株探米国株
英語
エドガーで原本を確認する
6-K 1 form6k.htm FORM 6-K Snow Lake Resources Ltd.: Form 6-K - Filed by newsfilecorp.com

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 6-K

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934

For the month of September 2025

Commission File Number: 001-41085

SNOW LAKE RESOURCES LTD.
(Translation of registrant's name into English)

360 Main St 30th Floor
Winnipeg, Manitoba R3C 4G1 Canada
(Address of principal executive offices)

Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F.

☒ Form 20-F  ☐ Form 40-F

Indicate by check mark if the Registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1):  ☐

Indicate by check mark if the Registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7):  ☐


SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

  SNOW LAKE RESOURCES LTD.
  (Registrant)
     
Date: September 17, 2025 By /s/ Kyle Nazareth
   
    Kyle Nazareth
    Chief Financial Officer

 


EXHIBIT INDEX

Exhibit   Description of Exhibit
   
99.1   Press Release dated September 17, 2025 – Pine Ridge Uranium Project Delivers Excellent Initial Drill Results


EX-99.1 2 exhibit99-1.htm EXHIBIT 99.1 Snow Lake Resources Ltd.: Exhibit 99.1 - Filed by newsfilecorp.com

Pine Ridge Uranium Project Delivers Excellent Initial Drill Results

Winnipeg, Manitoba - September 17, 2025 - Snow Lake Resources Ltd., d/b/a Snow Lake Energy (NASDAQ: LITM) ("Snow Lake"), a uranium exploration and development company, announces excellent initial drill results on its Pine Ridge Uranium Project ("Pine Ridge"), located in the prolific Powder River Basin in Wyoming, a 50/50 joint venture (the "Joint Venture") with Global Uranium and Enrichment Limited ("GUE").

The Joint Venture has completed a total of 33 holes on Pine Ridge, for a total of 12,540m (41,140 ft) of drilling.  The drilling has delivered encouraging intercepts including 1.1m at 780 ppm U3O8 within a broader interval of 3.5m at 540 ppm U3O8, and including 1.2m at 1,320 ppm U3O8 within a broader interval of 2.0m at 920 ppm U3O8.

Highlights

  • Drill results from the first 33 drill holes confirm the strong potential of Pine Ridge
  • Wide-spaced drilling focused on aggressively exploring near-surface roll front mineralisation, returned encouraging results, including:
    • 2.0m at 0.092% (920 ppm) U3O8 from 314.8m in PR25-017, including
      • 1.2m at 0.132% (1,320 ppm) U3O8 from 315.0m
    • 2.3m at 0.071% (710 ppm) U3O8 from 411.6m in PR25-008 including
      • 1.7m at 0.085% (850 ppm) U3O8 from 411.9m
    • 1.4m at 0.035% (350 ppm) U3O8 from 237.3m in PR25-004
    • 1.1m at 0.031% (310 ppm) U3O8 from 334.0m in PR25-005
    • 2.1m at 0.034% (340 ppm) U3O8 from 348.1m in PR25-007
    • 1.8m at 0.042% (420 ppm) U3O8 from 388.0 in PR25-009
    • 3.5m at 0.054% (540 ppm) U3O8 from 321.3m in PR25-031, including
      • 1.1m at 0.078% (780 ppm) U3O8 from 321.4m
    • 1.8m at 0.060% (600 ppm) U3O8 from 350.4m in PR25-023 including
      • 1.2m at 0.073% (730 ppm) U3O8 from 350.5m
    • 4.0m at 0.035% (350 ppm) U3O8 from 315.3m in PR25-027
    • 2.1m at 0.048% (480 ppm) U3O8 from 276.1m in PR25-033
    • 1.4m at 0.046% (460 ppm) U3O8 from 378.6m in PR25-020
  • Drilling is ongoing and is expected to continue through to the end of November 2025

CEO Remarks

"We are very pleased and encouraged with the initial drill results from our Pine Ridge uranium project in the Powder River Basin, Wyoming.  The wide spaced drilling, designed to target roll-front uranium deposits, has confirmed the presence of redox boundaries and uranium mineralization, and continues to demonstrate the strong development potential of Pine Ridge.  Our drill program will continue through the second half of 2025 as we target a maiden mineral resource estimate by year end," said Frank Wheatley, CEO of Snow Lake.

Figure 1

Drilling at the Pine Ridge Uranium Project in the Powder River Basin of Wyoming, USA.

Drill Program

Ongoing results are very encouraging as they have confirmed and further defined the original concept of multiple redox boundaries that are hosted by numerous sand horizons.  The drill program was designed to test high-priority areas that were outlined by historical drilling with drill centers of approximately 150m (500 ft.).  Drill results will continue to be evaluated, and infill drilling will take place to further outline roll front deposits and develop an inferred mineral resource estimate.


Details of drill results and drill collars are set out in Schedule A.

Figure 2

Detailed map showing the locations and results of the first and second series of holes drilled at the Pine Ridge
Project.  Intervals reported at a cutoff of 200 ppm and a thickness of >0.3m.

Pine Ridge Uranium Project - Overview

Pine Ridge is an In-Situ Recovery (ISR) uranium exploration project located in the southwestern Powder River Basin of Wyoming, the premier U.S. uranium basin.  Pine Ridge  is surrounded by existing uranium projects held by UEC and Cameco and is also located only ~15km from Cameco's Smith Ranch Mill, which has a licensed capacity of 5.5Mlbs U3O8 p.a. The Smith Ranch mill is one of the largest uranium production facilities in the U.S.


Figure 3

Pine Ridge Uranium Project and Adjacent Properties

Qualified Person

Technical information in this news release has been reviewed and approved by Ron Scott PhD, PGeo, who is a Qualified Person as defined by the Securities and Exchange Commission's Regulation S-K 1300.

About Snow Lake Resources Ltd.

Snow Lake Resources Ltd. is a Canadian nuclear fuel cycle and critical minerals company listed on (NASDAQ:LITM), with a portfolio of American focused uranium projects, together with interests in next-generation uranium enrichment and advanced reactor technology.  The Pine Ridge Uranium project is an exploration stage project located in Wyoming, United States.  Snow Lake also holds a portfolio of additional exploration stage critical minerals projects located in Manitoba and Namibia, as well as investments in a number of public companies with critical minerals assets, including antimony, rare earths, and lithium in North America.  Learn more at www.snowlakeenergy.com.


Forward-Looking Statements: This press release contains "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, Section 21E of the Securities Exchange Act of 1934 and the "safe harbor" provisions under the Private Securities Litigation Reform Act of 1995 that are subject to substantial risks and uncertainties.  All statements, other than statements of historical fact, contained in this press release are forward-looking statements, including without limitation statements with regard to Snow Lake Resources Ltd.  We base these forward-looking statements on our expectations and projections about future events, which we derive from the information currently available to us.  Forward-looking statements contained in this press release may be identified by the use of words such as "anticipate," "believe," "contemplate," "could," "estimate," "expect," "intend," "seek," "may," "might," "plan," "potential," "predict," "project," "target," "aim," "should," "will," "would," or the negative of these words or other similar expressions, although not all forward-looking statements contain these words.  Forward-looking statements are based on Snow Lake Resources Ltd.'s current expectations and are subject to inherent uncertainties, risks and assumptions that are difficult to predict.  Further, certain forward-looking statements are based on assumptions as to future events that may not prove to be accurate. Some of these risks and uncertainties are described more fully in the section titled "Risk Factors" in our registration statements and annual reports filed with the Securities and Exchange Commission.  Forward-looking statements contained in this announcement are made as of this date, and Snow Lake Resources Ltd. undertakes no duty to update such information except as required under applicable law.

Contact and Information
Frank Wheatley, CEO
 
Investor Relations
 
Investors:
ir@snowlakelithium.com


Website:
www.snowlakeenergy.com
 
Follow us on Social Media
 
Twitter:
www.twitter.com/SnowLakeEnergy


LinkedIn:
www.linkedin.com/company/snow-lake-energy


Schedule A

Drill results for the first 17 holes are shown in Table 1 below and the collar details are shown in Table 2.

Hole-ID From (m) To (m) Thickness (m) Avg  eU3O8% U3O8 (ppm) GxT (m%)
PR25-004 225.8 226.3 0.5 0.026 260 0.01
and 233.8 234.1 0.3 0.024 240 0.01
and 237.3 238.6 1.4 0.035 350 0.05
PR25-005 331.8 332.1 0.3 0.021 210 0.01
and 334.0 335.1 1.1 0.031 310 0.03
PR25-007 343.5 344.1 0.6 0.032 320 0.02
and 348.1 350.2 2.1 0.034 340 0.07
and 356.0 357.1 1.1 0.027 270 0.03
and 363.9 364.5 0.6 0.024 240 0.01
PR25-008 411.6 413.9 2.3 0.071 710 0.16
including 411.9 413.6 1.7 0.085 850 0.14
PR25-009 388.0 389.8 1.8 0.042 420 0.08
PR25-013 397.6 398.0 0.5 0.024 240 0.01
PR25-016 315.6 316.8 1.2 0.038 380 0.05
and 325.1 325.8 0.8 0.042 420 0.03
PR25-017 311.3 311.6 0.3 0.024 240 0.01
and 314.8 316.8 2.0 0.092 920 0.18
including 315.0 316.2 1.2 0.132 1,320 0.16

Table 1:  Uranium intercepts from the first seventeen completed holes.  Minimum reported thicknesses are >0.3m
and grade 0.02% U3O8.   "Including" intervals are compiled at a cutoff of 0.05% U3O8.

HoleID

Easting
(83_13)

Northing
(83_13)

Elev

(m)

Azimuth

(top of hole)

Dip

(top of hole)

TD

(m)

PR25-001

436976

4783201

1616

0

-90

384

PR25-002

436580

4783386

1625

0

-90

219

PR25-003

436586

4783544

1625

0

-90

244

PR25-004

436929

4783715

1624

0

-90

378

PR25-005

436943

4783573

1620

0

-90

378

PR25-006

437090

4783559

1625

0

-90

378

PR25-007

437091

4783711

1633

0

-90

378

PR25-008

437344

4784949

1673

0

-90

427

PR25-009

437357

4785097

1695

0

-90

427

PR25-010

437341

4785411

1687

0

-90

427

PR25-011

437486

4785544

1692

0

-90

427

PR25-012

437487

4785406

1693

0

-90

427

PR25-013

437490

4785110

1691

0

-90

427

PR25-014

437491

4784957

1672

0

-90

445

PR25-015

437638

4785107

1677

0

-90

445

PR25-016

437646

4785405

1697

0

-90

445

PR25-017

437646

4785548

1685

0

-90

445

Table 2:  Drill collar details for drillholes.


Drill results for the next 16 holes are shown in Table 3 below and the collar details are shown in Table 4.

Hole ID

From

(m)

To

(m)

Thickness

(m)

Avg eU3O8
(%)

U3O8

(ppm)

GxT (m%)

PR25-019

367.0

367.7

0.8

0.038

380

0.03

PR25-020

including

378.6

379.9

1.4

0.046

460

0.06

378.9

379.6

0.8

0.055

550

0.04

PR25-021

394.9

396.7

1.8

0.027

270

0.05

PR25-023

including

350.4

352.2

1.8

0.060

600

0.11

350.5

351.7

1.2

0.073

730

0.09

PR25-024

and

including

318.1

319.1

1.1

0.050

500

0.05

330.6

332.4

1.8

0.049

490

0.09

331.0

331.9

0.9

0.065

650

0.06

PR25-027

315.3

319.3

4.0

0.035

350

0.14

PR25-029

and

347.2

348.2

1.1

0.039

390

0.04

351.9

352.3

0.5

0.037

370

0.02

PR25-031

including

including

321.3

324.8

3.5

0.054

540

0.19

321.4

322.5

1.1

0.078

780

0.08

323.5

324.2

0.6

0.055

550

0.03

PR25-033

and

including

267.0

268.2

1.2

0.035

350

0.04

276.1

278.3

2.1

0.048

480

0.10

277.4

278.0

0.6

0.054

540

0.03

Table 3: Uranium intercepts from the recently completed holes.  Minimum reported thicknesses are >0.3m and
grade 0.02% U3O8.   "Including" intervals are compiled at a cutoff of 0.05% U3O8.

Hole ID

Easting
(83_13)

Northing (83_13)

Elev

(m)

Azimuth

(top of hole)

Dip

(top of hole)

TD

(m)

PR25-018

437651

4785689

1677

0

-90

445

PR25-019

437487

4785476

1699

0

-90

445

PR25-020

437354

4785171

1688

0

-90

445

PR25-021

437324

4784817

1658

0

-90

427

PR25-022

437259

4783872

1649

0

-90

396

PR25-023

437027

4783631

1633

0

-90

378

PR25-024

436973

4783413

1618

0

-90

378

PR25-025

436903

4783304

1618

0

-90

360

PR25-026

436903

4783194

1618

0

-90

360

PR25-027

436988

4783411

1618

0

-90

360

PR25-028

436576

4783237

1628

0

-90

250

PR25-029

437260

4784022

1648

0

-90

396

PR25-030

437325

4784660

1656

0

-90

415

PR25-031

436668

4782622

1657

0

-90

384

PR25-032

436670

4782773

1641

0

-90

37

PR25-033

436974

4783042

1617

0

-90

366

Table 4: Drill collar details for drillholes