaining proceeds of the 2023 Secured Note as well as funds raised through its ATM and other potential financings.

 

At Iskut, the Company will conduct a planned 2024 exploration program that is focused on 15,000 meters of diamond drilling for a copper/gold porphyry deposit at Snip North, Quartz Rise or on the Bronson deposit. The Company also plans to complete and file a NI43-101 technical report on an expansion of the Bronson Slope Resource. Costs are estimated at $11.9 million. Environmental work will also continue on the reclamation and closure plan for the Johnny Mountain mine and along with regular monitoring and project carrying costs, an additional $2.9 million is expected to be incurred for a total plan of $14.8 million.

 

In 2024, at the Company’s 3 Aces project, the Company will conduct a $5.9 million exploration program that will include drill testing three priority resource expansion targets in the Central Core Area (CCA), completing a surface evaluation of three regional targets, drill testing two priority regional targets and complete a regional exploration model and prioritize targets throughout the property for resource definition in 2025. The 2023 exploration program was successful in testing and refining the 3 Aces exploration model, which led to prioritizing the 2024 targets.

 

Additional environmental and technical work and carrying costs for the project entails an additional $2.7 million of spending bringing the project total budget to $8.6 million.

 

At Snowstorm, a $1.1 million program is planned to complete a ground survey of permit requirements for the Goldstorm target and to refine the Company’s strategy for opportunities to discover a Getchell style deposit.

 

No significant spending is expected for the Courageous Lake project as the Company completed and filed the 2024 PFS.

 

The Company is exploring various alternatives for raising the funding necessary to fund operations and meeting its established objectives. Possible financing options include the sale of shares or debt issued by the Company, including a possible financing under a Prospectus Supplement to its existing Base Shelf Prospectus, share sales through its ATM program, the sale of a royalty or streaming interest in the KSM Project, funding from a joint venture partner as part of earning into an interest in the KSM Project and the sale of all or some form of interest in one of the Company’s other projects.

 

Page 22


 

SUSTAINABILITY

 

Management and the Board of Directors consider more than just environmental, social and governance issues when considering Sustainability. The Company also takes into account diversity, equity and inclusion (DEI) to form our overall approach to Sustainability. Thus the Board of Directors and management has incorporated Sustainability into the Company goals, priorities and strategies to operate safely, sustainably and with the highest governance standards. The Board of Directors has established a Sustainability Committee and granted that committee the authority to investigate any activity of the Corporation and its affiliates relating to sustainability. This Committee reviews climate related risks and opportunities each time they meet and shares key discussion points with the full Board of Directors. The Company’s sustainability strategy encompasses its Sustainability Policy, a strategic framework and the Company’s sustainability reporting practice. The Sustainability Policy guides the decision and behaviors of the Company’s employees, contractors and the Board of Directors. The policy also governs the strategic framework and sustainability goals. The Company publishes its Sustainability Report, including its Climate Strategy report, annually covering its sustainability performance and approach to climate change for the preceding year. As the Company operates in the natural resource extraction industry, the Company strives to achieve the highest operating standards, assessing and mitigating the impacts on the physical environment and the communities in which the Company operates.

 

During the second quarter of 2023, the Company published its 2022 Sustainability Report providing insight to the Company's commitment to local communities, culture, and sustainability. The report captures all of 2022 and highlights the Company’s progress towards integrating sustainability into its operations and the Company will be issuing its 2023 Sustainability Report in the second quarter of 2024. The reports are prepared with select disclosures and guidance from the Sustainability Standards Accounting Board Metals and Mining Industry Standards and the Global Reporting Initiative Standards, as well as metrics designed for specifically for the Company relating to culture, communities and local engagement.

 

Also in early 2023, the Company issued its inaugural Climate Strategy Report disclosing Scope 1, 2 and 3 emissions, compliant with the Task Force on Climate-Related Financial Disclosures (TCFD) and concurrently made submissions for the Climate Disclosure Project (CDP) scoring that will provide a snapshot of the Company’s disclosure and environmental performance. Although these reports are in advance of mandatory reporting, the Company believes the time and resources required to develop the processes, including embedded internal controls over those processes, is considerable and further believes the voluntary disclosures will aid in the evolution of its reporting. Management and the Board of Directors attend workshops to identify, assess and develop plans for relevant climate related risks and opportunities. The workshops also act to prioritize identified threats, risks and opportunities for the development of action plans. Threats or risks considered and assessed included those associated with the transition to a low-carbon economy, and physical impact risks due to climate change. And finally, scenario analysis is used to assess potential implications to the Company as a whole. The scenarios used were developed by the Network for Greening the Financial System and entail evaluating physical and transition risks and impacts to the Company under three future climate change outcomes and three time horizons. Each scenario and time frame illustrated the highest potential impact and the level of action needed but also common impacts amongst all scenarios. Although potential impacts were identified such as supply chain instability, increasing investor expectations, extreme weather events and metals prices volatility, there were currently no near term material climate related risks or opportunities identified within all of these approaches and processes completed by the Company. All risks and uncertainties are discussed within the Company’s most recent Annual Information Form filed on SEDAR+ at www.sedarplus.ca, and the Annual Report on Form 40-F filed on EDGAR at www.sec.gov/edgar.shtml.

 

For the twelve months ended December 31, 2023, the Company had no significant environmental and safety incidents or concerns.

 

In addition to the Sustainability Policy, the Company has also implemented its Environmental Policy; Health and Safety Policy including a separate policy on discrimination, bullying, harassment, and violence; a Workplace Employment Policy; and its Policy Statement on Diversity. The Sustainability Reports, including climate strategy, and all of the Company’s policies related to ESG can be found on the Company’s website www.seabridgegold.com.

 

Page 23


 

INTERNAL CONTROLS OVER FINANCIAL REPORTIG

 

The Company’s management under the supervision of the Chief Executive Officer and Chief Financial Officer are responsible for designing adequate internal controls over financial reporting or causing them to be designed under their supervision in order to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with IFRS. Management is responsible for establishing and maintaining adequate internal controls over financial reporting. Management evaluated the effectiveness of the Company’s internal controls over financial reporting as of December 31, 2023 based on criteria established in Internal Control – Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Based on that evaluation of the internal controls at December 31, 2023, management has concluded that the Company’s internal controls and procedures are appropriately designed and operating effectively. The registered public accounting firm that audited the Company’s consolidated financial statements has issued their attestation report on management’s assessment of the effectiveness of internal control over financial reporting as of December 31, 2023.

 

CHANGES TO INTERNAL CONTROLS OVER FINANCIAL REPORTING

 

There was no change in the Company’s internal controls over financial reporting that occurred during the period beginning October 1, 2023, and ended on December 31, 2023 that has materially affected or is reasonably likely to materially affect, the Company’s internal controls over financial reporting.

 

DISCLOSURE CONTROLS AND PROCEDURES AND INTERNAL CONTROLS OVER FINANCIAL REPORTING

 

Pursuant to regulations adopted by the U.S. Securities and Exchange Commission, under the U.S. Sarbanes-Oxley Act of 2002 and those of the Canadian Securities Administrators, management evaluates the effectiveness of the design and operation of the Company's disclosure controls and procedures, and internal control over financial reporting. This evaluation is done under the supervision of, and with the participation of, the Chief Executive Officer and the Chief Financial Officer.

 

Disclosure controls and procedures have been designed to ensure that information required to be disclosed by the Company is recorded, processed, summarized and reported within the time periods specified in the rules and forms. Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by the Company is accumulated and communicated to management as appropriate, to allow timely decisions regarding required disclosure. The Company’s Chief Executive Officer and Chief Financial Officer have concluded, based on their evaluation of the design of the disclosure controls and procedures as of December 31, 2023, that they are appropriately designed and effective.

 

Page 24


 

LIMITATIONS OF CONTROLS AND PROCEDURES

 

The Company’s management, including the Chief Executive Officer and Chief Financial Officer, believes that any internal controls over financial reporting and disclosure controls and procedures, no matter how well designed, can have inherent limitations. Therefore, even those systems determined to be effective can provide only reasonable assurance that the objectives of the control system are met.

 

CYBERSECURITY

 

The Company’s management is responsible for cybersecurity risks that face the Company, and the Board of Directors has granted the Audit Committee the authority to oversee management’s assessment of those risks and their prevention and mitigation approaches and to investigate any material breaches. To date, there have been no material breaches of security measures.

 

An independent privacy assessment review and systems penetration test was completed in 2023. The review reported on the vulnerability and assessed the level of protection from external threats to the Company’s data and information systems. During the fourth quarter of 2023, a cyber security framework was developed and implemented.

 

SHARES ISSUED AND OUTSTANDING

 

At March 27, 2024, the issued and outstanding common shares of the Company totaled 86,853,771. In addition, there were 50,000 stock options and 634,660 RSUs. Assuming the conversion of all of these instruments is outstanding, there would be 87,538,431 common shares issued and outstanding.

 

RELATED PARTY TRANSACTIONS

 

During year ended December 31, 2023 and 2022, there were no payments to related parties other than compensation paid to key management personnel. These transactions were in the normal course of operations and were measured at the exchange amount, which is the amount of consideration established and agreed to by the related parties.

 

RECENT ACCOUNTING PRONOUNCEMENTS

 

Refer to Note 3 (M) in the Company’s audited consolidated financial statements for the year ended December 31, 2023.

 

CRITICAL ACCOUNTING ESTIMATES

 

Refer to Note 4 in the Company’s audited consolidated financial statements for the year ended December 31, 2023.

 

Page 25


 

RISKS AND UNCERTAINTIES

 

Risks and uncertainties are discussed within the Company’s most recent Annual Information Form filed on SEDAR at www.sedarplus.ca, and the 2023 Annual Report on Form 40-F filed on EDGAR at www.sec.gov/edgar.shtml.

 

FORWARD LOOKING STATEMENTS

 

The consolidated financial statements and management’s discussion and analysis and any other materials included with them, contain certain forward-looking statements relating but not limited to the Company’s expectations, intentions, plans and beliefs. Forward-looking information can often be identified by forward-looking words such as “anticipate”, “believe”, “expect”, “goal”, “plan”, “intend”, “estimate”, “may” and “will” or similar words suggesting future outcomes, or other expectations, beliefs, estimates, plans, objectives, assumptions, intentions or statements about future events or performance. Forward-looking information may include reserve and resource estimates and expected changes to them, estimates of future production and related financial analysis, unit costs, costs of capital projects and timing of commencement of operations, and is based on current expectations that involve a number of business risks and uncertainties. Factors that could cause actual results to differ materially from any forward-looking statement include, but are not limited to, failure to establish estimated resources and reserves, the grade and recovery of ore which is mined varying from estimates, capital and operating costs varying significantly from estimates, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and other factors. Forward-looking statements are subject to risks, uncertainties and other factors that could cause actual results to differ materially from expected results.

 

Potential shareholders and prospective investors should be aware that these statements are subject to known and unknown risks, uncertainties and other factors that could cause actual results to differ materially from those suggested by the forward-looking statements. Shareholders are cautioned not to place undue reliance on forward-looking information. By its nature, forward-looking information involves numerous assumptions, inherent risks and uncertainties, both general and specific, that contribute to the possibility that the predictions, forecasts, projections and various future events will not occur. The Company undertakes no obligation to update publicly or otherwise revise any forward-looking information whether as a result of new information, future events or other such factors which affect this information, except as required by law.

 