Second Quarter total operating revenues of $232.3 million, a decrease of $14.7 million or 6% compared to the first quarter of 2026.
|
|
|
• |
Second Quarter net loss of $241.4 million compared to net loss of $29.0 million in the first quarter of 2026, primarily driven by a $176.3 million debt extinguishment charge related to the refinancing of our senior secured notes due 2028
and 2030 and convertible bonds due 2028.
|
|
|
• |
Second Quarter Adjusted EBITDA of $43.8 million, a decrease of $44.7 million or 51% compared to the first quarter of 2026.
|
|
|
• |
Refinanced substantially all existing debt through the issuance of senior secured notes due 2032 and 2034 and convertible notes due 2033, extending debt maturities and reducing financing costs.
|
|
|
• |
Amended super senior revolving credit facility, increasing the commitments to $250.0 million, reducing the margin, extending the maturity date, and further strengthening liquidity.
|
|
|
• |
Subsequent to quarter end, completed the acquisition of five premium jack-up rigs via new 50/50 joint venture for a total purchase price of $287 million.
|
|
|
• |
Year-to-date 2026, the Company has been awarded 21 contract commitments, representing approximately 4,350 days and $541 million of Dayrate Equivalent Backlog.
|
| • |
Second Quarter total operating revenues of $232.3 million, a decrease of $14.7 million or 6% compared to the first quarter of 2026.
|
| • |
Second Quarter net loss of $241.4 million compared to net loss of $29.0 million in the first quarter of 2026, primarily driven by a $176.3 million debt extinguishment charge related to the refinancing of our senior secured notes due 2028 and
2030 and convertible bonds due 2028.
|
| • |
Second Quarter Adjusted EBITDA1 of $43.8 million, a decrease of $44.7 million or 51% compared to the first quarter of 2026.
|
| • |
Refinanced substantially all existing debt through the issuance of senior secured notes due 2032 and 2034 and convertible notes due 2033, extending debt maturities and reducing financing costs.
|
| • |
Amended super senior revolving credit facility, increasing the commitments to $250.0 million, reducing the margin, extending the maturity date, and further strengthening liquidity.
|
| • |
Subsequent to quarter end, completed the acquisition of five premium jack-up rigs via new 50/50 joint venture for a total purchase price of $287 million.
|
| • |
Year-to-date 2026, the Company has been awarded 21 contract commitments, representing approximately 4,350 days and $541 million of Dayrate Equivalent Backlog2.
|

|
(In $ million)
|
Q2 2026
|
Q1 2026
|
Change ($)
|
Change (%)
|
|||||||||||||
|
Total operating revenues
|
232.3
|
247.0
|
(14.7
|
)
|
(6
|
)%
|
|||||||||||
|
Total operating expenses
|
(232.1
|
)
|
(201.0
|
)
|
(31.1
|
)
|
(15
|
)%
|
|||||||||
|
Operating income
|
0.3
|
46.0
|
(45.7
|
)
|
(99
|
)%
|
|||||||||||
|
Other non-operating income
|
6.0
|
—
|
6.0
|
100
|
%
|
||||||||||||
|
Total financial expenses, net
|
(236.5
|
)
|
(62.7
|
)
|
(173.8
|
)
|
(277
|
)%
|
|||||||||
|
Net loss
|
(241.4
|
)
|
(29.0
|
)
|
(212.4
|
)
|
|
nm
|
3 | ||||||||
|
Adjusted EBITDA
|
43.8
|
88.5
|
(44.7
|
)
|
(51
|
)%
|
|||||||||||
|
Cash and cash equivalents
|
223.6
|
246.0
|
(22.4
|
)
|
(9
|
)%
|
|||||||||||
|
Total equity
|
961.6
|
1,197.2
|
(235.6
|
)
|
(20
|
)%
|
|||||||||||







|
(in US$ millions)
|
Q2 2026
|
Q1 2026
|
|||||||
|
Net loss attributable to shareholders
|
(241.4
|
)
|
(29.0
|
)
|
|||||
|
Depreciation of non-current assets
|
43.5
|
42.5
|
|||||||
|
Other non-operating income
|
(6.0
|
)
|
—
|
||||||
|
Loss from equity method investments
|
0.3
|
1.2
|
|||||||
|
Interest income
|
(1.7
|
)
|
(1.7
|
)
|
|||||
|
Interest expense
|
236.4
|
63.2
|
|||||||
|
Foreign exchange loss, net
|
0.7
|
0.6
|
|||||||
|
Other financial expenses
|
1.1
|
0.6
|
|||||||
|
Income tax expense
|
10.9
|
11.1
|
|||||||
|
Adjusted EBITDA
|
43.8
|
88.5
|
|
For the three months ended
|
For the six months ended
|
||||||||||||||||
|
(In $ millions, except per share data)
|
June 30, 2026
|
June 30, 2025
|
June 30, 2026
|
June 30, 2025
|
|||||||||||||
|
Operating revenues
|
|||||||||||||||||
|
Dayrate revenue
|
187.7
|
238.5
|
397.2
|
440.7
|
|||||||||||||
|
Bareboat charter revenue
|
32.9
|
20.3
|
59.5
|
27.9
|
|||||||||||||
|
Management contract revenue
|
11.7
|
8.9
|
22.6
|
15.7
|
|||||||||||||
|
Total operating revenues
|
232.3
|
267.7
|
479.3
|
484.3
|
|||||||||||||
|
Gain on disposals
|
0.1
|
—
|
0.1
|
0.4
|
|||||||||||||
|
Operating expenses
|
|||||||||||||||||
|
Rig operating and maintenance expenses
|
(175.1
|
)
|
(122.2
|
)
|
(319.8
|
)
|
(232.0
|
)
|
|||||||||
|
Depreciation of non-current assets
|
(43.5
|
)
|
(36.7
|
)
|
(86.0
|
)
|
(72.6
|
)
|
|||||||||
|
General and administrative expenses
|
(13.5
|
)
|
(12.3
|
)
|
(27.3
|
)
|
(23.4
|
)
|
|||||||||
|
Total operating expenses
|
(232.1
|
)
|
(171.2
|
)
|
(433.1
|
)
|
(328.0
|
)
|
|||||||||
|
Operating income
|
0.3
|
96.5
|
46.3
|
156.7
|
|||||||||||||
|
Other non-operating income
|
6.0
|
—
|
6.0
|
—
|
|||||||||||||
|
Loss from equity method investments
|
(0.3
|
)
|
(0.2
|
)
|
(1.5
|
)
|
(2.0
|
)
|
|||||||||
|
Financial income (expenses), net
|
|||||||||||||||||
|
Interest income
|
1.7
|
0.5
|
3.4
|
1.1
|
|||||||||||||
|
Interest expense
|
(236.4
|
)
|
(57.2
|
)
|
(299.6
|
)
|
(115.3
|
)
|
|||||||||
|
Other financial (expenses) / income, net
|
(1.8
|
)
|
0.3
|
(3.0
|
)
|
(4.9
|
)
|
||||||||||
|
Total financial expenses, net
|
(236.5
|
)
|
(56.4
|
)
|
(299.2
|
)
|
(119.1
|
)
|
|||||||||
|
(Loss) / income before income taxes
|
(230.5
|
)
|
39.9
|
(248.4
|
)
|
35.6
|
|||||||||||
|
Income tax expense
|
(10.9
|
)
|
(4.8
|
)
|
(22.0
|
)
|
(17.4
|
)
|
|||||||||
|
Net (loss) / income attributable to shareholders
|
(241.4
|
)
|
35.1
|
(270.4
|
)
|
18.2
|
|||||||||||
|
Total comprehensive (loss) / income attributable to shareholders
|
(241.4
|
)
|
35.1
|
(270.4
|
)
|
18.2
|
|||||||||||
|
Basic (loss) / income per share
|
(0.79
|
)
|
0.15
|
(0.88
|
)
|
0.08
|
|||||||||||
|
Diluted (loss) / income per share
|
(0.79
|
)
|
0.14
|
(0.88
|
)
|
0.08
|
|||||||||||
|
Weighted-average shares outstanding - basic
|
307,391,018
|
238,907,129
|
307,653,974
|
241,134,285
|
|||||||||||||
|
Weighted-average shares outstanding - diluted
|
307,391,018
|
273,877,730
|
307,653,974
|
242,362,500
|
|||||||||||||
|
June 30, 2026
|
December 31, 2025
|
||||||||
|
(In $ millions, except per share data)
|
Unaudited
|
Audited
|
|||||||
|
ASSETS
|
|||||||||
|
Current assets
|
|||||||||
|
Cash and cash equivalents
|
223.6
|
379.7
|
|||||||
|
Restricted cash
|
1.0
|
1.0
|
|||||||
|
Trade receivables, net
|
192.5
|
191.8
|
|||||||
|
Prepaid expenses
|
12.8
|
8.3
|
|||||||
|
Deferred costs
|
27.5
|
29.3
|
|||||||
|
Accrued revenue
|
108.2
|
132.9
|
|||||||
|
Due from related parties
|
3.9
|
2.3
|
|||||||
|
Other current assets
|
27.3
|
23.1
|
|||||||
|
Total current assets
|
596.8
|
768.4
|
|||||||
|
Non-current assets
|
|||||||||
|
Property, plant and equipment
|
1.8
|
2.0
|
|||||||
|
Jack-up drilling rigs, net
|
3,036.5
|
2,742.7
|
|||||||
|
Equity method investments
|
10.3
|
11.8
|
|||||||
|
Other non-current assets
|
50.9
|
100.7
|
|||||||
|
Total non-current assets
|
3,099.5
|
2,857.2
|
|||||||
|
Total assets
|
3,696.3
|
3,625.6
|
|||||||
|
LIABILITIES AND EQUITY
|
|||||||||
|
Current liabilities
|
|||||||||
|
Trade payables
|
61.6
|
33.8
|
|||||||
|
Accrued expenses
|
89.1
|
76.0
|
|||||||
|
Short-term accrued interest
|
21.0
|
31.2
|
|||||||
|
Short-term debt
|
—
|
129.3
|
|||||||
|
Short-term deferred revenue
|
21.6
|
24.2
|
|||||||
|
Other current liabilities
|
42.4
|
56.2
|
|||||||
|
Total current liabilities
|
235.7
|
350.7
|
|||||||
|
Non-current liabilities
|
|||||||||
|
Long-term debt
|
2,485.3
|
2,021.0
|
|||||||
|
Long-term deferred revenue
|
12.2
|
29.5
|
|||||||
|
Other non-current liabilities
|
1.5
|
1.8
|
|||||||
|
Total non-current liabilities
|
2,499.0
|
2,052.3
|
|||||||
|
Total liabilities
|
2,734.7
|
2,403.0
|
|||||||
|
Shareholders’ Equity
|
|||||||||
|
Common shares of par value $0.10 per share: authorized 365,000,000 (2025: 365,000,000) shares, issued 315,400,000 (2025: 315,400,000) shares and outstanding
308,512,741 (2025: 307,215,419) shares
|
31.6
|
31.6
|
|||||||
|
Treasury shares
|
(6.4
|
)
|
(18.1
|
)
|
|||||
|
Additional paid in capital
|
519.6
|
521.9
|
|||||||
|
Contributed surplus
|
1,919.0
|
1,919.0
|
|||||||
|
Accumulated deficit
|
(1,502.2
|
)
|
(1,231.8
|
)
|
|||||
|
Total equity
|
961.6
|
1,222.6
|
|||||||
|
Total liabilities and equity
|
3,696.3
|
3,625.6
|
|||||||
|
For the three months ended
|
For the six months ended
|
||||||||||||||||
|
(In $ millions)
|
June 30, 2026
|
June 30, 2025
|
June 30, 2026
|
June 30, 2025
|
|||||||||||||
|
Cash flows from operating activities
|
|||||||||||||||||
|
Net (loss) / income
|
(241.4
|
)
|
35.1
|
(270.4
|
)
|
18.2
|
|||||||||||
|
Adjustments to reconcile net (loss) / income to net cash provided by
operating activities:
|
|||||||||||||||||
|
Non-cash share-based compensation expense
|
2.2
|
2.6
|
4.8
|
6.0
|
|||||||||||||
|
Provision for credit losses
|
11.5
|
—
|
19.9
|
—
|
|||||||||||||
|
Depreciation of non-current assets
|
43.5
|
36.7
|
86.0
|
72.6
|
|||||||||||||
|
Other non-operating income
|
(6.0
|
)
|
—
|
(6.0
|
)
|
—
|
|||||||||||
|
Amortization of deferred costs
|
11.7
|
14.5
|
22.1
|
24.7
|
|||||||||||||
|
Amortization of deferred revenue
|
(11.2
|
)
|
(14.3
|
)
|
(24.3
|
)
|
(22.1
|
)
|
|||||||||
|
Loss on debt extinguishment
|
176.3
|
—
|
176.3
|
—
|
|||||||||||||
|
Amortization of debt discount
|
1.1
|
1.7
|
2.8
|
3.4
|
|||||||||||||
|
Amortization of debt premium
|
(0.4
|
)
|
(0.7
|
)
|
(1.1
|
)
|
(1.4
|
)
|
|||||||||
|
Amortization of deferred finance charges
|
2.4
|
3.2
|
6.4
|
6.4
|
|||||||||||||
|
Non-cash financing fee
|
—
|
0.2
|
—
|
4.4
|
|||||||||||||
|
Loss from equity method investments
|
0.3
|
0.2
|
1.5
|
2.0
|
|||||||||||||
|
Deferred income tax
|
(1.2
|
)
|
(5.5
|
)
|
(1.0
|
)
|
(6.0
|
)
|
|||||||||
|
Change in assets and liabilities:
|
|||||||||||||||||
|
Amounts due from related parties
|
(2.7
|
)
|
0.9
|
(1.6
|
)
|
75.3
|
|||||||||||
|
Trade payables and accrued expenses
|
27.0
|
8.0
|
45.7
|
(14.6
|
)
|
||||||||||||
|
Accrued interest
|
(58.8
|
)
|
(45.3
|
)
|
(6.6
|
)
|
2.5
|
||||||||||
|
Other current and non-current assets
|
33.3
|
(60.7
|
)
|
(18.9
|
)
|
(42.2
|
)
|
||||||||||
|
Other current and non-current liabilities
|
(9.4
|
)
|
29.7
|
(9.3
|
)
|
15.8
|
|||||||||||
|
Net cash (used in) / provided by operating activities
|
(21.8
|
)
|
6.3
|
26.3
|
145.0
|
||||||||||||
|
Cash flows from investing activities
|
|||||||||||||||||
|
Purchase of property, plant and equipment
|
—
|
—
|
(0.3
|
)
|
(0.1
|
)
|
|||||||||||
|
Proceeds from other non-operating activities
|
6.0
|
—
|
6.0
|
—
|
|||||||||||||
|
Additions to jack-up drilling rigs
|
(8.3
|
)
|
(13.4
|
)
|
(190.9
|
)
|
(38.4
|
)
|
|||||||||
|
Net cash used in investing activities
|
(2.3
|
)
|
(13.4
|
)
|
(185.2
|
)
|
(38.5
|
)
|
|||||||||
|
Cash flows from financing activities
|
|||||||||||||||||
|
Repayment of debt
|
(2,293.1
|
)
|
(70.7
|
)
|
(2,293.1
|
)
|
(70.7
|
)
|
|||||||||
|
Cash distributions paid
|
—
|
—
|
—
|
(4.7
|
)
|
||||||||||||
|
Debt proceeds, net of issuance costs
|
2,291.3
|
—
|
2,291.3
|
—
|
|||||||||||||
|
Purchase of treasury shares
|
—
|
—
|
—
|
(0.2
|
)
|
||||||||||||
|
Proceeds from exercise of share options
|
3.6
|
—
|
4.6
|
—
|
|||||||||||||
|
Net cash provided by / (used in) financing activities
|
1.8
|
(70.7
|
)
|
2.8
|
(75.6
|
)
|
|||||||||||
|
Net (decrease) / increase in cash and cash equivalents and restricted cash
|
(22.3
|
)
|
(77.8
|
)
|
(156.1
|
)
|
30.9
|
||||||||||
|
Cash and cash equivalents and restricted cash at the beginning of the period
|
246.9
|
171.2
|
380.7
|
62.5
|
|||||||||||||
|
Cash and cash equivalents and restricted cash at the end of the period
|
224.6
|
93.4
|
224.6
|
93.4
|
|||||||||||||
|
For the three months ended
|
For the six months ended
|
||||||||||||||||
|
(In $ millions)
|
June 30, 2026
|
June 30, 2025
|
June 30, 2026
|
June 30, 2025
|
|||||||||||||
|
Supplementary disclosure of cash flow information
|
|||||||||||||||||
|
Interest paid
|
(115.8
|
)
|
(98.3
|
)
|
(121.8
|
)
|
(104.4
|
)
|
|||||||||
|
Income taxes paid
|
(15.1
|
)
|
(20.8
|
)
|
(21.8
|
)
|
(37.7
|
)
|
|||||||||
|
Non-cash additions to jack-up drilling rigs financed by long-term debt
|
—
|
—
|
150.0
|
—
|
|||||||||||||
|
Non-cash offset of other current and non-current assets and jack-up rigs
|
1.2
|
(8.5
|
)
|
2.8
|
(9.1
|
)
|
|||||||||||
|
June 30, 2026
|
December 31, 2025
|
||||||||
|
Cash and cash equivalents
|
223.6
|
379.7
|
|||||||
|
Restricted cash
|
1.0
|
1.0
|
|||||||
|
Total cash and cash equivalents and restricted cash
|
224.6
|
380.7
|
|||||||
![]() |
Borr Drilling
Fleet Status Report - 11 August 2026
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
|
New Contracts / Extensions / Amendments
|
||||
|
Idun
|
|
|||
|
• Contract: July 2026 to September 2026, Undisclosed (Vietnam)
|
||||
|
Gunnlod
|
||||
|
• Contract: August 2026 to April 2027, PVEP-NCS (Vietnam)
|
||||
|
Prospector 1
|
|
|||
|
• Contract Extension: September 2026 to April 2027, One-DYAS (Netherlands)
|
||||
|
Idun
|
||||
|
• Contract: September 2026 to October 2026, HLHV JOC (Vietnam)
|
||||
|
Gerd
|
|
|||
|
• Contract Extension: February 2027 to March 2027, Foxtrot (Ivory Coast)
|
||||
|
|
Galar |
|
|
|
|
|
• Contract extension: May 2028 to May 2030, PEMEX (Mexico)
|
|
|
|
|
|
Gersemi |
|
|
|
|
|
• Contract extension: May 2028 to May 2030, PEMEX (Mexico)
|
|
|
|
|
Letters of Award
|
||||
|
Mist
|
|
|||
|
• Binding LOA: October 2026 to November 2026, Sarawak Shell (Malaysia)
|
||||
|
Other Developments
|
||||
|
Skald
|
|
|||
|
• Commenced operations with Vestigo Petroleum in Malaysia in late May 2026
|
||||
|
Prospector 5
|
||||
|
• Concluded operations with Eni in Congo in late May 2026 and commenced operations with BW Energy in Gabon in early July 2026
|
||||
|
Joro
|
|
|||
|
• Concluded operations with Siemens Energy in Germany in late May 2026 and subsequently warm stacked in the United Kingdom
|
||||
|
Sif
|
||||
|
• Commenced operations with Petronas in Suriname in mid-July 2026
|
||||
|
Idun
|
|
|||
|
• Commenced operations with an undisclosed operator in Vietnam in mid-July 2026
|
||||
|
Thor
|
||||
|
• Concluded operations with HLHV JOC in Vietnam in late July and commenced operations with PVEP-Cuulong in direct continuation
|
||||
|
Odin
|
|
|||
|
• Commenced mobilization activities to undisclosed operator’s first designated location offshore Texas in mid-August 2026
|
||||
![]() |
Borr Drilling
Fleet Status Report - 11 August 2026
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Rig Name
|
Rig Design
|
Rig Water
Depth (ft)
|
Year
Built
|
Customer / Status
|
Contract Start
|
Contract End
|
Location
|
Comments
|
||||||||
|
Contracted Rigs
|
||||||||||||||||
| |
||||||||||||||||
|
Arabia I
|
KFELS B Class
|
400 ft
|
2020
|
Petrobras 3
|
April - 2025
|
April - 2029
|
Brazil
|
Operating with option to extend
|
||||||||
|
Arabia II
|
KFELS B Class
|
400 ft
|
2019
|
Bunduq
|
September - 2025
|
January - 2027
|
United Arab Emirates
|
Operating with option to extend
|
||||||||
|
Arabia III 1
|
KFELS Super A Class
|
400 ft
|
2013
|
Saudi Aramco
|
September - 2023
|
September - 2028
|
Saudi Arabia
|
Operating with option to extend
|
||||||||
|
Bestla 1
|
Gusto MSC CJ50
|
350 ft
|
2008
|
Eni 4
|
December - 2025
|
December - 2026
|
Netherlands
|
Operating with option to extend
|
||||||||
|
Forseti 1
|
|
F&G JU-3000N
|
400 ft
|
2013
|
Noble Corp 4
|
December - 2025
|
December - 2026
|
United Arab Emirates
|
Committed under BBC
|
|||||||
|
Galar
|
PPL Pacific Class 400
|
400 ft
|
2017
|
PEMEX 2
|
April - 2024
|
May - 2030
|
Mexico
|
Operating
|
||||||||
|
Gerd
|
PPL Pacific Class 400
|
400 ft
|
2018
|
Foxtrot International
|
February - 2026
|
March - 2027
|
Ivory Coast
|
Operating
|
||||||||
|
Gersemi
|
PPL Pacific Class 400
|
400 ft
|
2018
|
PEMEX 2
|
January - 2024
|
May - 2030
|
Mexico
|
Operating
|
||||||||
|
Grid
|
PPL Pacific Class 400
|
400 ft
|
2018
|
Halliburton
|
March - 2026
|
November - 2026
|
Angola
|
Operating with option to extend
|
||||||||
|
Gunnlod
|
PPL Pacific Class 400
|
400 ft
|
2018
|
TLJOC
|
May - 2026
|
August - 2026
|
Vietnam
|
Operating
|
||||||||
|
PVEP-NCS
|
August - 2026
|
April - 2027
|
Vietnam
|
Committed with option to extend
|
||||||||||||
|
Idun
|
KFELS Super B Bigfoot Class
|
350 ft
|
2013
|
Undisclosed
|
July - 2026
|
September - 2026
|
Vietnam
|
Operating
|
||||||||
|
HLHV JOC
|
September - 2026
|
October - 2026
|
Vietnam
|
Committed
|
||||||||||||
|
Mist
|
KFELS Super B Bigfoot Class
|
350 ft
|
2013
|
Valeura Energy
|
December - 2023
|
August - 2026
|
Thailand
|
Operating
|
||||||||
|
Sarawak Shell
|
October - 2026
|
November - 2026
|
Malaysia
|
LOA
|
||||||||||||
|
Natt
|
PPL Pacific Class 400
|
400 ft
|
2018
|
SNEPCO
|
April - 2026
|
March - 2027
|
Nigeria
|
Operating with option to extend
|
||||||||
|
Njord
|
PPL Pacific Class 400
|
400 ft
|
2019
|
PEMEX 2
|
May - 2026
|
April - 2028
|
Mexico
|
Operating with option to extend
|
||||||||
|
Norve
|
PPL Pacific Class 400
|
400 ft
|
2011
|
Vaalco Energy
|
November - 2025
|
September - 2026
|
Gabon
|
Operating
|
||||||||
|
Odin
|
KFELS Super B Bigfoot Class
|
350 ft
|
2013
|
Undisclosed
|
August - 2026
|
December - 2026
|
United States of America
|
Committed with option to extend
|
||||||||
|
Cantium
|
February - 2027
|
July - 2027
|
United States of America
|
Committed with option to extend
|
||||||||||||
|
Prospector 1 1
|
F&G, JU2000E
|
400 ft
|
2013
|
ONE-Dyas
|
December - 2025
|
April - 2027
|
Netherlands
|
Operating with option to extend
|
||||||||
|
Prospector 5 1
|
F&G, JU2000E
|
400 ft
|
2014
|
BW Energy
|
July - 2026
|
July - 2027
|
Gabon
|
Operating with option to extend
|
||||||||
|
Ran 1
|
KFELS Super A Class
|
400 ft
|
2013
|
Eni
|
May - 2025
|
September - 2026
|
Mexico
|
Operating
|
||||||||
|
Saga
|
KFELS Super B Bigfoot Class
|
400 ft
|
2018
|
Brunei Shell Petroleum
|
November - 2022
|
April - 2027
|
Brunei
|
Operating with option to extend
|
||||||||
|
Sif 1
|
F&G, JU-3000N
|
400 ft
|
2013
|
Petronas
|
July - 2026
|
October - 2026
|
Suriname
|
Operating
|
||||||||
|
Skald
|
KFELS Super B Bigfoot Class
|
400 ft
|
2018
|
Vestigo Petroleum
|
May - 2026
|
November - 2026
|
Malaysia
|
Operating with option to extend
|
||||||||
|
Thor
|
KFELS Super B Bigfoot Class
|
400 ft
|
2019
|
PVEP-Cuulong
|
July - 2026
|
November - 2026
|
Vietnam
|
Operating
|
||||||||
|
Undisclosed
|
November - 2026
|
April - 2027
|
Vietnam
|
Committed
|
||||||||||||
|
Vali
|
KFELS Super B Bigfoot Class
|
400 ft
|
2024
|
Mellitah Oil and Gas
|
March - 2025
|
October - 2026
|
Libya
|
Operating with option to extend
|
||||||||
|
Available Rigs
|
||||||||||||||||
|
Freyja 1
|
F&G, JU-3000N
|
400 ft
|
2014
|
Singapore
|
Warm Stacked
|
|||||||||||
|
Groa
|
PPL Pacific Class 400
|
400 ft
|
2018
|
United Arab Emirates
|
Warm Stacked
|
|||||||||||
|
Hild
|
KFELS Super B Class
|
400 ft
|
2020
|
Mexico
|
Warm Stacked
|
|||||||||||
|
Joro 1
|
Gusto MSC CJ50
|
350 ft
|
2008
|
United Kingdom
|
Warm Stacked
|
|||||||||||
|
Var
|
KFELS Super B Bigfoot Class
|
400 ft
|
2024
|
Singapore
|
Warm Stacked
|
|||||||||||
|
Operating / Committed
|
Available
|
Cold Stacked
|
||||||||||||
|
Total Fleet
|
29
|
24
|
5
|
0
|
||||||||||

![]() |
Borr Drilling
Fleet Status Report - 11 August 2026
|
|
| |
|||||
| |
|||||
|
Additional information regarding this Fleet Status Report
|
|||||
| This summary contains information on letters of intent/award and advanced negotiations. Letters of intent/award or advanced negotiations may not result in an actual drilling contract. | |||||
| Forward Looking Statements: The statements described in this status report that are not historical facts are “Forward Looking Statements”. Forward Looking Statements reflect management’s current expectations and assumptions, and are subject to inherent uncertainties, risks and changes in circumstances that are difficult to predict. No assurance can be given that the expectations expressed in these Forward-Looking Statements will prove to be correct. Actual results could differ materially from expectations expressed in, or implied by, the Forward-Looking Statements if one or more of the underlying assumptions or expectations proves to be inaccurate or is unrealised. These include, but are not limited to, changes to commencement dates, contract duration, earned day rates, locations and other contractual terms; risks relating to the delivery of drilling rigs under construction; sale and purchase of drilling units; oil and gas prices; and risks associated with international operations generally. No Forward-Looking Statement contained in herein or expressed elsewhere should be relied upon as predicting future events. We undertake no obligation to update or revise any Forward-Looking Statements to reflect events or circumstances that occur, or which we become aware of, after the date hereof, except as otherwise may be required by law. |
|||||